CN109322307A - 一种空心桩头封堵装置及其使用的施工方法 - Google Patents
一种空心桩头封堵装置及其使用的施工方法 Download PDFInfo
- Publication number
- CN109322307A CN109322307A CN201811375052.1A CN201811375052A CN109322307A CN 109322307 A CN109322307 A CN 109322307A CN 201811375052 A CN201811375052 A CN 201811375052A CN 109322307 A CN109322307 A CN 109322307A
- Authority
- CN
- China
- Prior art keywords
- plug cover
- plugging device
- pile crown
- bottom plate
- hollow pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明涉及一种可有效防止泥土等杂物进入桩芯的空心桩头封堵装置及其使用的施工方法,上述封堵装置包括:中空堵头盖,堵头盖呈倒置的圆台状,堵头盖上沿其高度方向设有两个呈上、下平行间隔设置的O形密封圈,O形密封圈套设于堵头盖的外周壁上;以及环形的底板,底板连接于堵头盖内侧壁的底部,底板上设有出气孔盖,出气孔盖铰接于底板上。本发明提供的空心桩头封堵装置中,通过设置O形密封圈和出气孔盖,可有效防止泥土等杂物进入桩芯中,避免了后期桩芯掏泥的工作量。
Description
技术领域
本发明涉及一种封堵装置,尤其涉及一种空心桩头封堵装置及其使用的施工方法。
背景技术
目前,随着工程建设的发展,桩基混凝土大量应用,在使用空心桩施工时,压桩过程中会将周边淤泥和杂物等掉入桩芯位置,不利于后期桩芯浇筑混凝土工序的进行,也增加了桩芯掏泥的工作量。
发明内容
针对现有桩基施工中存在的上述问题,现提供一种可有效防止泥土等杂物进入桩芯的空心桩头封堵装置及其使用的施工方法。
具体技术方案如下:
本发明的第一个方面是提供一种空心桩头封堵装置,具有这样的特征,包括:
中空堵头盖,堵头盖呈倒置的圆台状,堵头盖上沿其高度方向设有两个呈上、下平行间隔设置的O形密封圈,O形密封圈套设于堵头盖的外周壁上;以及
环形的底板,底板连接于堵头盖内侧壁的底部,底板上设有出气孔和可盖合出气孔的出气孔盖,出气孔盖铰接于底板上。
上述的空心桩头封堵装置,还具有这样的特征,堵头盖上沿其高度方向设有两个呈上、下平行间隔设置的密封圈槽,O形密封圈分别一一对应套设于密封圈槽中。
上述的空心桩头封堵装置,还具有这样的特征,堵头盖上还设有提拉手把,提拉手把的两端连接于堵头盖内侧壁的上部。
本发明的第二个方面是提供利用上述空心桩头封堵装置的施工方法,具有这样的特征,包括:当最后一节桩施工至离地面1-1.5m时,暂停压桩,将封堵装置放入桩芯中,保证O形密封圈与桩内壁紧密接触且堵头盖未完全进入桩芯中,继续进行压桩至将桩施工至设计标高;当土方开挖施工至设计标高后即可拔出封堵装置。
上述的施工方法,还具有这样的特征,堵头盖上还设有提拉手把;
当土方开挖施工至设计标高后,将出气孔盖打开以平衡内、外气压,再利用提拉手把将封堵装置从桩芯中拔出。
上述方案的有益效果是:
本发明提供的空心桩头封堵装置中,通过设置O形密封圈和出气孔盖,可有效防止泥土等杂物进入桩芯中,避免了后期桩芯掏泥的工作量。使用上述空心桩头封堵装置的施工方法较常规工艺可有效缩短施工工期。
附图说明
图1为本发明的实施例中提供的空心桩头封堵装置的剖视结构示意图;
图2为本发明的实施例中提供的空心桩头封堵装置的安装示意图。
附图中:1、堵头盖;2、O形密封圈;3、底板;4、出气孔盖;5、密封圈槽;6、提拉手把。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动的前提下所获得的所有其他实施例,都属于本发明保护的范围。
需要说明的是,在不冲突的情况下,本发明中的实施例及实施例中的特征可以相互组合。
下面结合附图和具体实施例对本发明作进一步说明,但不作为本发明的限定。
如图1和图2所示,本发明的实施例中提供的空心桩头封堵装置,包括:中空堵头盖1,堵头盖1呈倒置的圆台状,堵头盖1上沿其高度方向设有两个呈上、下平行间隔设置的密封圈槽5,上述密封圈槽5内套设由O形密封圈2;以及环形的底板3,底板3连接于堵头盖1内侧壁的底部,底板3上设有出气孔和可盖合上述出气孔的出气孔盖4,出气孔盖4铰接于底板3上。
本发明中当将堵头盖1塞于空心桩头的桩芯中时,通过堵头盖1上的两个O形密封圈2贴合于桩头内壁以实现桩芯密封,同时借助出气盖板4以实现对桩头顶部的密封,上述密封可防止泥土等杂物进入桩芯中,避免了后期桩芯掏泥的工作量,从而有效节省人工成本的同时还可缩短工期。
本发明中通过将堵头盖1优化为倒置的圆台状结构以适应桩头上粗下细的结构特征,以保证良好的封堵效果。
进一步的,本实施例提供的空心桩头封堵装置中还包括提拉手把6,本实施例中提拉手把6的两端连接于堵头盖1内侧壁的上部,本实施例中通过设置提拉手把6以方便后期土方开挖施工至设计标高后操作者可使用提拉手把6将装置取出即可。
本发明中提供的空心桩头封堵装置的使用方法为:当最后一节桩施工至离地面1-1.5m时,暂停压桩,将封堵装置放入桩芯中,保证O形密封圈2与桩内壁紧密接触且堵头盖1未完全进入桩芯中(此时封堵装置借助O形密封圈2与桩头内壁的摩擦力可不下滑),再继续进行压桩,压桩过程中当送桩器作用于桩芯时桩芯内高压气体将出气孔盖4顶压使其绕其一侧转动,从而排气以平衡桩芯内、外气压,当送桩间隙时出气孔盖4在自身重力作用下转动并盖合于底板3上以将出气孔封盖,从而防止泥土等杂物进入桩芯中,循环往复至将桩施工至设计标高为止,此时封堵装置即可卡设于桩芯中;本发明中当土方开挖施工至设计标高后,即可拔出封堵装置,此时只需检查、更换破损的O形密封圈2并进行回收利用即可,上述施工方式不同于常规压桩完毕后再人工盖桩(实际施工时桩端距地面通常为-1~-1.5m,人工盖桩工作强度大且也不易施工),本发明中于最后一节桩施工至离地面1-1.5m时利用封堵装置进行封堵最后再压桩完毕,可有效避免桩基施工至地面以下后周围的土方进入桩芯内造成桩头堵塞。
以上仅为本发明较佳的实施例,并非因此限制本发明的实施方式及保护范围,对于本领域技术人员而言,应当能够意识到凡运用本发明说明书及图示内容所作出的等同替换和显而易见的变化所得到的方案,均应当包含在本发明的保护范围内。
Claims (5)
1.一种空心桩头封堵装置,其特征在于,包括:
中空堵头盖(1),所述堵头盖(1)呈倒置的圆台状,所述堵头盖(1)上沿其高度方向设有两个呈上、下平行间隔设置的O形密封圈(2),所述O形密封圈(2)套设于所述堵头盖(1)的外周壁上;以及
环形的底板(3),所述底板(3)连接于所述堵头盖(1)内侧壁的底部,所述底板(3)上设有出气孔和可盖合所述出气孔的出气孔盖(4),所述出气孔盖(4)铰接于所述底板(3)上。
2.根据权利要求1所述的空心桩头封堵装置,其特征在于,所述堵头盖(1)上沿其高度方向设有两个呈上、下平行间隔设置的密封圈槽(5),所述O形密封圈(2)分别一一对应套设于所述密封圈槽(5)中。
3.根据权利要求1或2所述的空心桩头封堵装置,其特征在于,所述堵头盖(1)上还设有提拉手把(6),所述提拉手把(6)的两端连接于所述堵头盖(1)内侧壁的上部。
4.一种利用权利要求1-3任一项所述空心桩头封堵装置的施工方法,其特征在于,包括:当最后一节桩施工至离地面1-1.5m时,暂停压桩,将封堵装置放入桩芯中,保证O形密封圈(2)与桩内壁紧密接触且堵头盖(1)未完全进入所述桩芯中,继续进行压桩至将桩施工至设计标高;当土方开挖施工至设计标高后即可拔出所述封堵装置。
5.一种利用权利要求4所述空心桩头封堵装置的施工方法,其特征在于,所述堵头盖(1)上还设有提拉手把(6);
当土方开挖施工至设计标高后,再利用所述提拉手把(6)将所述封堵装置从所述桩芯中拔出。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811375052.1A CN109322307A (zh) | 2018-11-19 | 2018-11-19 | 一种空心桩头封堵装置及其使用的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811375052.1A CN109322307A (zh) | 2018-11-19 | 2018-11-19 | 一种空心桩头封堵装置及其使用的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109322307A true CN109322307A (zh) | 2019-02-12 |
Family
ID=65258121
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811375052.1A Pending CN109322307A (zh) | 2018-11-19 | 2018-11-19 | 一种空心桩头封堵装置及其使用的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109322307A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115075224A (zh) * | 2022-07-12 | 2022-09-20 | 中建八局第一建设有限公司 | 一种钢柔结合的预制管桩多功能挡板及实现方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202023185U (zh) * | 2011-03-23 | 2011-11-02 | 涂荫玖 | 一种混凝土管桩 |
CN103572833A (zh) * | 2012-07-19 | 2014-02-12 | 深圳市博德维建筑技术有限公司 | 气膜建筑的泄压装置 |
CN205381544U (zh) * | 2016-01-28 | 2016-07-13 | 武汉理工大学 | 一种海上钢管桩浮运密封塞 |
CN108625358A (zh) * | 2018-06-08 | 2018-10-09 | 吴健 | 桩体防护端板及具有该桩体防护端板的预制桩 |
CN208039254U (zh) * | 2018-03-16 | 2018-11-02 | 中建八局第三建设有限公司 | 一种避免phc预应力管桩内部落入杂物的防护装置 |
-
2018
- 2018-11-19 CN CN201811375052.1A patent/CN109322307A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202023185U (zh) * | 2011-03-23 | 2011-11-02 | 涂荫玖 | 一种混凝土管桩 |
CN103572833A (zh) * | 2012-07-19 | 2014-02-12 | 深圳市博德维建筑技术有限公司 | 气膜建筑的泄压装置 |
CN205381544U (zh) * | 2016-01-28 | 2016-07-13 | 武汉理工大学 | 一种海上钢管桩浮运密封塞 |
CN208039254U (zh) * | 2018-03-16 | 2018-11-02 | 中建八局第三建设有限公司 | 一种避免phc预应力管桩内部落入杂物的防护装置 |
CN108625358A (zh) * | 2018-06-08 | 2018-10-09 | 吴健 | 桩体防护端板及具有该桩体防护端板的预制桩 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115075224A (zh) * | 2022-07-12 | 2022-09-20 | 中建八局第一建设有限公司 | 一种钢柔结合的预制管桩多功能挡板及实现方法 |
CN115075224B (zh) * | 2022-07-12 | 2023-07-07 | 中建八局第一建设有限公司 | 一种钢柔结合的预制管桩多功能挡板及实现方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106644625A (zh) | 一种低强度微生物钙质砂三轴试样制样装置及其使用方法 | |
CN109322307A (zh) | 一种空心桩头封堵装置及其使用的施工方法 | |
CN107268604A (zh) | 一种空心预制桩的施工系统及施工方法 | |
CN209656354U (zh) | 一种气压弹簧式定深污染水/气取样装置 | |
CN206768797U (zh) | 建筑用固定抓地桩 | |
CN206515096U (zh) | 石油液体取样装置 | |
CN206496969U (zh) | 一种土工试验用的压力室 | |
CN204959781U (zh) | 一种降水井封堵装置 | |
JP5713442B2 (ja) | 地盤改良方法および減圧容器 | |
CN203411974U (zh) | 一种可视注浆情况的护坡桩钢管 | |
CN207047834U (zh) | 一种空心预制桩的施工系统 | |
CN208201856U (zh) | 一种混凝土灌注桩桩头浮浆砼收集装置 | |
CN203161132U (zh) | 一种旋挖桩机水下清渣筒 | |
CN103526767B (zh) | 一种降水井封堵装置及封堵降水井的方法 | |
CN203546741U (zh) | 一种降水井封堵装置 | |
CN210507539U (zh) | 一种可调节式道路井盖 | |
CN103556636B (zh) | 一种用于穿越深厚密实砂层的phc管桩沉桩装置 | |
CN208347270U (zh) | 一种江河桩基的施工辅助平台 | |
CN203741834U (zh) | 一种带有气囊的桩筒结构 | |
CN206346200U (zh) | 异形基坑拐角处施工结构 | |
CN205475290U (zh) | 一种大水量降水井封堵装置 | |
CN204283203U (zh) | 排桩钻挖机 | |
CN206144520U (zh) | 水力座封桥塞 | |
CN209686595U (zh) | 一种预埋结构 | |
CN204899905U (zh) | 液压活塞推动式密闭测试装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190212 |