CN109302939A - A kind of landscape engineering bracing means of transfer trees - Google Patents

A kind of landscape engineering bracing means of transfer trees Download PDF

Info

Publication number
CN109302939A
CN109302939A CN201811322708.3A CN201811322708A CN109302939A CN 109302939 A CN109302939 A CN 109302939A CN 201811322708 A CN201811322708 A CN 201811322708A CN 109302939 A CN109302939 A CN 109302939A
Authority
CN
China
Prior art keywords
piece
embraced
articulated
bracing means
rod sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811322708.3A
Other languages
Chinese (zh)
Other versions
CN109302939B (en
Inventor
祁俊卿
高建
纪超
郑天华
史爱超
王璇
柴俊虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Changdao Municipal Engineering Group Co Ltd
Original Assignee
Beijing Changdao Municipal Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Changdao Municipal Engineering Group Co Ltd filed Critical Beijing Changdao Municipal Engineering Group Co Ltd
Priority to CN201811322708.3A priority Critical patent/CN109302939B/en
Publication of CN109302939A publication Critical patent/CN109302939A/en
Application granted granted Critical
Publication of CN109302939B publication Critical patent/CN109302939B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/04Supports for hops, vines, or trees
    • A01G17/14Props; Stays
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/04Supports for hops, vines, or trees
    • A01G17/14Props; Stays
    • A01G17/16Devices for driving-in or pulling-out props

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Botany (AREA)
  • Environmental Sciences (AREA)
  • Supports For Plants (AREA)

Abstract

The present invention relates to a kind of landscape engineering bracing means of transfer trees.Including multiple reinforcement assemblies;Reinforcement assembly includes intermediate armful of piece and piece is embraced in the first side, second side embraces piece, and the first side is embraced to be articulated and connected between piece and intermediate armful of piece, and second side embraces piece and intermediate embrace is articulated and connected between piece;The first rubber cushion blocks are equipped in the inner surface that piece is embraced in the first side, are equipped with the second rubber cushion blocks in the inner surface that second side embraces piece;Two opposite otic placodes are equipped on the intermediate lateral wall for embracing piece, further include support arm, the upper end of support arm is located between two otic placodes and is articulated and connected, and is equipped with U-bracket in the lower end of support arm;It further include branch rod sleeve, U-bracket is straddled on the cylinder of branch rod sleeve and is articulated and connected;It is also equipped with the threaded sleeve of perforation to inner cavity on the side wall of branch rod sleeve, fastening screw is equipped in threaded sleeve;It further include the cuspidated strut of lower end band.The configuration of the present invention is simple, operation is convenient, fixed, can reuse.

Description

A kind of landscape engineering bracing means of transfer trees
Technical field
The adding with transfer trees the invention belongs to landscape engineering technical field more particularly to a kind of landscape engineering It is fixedly mounted with and sets.
Background technique
In landscape engineering, the transfer to trees is generally involved.Trees transfer is one in landscape engineering The basic operation of item is mainly used for a kind of protectiveness transplanting carried out to forming trees.With the hair at full speed of construction of city afforestation Exhibition, the quality requirement that people build municipal landscaping greenland is also higher and higher, and big tree transplanting is to be in specific time, locality Meet implantation methods used by particular requirement, the ecological benefits of garden greenland can be improved in a short time, optimizes greenery patches structure, Improve environmental landscape, meets the effect of key construction project, heavy civil construction greening and beautification in time.
Construction of city afforestation is increasingly taken seriously, but its root system of the trees of transfer, by destroying, regenerating after transplanting needs Want the long period.Wind loading rating during regeneration is weaker, is more especially in the transplanting trees in air port, it is also very desirable to assist Facility is fixed temporarily, and again removes fixed device after the completion of transplanting trees regeneration, in order to avoid it is fixed temporarily facility influence Transplant the further growth of trees.
Bracing means in the prior art is generally the braced frame for using waddy to build, and braced frame includes fixing In the middle part of trees it is bundled by four waddys, clench the obtained rectangular frame of processing, four branch are fixed on rectangular frame Strut, the bottom of support rod are fixedly connected with four ground piles for being embedded in below ground.Above-mentioned bracing means has the following deficiencies: Firstly, overall structural strength is not high, due to being that waddy is built, the connection between waddy (fix by wire binding, nail Deng) lack stability, it is easy within the regeneration period of trees loosely, to cause to reinforce and fail, and wooden material is easy to rot, lead Entire frame is caused to be easy loose;Secondly, existing bracing means at the scene by manually being built by hand, it is very time-consuming to take Power leads to the strengthening construction labor intensive of transfer trees;Furthermore in order to enable the trees of braced frame and transfer fixed without de- From, in construction may using metal nail by frame follow closely on trunk, this causes to damage trees, causes trees dead when serious It dies;Furthermore since wooden material is easy to rot and easily damaged, cause existing bracing means that can not reuse, Cause the waste of material.Therefore the bracing means for needing exploitation to design a kind of novel transfer trees is asked with solving above-mentioned technology Topic.
Summary of the invention
The present invention is to solve technical problem present in well-known technique and provide that a kind of structure is simple, operation is convenient, fixed The landscape engineering bracing means of transfer trees that is firm, can reusing, promotes transfer trees strengthening construction just Victory reduces construction cost, promotes the fixed effect to transfer trees.
The technical scheme adopted by the present invention to solve the technical problems existing in the known art is that a kind of afforestation work The bracing means of journey transfer trees includes multiple reinforcement assemblies;Reinforcement assembly includes intermediate piece and the quartile of embracing in the of two sides Piece is embraced in side, second side embraces piece, and the first side embraces and uses first axle between the inside edge of piece and the intermediate outer ledge for embracing piece Articulated connection, second side, which is embraced, to be articulated and connected between the inside edge of piece and the intermediate outer ledge for embracing piece using second hinge;? The outer ledge that piece is embraced in first side is equipped with the first outer crimping, forms the first pin hole inside the first outer crimping, embraces piece in second side Outer ledge be equipped with the second outer crimping, form the second pin hole inside the second outer crimping;It is set in the inner surface that piece is embraced in the first side There are the first rubber cushion blocks, is equipped with the second rubber cushion blocks in the inner surface that second side embraces piece;It is equipped on the intermediate lateral wall for embracing piece Two opposite otic placodes, further include support arm, and the upper end of support arm is located between two otic placodes and is articulated and connected using inside pin, propped up The lower end of arm is mounted with U-bracket;It further include branch rod sleeve, U-bracket is straddled on the cylinder of branch rod sleeve and used The outer pin articulated connection of opposite two;The threaded sleeve of perforation to inner cavity is also equipped on the side wall of branch rod sleeve, in spiral shell Fastening screw is equipped in line casing;It further include the cuspidated strut of lower end band, the upper position of strut is in branch rod sleeve and adopting It is locked with fastening screw;First side of each reinforcement assembly embraces piece, intermediate armful of piece and second side and embraces piece and hold around on trunk, and adjacent two It embraces and is fixedly connected between piece using U-shaped clamp in the adjoining side of a reinforcement assembly;Ground is inserted at the tip of the strut of each reinforcement assembly Below.
The advantages and positive effects of the present invention are: the present invention provides a kind of afforestation works of structure design advantages of simple The journey bracing means of transfer trees, compared with existing bracing means, the technical program have operate it is convenient, fixed, Can reuse and other effects.Due to embracing piece using the first side, intermediate armful of piece, second side embrace piece, support arm, U-bracket and strut Sleeve etc. is constituted, therefore this bracing means can be pre-formed, is reached direct construction and installation behind scene, is greatly improved reinforcing and apply The efficiency of work.Bracing means integrally can be using the production of the high-strength materials such as sheet metal, therefore overall structural strength is high, is not easy Loose or dislocation under the action of external force.This bracing means is attached using clamp etc., and is contacted by rubber cushion blocks with trunk, no There is the fixation of the forms such as wire, nail between meeting and the trunk of transfer trees, therefore will not influence transfer trees again Growth.Entire bracing means is easy to disassemble, is able to carry out recycling, therefore can greatly reduce transfer in the long run The cost of trees strengthening construction.Furthermore it is possible to select to hold around trunk using multiple reinforcement assemblies according to the diameter of trunk, Therefore also solve the problems, such as that the different caused constructions of the bole thickness of the transfer trees to be reinforced are inconvenient.
Preferably: it is two groups that the otic placode on piece lateral wall is embraced in centre, upper and lower discrete setting;Support arm is for two and isometric, on The U-bracket of the support arm in portion and the outer fix of branch rod sleeve middle and upper part are articulated and connected, the U-bracket and strut of the support arm of lower part The inner side of sleeve middle and lower part is articulated and connected, and enabling has an angle a between the center line and vertical direction of branch rod sleeve, folder Angle a is more than or equal to 5 ° and is less than or equal to 15 °.
Preferably: muscle in multiple first is equipped on the inner sidewall that piece is embraced in the first side, the first rubber cushion blocks injection molding exists In each first on muscle;Muscle in multiple second is equipped on the inner sidewall that second side embraces piece, the second rubber cushion blocks injection molding is each In second on muscle.
Preferably: branch rod sleeve is metal side tube, and strut is wooden material, and the inner end of fastening screw is taper.
Preferably: U-shaped clamp is made using metallic rod bending forming, and generally U-shape, both ends are rolled over outward Bending is at opening.
Preferably: the quantity of reinforcement assembly is two, along the setting of 180 ° of the circumferential direction interval of trunk.
Preferably: the quantity of reinforcement assembly is three, along the setting of 120 ° of the circumferential direction interval of trunk.
Preferably: the quantity of reinforcement assembly is four, and the circumferential direction along trunk is set at 90 ° intervals.
Detailed description of the invention
Fig. 1 is overlooking structure diagram of the invention;
Fig. 2 is schematic view of the front view of the invention;
Fig. 3 is the overlooking structure diagram of the first usage mode;
Fig. 4 is the overlooking structure diagram of second of usage mode;
Fig. 5 is the overlooking structure diagram of the third usage mode;
Fig. 6 is the schematic view of the front view of use state of the present invention, is the first usage mode;
Fig. 7 is the structural schematic diagram of the U-shaped clamp in Fig. 6.
In figure: 1, the first outer crimping;2, the first pin hole;3, muscle in first;4, piece is embraced in the first side;5, the first rubber cushion blocks; 6, first axle;7, inside pin;8, otic placode;9, intermediate to embrace piece;10, second hinge;11, the second rubber cushion blocks;12, second side is embraced Piece;13, muscle in second;14, the second pin hole;15, the second outer crimping;16, support arm;17, U-bracket;18, branch rod sleeve;19, outer Pin;20, fastening screw;21, threaded sleeve;22, strut;23, tip;24, soil ball;25, trunk;26, ground;27, U-shaped card Son.
Specific embodiment
In order to further understand the content, features and effects of the present invention, hereby lifting following embodiment, detailed description are as follows:
Referring to Figure 1 and Fig. 2, the bracing means of landscape engineering transfer trees of the invention include multiple reinforcing groups Part selects to hold around trunk 25 using multiple reinforcement assemblies according to the diameter of trunk 25, and flexibility ratio is higher.
Reinforcement assembly includes intermediate piece 9 and the quartile of embracing in piece 4 is embraced in the first side of two sides, second side embraces piece 12, the first side It embraces and is articulated and connected between the inside edge of piece 4 and the intermediate outer ledge for embracing piece 9 using first axle 6, second side embraces piece 12 It is articulated and connected between inside edge and the intermediate outer ledge for embracing piece 9 using second hinge 10.Piece 9 is embraced in centre, piece 4 is embraced in the first side Embracing 12 three of piece with second side can be made of thick metal plate, and both first axle 6 and second hinge 10 can be folding Form, then intermediate at this time armful of piece 9, the first side are embraced and are welded and fixed between piece 4 and the edge and folding of second side armful 12 three of piece;The Both one hinge 6 and second hinge 10 are also possible on the intermediate side embraced piece 9, the first side armful piece 4 and second side and embrace 12 three of piece Edge forms to obtain, and is such as staggered in the intermediate edge formation for embracing piece 9, the first side armful piece 4 and second side armful 12 three's plate body of piece Reel, after docking in reel be inserted into hinge-rod form complete hinge.
It is equipped with the first outer crimping 1 in the outer ledge that piece 4 is embraced in the first side, forms the first pin hole inside the first outer crimping 1 2, it is equipped with the second outer crimping 15 in the outer ledge that second side embraces piece 12, forms the second pin hole 14 inside the second outer crimping 15. Both first outer crimping 1 and the second outer crimping 15 are wound into the outer ledge that piece 4 and second side armful piece 12 are embraced in the first side respectively Type obtains.
In actual use, the first side of each reinforcement assembly embraces piece 4, intermediate armful of piece 9 and second side and embraces piece 12 and hold around in trunk On 25, the adjoining side of two neighboring reinforcement assembly is embraced and is fixedly connected between piece using U-shaped clamp 27.As shown in fig. 7, U-shaped clamp 27 are made using metallic rod bending forming, generally U-shape, and bending forms opening outward at both ends.Add when multiple Gu component is held around when on trunk 25, the side of two neighboring reinforcement assembly is embraced piece and is also abutted, and is embedded in U-shaped from upper and lower part at this time Clamp 27, two shank portions of U-shaped clamp 27 are inserted into respectively in the pin hole for the outer crimping that piece is embraced in two sides, complete to fix, behaviour Make convenient and efficient.
The first rubber cushion blocks 5 are equipped in the inner surface that piece 4 is embraced in the first side, are equipped with second in the inner surface that second side embraces piece 12 Rubber cushion blocks 11.After multiple reinforcement assemblies are held around on trunk 25, the first side of each reinforcement assembly is embraced between piece 4 and trunk 25 Padded up by the first rubber cushion blocks 5 avoid direct contact with, second side embrace padded between piece 12 and trunk 25 by the second rubber cushion blocks 11 Get up to avoid direct contact with, the surface to trunk 25 is avoided to damage, additionally, due to the first rubber cushion blocks 5 and the second rubber pad Both moneys 11 are able to carry out certain deformation, then rely on these deformation quantities, and each reinforcement assembly can be held around securely in trunk 25 On.
In the present embodiment, muscle 3 in multiple first, the injection molding of the first rubber cushion blocks 5 are equipped on the inner sidewall that piece 4 is embraced in the first side It is molded in each first on muscle 3;Muscle 13 in multiple second, the second rubber cushion blocks 11 are equipped on the inner sidewall that second side embraces piece 12 Injection molding is in each second on muscle 13.
Two opposite otic placodes 8 are equipped on the intermediate lateral wall for embracing piece 9, further include support arm 16, the upper end position of support arm 16 It is articulated and connected between two otic placodes 8 and using inside pin 7, is mounted with U-bracket 17 in the lower end of support arm 16.Further include Branch rod sleeve 18, U-bracket 17 are straddled on the cylinder of branch rod sleeve 18 and are articulated and connected using two opposite outer pins 19. It is also equipped with the threaded sleeve 21 of perforation to inner cavity on the side wall of branch rod sleeve 18, fastening screw is equipped in threaded sleeve 21 20.It further include the strut 22 that lower end has tip 23, the upper position of strut 22 is in branch rod sleeve 18 and using fastening screw 26 or less ground is inserted into the lower end of 20 lockings, strut 22.
In the present embodiment, it is two groups that the otic placode 8 on 9 lateral wall of piece is embraced in centre, upper and lower discrete setting.Correspondingly, support arm 16 For two and isometric, the U-bracket 17 of the support arm 16 on top and the outer fix of 18 middle and upper part of branch rod sleeve are articulated and connected, lower part Support arm 16 U-bracket 17 and 18 middle and lower part of branch rod sleeve inner side be articulated and connected, constitute four-bar mechanism.This When, there is an angle a, angle a to be more than or equal to 5 ° between the center line and vertical direction of branch rod sleeve 18 and be less than or equal to 15 °, Preferably 10 °.The setting of the angle needs to consider the overall height of the transfer trees of this bracing means application, bracing means setting Must be higher, then angle a is then answered smaller, and excessive angle a will lead to the lower end of strut 22 excessively far from trunk 25.
In the present embodiment, branch rod sleeve 18 is metal side tube, and strut 22 is wooden material, and the inner end of fastening screw 20 is cone Shape, when after such strut 22 is inserted into branch rod sleeve 18 and screwing fastening screw 20, inner end screws in the inside of strut 22, It is completely embedded reliable.In order to guarantee fixed effect, fastening screw 20 can be set to multiple, carry out from multiple points to strut 22 It is fixed.In fact, strut 22 preferentially be chosen for compared with hard solid wood preferably, in order to avoid 22 premature failure of strut, then to strut 22 are surface-treated the durability degree that (such as varnishing) will be obviously improved strut 22.
In specific usage mode, there are following three kinds of typical-samples:
(1) Fig. 3 is referred to, the quantity of reinforcement assembly is two, along the setting of 180 ° of the circumferential direction interval of trunk 25;
(2) Fig. 4 is referred to, the quantity of reinforcement assembly is three, along the setting of 120 ° of the circumferential direction interval of trunk 25;
(3) Fig. 5 is referred to, the quantity of reinforcement assembly is four, and the circumferential direction along trunk 25 is set at 90 ° intervals.
The selection of three of the above typical-sample depends primarily on the diameter of trunk 25, and the diameter the big, the reinforcement assembly used Quantity needs more.
Refer to Fig. 6, it can be seen that the usage mode (by taking two reinforcement assemblies as an example) of this bracing means:
Transfer trees with soil ball 24 are planted in the tree well on ground, after soil compression, by two reinforcement assemblies Piece 9 is embraced in centre, piece 4 is embraced in the first side and second side is embraced 12 part of piece and held around in the appropriate position of trunk 25, uses four U later Shape clamp 27 (positive two, two, the back side) is embraced piece to two neighboring side and is fixed;Two reinforcing groups are unfolded outward later The branch rod sleeve 18 of part from top to bottom penetrates two struts 22 in two branch rod sleeves 18, until the bottom of strut 22 and ground Face 26 contacts, and beats from the upper end of strut 22 up to ground 26 is inserted at the tip of strut 22 23 hereinafter, the depth of insertion depends on The soil property situation of surrounding, soil property is more closely knit then can be shallow, and soil property compares conveying then can be deep;Each is screwed later Strut 22 is fixed in the fastening screw 20 of rod sleeve 18, then completes strengthening construction;Process is opposite when being dismantled.

Claims (8)

1. a kind of landscape engineering bracing means of transfer trees, it is characterized in that: including multiple reinforcement assemblies;Reinforcement assembly Including intermediate piece (9) and the quartile of embracing in piece (4) are embraced in the first side of two sides, second side embraces piece (12), the interior of piece (4) is embraced in the first side It is articulated and connected between side edge and the intermediate outer ledge for embracing piece (9) using first axle (6), second side embraces the inside of piece (12) It is articulated and connected between edge and the intermediate outer ledge for embracing piece (9) using second hinge (10);The outside of piece (4) is embraced in the first side Edge is equipped with the first outer crimping (1), forms the first pin hole (2) inside the first outer crimping (1), embraces the outer of piece (12) in second side Side edge is equipped with the second outer crimping (15), forms the second pin hole (14) inside the second outer crimping (15);Piece (4) are embraced in the first side Inner surface be equipped with the first rubber cushion blocks (5), second side embrace piece (12) inner surface be equipped with the second rubber cushion blocks (11);In Between embrace the lateral wall of piece (9) and be equipped with two opposite otic placodes (8), further include support arm (16), the upper end of support arm (16) is located at two It is articulated and connected between a otic placode (8) and using inside pin (7), is mounted with U-bracket (17) in the lower end of support arm (16);Also Including branch rod sleeve (18), U-bracket (17) straddles on the cylinder of branch rod sleeve (18) and uses two opposite outer pins (19) it is articulated and connected;The threaded sleeve (21) of perforation to inner cavity is also equipped on the side wall of branch rod sleeve (18), in thread bush It manages in (21) and is equipped with fastening screw (20);It further include the strut (22) that lower end has tip (23), the upper position of strut (22) It is locked in branch rod sleeve (18) and using fastening screw (20);
Piece (4) are embraced in first side of each reinforcement assembly, piece (9) are embraced in centre and second side is embraced piece (12) and held around on trunk (25), phase It embraces and is fixedly connected between piece using U-shaped clamp (27) in the adjoining side of adjacent two reinforcement assemblies;The strut (22) of each reinforcement assembly Ground (26) are inserted into below in tip (23).
2. the landscape engineering as described in claim 1 bracing means of transfer trees, it is characterized in that: intermediate embrace piece (9) Otic placode (8) on lateral wall is two groups, upper and lower discrete setting;Support arm (16) is two and isometric, the U-shaped of the support arm (16) on top The outer fix of bracket (17) and branch rod sleeve (18) middle and upper part is articulated and connected, the U-bracket (17) of the support arm (16) of lower part with The inner side of branch rod sleeve (18) middle and lower part is articulated and connected, and enabling has between the center line and vertical direction of branch rod sleeve (18) One angle a, angle a are more than or equal to 5 ° and are less than or equal to 15 °.
3. the landscape engineering as claimed in claim 2 bracing means of transfer trees, it is characterized in that: embracing piece in the first side (4) inner sidewall is equipped with muscle (3) in multiple first, and (5) injection molding of the first rubber cushion blocks is in each first on muscle (3);? The inner sidewall that second side embraces piece (12) is equipped with muscle (13) in multiple second, and (11) injection molding of the second rubber cushion blocks is each second On interior muscle (13).
4. the landscape engineering as claimed in claim 3 bracing means of transfer trees, it is characterized in that: branch rod sleeve (18) For metal side tube, strut (22) is wooden material, and the inner end of fastening screw (20) is taper.
5. the landscape engineering as claimed in claim 4 bracing means of transfer trees, it is characterized in that: U-shaped clamp (27) It is made using metallic rod bending forming, generally U-shape, bending forms opening outward at both ends.
6. such as the landscape engineering described in any one of claim 1 to 5 bracing means of transfer trees, it is characterized in that: plus Gu the quantity of component is two, along the setting of 180 ° of the circumferential direction interval of trunk (25).
7. such as the landscape engineering described in any one of claim 1 to 5 bracing means of transfer trees, it is characterized in that: plus Gu the quantity of component is three, along the setting of 120 ° of the circumferential direction interval of trunk (25).
8. such as the landscape engineering described in any one of claim 1 to 5 bracing means of transfer trees, it is characterized in that: plus Gu the quantity of component is four, the circumferential direction along trunk (25) is set at 90 ° intervals.
CN201811322708.3A 2018-11-08 2018-11-08 Reinforcement device for transfer trees for landscaping engineering Active CN109302939B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811322708.3A CN109302939B (en) 2018-11-08 2018-11-08 Reinforcement device for transfer trees for landscaping engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811322708.3A CN109302939B (en) 2018-11-08 2018-11-08 Reinforcement device for transfer trees for landscaping engineering

Publications (2)

Publication Number Publication Date
CN109302939A true CN109302939A (en) 2019-02-05
CN109302939B CN109302939B (en) 2023-12-08

Family

ID=65222734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811322708.3A Active CN109302939B (en) 2018-11-08 2018-11-08 Reinforcement device for transfer trees for landscaping engineering

Country Status (1)

Country Link
CN (1) CN109302939B (en)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200241455Y1 (en) * 2001-05-15 2001-10-15 김용석 tree supporter which can be adjusted
US20070010356A1 (en) * 2005-07-08 2007-01-11 Moller Jorgen J Jr Basketball hoop system
CN101611949A (en) * 2009-07-24 2009-12-30 赵红涛 Multifunctional anti-skidding hiking boots
CN202587988U (en) * 2011-12-08 2012-12-12 西南石油大学 Tree stabilizer
CN205727370U (en) * 2016-05-27 2016-11-30 盛世园林集团股份有限公司 A kind of scalable tree bracket
CN106954498A (en) * 2017-03-20 2017-07-18 山东省果树研究所 A kind of baffle plate for being used to fix pear tree
CN206776311U (en) * 2017-04-27 2017-12-22 郭堃灿 A kind of garden fruit tree lower floor branch bracket
CN107567948A (en) * 2017-09-29 2018-01-12 临泉县生产力促进中心 It is a kind of to help straight frame for the firm of ornamental trees and shrubs transplanting
CN206879570U (en) * 2017-05-25 2018-01-16 赵林峰 A kind of plant oriented growth device of gardens gardening
CN206895374U (en) * 2017-06-30 2018-01-19 石城县松湖林业化工有限公司 A kind of hillside tree planting fixed mount
CN207070689U (en) * 2017-08-17 2018-03-06 胡士兵 A kind of fixed support for being used to fix ornamental trees and shrubs
CN207201538U (en) * 2017-08-04 2018-04-10 浙江九合环境股份有限公司 A kind of anti-fall holder device of new transplanting of garden landscape
CN207639308U (en) * 2017-11-14 2018-07-24 时利利 A kind of telescopic tree support device of New-type instant dismounting
CN207678298U (en) * 2018-01-09 2018-08-03 湖南生物机电职业技术学院 A kind of midget plant of fruit-picking
CN207854653U (en) * 2018-01-31 2018-09-14 金华菁英科技服务有限公司 A kind of adjustable trees righting structure
CN108551971A (en) * 2018-06-15 2018-09-21 刘芳 A kind of transplanting tree fixing device
CN209151804U (en) * 2018-11-08 2019-07-26 北京场道市政工程集团有限公司 A kind of landscape engineering bracing means of transfer trees

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200241455Y1 (en) * 2001-05-15 2001-10-15 김용석 tree supporter which can be adjusted
US20070010356A1 (en) * 2005-07-08 2007-01-11 Moller Jorgen J Jr Basketball hoop system
CN101611949A (en) * 2009-07-24 2009-12-30 赵红涛 Multifunctional anti-skidding hiking boots
CN202587988U (en) * 2011-12-08 2012-12-12 西南石油大学 Tree stabilizer
CN205727370U (en) * 2016-05-27 2016-11-30 盛世园林集团股份有限公司 A kind of scalable tree bracket
CN106954498A (en) * 2017-03-20 2017-07-18 山东省果树研究所 A kind of baffle plate for being used to fix pear tree
CN206776311U (en) * 2017-04-27 2017-12-22 郭堃灿 A kind of garden fruit tree lower floor branch bracket
CN206879570U (en) * 2017-05-25 2018-01-16 赵林峰 A kind of plant oriented growth device of gardens gardening
CN206895374U (en) * 2017-06-30 2018-01-19 石城县松湖林业化工有限公司 A kind of hillside tree planting fixed mount
CN207201538U (en) * 2017-08-04 2018-04-10 浙江九合环境股份有限公司 A kind of anti-fall holder device of new transplanting of garden landscape
CN207070689U (en) * 2017-08-17 2018-03-06 胡士兵 A kind of fixed support for being used to fix ornamental trees and shrubs
CN107567948A (en) * 2017-09-29 2018-01-12 临泉县生产力促进中心 It is a kind of to help straight frame for the firm of ornamental trees and shrubs transplanting
CN207639308U (en) * 2017-11-14 2018-07-24 时利利 A kind of telescopic tree support device of New-type instant dismounting
CN207678298U (en) * 2018-01-09 2018-08-03 湖南生物机电职业技术学院 A kind of midget plant of fruit-picking
CN207854653U (en) * 2018-01-31 2018-09-14 金华菁英科技服务有限公司 A kind of adjustable trees righting structure
CN108551971A (en) * 2018-06-15 2018-09-21 刘芳 A kind of transplanting tree fixing device
CN209151804U (en) * 2018-11-08 2019-07-26 北京场道市政工程集团有限公司 A kind of landscape engineering bracing means of transfer trees

Also Published As

Publication number Publication date
CN109302939B (en) 2023-12-08

Similar Documents

Publication Publication Date Title
CN102733385B (en) Fully-recycled body expanding anchor rod and construction method for anchoring ground using same
CN209151804U (en) A kind of landscape engineering bracing means of transfer trees
CN104141298A (en) Manufacturing and mounting method and auxiliary mounting device for reinforcement cage in pile hole
CN105350816B (en) Power network electric pole reinforces heightening device
CN109302939A (en) A kind of landscape engineering bracing means of transfer trees
CN204418169U (en) The recoverable prestressed anchor cable of a kind of assembling
CN212375799U (en) Slope protection net for water conservancy
CN204456279U (en) Novel all-in-one board house formula moves pump house
CN207633363U (en) Hypogee ventilation opening
CN206337559U (en) A kind of prefabricated pile mechanical connecting structure
CN206495204U (en) Prefabricated PC combines square pile
CN214339097U (en) Buried root fixing device for aerial ecological courtyard
CN204180639U (en) Vineyard mechanized cultivation management devices
CN209897840U (en) Recyclable sapling support for landscaping
CN208168510U (en) A kind of sectional electric pole equipped with inscribed flange
CN206859743U (en) A kind of concrete imitation wood corridor
CN206090562U (en) A earth anchor device for preventing wind act as go -between
CN2182210Y (en) Connecting device for reinforcing bar
CN205776839U (en) A kind of wall thermal insulation structure
CN103343625A (en) Method for constructing anti-typhoon greenhouse
CN203243754U (en) Anti-typhoon greenhouse base
CN204803914U (en) Photovoltaic support basis and photovoltaic support
CN205276299U (en) Novel wood moulding foundation structure
CN205349415U (en) Self -adaptation template for gob entry
CN103329755A (en) Typhoon resistant greenhouse base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant