A kind of building ground strikes off equipment
Technical field
Equipment is struck off the present invention relates to one kind more particularly to a kind of building ground strikes off equipment.
Background technique
Building ground generally can be rough state, will lead to people in this way needs at work because of engineer operation
The case where being careful ground, people do not pay attention to the sharp thing that may can fall down or step on, so people can generally use shovel
Son evens ground out, but if things go on like this scoop is easy to damage, and will cause the waste of scoop, and some thing scoops
It is not easy to root out, the working efficiency for causing people to even ground out reduces, and drags the normal job schedule of slow people.
Summary of the invention
When in order to overcome building ground to be evened out with scoop, scoop is easy damage, so as to cause waste, scoop to some things
It cannot root out easily, the shortcomings that people even the inefficiency on ground out, therefore, technical problem of the invention are as follows: a kind of energy is provided
Enough building grounds that is struck off, be can be improved the efficiency for scraping plane earth to ground automatically strike off equipment.
Technical solution is: a kind of building ground strikes off equipment, include cabinet, wheel, be moved forward and backward device, connecting plate and
Flattening device, bottom of box left and right sides front and back two are equipped with wheel, are provided with tapping hole, cabinet inner top on the right side of top of the box
Left side, which is equipped with, is moved forward and backward device, is equipped with flattening device on the left of cabinet, is moved forward and backward between device and flattening device and passes through connection
Plate connection.
Further, being moved forward and backward device includes mounting base, motor, first rotating shaft, sector gear, installing frame and tooth
Item, cabinet inner top left side are equipped with mounting base, and mounting base bottom is equipped with motor, and the output shaft of motor is equipped with first rotating shaft, the
One shaft left end is equipped with sector gear, and installing frame is equipped on the right side of connecting plate, is all provided among installing frame inner top centre and interior bottom
There is rack gear, sector gear is engaged with rack.
Further, flattening device includes sliding rail, sliding block, clapboard, mounting plate, spring, guide rod, arc branch
Bar, ball, first bearing seat, the second shaft, barrel cam, worm gear, second bearing seat, worm screw and strike-off stick, on the left of cabinet on
Lower two are equipped with sliding rail, and sliding rail left slide formula is equipped with sliding block, is equipped with clapboard, clapboard right side central on the left of the sliding block of top
It is connect with connecting plate left side, mounting plate is equipped on the left of clapboard, is connect on the left of mounting plate lower right side and lower section sliding block, mounting plate
Top is equipped with first bearing seat, and the second shaft is equipped in first bearing seat, is equipped with barrel cam in the middle part of the second shaft, and second
Shaft left part is equipped with first bearing seat, and left first bearing seat bottom is equipped with mounting plate, and two side's mounting plate bottoms of left and right centre is
It is provided with pilot hole, left mounting plate right side central and right mounting plate left side central portion are provided with a word hole, pilot hole and a word hole
Connection, pilot hole inner top centre are equipped with spring, and spring bottom end is connected with guide rod, and guide rod passes through pilot hole, two sides of left and right
Strike-off stick has been bolted in guide rod bottom, and left guide rod right side central and right guide rod left side central portion are equipped with arc
Shape strut, arcuate struts pass through a word hole, are equipped with ball at the top of arcuate struts, ball is contacted with barrel cam bottom, clapboard
Top right side is inserted to be equipped with second bearing seat, worm screw is equipped in second bearing seat, the second shaft right end is equipped with worm gear, worm gear
Positioned at worm screw rear, worm and wheel cooperation.
Further, further include have big belt pulley, 3rd bearing seat, third shaft, small belt pulley, flat belt, blade,
Wind-collecting cover and outlet housing, first rotating shaft middle part are equipped with big belt pulley, and bottom left is equipped with 3rd bearing seat, third axis in cabinet
It holds and third shaft is installed on seat, small belt pulley is installed in third shaft, flat skin is wound between big belt pulley and small belt pulley
Band, third shaft left end are equipped with blade, and bottom left is equipped with wind-collecting cover in cabinet, and wind-collecting cover is located at 3rd bearing seat left, case
Internal bottom left is provided with air outlet, and air outlet is connected to wind-collecting cover, and outlet housing, outlet housing and outlet air are equipped on the left of the bottom of box
Mouth connection, outlet housing are located at strike-off stick bottom right.
Further, further including having annulus, demarcation plate and inserted link, it is equipped among bottom and among inner top in cabinet
Annulus, annulus are located at mounting base right, demarcation plate are equipped on the right side of both up and down annulus, is uniformly provided with through-hole on demarcation plate, is separated
The left side top and the bottom of plate are all connected with right inserted link, and inserted link is located in annulus.
Further, further including having rotating device, rotating device includes diamond shape notch board, diamond block and rocking handle, worm screw
Top is equipped with diamond shape notch board, and diamond block is equipped in diamond shape notch board, and diamond block and diamond shape notch board cooperate, and diamond block top center is equipped with
Rocking handle.
When people need to strike off building ground, first passes through wheel and push by this equipment to the ground for needing to be calibrated
Side, after this equipment is moved to suitable position, people stop pushing, and then people move flattening device, flattening device still further below
After being moved downward to suitable position, people stop mobile flattening device, and then people, which start, is moved forward and backward device, so that front and back is moved
Dynamic device drives flattening device to be moved forward and backward by connecting plate, can so strike off to building ground, when ground is calibrated
Afterwards, people, which close, is moved forward and backward device.
When people need using device is moved forward and backward, first start the rotation of motor positive direction, the rotation of motor positive direction passes through
First rotating shaft drive sector gear positive direction rotation, sector gear is turned to engaged with the rack gear of top after, pass through top rack gear
Installing frame is driven to move backward, installing frame moves rearwardly through connecting plate and flattening device is driven to move backward, sector gear rotation
It to after being engaged with the rack gear of lower section, is moved forward by lower section rack drives installing frame, installing frame is advanced through connecting plate
Flattening device is driven to move forward, motor persistently rotates, and flattening device can be driven constantly to be moved forward and backward pair by connecting plate
Ground is struck off, and after ground is calibrated, people close motor.
When people need to adjust the height of flattening device, first with other tool positive direction rotary worms, worm screw positive direction
Rotation drives the rotation of the second shaft positive direction by worm gear, and the rotation of the second shaft positive direction drives the rotation of barrel cam positive direction,
The rotation of barrel cam positive direction drives ball to move down, and ball moves downwards through arcuate struts and drives guide rod to moving down
Dynamic, pilot hole play the guiding role to guide rod, and spring is stretched therewith, and guide rod, which moves down, drives strike-off stick to move down,
After strike-off stick is moved downward to suitable position, people stop operating worm screw, then people restart motor positive direction rotate so that
Connecting plate is moved forward and backward, and connecting plate, which is moved forward and backward, drives clapboard to be moved forward and backward, and top sliding rail and top sliding block play clapboard
Guiding role, clapboard, which is moved forward and backward, drives right mounting plate to be moved forward and backward, and lower section sliding rail and lower section sliding block are to right mounting plate
It play the guiding role, right mounting plate, which is moved forward and backward, drives strike-off stick to be moved forward and backward, and strike-off stick back-and-forth motion can carry out ground
It strikes off, after ground is calibrated, people close motor, and then people use other tool opposite direction rotary worms, worm screw opposite direction again
Rotation is so that barrel cam opposite direction rotates, and under the action of the spring, guide rod drives arcuate struts and strike-off stick to move up
It resets, after strike-off stick is moved upward to reset, people stop operating worm screw.
When people start motor rotation, motor rotation drives big belt pulley rotation by first rotating shaft, and big belt pulley turns
Dynamic to drive small belt pulley rotation by flat belt, small belt pulley rotation is rotated by third shaft band movable vane piece, and blade rotation produces
Raw wind-force, wind-force are gone out by wind-collecting cover and air outlet from outlet housing, and this measure makes strike-off stick while scraping plane earth, wind-force
The dust of strike-off stick bottom can be blown away, when people close motor, blade also stops operating therewith.
When people have encountered obstacle difficult to deal with when scraping plane earth, tapping hole can be first passed through and put one into cabinet
A little weights, demarcation plate separate weight and back-and-forth motion device, and this measure can increase the gravity of this equipment right, make entirely to set
It is standby to keep balancing at work.
When people need rotary worm, hand rotation crank is first used, rocking handle rotation drives diamond shape notch board to turn by diamond block
Dynamic, the rotation of diamond shape notch board drives worm screw rotation, and when not needing rotary worm, rocking handle is moved up, so that diamond block is from diamond shape
It removes in notch board, then puts rocking handle well, this measure makes people not need to carry out rotary worm using other tools, helps people
More easily operate this equipment.
Beneficial effects of the present invention: the present invention, can be in strike-off stick while scraping plane earth by the blade of setting, wind
Power can blow away the dust of strike-off stick bottom, facilitate the cleaning of people, by the demarcation plate and tapping hole of setting, can increase
The gravity of this equipment right enables whole equipment to keep balancing at work, by the rotating device of setting, so that people are not
It needs to come using other tools rotary worm, people is helped more easily to operate this equipment.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the first part schematic view of the front view of the invention.
Fig. 3 is second of part schematic view of the front view of the invention.
Fig. 4 is the third part schematic view of the front view of the invention.
Figure label title: 1 cabinet, 2 wheels, 3 tapping holes, 4 back-and-forth motion devices, 41 mounting bases, 42 motors, 43 first
Shaft, 44 sector gears, 45 installing frames, 46 rack gears, 5 connecting plates, 6 flattening devices, 61 sliding rails, 62 sliding blocks, 63 clapboards, 64 peaces
Loading board, 65 pilot holes, 66 1 word holes, 67 springs, 68 guide rods, 69 arcuate struts, 610 balls, 611 first bearing seats, 612
Two shafts, 613 barrel cams, 614 worm gears, 615 second bearing seats, 616 worm screws, 617 strike-off sticks, 7 big belt pulleys, 8 third axis
Hold seat, 9 third shafts, 10 small belt pulleys, 11 flat belts, 12 blades, 13 wind-collecting covers, 14 air outlets, 15 outlet housings, 16 annulus,
17 demarcation plates, 18 through-holes, 19 inserted links, 20 rotating devices, 201 diamond shape notch boards, 202 diamond blocks, 203 rocking handles.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
A kind of building ground strikes off equipment, as shown in Figs 1-4, includes cabinet 1, wheel 2, is moved forward and backward device 4, connecting plate 5
With flattening device 6,1 bottom of cabinet left and right sides front and back two is equipped with wheel 2, and 1 top right side of cabinet is provided with tapping hole 3, case
It is equipped on the left of 1 inner top of body and is moved forward and backward device 4, be equipped with flattening device 6 on the left of cabinet 1, be moved forward and backward device 4 and flattening device
It is connected between 6 by connecting plate 5.
Embodiment 2
A kind of building ground strikes off equipment, as shown in Figs 1-4, includes cabinet 1, wheel 2, is moved forward and backward device 4, connecting plate 5
With flattening device 6,1 bottom of cabinet left and right sides front and back two is equipped with wheel 2, and 1 top right side of cabinet is provided with tapping hole 3, case
It is equipped on the left of 1 inner top of body and is moved forward and backward device 4, be equipped with flattening device 6 on the left of cabinet 1, be moved forward and backward device 4 and flattening device
It is connected between 6 by connecting plate 5.
Being moved forward and backward device 4 includes mounting base 41, motor 42, first rotating shaft 43, sector gear 44, installing frame 45 and tooth
Item 46,1 inner top of cabinet left side are equipped with mounting base 41, and 41 bottom of mounting base is equipped with motor 42, and the output shaft of motor 42 is equipped with
First rotating shaft 43,43 left end of first rotating shaft are equipped with sector gear 44, and installing frame 45, top in installing frame 45 are equipped on the right side of connecting plate 5
It is equipped with rack gear 46 among portion and among interior bottom, sector gear 44 is engaged with rack gear 46.
Embodiment 3
A kind of building ground strikes off equipment, as shown in Figs 1-4, includes cabinet 1, wheel 2, is moved forward and backward device 4, connecting plate 5
With flattening device 6,1 bottom of cabinet left and right sides front and back two is equipped with wheel 2, and 1 top right side of cabinet is provided with tapping hole 3, case
It is equipped on the left of 1 inner top of body and is moved forward and backward device 4, be equipped with flattening device 6 on the left of cabinet 1, be moved forward and backward device 4 and flattening device
It is connected between 6 by connecting plate 5.
Being moved forward and backward device 4 includes mounting base 41, motor 42, first rotating shaft 43, sector gear 44, installing frame 45 and tooth
Item 46,1 inner top of cabinet left side are equipped with mounting base 41, and 41 bottom of mounting base is equipped with motor 42, and the output shaft of motor 42 is equipped with
First rotating shaft 43,43 left end of first rotating shaft are equipped with sector gear 44, and installing frame 45, top in installing frame 45 are equipped on the right side of connecting plate 5
It is equipped with rack gear 46 among portion and among interior bottom, sector gear 44 is engaged with rack gear 46.
Flattening device 6 includes sliding rail 61, sliding block 62, clapboard 63, mounting plate 64, spring 67, guide rod 68, arc branch
Bar 69, ball 610, first bearing seat 611, the second shaft 612, barrel cam 613, worm gear 614, second bearing seat 615, worm screw
616 and strike-off stick 617,1 left side of cabinet is equipped with sliding rail 61 for two up and down, and 61 left slide formula of sliding rail is equipped with sliding block 62, top
It is equipped with clapboard 63 on the left of sliding block 62, is connected on the left of 63 right side central of clapboard and connecting plate 5, installation is equipped on the left of clapboard 63
Connected on the left of plate 64,64 lower right side of mounting plate and lower section sliding block 62, at the top of mounting plate 64 be equipped with first bearing seat 611, first
Second shaft 612 is installed on bearing block 611, barrel cam 613,612 left part of the second shaft are installed in the middle part of the second shaft 612
Equipped with first bearing seat 611, first bearing seat 611 bottom in left is equipped with mounting plate 64, controls among two side's mounting plates, 64 bottom
It is provided with pilot hole 65,64 right side central of left mounting plate and 64 left side central portion of right mounting plate are provided with a word hole 66, guiding
Hole 65 is connected to a word hole 66, and spring 67 is equipped among 65 inner top of pilot hole, and 67 bottom end of spring is connected with guide rod 68, is oriented to
Bar 68 passes through pilot hole 65, and strike-off stick 617,68 right side of left guide rod has been bolted in left and right two side's guide rods, 68 bottom
Middle part and 68 left side central portion of right guide rod are equipped with arcuate struts 69, and arcuate struts 69 pass through a word hole 66, arcuate struts 69
Top is equipped with ball 610, and ball 610 is contacted with 613 bottom of barrel cam, and 63 top right side of clapboard is inserted to be equipped with the second axis
Seat 615 is held, worm screw 616 is installed in second bearing seat 615,612 right end of the second shaft is equipped with worm gear 614, and worm gear 614 is located at snail
616 rear of bar, worm screw 616 and worm gear 614 cooperate.
Embodiment 4
A kind of building ground strikes off equipment, as shown in Figs 1-4, includes cabinet 1, wheel 2, is moved forward and backward device 4, connecting plate 5
With flattening device 6,1 bottom of cabinet left and right sides front and back two is equipped with wheel 2, and 1 top right side of cabinet is provided with tapping hole 3, case
It is equipped on the left of 1 inner top of body and is moved forward and backward device 4, be equipped with flattening device 6 on the left of cabinet 1, be moved forward and backward device 4 and flattening device
It is connected between 6 by connecting plate 5.
Being moved forward and backward device 4 includes mounting base 41, motor 42, first rotating shaft 43, sector gear 44, installing frame 45 and tooth
Item 46,1 inner top of cabinet left side are equipped with mounting base 41, and 41 bottom of mounting base is equipped with motor 42, and the output shaft of motor 42 is equipped with
First rotating shaft 43,43 left end of first rotating shaft are equipped with sector gear 44, and installing frame 45, top in installing frame 45 are equipped on the right side of connecting plate 5
It is equipped with rack gear 46 among portion and among interior bottom, sector gear 44 is engaged with rack gear 46.
Flattening device 6 includes sliding rail 61, sliding block 62, clapboard 63, mounting plate 64, spring 67, guide rod 68, arc branch
Bar 69, ball 610, first bearing seat 611, the second shaft 612, barrel cam 613, worm gear 614, second bearing seat 615, worm screw
616 and strike-off stick 617,1 left side of cabinet is equipped with sliding rail 61 for two up and down, and 61 left slide formula of sliding rail is equipped with sliding block 62, top
It is equipped with clapboard 63 on the left of sliding block 62, is connected on the left of 63 right side central of clapboard and connecting plate 5, installation is equipped on the left of clapboard 63
Connected on the left of plate 64,64 lower right side of mounting plate and lower section sliding block 62, at the top of mounting plate 64 be equipped with first bearing seat 611, first
Second shaft 612 is installed on bearing block 611, barrel cam 613,612 left part of the second shaft are installed in the middle part of the second shaft 612
Equipped with first bearing seat 611, first bearing seat 611 bottom in left is equipped with mounting plate 64, controls among two side's mounting plates, 64 bottom
It is provided with pilot hole 65,64 right side central of left mounting plate and 64 left side central portion of right mounting plate are provided with a word hole 66, guiding
Hole 65 is connected to a word hole 66, and spring 67 is equipped among 65 inner top of pilot hole, and 67 bottom end of spring is connected with guide rod 68, is oriented to
Bar 68 passes through pilot hole 65, and strike-off stick 617,68 right side of left guide rod has been bolted in left and right two side's guide rods, 68 bottom
Middle part and 68 left side central portion of right guide rod are equipped with arcuate struts 69, and arcuate struts 69 pass through a word hole 66, arcuate struts 69
Top is equipped with ball 610, and ball 610 is contacted with 613 bottom of barrel cam, and 63 top right side of clapboard is inserted to be equipped with the second axis
Seat 615 is held, worm screw 616 is installed in second bearing seat 615,612 right end of the second shaft is equipped with worm gear 614, and worm gear 614 is located at snail
616 rear of bar, worm screw 616 and worm gear 614 cooperate.
It further include having big belt pulley 7,3rd bearing seat 8, third shaft 9, small belt pulley 10, flat belt 11, blade 12, collection
Fan housing 13 and outlet housing 15 are equipped with big belt pulley 7 in the middle part of first rotating shaft 43, and bottom left is equipped with 3rd bearing seat in cabinet 1
8, third shaft 9 is installed on 3rd bearing seat 8, small belt pulley 10, big belt pulley 7 and belt lace are installed in third shaft 9
Flat belt 11 is wound between wheel 10,9 left end of third shaft is equipped with blade 12, and bottom left is equipped with wind-collecting cover 13 in cabinet 1, collects wind
Cover 13 is located at 8 left of 3rd bearing seat, and bottom left is provided with air outlet 14 in cabinet 1, and air outlet 14 is connected to wind-collecting cover 13, case
1 bottom left of body is equipped with outlet housing 15, and outlet housing 15 is connected to air outlet 14, and outlet housing 15 is located at 617 bottom right of strike-off stick.
Embodiment 5
A kind of building ground strikes off equipment, as shown in Figs 1-4, includes cabinet 1, wheel 2, is moved forward and backward device 4, connecting plate 5
With flattening device 6,1 bottom of cabinet left and right sides front and back two is equipped with wheel 2, and 1 top right side of cabinet is provided with tapping hole 3, case
It is equipped on the left of 1 inner top of body and is moved forward and backward device 4, be equipped with flattening device 6 on the left of cabinet 1, be moved forward and backward device 4 and flattening device
It is connected between 6 by connecting plate 5.
Being moved forward and backward device 4 includes mounting base 41, motor 42, first rotating shaft 43, sector gear 44, installing frame 45 and tooth
Item 46,1 inner top of cabinet left side are equipped with mounting base 41, and 41 bottom of mounting base is equipped with motor 42, and the output shaft of motor 42 is equipped with
First rotating shaft 43,43 left end of first rotating shaft are equipped with sector gear 44, and installing frame 45, top in installing frame 45 are equipped on the right side of connecting plate 5
It is equipped with rack gear 46 among portion and among interior bottom, sector gear 44 is engaged with rack gear 46.
Flattening device 6 includes sliding rail 61, sliding block 62, clapboard 63, mounting plate 64, spring 67, guide rod 68, arc branch
Bar 69, ball 610, first bearing seat 611, the second shaft 612, barrel cam 613, worm gear 614, second bearing seat 615, worm screw
616 and strike-off stick 617,1 left side of cabinet is equipped with sliding rail 61 for two up and down, and 61 left slide formula of sliding rail is equipped with sliding block 62, top
It is equipped with clapboard 63 on the left of sliding block 62, is connected on the left of 63 right side central of clapboard and connecting plate 5, installation is equipped on the left of clapboard 63
Connected on the left of plate 64,64 lower right side of mounting plate and lower section sliding block 62, at the top of mounting plate 64 be equipped with first bearing seat 611, first
Second shaft 612 is installed on bearing block 611, barrel cam 613,612 left part of the second shaft are installed in the middle part of the second shaft 612
Equipped with first bearing seat 611, first bearing seat 611 bottom in left is equipped with mounting plate 64, controls among two side's mounting plates, 64 bottom
It is provided with pilot hole 65,64 right side central of left mounting plate and 64 left side central portion of right mounting plate are provided with a word hole 66, guiding
Hole 65 is connected to a word hole 66, and spring 67 is equipped among 65 inner top of pilot hole, and 67 bottom end of spring is connected with guide rod 68, is oriented to
Bar 68 passes through pilot hole 65, and strike-off stick 617,68 right side of left guide rod has been bolted in left and right two side's guide rods, 68 bottom
Middle part and 68 left side central portion of right guide rod are equipped with arcuate struts 69, and arcuate struts 69 pass through a word hole 66, arcuate struts 69
Top is equipped with ball 610, and ball 610 is contacted with 613 bottom of barrel cam, and 63 top right side of clapboard is inserted to be equipped with the second axis
Seat 615 is held, worm screw 616 is installed in second bearing seat 615,612 right end of the second shaft is equipped with worm gear 614, and worm gear 614 is located at snail
616 rear of bar, worm screw 616 and worm gear 614 cooperate.
It further include having big belt pulley 7,3rd bearing seat 8, third shaft 9, small belt pulley 10, flat belt 11, blade 12, collection
Fan housing 13 and outlet housing 15 are equipped with big belt pulley 7 in the middle part of first rotating shaft 43, and bottom left is equipped with 3rd bearing seat in cabinet 1
8, third shaft 9 is installed on 3rd bearing seat 8, small belt pulley 10, big belt pulley 7 and belt lace are installed in third shaft 9
Flat belt 11 is wound between wheel 10,9 left end of third shaft is equipped with blade 12, and bottom left is equipped with wind-collecting cover 13 in cabinet 1, collects wind
Cover 13 is located at 8 left of 3rd bearing seat, and bottom left is provided with air outlet 14 in cabinet 1, and air outlet 14 is connected to wind-collecting cover 13, case
1 bottom left of body is equipped with outlet housing 15, and outlet housing 15 is connected to air outlet 14, and outlet housing 15 is located at 617 bottom right of strike-off stick.
Further include having annulus 16, demarcation plate 17 and inserted link 19, is equipped with annulus among bottom and among inner top in cabinet 1
16, annulus 16 is located at 41 right of mounting base, and demarcation plate 17 is equipped on the right side of both up and down annulus 16, is uniformly provided on demarcation plate 17 logical
Hole 18, the left side top and the bottom of demarcation plate 17 are all connected with right inserted link 19, and inserted link 19 is located in annulus 16.
It further include having rotating device 20, rotating device 20 includes diamond shape notch board 201, diamond block 202 and rocking handle 203, snail
It is equipped with diamond shape notch board 201 at the top of bar 616, is equipped with diamond block 202 in diamond shape notch board 201, diamond block 202 is matched with diamond shape notch board 201
It closes, 202 top center of diamond block is equipped with rocking handle 203.
When people need to strike off building ground, first passes through wheel 2 and push by this equipment to the ground for needing to be calibrated
Side, after this equipment is moved to suitable position, people stop pushing, and then people move flattening device 6, flattening device still further below
After 6 are moved downward to suitable position, people stop mobile flattening device 6, and then people, which start, is moved forward and backward device 4, so that preceding
Mobile device 4 drives flattening device 6 to be moved forward and backward by connecting plate 5 afterwards, can so strike off to building ground, work as ground
After being calibrated, people, which close, is moved forward and backward device 4.
When people need using device 4 is moved forward and backward, first start the rotation of 42 positive direction of motor, the rotation of 42 positive direction of motor
By first rotating shaft 43 drive 44 positive direction of sector gear rotation, sector gear 44 is turned to engaged with the rack gear 46 of top after,
By top rack gear 46 drive installing frame 45 move backward, installing frame 45 move rearwardly through connecting plate 5 drive flattening device 6 to
After move, sector gear 44 is turned to engaged with the rack gear 46 of lower section after, drive installing frame 45 to Forward by lower section rack gear 46
Dynamic, installing frame 45 is advanced through connecting plate 5 and flattening device 6 is driven to move forward, and motor 42 persistently rotates, and can pass through company
Fishplate bar 5 drives flattening device 6 to be constantly moved forward and backward and strikes off to ground, and after ground is calibrated, people close motor 42
?.
When people need to adjust the height of flattening device 6, first with other tool positive direction rotary worms 616, worm screw 616
Positive direction rotation drives the rotation of 612 positive direction of the second shaft by worm gear 614, and the rotation of 612 positive direction of the second shaft drives barrel-shaped
The rotation of 613 positive direction of cam, the rotation of 613 positive direction of barrel cam drive ball 610 to move down, and ball 610 moves down logical
Crossing arcuate struts 69 drives guide rod 68 to move down, and pilot hole 65 play the guiding role to guide rod 68, and spring 67 is drawn therewith
It stretches, guide rod 68, which moves down, drives strike-off stick 617 to move down, after strike-off stick 617 is moved downward to suitable position, Ren Menting
Only rotary worm 616, then people restart 42 positive direction of motor and rotate so that connecting plate 5 is moved forward and backward, and move before and after connecting plate 5
Dynamic that clapboard 63 is driven to be moved forward and backward, top sliding rail 61 and top sliding block 62 play the guiding role to clapboard 63, before clapboard 63
Mobile afterwards that right mounting plate 64 is driven to be moved forward and backward, lower section sliding rail 61 and lower section sliding block 62 play guiding to right mounting plate 64 and make
With right mounting plate 64, which is moved forward and backward, drives strike-off stick 617 to be moved forward and backward, and the back-and-forth motion of strike-off stick 617 can carry out ground
It strikes off, after ground is calibrated, people close motor 42, and then people use other tool opposite direction rotary worms 616, worm screw again
616 opposite directions rotate so that 613 opposite direction of barrel cam rotates, and under the action of spring 67, guide rod 68 drives arcuate struts
69 and strike-off stick 617 move up reset, after strike-off stick 617 is moved upward to reset, people stop operating worm screw 616.
When people, which start motor 42, to be rotated, the rotation of motor 42 drives big belt pulley 7 to rotate by first rotating shaft 43, great Pi
The rotation of belt wheel 7 drives small belt pulley 10 to rotate by flat belt 11, and the rotation of small belt pulley 10 is by third shaft 9 with movable vane piece 12
Rotation, the rotation of blade 12 generate wind-force, and wind-force is gone out by wind-collecting cover 13 and air outlet 14 from outlet housing 15, and this measure to strike off
While scraping plane earth, wind-force can blow away the dust of 617 bottom of strike-off stick plate 617, when people close motor 42, blade
12 also stop operating therewith.
When people have encountered obstacle difficult to deal with when scraping plane earth, tapping hole 3 can be first passed through and put into cabinet 1
Some weights, demarcation plate 17 separate weight and back-and-forth motion device 4, and this measure can increase the gravity of this equipment right, make
Whole equipment can keep balancing at work.
When people need rotary worm 616, hand rotation crank 203 is first used, the rotation of rocking handle 203 passes through 202 band of diamond block
Dynamic diamond shape notch board 201 rotates, and the rotation of diamond shape notch board 201 drives worm screw 616 to rotate, when not needing rotary worm 616, by rocking handle
203 move up, so that diamond block 202 is removed out of diamond shape notch board 201, then put rocking handle 203 well, this measure makes people
Do not need to carry out rotary worm 616 using other tools, help people more easily operate this equipment.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention,
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features,
All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention
Within protection scope.