CN109319684A - GIL cylinder docking lifting tooling and component, GIL cylinder method of adjustment - Google Patents
GIL cylinder docking lifting tooling and component, GIL cylinder method of adjustment Download PDFInfo
- Publication number
- CN109319684A CN109319684A CN201710646933.1A CN201710646933A CN109319684A CN 109319684 A CN109319684 A CN 109319684A CN 201710646933 A CN201710646933 A CN 201710646933A CN 109319684 A CN109319684 A CN 109319684A
- Authority
- CN
- China
- Prior art keywords
- gil cylinder
- gil
- cylinder
- docking
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F7/00—Lifting frames, e.g. for lifting vehicles; Platform lifts
- B66F7/02—Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms suspended from ropes, cables, or chains or screws and movable along pillars
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F7/00—Lifting frames, e.g. for lifting vehicles; Platform lifts
- B66F7/28—Constructional details, e.g. end stops, pivoting supporting members, sliding runners adjustable to load dimensions
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
Abstract
It is docked the present invention provides GIL cylinder and uses lifting tooling and component, GIL cylinder method of adjustment, it is inconvenient when solving the problems, such as GIL cylinder docking in the prior art.GIL cylinder docking lifting tooling includes the mobile bracket for arranging and being used cooperatively with other lifting toolings front and backs, and mobile bracket is equipped with elevating mechanism, and the output end of the elevating mechanism is equipped with the support base for being used for positioning support GIL cylinder.The docking of GIL cylinder passes through support base and the elevating mechanism for driving support base lifting with lifting tooling, the height of butted part in GIL cylinder is adjusted, when being used cooperatively together with others lifting tooling, the pitch angle of GIL cylinder can be adjusted, facilitate docking, the front-rear position of GIL cylinder and horizontal docking angle are adjusted by the movement of mobile bracket.
Description
Technical field
The present invention relates to GIL cylinders to dock with lifting tooling and component, GIL cylinder method of adjustment.
Background technique
GIL is the abbreviation of gas-insulated transmission line, is a kind of using SF6Gas or other mixed gas are situated between as insulation
The novel power transmission route of matter, shell and conductor coaxial arrangement.GIL bus outer cover is equipped with GIL cylinder, when installation, needs two
A GIL cylinder is docked.Since the full-length of GIL cylinder is generally 12~18 meters, existing method is usually used two
Platform crane lifts the same GIL cylinder, realizes level angle, pitch angle and anteroposterior position by the cooperation of two cranes
The adjustment set, but it is constrained to the complexity multiplicity of in-site installation environment, such as mountain and forest region, crane can not move into, and can not construct
Operation, at the same it is time-consuming longer with crane lifting docking, it is at high cost, and crane Adjustment precision is lower, it is inconvenient.
Summary of the invention
The purpose of the present invention is to provide a kind of GIL cylinders to dock with lifting tooling, to solve in the prior art using hanging
Vehicle suspention adjustment GIL cylinder is to realize the method for the cylinder docking problem inconvenient when implementing;A kind of GIL cylinder is also provided
Docking lifting tool component and GIL cylinder method of adjustment.
To achieve the above object, GIL cylinder docking of the present invention is with the technical solution of lifting tooling: a kind of GIL cylinder pair
It connects and is set on mobile bracket with lifting tooling including the mobile bracket for arranging and being used cooperatively with other lifting toolings front and backs
There is elevating mechanism, the output end of the elevating mechanism is equipped with the branch of the GIL cylinder extended along the longitudinal direction for positioning support
Support seat.
The bottom of the mobile bracket is equipped with the traveling wheel mechanism that can make to be lifted the mobile adjustment of tooling.
The support base includes the cantilever for being used to support GIL cylinder, and one end of the left and right directions of the cantilever, which is equipped with, to be used for
It is oriented to the guide frame of connection in the up-down direction with the mobile bracket, the other end is to be filled to GIL for pitching in left-right direction
So that the projecting end of cantilever lifting GIL cylinder below cylinder.
Guide frame is the vertical arm being connected with cantilever one end, and the vertical arm is oriented to along the vertical direction is mounted on the mobile branch
On frame.
Mobile bracket is L-shaped structure, and L-shaped mobile bracket includes stand and level frame, and the vertical arm guiding is mounted on vertical
On frame, the traveling wheel mechanism is set on level frame.
Support base is equipped with locating piece, and locating piece forms the locating slot for being positioned to GIL cylinder.
Elevating mechanism includes the rope that output end bypasses pulley and is connected with the support base, and the other end of the rope twines
It is wound on rope disk.
The support base is equipped with back-up roller wheel, and the axis of back-up roller wheel facilitates GIL perpendicular to the axis of GIL cylinder
Body moves along the longitudinal direction.
GIL cylinder docking of the present invention is with the technical solution of lifting tool component: a kind of GIL cylinder docking lifting tooling
Component, including at least two GIL cylinders docking lifting tooling, are respectively lifted tooling and arrange along the longitudinal direction when in use, and GIL
Body docking lifting tooling, including the mobile bracket for arranging and being used cooperatively with other lifting toolings front and backs, mobile bracket
It is equipped with elevating mechanism, the output end of the elevating mechanism is equipped with the GIL cylinder extended along the longitudinal direction for positioning support
Support base.
The bottom of the mobile bracket is equipped with the traveling wheel mechanism that can make to be lifted the mobile adjustment of tooling.
The support base includes the cantilever for being used to support GIL cylinder, and one end of the left and right directions of the cantilever, which is equipped with, to be used for
It is oriented to the guide frame of connection in the up-down direction with the mobile bracket, the other end is to be filled to GIL for pitching in left-right direction
So that the projecting end of cantilever lifting GIL cylinder below cylinder.
Guide frame is the vertical arm being connected with cantilever one end, and the vertical arm is oriented to along the vertical direction is mounted on the mobile branch
On frame.
Mobile bracket is L-shaped structure, and L-shaped mobile bracket includes stand and level frame, and the vertical arm guiding is mounted on vertical
On frame, the traveling wheel mechanism is set on level frame.
Support base is equipped with locating piece, and locating piece forms the locating slot for being positioned to GIL cylinder.
Elevating mechanism includes the rope that output end bypasses pulley and is connected with the support base, and the other end of the rope twines
It is wound on rope disk.
The support base is equipped with back-up roller wheel, and the axis of back-up roller wheel facilitates GIL perpendicular to the axis of GIL cylinder
Body moves along the longitudinal direction.
The technical solution of GIL cylinder method of adjustment of the present invention is: GIL barrel support to be docked is placed at least two
It is lifted on the support base of tooling, the pitch angle of GIL cylinder is adjusted by the height of each elevating mechanism adjustment respective support seat,
By the front-rear position of the back-and-forth motion adjustment GIL cylinder of each mobile bracket, adjustment GIL is moved left and right by each mobile bracket
The horizontal docking angle of cylinder.
The beneficial effects of the present invention are: GIL cylinder docking lifting tooling provided by the invention, passes through support base and drive
The elevating mechanism of support base lifting, is adjusted the height of corresponding part in GIL cylinder, matches together with others lifting tooling
It closes in use, the pitch angle of GIL cylinder can be adjusted, facilitates docking.Meanwhile support base, elevating mechanism are installed in movement
On bracket, it can be realized by the movement of mobile bracket and GIL cylinder front-rear position, horizontal docking angle be adjusted, and it is existing
Having to need to be adjusted with two cranes in technology and compare, lifting tool structure is simple, and it is at low cost, it is easy to operate.Simultaneously because
It is mutually indepedent to be lifted tooling, when facing complicated landform, each mobile bracket be can be set in the plane of different height, be separately provided
In different positions, the two is independent of each other, and can adapt to complicated landform, also facilitates transport.
Detailed description of the invention
Fig. 1 uses schematic diagram with lifting tool component embodiment 1 for GIL cylinder of the present invention docking;
Fig. 2 is the left view at Fig. 1 middle pulley;
Fig. 3 uses schematic diagram with lifting tool component embodiment 2 for GIL cylinder of the present invention docking.
Specific embodiment
Embodiments of the present invention are described further with reference to the accompanying drawing.
The specific embodiment of GIL cylinder docking lifting tool component of the invention, as shown in Figure 1 to Figure 2, the present embodiment
In, the left and right directions of Fig. 1 is defined as front-rear direction, and GIL cylinder docking lifting tool component includes the two of time interval arrangement
A GIL cylinder docking lifting tooling, the structure of two lifting toolings are identical.The present embodiment is docked with one of GIL cylinder
With being illustrated for lifting tooling, GIL cylinder docking lifting tooling includes mobile bracket 1, and mobile bracket 1 is hand propelled knot
Structure.Mobile bracket 1 includes stand 11 and the level frame 13 for forming L-shaped structure, is provided with traveling wheel 2 on the bottom surface of level frame 13,
The movement in direction around traveling wheel 2 can be such that bracket 1 realizes.Stand 11 is two and arranges along the longitudinal direction that two vertical
Crossbearer 12 is fixed between frame 11.Guide rail (being not drawn into figure) is provided on the corresponding side of two stands 11, in guide rail
On support base 6 is installed, support base 6 is L-shaped structure, consistent with the opening of L-shaped mobile bracket 1.Support base 6 includes transverse arm 61
With vertical arm 62, transverse arm 61 is used to support GIL cylinder 8, and vertical arm 62 is connected with the guide rail of stand 11, and at L-shaped knot is arranged in support base 6
Structure is can to make bracket 1 that the fork of GIL cylinder 8 are mounted in transverse arm 61 when moving in left-right direction to simulate the fork of fork truck and fill mode
On.Locating piece 7 is equipped on transverse arm 61, locating piece 7 is wedge structure, in the present embodiment, the quantity of the locating piece 7 on transverse arm 61
It is four, and is dispensed along two rows in the front-back direction, every row forms a locating piece group, and two of the same locating piece group are fixed
Position block 7 forms the V-arrangement card slot being put into for GIL cylinder 8.In the present embodiment, GIL cylinder 8 is supported on locating piece 7 and and transverse arm
61 is contactless.
Pulley 9 is installed on crossbearer 12, rope disc carrier 4 is installed between two stands 11, on rope disc carrier 4
Rope disk 5 is installed, one end of rope 10 is connected after passing through pulley 9 with vertical arm 62, and the other end is wrapped on rope disk 5, this reality
It applies in example, rope disk 5 is the rope disk with ratcher function, prevents GIL cylinder 8 from falling automatically.Rope disk 5 is provided with shake
Handle 14.
GIL cylinder docking of the invention is mutually indepedent with two brackets in lifting tool component, in use, by front-rear direction
The GIL cylinder 8 of extension is put into the V-shaped groove that locating piece forms by up and down direction.Since the length of GIL cylinder 8 is larger, Neng Gouzhi
Support is realized at the both ends for supportting GIL cylinder 8, while the docking of GIL cylinder can individually be gone up and down with lifting tooling, adjust GIL cylinder 8
Height and pitch angle, mobile bracket 1 oneself moved adjust the horizontal docking angle of the left and right directions of GIL cylinder and
Position in the front-back direction is completed to dress.When the landform at scene is not flat, two mobile brackets are separately fixed at different height
In plane, gone up and down respectively later.
In the present embodiment, rope, pulley and shake handle constitute elevating mechanism, in other embodiments, when GIL cylinder
Weight it is larger when, pulley can be changed into pulley blocks.In other embodiments, shake handle can be replaced with structures such as motors
Hand.In other embodiments, the elevating mechanism of non-pulley can be used, driving cylinder can be such as used, make the output end of driving cylinder
It is connected with vertical arm and realizes moving up and down for drive vertical arm.
In other embodiments, elevating mechanism can be other structures, such as hydraulic drive mechanism.
In the present embodiment, the docking of GIL cylinder can be increased according to the actual situation with the quantity of lifting tooling.
In the present embodiment, the quantity of positioning group is two and arranges along the longitudinal direction, in other embodiments, positioning group
Quantity can be one, and the length along the longitudinal direction of locating piece is larger at this time, and positioning can be completed using a locating piece.
In the above embodiments, locating piece is pre-placed or is fixed on transverse arm, later again by up and down direction
It is put into workpiece, in other embodiments, locating piece can not be set on transverse arm in advance, after transverse arm height is reduced, pushes and moves
Dynamic bracket moves mobile bracket in left-right direction, and side split is made to fill workpiece, and it is fixed to place at one end of the fork dress of transverse arm later
Position block, makes locating piece clamp GIL cylinder together with vertical arm, prevents GIL cylinder from moving.
In the present embodiment, transverse arm is cantilever, and vertical arm is guide frame, and one end far from vertical arm is to overhang in transverse arm
End.In the present embodiment, the one end of rope being connected with support base is output end.
The specific embodiment 2 of GIL cylinder docking lifting tool component of the present invention, as shown in figure 3, not with embodiment 1
It is with place, multiple groups back-up roller wheel group is arranged on transverse arm 61, and each roller group includes two back-up roller wheels being oppositely arranged 15,
GIL cylinder 8 is placed in back-up roller wheel, and the axis of back-up roller wheel 15 can facilitate GIL cylinder perpendicular to the axis of GIL cylinder 8
8 are moved along axial direction (front-rear direction).
The specific embodiment of GIL cylinder of the present invention docking lifting tooling, the structure of GIL cylinder docking lifting tooling with
Structure in above-described embodiment is consistent, and details are not described herein for content.
GIL cylinder to be docked is placed on above-mentioned each by the specific embodiment of GIL cylinder method of adjustment of the present invention simultaneously
On support base of the GIL cylinder docking with lifting tooling, adjusted by adjusting each GIL cylinder docking with the elevating mechanism of lifting tooling
The height of whole respective support seat is to adjust the pitch angle of GIL cylinder, by making each mobile bracket be moved forward and backward adjustment GIL cylinder
Front-rear position, by make each mobile bracket move left and right adjustment GIL cylinder horizontal docking angle, be finally completed to GIL
Body adjustment, it is convenient to be docked with others GIL cylinder.
Claims (10)
1. a kind of GIL cylinder docking lifting tooling, it is characterised in that: including for arranging and matching with before and after other lifting toolings
The mobile bracket used is closed, mobile bracket is equipped with elevating mechanism, and the output end of the elevating mechanism is equipped with for positioning branch
Support the support base of the GIL cylinder extended along the longitudinal direction.
2. GIL cylinder docking lifting tooling according to claim 1, it is characterised in that: the bottom of the mobile bracket
Equipped with the traveling wheel mechanism that can make the mobile adjustment of lifting tooling.
3. GIL cylinder docking lifting tooling according to claim 2, it is characterised in that: the support base includes being used for
Support the cantilever of GIL cylinder, one end of the left and right directions of the cantilever be equipped with for the mobile bracket in the up-down direction
It is oriented to the guide frame of connection, the other end is to be filled to below GIL cylinder for pitching in left-right direction so that cantilever is lifted GIL cylinder
Projecting end.
4. GIL cylinder according to claim 3 docking lifting tooling, it is characterised in that: guide frame is and cantilever one
The connected vertical arm in end, the vertical arm is oriented to along the vertical direction to be mounted on the mobile bracket.
5. GIL cylinder docking lifting tooling according to claim 4, it is characterised in that: mobile bracket is L-shaped structure, L
The mobile bracket of shape includes stand and level frame, and the vertical arm guiding is mounted in stand, and the traveling wheel mechanism is set to level
On frame.
6. GIL cylinder docking lifting tooling according to claim 1, it is characterised in that: support base is equipped with locating piece,
Locating piece forms the locating slot for being positioned to GIL cylinder.
7. GIL cylinder docking lifting tooling according to claim 1, it is characterised in that: elevating mechanism includes output end
Around pulley and the rope that is connected with the support base, the other end of the rope is wrapped on rope disk.
8. GIL cylinder docking lifting tooling according to claim 1, it is characterised in that: the support base is equipped with branch
Idler wheel is supportted, the axis of back-up roller wheel facilitates GIL cylinder to move along the longitudinal direction perpendicular to the axis of GIL cylinder.
9. a kind of GIL cylinder docking lifting tool component, it is characterised in that: any including at least two such as claims 1 ~ 8
The docking of GIL cylinder described in one lifting tooling, each tooling that is lifted are arranged along the longitudinal direction when in use.
10. a kind of method using lifting tool component adjustment GIL cylinder as claimed in claim 9, it is characterised in that: will be to
The GIL barrel support of docking is placed on the support base of at least two lifting toolings, adjusts respective support by each elevating mechanism
The height of seat passes through the anteroposterior position of the back-and-forth motion adjustment GIL cylinder of each mobile bracket to adjust the pitch angle of GIL cylinder
It sets, passes through the horizontal docking angle for moving left and right adjustment GIL cylinder of each mobile bracket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710646933.1A CN109319684A (en) | 2017-08-01 | 2017-08-01 | GIL cylinder docking lifting tooling and component, GIL cylinder method of adjustment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710646933.1A CN109319684A (en) | 2017-08-01 | 2017-08-01 | GIL cylinder docking lifting tooling and component, GIL cylinder method of adjustment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109319684A true CN109319684A (en) | 2019-02-12 |
Family
ID=65245837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710646933.1A Pending CN109319684A (en) | 2017-08-01 | 2017-08-01 | GIL cylinder docking lifting tooling and component, GIL cylinder method of adjustment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109319684A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109850504A (en) * | 2019-03-13 | 2019-06-07 | 中国长江电力股份有限公司 | GIL horizontal pipe shift unit |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201240810Y (en) * | 2008-07-01 | 2009-05-20 | 林超 | Novel manual hoister |
CN101515704A (en) * | 2009-03-19 | 2009-08-26 | 浙江开关厂有限公司 | SF6 totally-enclosed combined electric appliance assembling method and workbench for assembling |
CN103737310A (en) * | 2014-01-15 | 2014-04-23 | 西安电子科技大学 | Cylindrical cabin docking assembly |
CN103753176A (en) * | 2014-01-15 | 2014-04-30 | 西安电子科技大学 | Manual fine-adjusting mechanism placed in cylindrical cabin connecting device |
CN204771348U (en) * | 2015-05-28 | 2015-11-18 | 安徽普力德特种设备有限公司 | Orthotic devices is used in butt joint of major diameter barrel |
-
2017
- 2017-08-01 CN CN201710646933.1A patent/CN109319684A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201240810Y (en) * | 2008-07-01 | 2009-05-20 | 林超 | Novel manual hoister |
CN101515704A (en) * | 2009-03-19 | 2009-08-26 | 浙江开关厂有限公司 | SF6 totally-enclosed combined electric appliance assembling method and workbench for assembling |
CN103737310A (en) * | 2014-01-15 | 2014-04-23 | 西安电子科技大学 | Cylindrical cabin docking assembly |
CN103753176A (en) * | 2014-01-15 | 2014-04-30 | 西安电子科技大学 | Manual fine-adjusting mechanism placed in cylindrical cabin connecting device |
CN204771348U (en) * | 2015-05-28 | 2015-11-18 | 安徽普力德特种设备有限公司 | Orthotic devices is used in butt joint of major diameter barrel |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109850504A (en) * | 2019-03-13 | 2019-06-07 | 中国长江电力股份有限公司 | GIL horizontal pipe shift unit |
CN109850504B (en) * | 2019-03-13 | 2023-12-29 | 中国长江电力股份有限公司 | GIL horizontal pipeline shifting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102442276B (en) | Device for rapidly replacing battery for electric automobile | |
CN104179376B (en) | Container-type storage car storehouse | |
CN105236150A (en) | Gantry lifting device for stacking | |
CN205116052U (en) | Car is put to traffic awl cloth and traffic awl storage device thereof | |
CN203428791U (en) | Portal crane | |
CN207114197U (en) | For the framework completion of bogie and the integration apparatus of dimensional measurement | |
CN109843751A (en) | Overhead waggon and transportation system | |
CN106005932A (en) | Multipurpose automatic transferring mechanism | |
CN204038979U (en) | Material box hoisters | |
CN205906608U (en) | Automatic transporting structure of multipurpose | |
CN207645405U (en) | A kind of feeding in continuous material type automatic loading system | |
CN109319684A (en) | GIL cylinder docking lifting tooling and component, GIL cylinder method of adjustment | |
CN204001908U (en) | Container-type storage car storehouse | |
CN107499216A (en) | A kind of building board carrier | |
CN110406922A (en) | A kind of RGV trolley | |
CN205034792U (en) | Longmen elevating gear is used to pile up neatly | |
CN205116053U (en) | It puts car to put awl mechanism and use this traffic of putting awl mechanism to bore cloth | |
CN101862765B (en) | Swing arm type upper sleeve system | |
CN205095426U (en) | Vertical lifting cinema that flies | |
CN208007840U (en) | It is a kind of to move case apparatus certainly | |
CN203271215U (en) | Automatic parking device | |
CN108995570A (en) | A kind of component transfer car(buggy) and movement system | |
CN206824944U (en) | Instrument desk assembly system and its standalone module chassis | |
CN205908083U (en) | Stereo garage's passageway travelling car | |
CN205116054U (en) | Car is put to traffic awl cloth and cloth awl mechanism thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190212 |
|
RJ01 | Rejection of invention patent application after publication |