CN103343625A - Method for constructing anti-typhoon greenhouse - Google Patents

Method for constructing anti-typhoon greenhouse Download PDF

Info

Publication number
CN103343625A
CN103343625A CN2013101752260A CN201310175226A CN103343625A CN 103343625 A CN103343625 A CN 103343625A CN 2013101752260 A CN2013101752260 A CN 2013101752260A CN 201310175226 A CN201310175226 A CN 201310175226A CN 103343625 A CN103343625 A CN 103343625A
Authority
CN
China
Prior art keywords
typhoon
booth
cement pre
greenhouse
fabricated panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101752260A
Other languages
Chinese (zh)
Inventor
刘克林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGXING SIAN KELIN PLANT PROTECTION PROFESSIONAL COOPERATIVES
Original Assignee
CHANGXING SIAN KELIN PLANT PROTECTION PROFESSIONAL COOPERATIVES
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGXING SIAN KELIN PLANT PROTECTION PROFESSIONAL COOPERATIVES filed Critical CHANGXING SIAN KELIN PLANT PROTECTION PROFESSIONAL COOPERATIVES
Priority to CN2013101752260A priority Critical patent/CN103343625A/en
Priority to CN201510142533.8A priority patent/CN104770245A/en
Publication of CN103343625A publication Critical patent/CN103343625A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Greenhouses (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a method for constructing an anti-typhoon greenhouse. The method comprises the steps: firstly a greenhouse base is installed, the greenhouse base is formed by concrete prefabricated slabs in a splicing mode, the concrete prefabricated slabs are in long strip shapes, and a plurality of evenly-spaced preformed holes are formed in the length directions of the concrete prefabricated slabs; then, load-bearing rods of the greenhouse are installed, and the bottom ends of the load-bearing rods of the greenhouse are inserted into the preformed holes and are in wedge caulking through wedges. Compared with a traditional method for constructing the greenhouse, the method for constructing the anti-typhoon greenhouse has the advantages that due to the fact that the greenhouse base is formed by the concrete prefabricated slabs in the splicing mode, the weight of the concrete prefabricated slabs is quite heavy, the formed base can ensure that the greenhouse has stronger anti-typhoon capacity after the load-bearing rods are inserted into the preformed holes, the material cost for manufacturing one concrete prefabricated slab is quite small, the concrete prefabricated slabs are easily obtained, and therefore the method has excellent economical performance and popularization prospects.

Description

A kind of job practices of Anti-Typhoon booth
Technical field
The present invention relates to a kind of job practices of planting the crops booth, what be specifically related to is a kind of mounting method of Anti-Typhoon booth.
Background technology
Bring massive losses usually for plantation peasant household in the typhoon season in coastal cities every year, generally all be because according to traditional booth building method, directly bearing bar is inserted in the soil or bearing bar is coiled knot mutually and form an integral body, facts have proved that these fixed forms are all firm inadequately, and how to promote a kind of Anti-Typhoon booth cheap and that be easy to Fast Installation dismounting be that of agricultural booth production industry fails the difficult problem that effectively solves for a long time.
Summary of the invention
The technical issues that need to address of the present invention are that a kind of job practices that possesses strong wind loading rating, makes things convenient for installing/dismounting, the economic Anti-Typhoon booth of easily promoting is provided.
Technical scheme of the present invention is: a kind of job practices of Anti-Typhoon booth, at first, the booth base is installed, described booth base uses cement pre-fabricated panel to be spliced, described cement pre-fabricated panel is strip, is provided with some equally spaced preformed holes at the cement pre-fabricated panel length direction; Then, the bearing bar of booth is installed, the bearing bar bottom of booth is inserted also use the chock wedging in the preformed hole.
Preferably, the breach that described preformed hole is opened up outside having around inner ring, chock inserts described breach jam-packed bearing bar.
Preferably, described cement pre-fabricated panel two ends are step-like protuberance, and the protuberance of correspondence overlapped when adjacent two cement pre-fabricated panels spliced.
Preferably, it is the concreting of C30 that described cement pre-fabricated panel adopts strength grade, in to establish 4 diameters that extend along the cement pre-fabricated panel length direction be the reinforcing bar of 2-6 millimeter, reinforcing bar two is done the bending of " U " type and is handled.
Preferably, described cement pre-fabricated panel is embedded in the earth.
Preferably, described protuberance has connecting hole, and described connecting hole is consistent with the preformed hole pore size.
Preferably, described adjacent two cement pre-fabricated panels connecting hole center in the vertical direction on the corresponding protuberance when splicing is overlapping, and dowel passes connecting hole and inserts in the earth the cement pre-fabricated panel grappling.
Preferably, described breach evenly distributes around preformed hole.
After adopting technique scheme, the present invention has following advantage:
Compare with the job practices of traditional in the past booth, after adopting after the job practices of Anti-Typhoon booth of the present invention, because this booth base adopts the splicing of polylith cement pre-fabricated panel, the weight of cement pre-fabricated panel is very big, the base that forms can guarantee to make booth possess stronger wind loading rating after inserting bearing bar in the preformed hole, and it is very little to make the material cost of a cement pre-fabricated panel, can obtain easily, thereby possess excellent economy and promotion prospect.Because the two ends of cement pre-fabricated panel are set to stairstepping, the structure of every cement pre-fabricated panel is identical, so the last length of booth base can determine that block-by-block splicing then is so have good flexibility and operability according to the length that reality is planted land used.Preformed hole on this cement pre-fabricated panel all adopts consistent aperture with connecting hole, when mounted cement pre-fabricated panel is joined in twos and just can obtain the base of booth, therefore also obtained good versatility, and the design that preformed hole and connecting hole are opened up breach outside adopting around the hole, in order to occur wind loading rating after underground still under the not enough situation in that bearing bar is inserted by preformed hole or connecting hole, chock can be inserted breach jam-packed bearing bar and preformed hole and connecting hole, compress the space that shakes of bearing bar, further improved the stability of the Anti-Typhoon booth base of the present invention.
Description of drawings
Accompanying drawing 1 is looked schematic diagram for the use state master of the Anti-Typhoon booth base of the present invention after assembling;
Accompanying drawing 2 is looked schematic diagram for the master of the cement pre-fabricated panel of the Anti-Typhoon booth base of the present invention;
Accompanying drawing 3 is the preformed hole on the cement pre-fabricated panel of the Anti-Typhoon booth base of the present invention and the details enlarged drawing of connecting hole.
Shown in the figure, 1, cement pre-fabricated panel, 10, preformed hole, 11, breach, 12, protuberance, 13, connecting hole, 2, bearing bar, 3, chock, 4, base.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present invention is described further:
As Fig. 1, Fig. 2, shown in Figure 3, the base 4 of the Anti-Typhoon booth of present embodiment comprises cement pre-fabricated panel 1, cement pre-fabricated panel is strip, be provided with some equally spaced preformed holes 10 in the longitudinal direction, the two ends of cement pre-fabricated panel 1 are provided with step-like protuberance 12, have connecting hole 13 on the protuberance 12, preformed hole 10, connecting hole 13 spacing are each other generally controlled at 50CM-100CM.Described preformed hole 10 is consistent with connecting hole 13 pore sizes, run through cement pre-fabricated panel 1, and open up the breach 11 of symmetry outside around the hole, after the bearing bar 2 with booth inserts in preformed hole 10 or the connecting hole 13, chock 3 together inserts in the breach 11, so that bigger extrusion stress to be provided, chock 3 can be gathered materials on the spot according to actual conditions, such as bamboo bar, branch etc.When cement pre-fabricated panel 1 is assembled into base 4, can determine the consumption of cement pre-fabricated panel 1 according to actual land used length.Comprise the metal material that rubble and the reinforcing bar isodensity of four diameters about 1 centimetre are bigger in the constituent of described cement pre-fabricated panel 1, be conducive to strengthen the Anti-Typhoon booth base of the present invention wind resistance in actual use like this.
As shown in Figure 2, it is the concreting of C30 that cement pre-fabricated panel 1 adopts strength grade, in establish the reinforcing bar of 4 diameter 2-6 millimeters, the processing of " U " type folding is done in order to the outer tension force of reinforcing steel bar in default reinforcing bar two, four corner ribs of cement pre-fabricated panel 1 are made the chamfering grinding process, prevent the too sharp-pointed plastic sheeting for farm use that consequently hurts.Preformed hole 10 is 2.7 centimetres circular port for diameter, and the diameter of bearing bar 2 is 2.2 centimetres, and when typhoon was attacked, chock 3 heads that hit with a hammer can easily take off chock 3 at ordinary times with jam-packed bearing bar 2, and installing/dismounting is comparatively convenient.
As Fig. 1, shown in Figure 2, job practices when the Anti-Typhoon booth of present embodiment is installed at first is that booth base 4 is installed, described booth base 4 is by polylith cement pre-fabricated panel 1 end to end forming, the protuberance 12 of every cement pre-fabricated panel 1 cooperates with protuberance 12 on corresponding another piece cement pre-fabricated panel 1, make on two cement pre-fabricated panels 1 connecting hole 13 center-aligned of protuberance 12 separately, the bearing bar 2 of some preformed hole 10 usefulness booth inserts wherein and directly to go in the earth on the base 4 of the booth after being assembled into, remaining connecting hole 13 usefulness dowel interts wherein and gos deep into earth with base 4 grapplings, wedging chock 3 also more is conducive to dismounting to obtain better stability in the breach 11 of preformed hole 10 and connecting hole 13 at last.
Below only be described with regard to the preferable example of the present invention, but can not be interpreted as it is limitations on claims.The present invention not only limits to and above example, and its concrete structure allows to change, and those skilled in the art can make various changes and distortion according to the present invention, only otherwise break away from spirit of the present invention, all should belong to the defined scope of claims of the present invention.

Claims (8)

1. the job practices of an Anti-Typhoon booth, it is characterized in that: at first, booth base (4) is installed, described booth base (4) uses cement pre-fabricated panel (1) to be spliced, described cement pre-fabricated panel (1) is strip, is provided with some equally spaced preformed holes (10) at cement pre-fabricated panel (1) length direction; Then, the bearing bar (2) of booth is installed, bearing bar (2) bottom of booth is inserted in the preformed hole (10) also with chock (3) wedging.
2. the job practices of Anti-Typhoon booth according to claim 1 is characterized in that: the breach (11) that described preformed hole (10) is opened up outside having around inner ring, chock (3) inserts described breach (11) jam-packed bearing bar (2).
3. the job practices of Anti-Typhoon booth according to claim 2, it is characterized in that: described cement pre-fabricated panel (1) two ends are step-like protuberance (12), and the protuberance (12) of correspondence overlaps during adjacent two cement pre-fabricated panels (1) splicing.
4. the job practices of Anti-Typhoon booth according to claim 3, it is characterized in that: it is the concreting of C30 that described cement pre-fabricated panel (1) adopts strength grade, in to establish 4 diameters that extend along cement pre-fabricated panel (1) length direction be the reinforcing bar of 2-6 millimeter, reinforcing bar two is done the bending of " U " type and is handled.
5. the job practices of Anti-Typhoon booth according to claim 4, it is characterized in that: described cement pre-fabricated panel (1) is embedded in the earth.
6. the job practices of Anti-Typhoon booth according to claim 5, it is characterized in that: described protuberance (12) has connecting hole (13), and described connecting hole (13) is consistent with preformed hole (10) pore size.
7. the job practices of Anti-Typhoon booth according to claim 6, it is characterized in that: described adjacent two cement pre-fabricated panels (1) connecting hole (13) center in the vertical direction on the corresponding protuberance (12) when splicing is overlapping, and dowel passes connecting hole (13) and inserts in the earth cement pre-fabricated panel (1) grappling.
8. the job practices of Anti-Typhoon booth according to claim 6 is characterized in that: described breach (11) evenly distributes on every side at preformed hole (10).
CN2013101752260A 2013-05-10 2013-05-10 Method for constructing anti-typhoon greenhouse Pending CN103343625A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2013101752260A CN103343625A (en) 2013-05-10 2013-05-10 Method for constructing anti-typhoon greenhouse
CN201510142533.8A CN104770245A (en) 2013-05-10 2013-05-10 Spliced structure for typhoon-resistant greenhouse base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101752260A CN103343625A (en) 2013-05-10 2013-05-10 Method for constructing anti-typhoon greenhouse

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201510142533.8A Division CN104770245A (en) 2013-05-10 2013-05-10 Spliced structure for typhoon-resistant greenhouse base

Publications (1)

Publication Number Publication Date
CN103343625A true CN103343625A (en) 2013-10-09

Family

ID=49278450

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510142533.8A Pending CN104770245A (en) 2013-05-10 2013-05-10 Spliced structure for typhoon-resistant greenhouse base
CN2013101752260A Pending CN103343625A (en) 2013-05-10 2013-05-10 Method for constructing anti-typhoon greenhouse

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201510142533.8A Pending CN104770245A (en) 2013-05-10 2013-05-10 Spliced structure for typhoon-resistant greenhouse base

Country Status (1)

Country Link
CN (2) CN104770245A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112075266A (en) * 2020-09-24 2020-12-15 高彦军 Cable membrane greenhouse structure with rapid building process

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107524149B (en) * 2017-07-31 2020-02-11 北方工业大学 Assembled soil nailing wall and construction and dismantling method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2325984Y (en) * 1998-04-15 1999-06-30 何维银 Moveable two-house two-film-layer day-light greenhouse capable of disassembling
JP2003061481A (en) * 2001-08-22 2003-03-04 Dohoku Sansai Center:Kk Agricultural transportable greenhouse, method for use thereof and movement method
CN201051811Y (en) * 2007-06-07 2008-04-30 范杰 Non-column bamboo quality shed keel frame
CN201403373Y (en) * 2009-04-24 2010-02-17 张征 Big-arch shelter for resisting typhoon
CN201518629U (en) * 2009-09-30 2010-07-07 杨凤先 Environment-friendly anti-aging double-heat-insulating greenhouse
CN103053362A (en) * 2013-01-15 2013-04-24 桐乡丰恺园艺有限公司 Agricultural single greenhouse and putting up method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001112355A (en) * 1999-10-20 2001-04-24 Shuji Matsuoka Tent house
CN101416600B (en) * 2008-12-15 2010-12-22 中国建筑股份有限公司 Solar energy tree cap and production method thereof
CN101775815B (en) * 2010-01-21 2011-07-20 浙江省交通规划设计研究院 Greening soil blocking component and installation method thereof
CN201648897U (en) * 2010-02-10 2010-11-24 茅金声 Base available for mutual linking and lapping

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2325984Y (en) * 1998-04-15 1999-06-30 何维银 Moveable two-house two-film-layer day-light greenhouse capable of disassembling
JP2003061481A (en) * 2001-08-22 2003-03-04 Dohoku Sansai Center:Kk Agricultural transportable greenhouse, method for use thereof and movement method
CN201051811Y (en) * 2007-06-07 2008-04-30 范杰 Non-column bamboo quality shed keel frame
CN201403373Y (en) * 2009-04-24 2010-02-17 张征 Big-arch shelter for resisting typhoon
CN201518629U (en) * 2009-09-30 2010-07-07 杨凤先 Environment-friendly anti-aging double-heat-insulating greenhouse
CN103053362A (en) * 2013-01-15 2013-04-24 桐乡丰恺园艺有限公司 Agricultural single greenhouse and putting up method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112075266A (en) * 2020-09-24 2020-12-15 高彦军 Cable membrane greenhouse structure with rapid building process
CN112075266B (en) * 2020-09-24 2022-07-12 山西清露金华节能科技有限公司 Cable membrane greenhouse structure with rapid building process

Also Published As

Publication number Publication date
CN104770245A (en) 2015-07-15

Similar Documents

Publication Publication Date Title
CN103343625A (en) Method for constructing anti-typhoon greenhouse
CN104005494B (en) A kind of precast shear wall does-wet mixing type vertical connection nodes structure
CN204356768U (en) A kind of special-shaped precast concrete pile
CN2816130Y (en) Hollow drainage prefabricated pile capable of largely increasing single-pile bearing capacity
CN201850557U (en) Discontinuous flange type screw pile foundation
CN203613533U (en) Reinforced prestressed pipe pile
CN203393740U (en) Integral reinforced concrete foundation structure for assembling drainage pipelines
CN201850556U (en) Three-point discontinuous screw pile foundation
CN203243754U (en) Anti-typhoon greenhouse base
CN204435368U (en) Prestressed concrete pile
CN103329755A (en) Typhoon resistant greenhouse base
CN203530959U (en) High-strength underground diaphragm wall
CN204370417U (en) A kind of for base pit engineering external corner or the road place of going along with sb. to guard him to drawing cable bolting structure
CN2359332Y (en) Man-made digging pile mould-pipe
CN103452101B (en) Prestressed-concrete pile and supporting piling wall
CN207228108U (en) A kind of novel enhanced pile pile
CN206956716U (en) A kind of combined type anti-pulling pipe piles
CN205975675U (en) Utility tunnel system
CN203188201U (en) Reducing enlarged toe pile foundation
CN201891115U (en) Three-point continuous screw pile foundation
CN202068784U (en) Economic, practical and multi-purpose greenhouse shed
CN203113323U (en) Tubular pile connector
CN103046554B (en) Construction method for improving integrity and lateral rigidity of double-row supporting piles of foundation pit
CN208533512U (en) Ground pile and its construction tool
CN203742021U (en) Novel frame wall structure with door opening or window opening

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131009