CN109322330A - A kind of light and dark digging combination Metro Station Structure avoiding housing demolition and its construction method - Google Patents

A kind of light and dark digging combination Metro Station Structure avoiding housing demolition and its construction method Download PDF

Info

Publication number
CN109322330A
CN109322330A CN201811255250.4A CN201811255250A CN109322330A CN 109322330 A CN109322330 A CN 109322330A CN 201811255250 A CN201811255250 A CN 201811255250A CN 109322330 A CN109322330 A CN 109322330A
Authority
CN
China
Prior art keywords
tunneling
open cut
light
dark
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811255250.4A
Other languages
Chinese (zh)
Inventor
刘建伟
卢致强
何明华
时亚昕
张培胜
白玉成
申小兵
钟扬
吴起
曹平
李冀伟
唐凯
张健
王培海
杜东平
张骐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Architectural Design And Research Institute
Original Assignee
Chengdu Architectural Design And Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Architectural Design And Research Institute filed Critical Chengdu Architectural Design And Research Institute
Priority to CN201811255250.4A priority Critical patent/CN109322330A/en
Publication of CN109322330A publication Critical patent/CN109322330A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a kind of light and dark digging combination Metro Station Structure for avoiding housing demolition and construction methods, including the tunneling region below the open cut region surrounded by several open cut fender posts and building, open cut region of first constructing, and rear tunneling region of constructing.Lateral super-front large pipe shed is set before hidden digging structure construction in advance, pipe canopy is supported by tunneling skirt piles and the open cut top plate constructed in advance.Tunneling skirt piles are constructed by longitudinal edge pilot tunnel, and pilot tunnel periphery deep hole grouting is first carried out before pilot tunnel construction and is reinforced.Soil excavation is carried out under the pre support system protection of steel tube shed and pours tunneling top plate, it is inverse from top to bottom to build the other structures such as the side wall, middle plate and bottom plate in tunneling region after top plate reaches structural strength.The light and dark digging combination Metro Station Structure and construction method can avoid removing, and guarantee project progress, reduce and coordinate difficulty, reduce construction investment, maintain box frame structure system in underground constant, on building function and operation management without influence.

Description

A kind of light and dark digging combination Metro Station Structure avoiding housing demolition and its construction method
Technical field
The present invention relates to technical field of buildings, more particularly to a kind of light and dark digging combination subway station for avoiding housing demolition Structure and its construction method.
Background technique
Subway station is in the case where there is open-cut condition, and when top plate earth-covering is less, general open-cut difficulty is small, Risk is small, speed of application is fast, economical.But it often due to being limited by various external conditions, can not remove meeting surface buildings In the case where, station can not use full open-cut, construct according to whole dark digging, be bound to cause that construction risk is big, difficulty is big, applies Phenomenon long between working hour, cost is high can receive unexpected effect if can use pattern of the tunneling in conjunction with open cut at this time Fruit.According to engineering practice in recent years, light and shade combination pattern station is roughly divided into following several types: platform tunneling, subway concourse and The open cut of plant management information system area;Half of open cut one side of something tunneling;Both ends open cut, intermediate tunneling;Intermediate open cut, two (lists) hold tunneling. Platform tunneling, subway concourse and mechanical floor open cut as shown in fig. 13 that, such as the open cut of Figure 14 one side of something, half of tunneling, as the open cut of the both ends Figure 15, Intermediate tunneling, such as open cut, both ends tunneling among Figure 16, and in both ends open cut, intermediate tunneling scheme, the integral layout at station is in " end Room formula ", since both ends subway concourse is not connected to mutually, operation management is inconvenient, and traffic efficiency is low.Platform tunneling, subway concourse and mechanical floor are bright In excavation case and half of open cut, half of tunneling scheme, subway concourse width is often limited, and subway concourse public area area is narrow, collection and distribution capacity It is low, manage inconvenient for use, equipment difficult arrangement.In intermediate open cut, both ends tunneling scheme, due to station length limited, public area Area compression, collection and distribution capacity reduce, equipment difficult arrangement.
In conclusion although traditional light and dark digging combination station pattern can guarantee exploitativeness, but all there is operation management Inconvenience, the deficiency of building function missing and equipment difficult arrangement.
Summary of the invention
It is an object of the invention to: overcome the above-mentioned problems in the prior art, proposes a kind of to avoid housing demolition Light and dark digging combination Metro Station Structure and its construction method avoid removing, and guarantee project progress, reduce and coordinate difficulty, reduce work Journey investment, maintains box frame structure system in underground constant, on building function and operation management without influence.
The purpose of the present invention is realized by following technical proposals:
A kind of light and dark digging combination Metro Station Structure avoiding housing demolition, it is bright including being surrounded by several open cut fender posts The tunneling region below region and building is dug, there is tunneling top plate below the building, have above the tunneling top plate Tunneling pipe canopy, the tunneling pipe canopy lower section are supported by tunneling skirt piles, have open cut main body in the open cut region, described Open cut body top has open cut top plate, and the open cut bottom part body has resistance to plucking structure.
A kind of light and dark digging combination Metro Station Structure avoiding housing demolition of the invention, the tunneling skirt piles pass through rectangle Pilot tunnel construction, pilot tunnel periphery carry out Deep-hole Pre-grouting.
A kind of light and dark digging combination Metro Station Structure avoiding housing demolition of the invention, the tunneling skirt piles and tunneling pipe There is tunneling just branch structure between canopy.
A kind of light and dark digging combination Metro Station Structure avoiding housing demolition of the invention, the open cut fender post top are Half of pilework.
Stake top is gone along with sb. to guard him in a kind of light and dark digging combination Metro Station Structure avoiding housing demolition of the invention, the open cut Portion is respectively arranged with the first crown beam and the second crown beam.
A kind of light and dark digging combination Construction Method of Metro Station avoiding housing demolition, below building and close in range into Row tunneling, rest part are open cut, are included the following steps:
Step 1: setting seam according to the needs and structure of construction headroom and building safety protection and require to determine light and dark digging model It encloses and line of demarcation;
Step 2: the setting of the open cut fender post of open cut part is excavated to tunneling top plate lower position with digging with support;
Step 3: the tunneling pipe along station transverse direction advanced levels is carried out on the open cut fender post of light and dark digging longitudinal direction boundary The setting of canopy;
Step 4: continuation is excavated to open cut part of substrate downwards, performs resistance to plucking structure, performs open cut waterproof body from bottom to top System and open cut main body, and backfill earthing;
Step 5: after the completion of open cut main structure construction, under tunneling pipe shed support, from light and dark digging transverse direction boundary along vehicle It stands and longitudinally carries out the deep hole grouting on pilot tunnel periphery;
Step 6: longitudinally abolishing the open cut fender post of light and dark digging boundary along station, excavate the side pilot tunnel soil body, perform side and lead The first branch structure in hole;
Step 7: leading the vertical tunneling skirt piles of in-cavity construction and tunneling crown beam on side;
Step 8: excavating the middle drift soil body, middle drift preliminary bracing of constructing, by the middle drift preliminary bracing and light and dark digging The main reinforcement of the open cut fender post of boundary connects;
Step 9: longitudinal divisions remove the open cut fender post of side pilot tunnel inner sidewall and light and dark digging boundary, tunneling top of constructing Plate, tunneling top plate one end are supported in tunneling crown beam, and the other end is linked together with open cut top plate;
Step 10: excavation section by section performs side wall, plate and dark in first layer into first layer below plate from top to bottom in tunneling area Dig water-proof system.
Step 11: excavation section by section performs side wall, plate and dark in the second layer into the second layer below plate from top to bottom in tunneling area Dig water-proof system;
Step 12: tunneling area below excavation section by section to bottom plate, performs side wall, tunneling bottom plate and tunneling waterproof body from top to bottom System.
A kind of light and dark digging combination Metro Station Structure for avoiding housing demolition of the invention and its construction method, in step 2 Open cut fender post only pours the half of section of Nearby Structure, is made into half skirt piles, and half not poured is arranged in the second crown beam Side section range.
A kind of light and dark digging combination Metro Station Structure for avoiding housing demolition of the invention and its construction method, the tunneling It should the transversely and horizontally aperture on adjacent open cut fender post before pipe roof construction.
A kind of light and dark digging combination Metro Station Structure for avoiding housing demolition of the invention and its construction method, the tunneling Pipe canopy is jumped hole and is performed, and performs and is spaced in 2 holes or more, after single hole pore-forming, the filling of down tube slip casting immediately.
A kind of light and dark digging combination Metro Station Structure for avoiding housing demolition of the invention and its construction method, the open cut Independent construction reinforced bar beams of concrete, the supporting beam as tunneling pipe canopy on top plate.
A kind of light and dark digging combination Metro Station Structure for avoiding housing demolition of the invention and its construction method, in step 4 Open cut top plate should be in light and dark digging boundary embedded bar connector.
A kind of light and dark digging combination Metro Station Structure for avoiding housing demolition of the invention and its construction method, in step 6 Side pilot tunnel headroom, which need to meet, goes along with sb. to guard him pile driving construction needs, and general hole bottom clear span can be taken as 3~4m, and clear height can be taken as 3~4m.
A kind of light and dark digging combination Metro Station Structure for avoiding housing demolition of the invention and its construction method, in step 9 Longitudinal divisions remove the open cut fender post of side pilot tunnel inner sidewall and light and dark digging longitudinal direction boundary, and longitudinal divisions length is not more than 6m, Tunneling top plate is performed using full framing in time after dismounting, tunneling top plate is linked as one by reinforcing bar connector and open cut main structure Body.
A kind of light and dark digging combination Metro Station Structure for avoiding housing demolition of the invention and its construction method, on tunneling top Under slab supporting, the stage excavation soil body, abolishes the open cut fender post of light and dark digging boundary from top to bottom, inverse to build each layer structure, tunneling Each layer structure is linked together with structure built by opencut method by reinforcing bar connector.
According to the above technical scheme, the beneficial effects of the present invention are: proposing that a kind of light and dark digging for avoiding housing demolition combines Metro Station Structure and its construction method avoid removing, and guarantee project progress, reduce and coordinate difficulty, reduce construction investment, maintain Underground box frame structure system is constant, on building function and operation management without influence.
Detailed description of the invention
Fig. 1 is that a kind of light and dark digging combination Metro Station Structure construction method step 1 for avoiding housing demolition of the present invention is illustrated Figure;
Fig. 2 is that a kind of light and dark digging combination Metro Station Structure construction method step 2 for avoiding housing demolition of the present invention is illustrated Figure;
Fig. 3 is that a kind of light and dark digging combination Metro Station Structure construction method step 3 for avoiding housing demolition of the present invention is illustrated Figure;
Fig. 4 is that a kind of light and dark digging combination Metro Station Structure construction method step 4 for avoiding housing demolition of the present invention is illustrated Figure;
Fig. 5 is that a kind of light and dark digging combination Metro Station Structure construction method step 5 for avoiding housing demolition of the present invention is illustrated Figure;
Fig. 6 is that a kind of light and dark digging combination Metro Station Structure construction method step 6 for avoiding housing demolition of the present invention is illustrated Figure;
Fig. 7 is that a kind of light and dark digging combination Metro Station Structure construction method step 7 for avoiding housing demolition of the present invention is illustrated Figure;
Fig. 8 is that a kind of light and dark digging combination Metro Station Structure construction method step 8 for avoiding housing demolition of the present invention is illustrated Figure;
Fig. 9 is that a kind of light and dark digging combination Metro Station Structure construction method step 9 for avoiding housing demolition of the present invention is illustrated Figure;
Figure 10 is that a kind of light and dark digging combination Metro Station Structure construction method step 10 for avoiding housing demolition of the present invention is shown It is intended to;
Figure 11 is that a kind of light and dark digging combination Metro Station Structure construction method step 11 for avoiding housing demolition of the present invention is shown It is intended to;
Figure 12 is that a kind of light and dark digging combination Metro Station Structure construction method step 12 for avoiding housing demolition of the present invention is shown It is intended to;
Figure 13 is the first situation of background technique;
Figure 14 is background technique second situation;
Figure 15 is the third situation of background technique;
Figure 16 is the 4th kind of situation of background technique.
Specific embodiment
The present invention is further illustrated with attached drawing combined with specific embodiments below.
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
If Fig. 1-12 is a kind of light and dark digging combination Metro Station Structure for avoiding housing demolition of the present invention and its construction method Embodiment, a kind of light and dark digging combination Metro Station Structure avoiding housing demolition, including what is surrounded by several open cut fender posts 2 The tunneling region in open cut region and the lower section of building 1, has tunneling top plate 6 below the building 1, on the tunneling top plate 6 Side has tunneling pipe canopy 7, is supported below the tunneling pipe canopy 7 by tunneling skirt piles 8, has open cut in the open cut region Main body 5 has open cut top plate 11 at the top of the open cut main body 5, and 5 bottom of open cut main body has resistance to plucking structure 12, described dark It digs skirt piles 8 to construct by rectangle pilot tunnel, pilot tunnel periphery carries out Deep-hole Pre-grouting, has between the tunneling skirt piles 8 and tunneling pipe canopy 7 There is tunneling just branch structure 10, is half of pilework at the top of the open cut fender post 2, at the top of the open cut fender post 2 respectively It is provided with the first crown beam 3 and the second crown beam 4.
A kind of light and dark digging combination Construction Method of Metro Station avoiding housing demolition, below building and close in range into Row tunneling, rest part are open cut, are included the following steps:
Step 1: setting seam according to the needs and structure of construction headroom and 1 safeguard protection of building and require to determine light and dark digging model It encloses and line of demarcation;
Step 2: the setting of the open cut fender post 2 of open cut part is excavated to 6 lower position of tunneling top plate with digging with support;
Step 3: the tunneling pipe along station transverse direction advanced levels is carried out on the open cut fender post 2 of light and dark digging longitudinal direction boundary The setting of canopy 7;
Step 4: continuation is excavated to open cut part of substrate downwards, performs resistance to plucking structure 12, performs open cut waterproof from bottom to top System and open cut main body 5, and backfill earthing;
Step 5: after the completion of open cut main structure construction, under 7 supporting of tunneling pipe canopy, from light and dark digging transverse direction boundary along vehicle It stands and longitudinally carries out the deep hole grouting on pilot tunnel periphery;
Step 6: longitudinally abolishing the open cut fender post 2 of light and dark digging boundary along station, excavate the side pilot tunnel soil body, perform side and lead The first branch structure 10 in hole;
Step 7: leading the vertical tunneling skirt piles 8 of in-cavity construction and tunneling crown beam 9 on side;
Step 8: excavating the middle drift soil body, middle drift preliminary bracing of constructing, by the middle drift preliminary bracing and light and dark digging The main reinforcement of the open cut fender post 2 of boundary connects;
Step 9: longitudinal divisions remove the open cut fender post 2 of side pilot tunnel inner sidewall and light and dark digging boundary, tunneling top of constructing Plate 6, described 6 one end of tunneling top plate are supported in tunneling crown beam 9, and the other end is linked together with open cut top plate 11;
Step 10: excavation section by section performs side wall, plate and dark in first layer into first layer below plate from top to bottom in tunneling area Dig water-proof system.
Step 11: excavation section by section performs side wall, plate and dark in the second layer into the second layer below plate from top to bottom in tunneling area Dig water-proof system;
Step 12: tunneling area below excavation section by section to bottom plate, performs side wall, tunneling bottom plate and tunneling waterproof body from top to bottom System.
Open cut fender post 2 only pours the half of section of Nearby Structure 1 in step 2, is made into half skirt piles, the second crown beam The half of section range not poured is set.
The tunneling pipe canopy 7 should the transversely and horizontally aperture on adjacent open cut fender post 2 before constructing.
The tunneling pipe canopy 7 is jumped hole and is performed, and performs and is spaced in 2 holes or more, after single hole pore-forming, down tube slip casting immediately is filled out It fills.
Independent construction reinforced bar beams of concrete, the supporting beam as tunneling pipe canopy 7 on the open cut top plate 11.
Open cut top plate should be in light and dark digging boundary embedded bar connector in step 4.
Pilot tunnel headroom in side, which need to meet, in step 6 goes along with sb. to guard him pile driving construction needs, and general hole bottom clear span can be taken as 3~4m, and clear height can It is taken as 3~4m.
Longitudinal divisions remove the open cut fender post of side pilot tunnel inner sidewall and light and dark digging longitudinal direction boundary, Zong Xiangfen in step 9 Segment length is not more than 6m, performs tunneling top plate using full framing in time after dismounting, tunneling top plate by reinforcing bar connector with it is bright Main structure is dug to be linked together.
Under tunneling roof timbering, the stage excavation soil body, abolishes the open cut fender post of light and dark digging boundary from top to bottom, inverse Each layer structure is built, each layer structure of tunneling is linked together with structure built by opencut method by reinforcing bar connector.
By taking metro station as an example:
The subway station is two layers of underground 14m island station, and the wide 23.1m of standard paragraphs is forward laid along road, and boundary lines of roads is wide There are a 6 story frame structure dormitory buildings at 20m, station middle part, and East and West direction is 21 meters long, and north and south is 6 meters wide, and about 1 meter of isolated footing buried depth, House intrusion station main body foundation pit in 3.2 meters be guarantee station open-cut foundation ditch normal construction, first premises perimeter setting every From stake (also serving as the fender post of open cut part), house is isolated to outside foundation pit, the structure built by opencut method for house not influence area of first constructing, Then boring construction house is got off station structure again.
1, the boundary of works area and separation of open cut and tunneling are determined
According to go along with sb. to guard him pile driving construction headroom, building safety protection demand and structure set seam require, according to 2 edge of open cut fender post away from It is arranged from basic 3 meters of the clear distance of building 1, to reduce disturbance of the crown beam construction and excavation to 1 basis of building, open cut is gone along with sb. to guard him Stake 2 is done to ground, and 4 or more open cut fender post 2 of the second crown beam only pours the half of section of Nearby Structure, is made into one side of something The half of section range not poured is arranged in stake, the second crown beam 4.In summary it can determine that tunneling range is 6.85 meters wide, length About 14 meters of section.
2, to take into account open cut and hidden digging structure stress demand, station top plate earth-covering is taken as 4m, and tunneling part is straight using flat-top Wall construction.
3, branch structure 10 is flat-tope structure as at the beginning of tunneling, to prevent ground from collapsing, from light and dark digging longitudinal direction boundary transverse direction It sets bimetallic tube canopy and forms tunneling pipe canopy 7, deep hole grouting can be used when necessary, stratum is reinforced, to improve the adhesive aggregation on stratum Power.
4, the construction of open cut fender post 2 uses rotary drilling rig or manually digging hole, and construction should jump hole and perform, perform and be spaced in 2 More than a hole, and guarantee the quality of mud or retaining wall.In Excavation Process, with digging with support, according to the monitoring situation in house, Tracing compensation and grouting is carried out in time to premises perimeter using mini-valve tube.After open cut main structure construction, it should be layered earth rammer It is real, tunneling broken pile construction can be carried out after being backfilled to ground, to guarantee the stress balance of the above fender post of top plate.
5, tunneling performs tunneling pipe canopy 7 before excavating first, is formed and is supported to the top soil body with the double-deck long pipe shed, the one end Guan Peng It rides in the pipe canopy supporting beam on open cut top plate, at least 2m outside the pilot tunnel of side is stretched out in one end.Pipe canopy exists before performing using alloy water drilling Aperture in stake, and stake cannot be directly cut off, guarantee go along with sb. to guard him effect of the stake to the periphery soil body.Pipe canopy uses auger bore, can be right The soil body generates certain crowd in-out effects, reduces the sedimentation in house.The drilling equipment using high pressure geomantic omen class should be avoided, to reduce soil The loss of body.Pipe roof construction should jump hole and perform, and perform and be spaced in 2 holes or more.After single hole pore-forming, the filling of down tube slip casting immediately, It cannot unify slip casting to porous pore-forming, to guarantee the timeliness of filling.
6, tunneling excavation construction first performs the side pilot tunnel of tunneling abutment wall position, and manually digging hole performs tunneling side in pilot tunnel Stake 8, using manually digging hole or mechanical hole building, and perform tunneling crown beam 9, construction should jump hole and perform, perform be spaced in 2 holes with On, and guarantee the quality of mud or retaining wall.Construction reinforced bar concrete guard wall in tunneling crown beam 9, while as the perpendicular of bimetallic tube canopy To support column.
7, the middle drift on construction tunneling top is completed at the same time abolishing for row's open cut fender post 2 in middle drift implementation. Open cut fender post 2 abolishes the influence maximum generated to whole stress system, should be segmented and abolish, and use static(al) measure, reduce Vibration, to reduce the adverse effect to house.
8, longitudinal divisions remove side pilot tunnel inner sidewall, remove length and are not more than 4m, perform side pilot tunnel and middle drift inner top panel Two lining structures and waterproof layer, one end is linked together by the reinforcing bar connector that open cut top plate 11 is reserved with open cut top plate 11, another It holds in the tunneling crown beam 9 being supported in the pilot tunnel of side, tunneling waterproof layer is carried out with structure built by opencut method to be connected.Two linings use full framing, Before two lining concrete reach intensity, full framing and structure collective effect newly is poured, form new load-carrying construction.Two lining coagulations After native top plate reaches intensity, the effective support system to house foundation is collectively formed with structure built by opencut method, tunneling skirt piles.
9, under tunneling top plate 6 and lateral 8 supporting of tunneling skirt piles, the soil body and broken on each laminate of stage excavation from top to bottom Except open cut fender post 2, each layer structure side wall, middle plate and waterproof layer are performed, plate passes through reinforcing bar connector with plate in open cut in structure It is linked together.The tunneling area soil body is excavated to bottom plate bottom, performs tunneling area base plate waterproofing and structure.
According to the above technical scheme, the beneficial effects of the present invention are: proposing that a kind of light and dark digging for avoiding housing demolition combines Metro Station Structure and its construction method carry out water conservancy diversion by basement bottom board weeper drain, and are drained by basement periphery French drain carries out water conservancy diversion and collects, and pumping system is then arranged in sump, can concentrate underground water carrying out pump drainage, to disappear Except security risk, and in basement bottom board weeper drain and basement periphery weeper drain setting filtering and discharge structure, prevent Only sewer pipe results in blockage.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of light and dark digging combination Metro Station Structure for avoiding housing demolition, which is characterized in that including being gone along with sb. to guard him by several open cuts Tunneling region below stake (2) the open cut region that surrounds and building (1) has tunneling top plate below the building (1) (6), there is tunneling pipe canopy (7) above the tunneling top plate (6), carried out below the tunneling pipe canopy (7) by tunneling skirt piles (8) It supports, there are open cut main body (5) in the open cut region, there are open cut top plate (11) at the top of the open cut main body (5), stated clearly Digging main body (5) bottom has resistance to plucking structure (12).
2. a kind of light and dark digging combination Metro Station Structure for avoiding housing demolition according to claim 1, which is characterized in that The tunneling skirt piles (8) are constructed by rectangle pilot tunnel, and pilot tunnel periphery carries out Deep-hole Pre-grouting.
3. a kind of light and dark digging combination Metro Station Structure for avoiding housing demolition according to claim 2, which is characterized in that There is tunneling just branch structure (10) between the tunneling skirt piles (8) and tunneling pipe canopy (7).
4. a kind of light and dark digging combination Metro Station Structure for avoiding housing demolition according to claim 3, which is characterized in that It is half of pilework at the top of the open cut fender post (2).
5. a kind of light and dark digging combination Metro Station Structure for avoiding housing demolition according to claim 4, feature exist In open cut fender post (2) top is respectively arranged with the first crown beam (3) and the second crown beam (4).
6. a kind of light and dark digging combination Construction Method of Metro Station for avoiding housing demolition, which is characterized in that below building and face Tunneling is carried out in nearly range, rest part is open cut, is included the following steps:
Step 1: setting seam according to the needs and structure of construction headroom and building (1) safeguard protection and require to determine light and dark digging range And line of demarcation;
Step 2: the setting of the open cut fender post (2) of open cut part is excavated to tunneling top plate (6) lower position with digging with support;
Step 3: the tunneling pipe canopy along station transverse direction advanced levels is carried out on the open cut fender post (2) of light and dark digging longitudinal direction boundary (7) construction;
Step 4: continuation is excavated to open cut part of substrate downwards, performs resistance to plucking structure (12), performs open cut waterproof body from bottom to top System and open cut main body (5), and backfill earthing;
Step 5: after the completion of open cut main structure construction, under tunneling pipe canopy (7) supporting, from light and dark digging transverse direction boundary along station Longitudinal deep hole grouting for carrying out pilot tunnel periphery;
Step 6: longitudinally abolishing the open cut fender post (2) of light and dark digging boundary along station, excavate the side pilot tunnel soil body, perform side pilot tunnel First branch structure (10);
Step 7: leading the vertical tunneling skirt piles (8) of in-cavity construction and tunneling crown beam (9) on side;
Step 8: excavating the middle drift soil body, the middle drift preliminary bracing and light and dark digging are demarcated in middle drift preliminary bracing of constructing The main reinforcement of the open cut fender post (2) at place connects;
Step 9: longitudinal divisions remove the open cut fender post (2) of side pilot tunnel inner sidewall and light and dark digging boundary, tunneling top plate of constructing (6), described tunneling top plate (6) one end is supported in tunneling crown beam (9), and the other end is linked together with open cut top plate (11);
Step 10: excavation section by section performs side wall, plate and tunneling are anti-in first layer into first layer below plate from top to bottom in tunneling area Aqueous systems;
Step 11: excavation section by section performs side wall, plate and tunneling are anti-in the second layer into the second layer below plate from top to bottom in tunneling area Aqueous systems;
Step 12: tunneling area below excavation section by section to bottom plate, performs side wall, tunneling bottom plate and tunneling water-proof system from top to bottom.
7. a kind of light and dark digging combination Construction Method of Metro Station for avoiding housing demolition according to claim 6, feature Be: open cut fender post (2) only pours the half of section of Nearby Structure (1) in step 2, is made into half skirt piles, the second hat The half of section range not poured is arranged in beam.
8. a kind of light and dark digging combination Construction Method of Metro Station for avoiding housing demolition according to claim 6, feature It is: should the transversely and horizontally aperture on adjacent open cut fender post (2) before tunneling pipe canopy (7) construction.
9. a kind of light and dark digging combination Construction Method of Metro Station for avoiding housing demolition according to claim 8, feature Be: the tunneling pipe canopy (7) is jumped hole and is performed, and performs and is spaced in 2 holes or more, after single hole pore-forming, the filling of down tube slip casting immediately.
10. a kind of light and dark digging combination Construction Method of Metro Station for avoiding housing demolition according to claim 6, feature It is: independent construction reinforced bar beams of concrete, the supporting beam as tunneling pipe canopy (7) on the open cut top plate (11).
CN201811255250.4A 2018-11-27 2018-11-27 A kind of light and dark digging combination Metro Station Structure avoiding housing demolition and its construction method Pending CN109322330A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811255250.4A CN109322330A (en) 2018-11-27 2018-11-27 A kind of light and dark digging combination Metro Station Structure avoiding housing demolition and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811255250.4A CN109322330A (en) 2018-11-27 2018-11-27 A kind of light and dark digging combination Metro Station Structure avoiding housing demolition and its construction method

Publications (1)

Publication Number Publication Date
CN109322330A true CN109322330A (en) 2019-02-12

Family

ID=65262947

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811255250.4A Pending CN109322330A (en) 2018-11-27 2018-11-27 A kind of light and dark digging combination Metro Station Structure avoiding housing demolition and its construction method

Country Status (1)

Country Link
CN (1) CN109322330A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005420A (en) * 2019-05-21 2019-07-12 成都市建筑设计研究院 A kind of ledge tunneling is inverse to build underground structure and construction method
CN110410083A (en) * 2019-08-16 2019-11-05 招商局重庆交通科研设计院有限公司 Hazy tunnel method
CN111139870A (en) * 2019-12-26 2020-05-12 北京城建设计发展集团股份有限公司 Thick plate underpinning cover digging semi-reverse construction method for building subway station under existing basement
CN111456773A (en) * 2020-04-16 2020-07-28 成都市建筑设计研究院 Close-fitting open-and-underground excavation combined subway station structure and construction method thereof
CN111550100A (en) * 2020-05-13 2020-08-18 北京中岩智泊科技有限公司 Construction method of underground excavation amplification type stereo garage
CN111779024A (en) * 2020-06-09 2020-10-16 中铁第四勘察设计院集团有限公司 Structure system of box culvert after underground access channel is penetrated, moved and modified and construction method thereof
CN111810202A (en) * 2020-07-20 2020-10-23 武汉市市政建设集团有限公司 Underground connecting channel interface construction method
CN113153383A (en) * 2021-03-24 2021-07-23 中交路桥建设有限公司 Construction method for deep-buried large-section subway station
CN113187487A (en) * 2021-06-17 2021-07-30 上海市地下空间设计研究总院有限公司 Double-deck full section of subway freezes secretly digs station structure
CN113216249A (en) * 2021-04-22 2021-08-06 北京城建设计发展集团股份有限公司 Method for constructing underground space under narrow road condition
CN118639689A (en) * 2024-08-12 2024-09-13 中国铁路设计集团有限公司 Construction method for constructing underground excavation station from open excavation subway station

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004092075A (en) * 2002-08-29 2004-03-25 Nippon Ps:Kk Structure and construction method for cut-and-cover tunnel
KR20050076286A (en) * 2004-01-20 2005-07-26 주식회사유신코퍼레이션 Method for extending and removing wall of subway structure in subway service line
JP2007284895A (en) * 2006-04-13 2007-11-01 Toda Constr Co Ltd Underground railway construction method
CN105888703A (en) * 2016-06-03 2016-08-24 北京城建设计发展集团股份有限公司 Method for constructing super-shallow-burial subway station under transverse canopy erected inside micro pilot tunnel
CN107288665A (en) * 2017-08-21 2017-10-24 中国建筑第八工程局有限公司 The construction method of Station
CN108286266A (en) * 2018-03-27 2018-07-17 中铁局集团第二工程有限公司 A method of exempt to remove using object in light and dark digging in combination and builds underground structure
CN209760299U (en) * 2018-11-27 2019-12-10 成都市建筑设计研究院 light and shade of avoiding house to tear open and move is dug and is combined subway station structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004092075A (en) * 2002-08-29 2004-03-25 Nippon Ps:Kk Structure and construction method for cut-and-cover tunnel
KR20050076286A (en) * 2004-01-20 2005-07-26 주식회사유신코퍼레이션 Method for extending and removing wall of subway structure in subway service line
JP2007284895A (en) * 2006-04-13 2007-11-01 Toda Constr Co Ltd Underground railway construction method
CN105888703A (en) * 2016-06-03 2016-08-24 北京城建设计发展集团股份有限公司 Method for constructing super-shallow-burial subway station under transverse canopy erected inside micro pilot tunnel
CN107288665A (en) * 2017-08-21 2017-10-24 中国建筑第八工程局有限公司 The construction method of Station
CN108286266A (en) * 2018-03-27 2018-07-17 中铁局集团第二工程有限公司 A method of exempt to remove using object in light and dark digging in combination and builds underground structure
CN209760299U (en) * 2018-11-27 2019-12-10 成都市建筑设计研究院 light and shade of avoiding house to tear open and move is dug and is combined subway station structure

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘鑫: "《地铁车站明暗挖交界部位防水综合施工技术》", 《工程技术》, pages 169 - 170 *
周建龙: "《超高层建筑结构设计与工程实践》", 同济大学出版社, pages: 298 - 299 *
姚少玉: "《明暗挖结合分离岛式车站临近高架桥施工技术研究》", 《施工技术》, vol. 43, no. 12, pages 80 - 81 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005420A (en) * 2019-05-21 2019-07-12 成都市建筑设计研究院 A kind of ledge tunneling is inverse to build underground structure and construction method
CN110410083A (en) * 2019-08-16 2019-11-05 招商局重庆交通科研设计院有限公司 Hazy tunnel method
CN110410083B (en) * 2019-08-16 2021-02-09 招商局重庆交通科研设计院有限公司 Semi-bright and semi-dark tunnel entering method
CN111139870A (en) * 2019-12-26 2020-05-12 北京城建设计发展集团股份有限公司 Thick plate underpinning cover digging semi-reverse construction method for building subway station under existing basement
CN111456773A (en) * 2020-04-16 2020-07-28 成都市建筑设计研究院 Close-fitting open-and-underground excavation combined subway station structure and construction method thereof
CN111456773B (en) * 2020-04-16 2024-05-24 成都市建筑设计研究院有限公司 Close-fitting type subway station structure combining light and shade excavation and construction method thereof
CN111550100A (en) * 2020-05-13 2020-08-18 北京中岩智泊科技有限公司 Construction method of underground excavation amplification type stereo garage
CN111779024A (en) * 2020-06-09 2020-10-16 中铁第四勘察设计院集团有限公司 Structure system of box culvert after underground access channel is penetrated, moved and modified and construction method thereof
CN111810202B (en) * 2020-07-20 2022-04-15 武汉市市政建设集团有限公司 Underground connecting channel interface construction method
CN111810202A (en) * 2020-07-20 2020-10-23 武汉市市政建设集团有限公司 Underground connecting channel interface construction method
CN113153383A (en) * 2021-03-24 2021-07-23 中交路桥建设有限公司 Construction method for deep-buried large-section subway station
CN113216249A (en) * 2021-04-22 2021-08-06 北京城建设计发展集团股份有限公司 Method for constructing underground space under narrow road condition
CN113216249B (en) * 2021-04-22 2022-03-29 北京城建设计发展集团股份有限公司 Method for constructing underground space under narrow road condition
CN113187487A (en) * 2021-06-17 2021-07-30 上海市地下空间设计研究总院有限公司 Double-deck full section of subway freezes secretly digs station structure
CN113187487B (en) * 2021-06-17 2024-03-22 上海市地下空间设计研究总院有限公司 Construction method of double-layer full-section frozen underground excavation station structure of subway
CN118639689A (en) * 2024-08-12 2024-09-13 中国铁路设计集团有限公司 Construction method for constructing underground excavation station from open excavation subway station

Similar Documents

Publication Publication Date Title
CN109322330A (en) A kind of light and dark digging combination Metro Station Structure avoiding housing demolition and its construction method
CN102704957B (en) Shed-frame method for shallowly burying large-sized underground structure construction
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN104452809B (en) A kind of super shallow tunnel cover and cut construction method
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN111456773B (en) Close-fitting type subway station structure combining light and shade excavation and construction method thereof
CN1837506B (en) Construction method for excavating box-shape structure over an operating tunnel
CN108286266A (en) A method of exempt to remove using object in light and dark digging in combination and builds underground structure
CN202707075U (en) Long-span subway station main structure constructed based on column and arch method
CN110159294B (en) Construction method for lengthening open cut tunnel at tunnel junction section of high and steep terrain bridge
CN108612117A (en) A kind of seabed water-retaining structure across municipal tunnel greatly and construction method
CN102748040A (en) Main structure for metro long-span station and pillar arching construction method thereof
CN105370288A (en) Construction method of shallow-buried large-span tunnels
CN107514262A (en) The construction method of shield piping lane
CN108797620A (en) A kind of OPT construction method of interlocking pile
CN103334452B (en) A kind of underground construction mixed construction method
CN109958445A (en) The frame construction method in Large Underground space is buried for an ultra shallow
CN110042842A (en) A kind of open cut construction method of deep foundation ditch for wearing river
CN111535328A (en) Pit shaft type underground garage foundation pit supporting system in water-rich stratum and construction method
CN109667603A (en) A kind of super shallow-buried tunnel structure and construction method
CN104164881A (en) Piling wall overlapping cantilever foundation pit support construction method and structure
CN107964971B (en) A kind of precipitation method of the subway station using the construction of PBA engineering method
CN113958322B (en) Tunnel excavation method under existing subway line
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN209760299U (en) light and shade of avoiding house to tear open and move is dug and is combined subway station structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 610017 No. 4, floor 1, building 1, No. 28, dongchenggenxia street, Qingyang District, Chengdu, Sichuan

Applicant after: Chengdu architectural design and Research Institute Co.,Ltd.

Address before: No.16, dongyuheyan street, Qingyang District, Chengdu, Sichuan 610017

Applicant before: CHENGDU ARCHITECTURAL DESIGN & Research Institute