CN109301748A - Cable replacement specific purpose tool - Google Patents

Cable replacement specific purpose tool Download PDF

Info

Publication number
CN109301748A
CN109301748A CN201811180315.3A CN201811180315A CN109301748A CN 109301748 A CN109301748 A CN 109301748A CN 201811180315 A CN201811180315 A CN 201811180315A CN 109301748 A CN109301748 A CN 109301748A
Authority
CN
China
Prior art keywords
cable
fixedly connected
pedestal
assembly
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811180315.3A
Other languages
Chinese (zh)
Inventor
邓五星
李海勇
赵明星
刘存卫
孙建新
王锐东
李波青
杨光敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aletai Power Supply Co Of Xinjiang Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Aletai Power Supply Co Of Xinjiang Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aletai Power Supply Co Of Xinjiang Power Co Ltd, State Grid Corp of China SGCC filed Critical Aletai Power Supply Co Of Xinjiang Power Co Ltd
Priority to CN201811180315.3A priority Critical patent/CN109301748A/en
Publication of CN109301748A publication Critical patent/CN109301748A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The present invention relates to cable machinery service kit technical fields, specially a kind of cable replacement specific purpose tool, including pedestal, connecting rod, support rod, fixed pulley group assembly, running block assembly, play messenger cable, cable elevator assembly, the left end of pedestal is fixedly installed with cable elevator assembly, it is fixedly installed with the connecting rod of inclined upward to the right on the pedestal of installation cable elevator assembly right, is fixedly connected with support rod between the middle part of connecting rod and the right end of pedestal.Structure of the invention is reasonable and compact, it is easy to use, by the way that the present invention is fixedly mounted on suitable cross arm insulator, in the case where fixed pulley group assembly, running block assembly, playing the cooperation of messenger cable and cable elevator assembly, the cable replacement that will can quickly and effectively fall off reduces the quantity of operating personnel, reduce the time of operation, the difficulty for reducing operation, alleviates the intensity of operation, and ensure that the personal safety of operating personnel.

Description

Cable replacement specific purpose tool
Technical field
The present invention relates to cable machinery service kit technical fields, are a kind of cable replacement specific purpose tools.
Background technique
It is continuously increased recently as power user consumption, distribution line line footpath gradually develops to big section, insulating, cable Weight also become increasingly heavier, fall off from cross arm insulator once will lead to cable in this way, the work difficulty of reset is just Very big, especially Chinese Mountain Areas etc. is some there are the region of the exceedingly odious weather such as strong wind, heavy rain, heavy snow, is easier to cause Cable falls off from cross arm insulator.According to statistics, Jimunai County, xinjiang was 2015 to 2016 winters, because strong wind etc. is extreme Bad weather causes cable from the event 9 that falls off on insulator, 14500 family of power failure amount, and 38.7 hours are up to when power failure, moves With 36, vehicle, 84 people of personnel amounts to 11.24 ten thousand degree of electricity of loss, causes weight huge economic loss.
Currently without the specific purpose tool of cable replacement, 6 people cooperation is generally required in operation, wherein 2 people on electric pole, 4 people on face, personnel need with shoulder the cable to fall off restoring a phase cable one pickaback to resetting on cross arm insulator on bar As at least need 40 minutes, expend that the time is extremely long, and task difficulty is very big, and operation intensity is extremely strong, and can be to the shoulder of service personnel It causes to be seriously worn, causes operating personnel injured.
Summary of the invention
The present invention provides a kind of cable replacement specific purpose tools, overcome the defects of the prior art, and can effectively solve In certainly current cable replacement work, operating personnel is more, and reset work expends the time and extremely grows, and task difficulty is very big, operation intensity pole By force, and the shoulder of service personnel can be caused to be seriously worn, causes the problem of operating personnel's injury.
The technical scheme is that realized by following measures: the cable replacement specific purpose tool, including pedestal, company Extension bar, fixed pulley group assembly, running block assembly, plays messenger cable, cable elevator assembly, the fixed peace in the left end of pedestal at support rod Equipped with cable elevator assembly, the connection of inclined upward to the right is fixedly installed on the pedestal of installation cable elevator assembly right Bar is fixedly connected with support rod between the middle part of connecting rod and the right end of pedestal, and it is fixed to be fixedly connected in the right end of connecting rod Pulley blocks assembly is equipped with running block assembly in the lower section of fixed pulley group assembly, has been equipped with messenger cable on cable elevator assembly, The left end for playing messenger cable is fixedly connected on the elevator end of cable elevator assembly, and the right end for playing messenger cable successively bypasses fixed pulley group The pulley of assembly and the pulley of running block assembly are finally fixedly connected on the lower end of fixed pulley group assembly, running block assembly Lower end is equipped with suspension hook.
Here is the further optimization and/or improvements to invention technology described above scheme:
Above-mentioned cable elevator assembly includes preceding installation plectane, installs plectane, front shoe, rear fixed plate, connecting plate and rotation afterwards Axis, front shoe and rear fixed plate are symmetrical vertical plate, the lower end of front shoe, rear fixed plate lower end respectively and even The lower end middle part of the front side of fishplate bar, rear side integrally connected, connecting plate is fixedly connected on pedestal, and the lower end of preceding installation plectane is with before The upper end of fixed plate is fixedly connected, and the rear lower end for installing plectane is fixedly connected with the upper end of rear fixed plate, in preceding installation plectane It is respectively equipped with mounting hole in the middle part of portion and rear installation plectane, fore bearing is equipped in the mounting hole of preceding installation plectane, in rear installation Rear bearing is equipped in the mounting hole of plectane, rotary shaft is mounted on fore bearing and rear bearing, and the front end of rotary shaft is located at preceding installation The front of plectane is fixedly installed with winding drum on preceding installation plectane and the rear rotary shaft installed between plectane, justifies in preceding installation The ratchet mechanism that rotary shaft can be driven to rotate is installed, winding drum is cable elevator assembly in the rotary shaft in front of plate Elevator end, the right end for playing messenger cable are fixedly connected on winding drum.
Above-mentioned ratchet mechanism includes ratchet, pawl and rocking bar, the fixed peace in the rotary shaft in front of preceding installation plectane Equipped with ratchet, the rocking bar that can independently rotate is arranged in the rotary shaft in front of ratchet, the middle part of rocking bar is equipped with pawl, pawl Left end insertion ratchet a tooth in.
Above-mentioned fixed pulley group assembly includes fixed pulley mounting rack, the first fixed pulley and the second fixed pulley, fixed pulley mounting rack Inside be equipped with transparent installation cavity, the upper and lower part of fixed pulley mounting rack installation cavity is separately installed with the first fixed pulley With the second fixed pulley, the lower end of fixed pulley mounting rack is fixedly connected with stay hook, running block assembly include movable pulley mounting rack, First movable pulley and the second movable pulley, the inside of movable pulley mounting rack are equipped with transparent installation cavity, movable pulley mounting rack peace The upper and lower part behaveing affectedly is separately installed with the second movable pulley and the first movable pulley, is fixedly connected in the lower end of movable pulley mounting rack There is suspension hook, the right end for playing messenger cable successively bypasses the first fixed pulley, the first movable pulley, the second fixed pulley and the second movable pulley and determines The stay hook of pulley mounting rack lower end is fixed together.
The middle part upper end of above-mentioned connecting rod is equipped with guiding mechanism, and guiding mechanism includes directive wheel and directive wheel mounting rack, is led The middle part upper end of connecting rod is fixedly connected on to the lower end of wheel mounting rack, directive wheel is mounted in directive wheel mounting rack, directive wheel Lower end and directive wheel mounting rack between be equipped with gap, rise messenger cable right end pass through directive wheel below gap.
It has been respectively fixedly connected with fixing bolt on front side of the lower end of above-mentioned pedestal and on rear side of lower end, has passed through spiral shell on fixing bolt Line is equipped with hold-doun nut;Or/and it is equipped with by fixed plate to upper right side on the pedestal of installation cable elevator assembly right Inclined connecting rod is fixedly connected with dismountable support rod between the middle part of connecting rod and the right end of pedestal.
Structure of the invention is reasonable and compact, easy to use, by the way that the present invention is fixedly mounted on suitable cross arm insulator On, it, can be quickly and effectively in the case where fixed pulley group assembly, running block assembly, playing the cooperation of messenger cable and cable elevator assembly The cable replacement that will be fallen off reduces the quantity of operating personnel, reduces the time of operation, reduces the difficulty of operation, mitigates The intensity of operation, and ensure that the personal safety of operating personnel.
Detailed description of the invention
Attached drawing 1 is the schematic view of the front view of preferred embodiment.
Attached drawing 2 is the work that fixed pulley group assembly and running block assembly are linked together by playing messenger cable in attached drawing 1 Theory structure schematic diagram.
Coding in attached drawing is respectively as follows: 1 for pedestal, and 2 be connecting rod, and 3 be support rod, and 4 be fixed pulley group assembly, and 5 are Pulley blocks assembly, 6 be messenger cable, and 7 be suspension hook, and 8 be preceding installation plectane, and 9 be front shoe, and 10 be connecting plate, and 11 be rotation Axis, 12 be ratchet, and 13 be pawl, and 14 be rocking bar, and 15 be fixed pulley mounting rack, and 16 be the first fixed pulley, and 17 be the second fixed pulley, 18 be stay hook, and 19 be movable pulley mounting rack, and 20 be the first movable pulley, and 21 be the second movable pulley, and 22 be directive wheel mounting rack, 23 For fixed plate.
Specific embodiment
The present invention is not limited by the following examples, can determine according to the technique and scheme of the present invention with actual conditions specific Embodiment.
In the present invention, for ease of description, the description of the relative positional relationship of each component is according to Figure of description 1 Butut mode be described, such as: front, rear, top, and bottom, left and right positional relationship be the cloth according to Figure of description 1 Figure direction determines.
Below with reference to examples and drawings, the invention will be further described:
As shown in attached drawing 1,2, the cable replacement specific purpose tool, including pedestal 1, connecting rod 2, support rod 3, fixed pulley group assembly 4, Running block assembly 5 plays messenger cable 6, cable elevator assembly, and the left end of pedestal 1 is fixedly installed with cable elevator assembly, is installing The connecting rod 2 of inclined upward to the right is fixedly installed on the pedestal 1 of cable elevator assembly right, at the middle part and bottom of connecting rod 2 It is fixedly connected with support rod 3 between the right end of seat 1, fixed pulley group assembly 4 is fixedly connected in the right end of connecting rod 2, is determining cunning The lower section of wheel group assembly 4 is equipped with running block assembly 5, has been equipped with messenger cable 6 on cable elevator assembly, plays a left side for messenger cable 6 End is fixedly connected on the elevator end of cable elevator assembly, and the right end for playing messenger cable 6 successively bypasses the pulley of fixed pulley group assembly 4 The lower end of fixed pulley group assembly 4 is finally fixedly connected on the pulley of running block assembly 5, the lower end of running block assembly 5 is set There is suspension hook 7.
In this way, at work, pedestal 1 is fixedly mounted on the cross-arm of upper part of telegraph pole by operating personnel, rolled up by cable It raises assembly and plays messenger cable 6 for the decentralization of running block assembly 5 to height identical with the cable of required reset, then by movable pulley The suspension hook 7 of the lower end of group assembly 5 catches on cable, by rotating cable elevator assembly, messenger cable 6 has been made gradually to be wrapped in cable volume It raises on the elevator end of assembly, to keep running block assembly 5 gradually close to fixed pulley group assembly 4, finally makes to need to be reset Cable be promoted at cross arm insulator, subsequent operating personnel by cable place cross arm insulator on, extract cable on hanging Hook 7 completes cable replacement work.In entire operation process, it is only necessary to which 2-3 people's cooperation greatly reduces the number of operating personnel Amount, while passing through, fixed pulley group assembly 4, running block assembly 5, playing being used cooperatively for messenger cable 6 and cable elevator assembly, it contracts The time for having subtracted operation reduces the difficulty of operation, alleviates the intensity of operation, and ensure that the personal safety of operating personnel.
Above-mentioned cable replacement specific purpose tool can be made further optimization and/or improvements according to actual needs:
As shown in Fig. 1, cable elevator assembly includes preceding installation plectane 8, installs plectane, front shoe 9, rear fixed plate, company afterwards Fishplate bar 10 and rotary shaft 11, front shoe 9 and rear fixed plate are symmetrical vertical plate, and the lower end of front shoe 9 is fixed afterwards Respectively with the front side of connecting plate 10, rear side integrally connected, the lower end middle part of connecting plate 10 is fixedly connected on pedestal 1 for the lower end of plate On, the lower end of preceding installation plectane 8 is fixedly connected with the upper end of front shoe 9, the lower end of rear installation plectane and rear fixed plate it is upper End is fixedly connected, and mounting hole is respectively equipped in the middle part of the middle part of preceding installation plectane 8 and rear installation plectane, in preceding installation plectane 8 It is equipped with fore bearing in mounting hole, rear bearing is equipped in the mounting hole of rear installation plectane, rotary shaft 11 is mounted on fore bearing with after On bearing, the front end of rotary shaft 11 is located at the front of preceding installation plectane 8, the rotation between preceding installation plectane 8 and rear installation plectane It is fixedly installed with winding drum in shaft 11, rotary shaft 11 can be driven by being equipped in the rotary shaft 11 in preceding 8 front of installation plectane The ratchet mechanism of rotation, winding drum are the elevator end of cable elevator assembly, and the right end for playing messenger cable 6 is fixedly connected on elevator On cylinder.
In this way, ratchet mechanism be it is public, operating personnel can have been made by rotating backward ratchet mechanism The right end of messenger cable 6 slowly extends, to keep fixed pulley group assembly 4 and running block assembly 5 increasingly remoter, needed for reaching Length, facilitate suspension hook 7 and cable connection, when needing to pull up cable, operating personnel by rotating forward ratchet mechanism, To make being wrapped on winding drum slowly of messenger cable 6, to make running block assembly 5 and cable gradually to fixed pulley group Assembly 4 is close, is finally completed the recovery operation of cable.
As shown in Fig. 1, ratchet mechanism includes ratchet 12, pawl 13 and rocking bar 14, in preceding 8 front of installation plectane It is fixedly installed with ratchet 12 in rotary shaft 11, is arranged with the rocking bar that can independently rotate in the rotary shaft 11 in 12 front of ratchet 14, the middle part of rocking bar 14 is equipped with pawl 13, and the left end of pawl 13 is inserted into a tooth of ratchet 12.In this way, by shaking rocking bar 14 can make pawl 13 that ratchet 12 be pushed to rotate, to make ratchet 12 that rotary shaft 11 be driven to rotate.
As shown in Fig. 2, fixed pulley group assembly includes fixed pulley mounting rack 15, the first fixed pulley 16 and the second fixed pulley 17, the inside of fixed pulley mounting rack 15 is equipped with transparent installation cavity, the upper and lower part of 15 installation cavity of fixed pulley mounting rack It is separately installed with the first fixed pulley 16 and the second fixed pulley 17, the lower end of fixed pulley mounting rack 15 is fixedly connected with stay hook 18, Running block assembly includes movable pulley mounting rack 19, the first movable pulley 20 and the second movable pulley 21, movable pulley mounting rack 19 it is interior Portion is equipped with transparent installation cavity, and the upper and lower part of 19 installation cavity of movable pulley mounting rack is separately installed with the second movable pulley 21 With the first movable pulley 20, it is fixedly connected with suspension hook 7 in the lower end of movable pulley mounting rack 19, the right end for playing messenger cable 6 successively bypasses First fixed pulley 16, the first movable pulley 20, the second fixed pulley 17 and the second movable pulley 21 are consolidated with 15 lower end of fixed pulley mounting rack Determine hook 18 to be fixed together.In this way, by by the first fixed pulley 16, the second fixed pulley 17, the first movable pulley 20 and second Messenger cable 6 has been wound between movable pulley 21, can enable the invention to lift heavier cable.
As shown in Fig. 1, the middle part upper end of connecting rod 2 is equipped with guiding mechanism, and guiding mechanism includes directive wheel and directive wheel Mounting rack 22, the lower end of directive wheel mounting rack 22 are fixedly connected on the middle part upper end of connecting rod 2, and directive wheel is mounted on directive wheel peace It shelves in 22, gap is equipped between the lower end and directive wheel mounting rack 22 of directive wheel, the right end for playing messenger cable 6 passes through under directive wheel The gap of side.In this way, directive wheel plays limit and guiding to messenger cable 6 is played, practicability of the invention is enhanced.
As shown in Fig. 1, it has been respectively fixedly connected with fixing bolt 24 on rear side of on front side of the lower end of pedestal 1 and lower end, in fixation Hold-doun nut 25 is equipped with by screw thread on bolt 24;Or/and by solid on the pedestal 1 of installation cable elevator assembly right Fixed board 23 is equipped with the connecting rod 2 of inclined upward to the right, is fixedly connected between the middle part of connecting rod 2 and the right end of pedestal 1 Dismountable support rod 3.In this way, cross arm insulator is equipped with multiple through-holes, the present invention can be by using fixing bolt 24 Hold-doun nut 25 is fixed on cross arm insulator;Fixed plate 23 and the left end of connecting rod 2 are installed together by pin shaft, work as support After bar 3 is removed, connecting rod 2 can be rotated down along pin shaft, finally be fit together with pedestal 1, convenient for fortune of the invention Defeated and carrying.
The above technical characteristic constitutes highly preferred embodiment of the present invention, with stronger adaptability and best implementation effect Fruit can increase and decrease non-essential technical characteristic, according to actual needs to meet the needs of different situations.

Claims (10)

1. a kind of cable replacement specific purpose tool, it is characterised in that including pedestal, connecting rod, support rod, fixed pulley group assembly, dynamic cunning Wheel group assembly plays messenger cable, cable elevator assembly, and the left end of pedestal is fixedly installed with cable elevator assembly, in installation cable volume Raise the connecting rod that inclined upward to the right is fixedly installed on the pedestal of assembly right, connecting rod middle part and pedestal right end it Between be fixedly connected with support rod, fixed pulley group assembly is fixedly connected in the right end of connecting rod, in the lower section of fixed pulley group assembly Equipped with running block assembly, it is equipped with messenger cable on cable elevator assembly, the left end for playing messenger cable is fixedly connected on cable volume It raises on the elevator end of assembly, the right end for playing messenger cable successively bypasses the pulley of fixed pulley group assembly and the pulley of running block assembly It is finally fixedly connected on the lower end of fixed pulley group assembly, the lower end of running block assembly is equipped with suspension hook.
2. cable replacement specific purpose tool according to claim 1, it is characterised in that cable elevator assembly includes preceding installation circle Plate installs plectane, front shoe, rear fixed plate, connecting plate and rotary shaft afterwards, and front shoe and rear fixed plate are symmetrical Vertical plate, the lower end of front shoe, rear fixed plate lower end respectively with the front side of connecting plate, rear side integrally connected, connecting plate It is fixedly connected on pedestal in the middle part of lower end, the lower end of preceding installation plectane is fixedly connected with the upper end of front shoe, installs plectane afterwards Lower end be fixedly connected with the upper end of rear fixed plate, be respectively equipped with installation in the middle part of the middle part of preceding installation plectane and rear installation plectane Hole is equipped with fore bearing in the mounting hole of preceding installation plectane, and rear bearing, rotary shaft peace are equipped in the mounting hole of rear installation plectane On fore bearing and rear bearing, the front end of rotary shaft is located at the front of preceding installation plectane, in preceding installation plectane and rear installation circle It is fixedly installed with winding drum in rotary shaft between plate, rotation can be driven by being equipped in the rotary shaft in front of preceding installation plectane The ratchet mechanism of axis rotation, winding drum are the elevator end of cable elevator assembly, and the right end for playing messenger cable is fixedly connected on volume It raises on cylinder.
3. cable replacement specific purpose tool according to claim 2, it is characterised in that ratchet mechanism includes ratchet, pawl And rocking bar, it is fixedly installed with ratchet in the rotary shaft in front of preceding installation plectane, is arranged with energy in the rotary shaft in front of ratchet Enough rocking bars independently rotated, the middle part of rocking bar are equipped with pawl, and the left end of pawl is inserted into a tooth of ratchet.
4. cable replacement specific purpose tool according to claim 1 or 2 or 3, it is characterised in that fixed pulley group assembly includes fixed Pulley mounting rack, the first fixed pulley and the second fixed pulley, the inside of fixed pulley mounting rack is equipped with transparent installation cavity, fixed sliding The upper and lower part of wheel mounting rack installation cavity is separately installed with the first fixed pulley and the second fixed pulley, the lower end of fixed pulley mounting rack It is fixedly connected with stay hook, running block assembly includes movable pulley mounting rack, the first movable pulley and the second movable pulley, movable pulley peace The inside shelved is equipped with transparent installation cavity, and it is dynamic that the upper and lower part of movable pulley mounting rack installation cavity is separately installed with second Pulley and the first movable pulley are fixedly connected with suspension hook in the lower end of movable pulley mounting rack, and the right end for playing messenger cable successively bypasses the One fixed pulley, the first movable pulley, the second fixed pulley and the second movable pulley are fixedly connected with the stay hook of fixed pulley mounting rack lower end Together.
5. cable replacement specific purpose tool according to claim 1 or 2 or 3, it is characterised in that the middle part upper end of connecting rod is set There is guiding mechanism, guiding mechanism includes directive wheel and directive wheel mounting rack, and the lower end of directive wheel mounting rack is fixedly connected on connection The middle part upper end of bar, directive wheel are mounted in directive wheel mounting rack, between being equipped between the lower end and directive wheel mounting rack of directive wheel Gap plays gap of the right end of messenger cable below directive wheel.
6. cable replacement specific purpose tool according to claim 4, it is characterised in that the middle part upper end of connecting rod is equipped with guiding Mechanism, guiding mechanism include directive wheel and directive wheel mounting rack, and the lower end of directive wheel mounting rack is fixedly connected in connecting rod Portion upper end, directive wheel are mounted in directive wheel mounting rack, and gap, lifting are equipped between the lower end and directive wheel mounting rack of directive wheel The right end of cable passes through the gap below directive wheel.
7. cable replacement specific purpose tool according to claim 1 or 2 or 3, it is characterised in that on front side of the lower end of pedestal under End rear side has been respectively fixedly connected with fixing bolt, is equipped with hold-doun nut by screw thread on fixing bolt;Or/and it is installing The connecting rod of inclined upward to the right is installed on the pedestal of cable elevator assembly right by fixed plate, connecting rod middle part with Dismountable support rod is fixedly connected between the right end of pedestal.
8. cable replacement specific purpose tool according to claim 4, it is characterised in that on front side of the lower end of pedestal and on rear side of lower end It has been respectively fixedly connected with fixing bolt, hold-doun nut is equipped with by screw thread on fixing bolt;Or/and in installation cable volume Raise the connecting rod for being equipped with inclined upward to the right on the pedestal of assembly right by fixed plate, middle part and pedestal in connecting rod Dismountable support rod is fixedly connected between right end.
9. cable replacement specific purpose tool according to claim 5, it is characterised in that on front side of the lower end of pedestal and on rear side of lower end It has been respectively fixedly connected with fixing bolt, hold-doun nut is equipped with by screw thread on fixing bolt;Or/and in installation cable volume Raise the connecting rod for being equipped with inclined upward to the right on the pedestal of assembly right by fixed plate, middle part and pedestal in connecting rod Dismountable support rod is fixedly connected between right end.
10. cable replacement specific purpose tool according to claim 6, it is characterised in that on front side of the lower end of pedestal and on rear side of lower end It has been respectively fixedly connected with fixing bolt, hold-doun nut is equipped with by screw thread on fixing bolt;Or/and in installation cable volume Raise the connecting rod for being equipped with inclined upward to the right on the pedestal of assembly right by fixed plate, middle part and pedestal in connecting rod Dismountable support rod is fixedly connected between right end.
CN201811180315.3A 2018-10-10 2018-10-10 Cable replacement specific purpose tool Pending CN109301748A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811180315.3A CN109301748A (en) 2018-10-10 2018-10-10 Cable replacement specific purpose tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811180315.3A CN109301748A (en) 2018-10-10 2018-10-10 Cable replacement specific purpose tool

Publications (1)

Publication Number Publication Date
CN109301748A true CN109301748A (en) 2019-02-01

Family

ID=65162169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811180315.3A Pending CN109301748A (en) 2018-10-10 2018-10-10 Cable replacement specific purpose tool

Country Status (1)

Country Link
CN (1) CN109301748A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202072422U (en) * 2011-05-30 2011-12-14 湖北省电力公司宜都市供电公司 Miniature lifting device for power distribution line maintenance
CN202337654U (en) * 2011-12-10 2012-07-18 潘守宏 Sleeper crane used for railway line overhaul
CN108059100A (en) * 2018-01-06 2018-05-22 李海斌 Electric power hoisting device
CN208862469U (en) * 2018-10-10 2019-05-14 国网新疆电力有限公司阿勒泰供电公司 Cable replacement specific purpose tool

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202072422U (en) * 2011-05-30 2011-12-14 湖北省电力公司宜都市供电公司 Miniature lifting device for power distribution line maintenance
CN202337654U (en) * 2011-12-10 2012-07-18 潘守宏 Sleeper crane used for railway line overhaul
CN108059100A (en) * 2018-01-06 2018-05-22 李海斌 Electric power hoisting device
CN208862469U (en) * 2018-10-10 2019-05-14 国网新疆电力有限公司阿勒泰供电公司 Cable replacement specific purpose tool

Similar Documents

Publication Publication Date Title
CN206274553U (en) A kind of spiral compression formula earthing clamp
CN105248408B (en) Pneumatic type bird-resistant
CN208862469U (en) Cable replacement specific purpose tool
CN206422456U (en) A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool
CN109301748A (en) Cable replacement specific purpose tool
CN205791238U (en) A kind of 10kV distribution line charged lifter of straightway three-phase conducting wire
CN206595631U (en) A kind of transmission line of electricity servicing unit
CN106871827B (en) Portable power transmission line arc sag detection device
CN209250196U (en) A kind of lightning rod core that can consolidate installation
CN108703191A (en) A kind of pickled and cured meat production pickled and cured meat hanger bracket
CN210480794U (en) High tension transmission line overhauls uses protector
CN107069533A (en) A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool
CN111725766A (en) 10kV urban power distribution network single-trunk column overhead equipment
CN208241187U (en) A kind of electric power transmission line foreign body eliminating apparatus
CN206628791U (en) A kind of adjustable abacus street code
CN110137889A (en) A kind of anti-dancing device of New Damping type
CN206409014U (en) A kind of electric pole for being easy to climb
CN209469366U (en) A kind of new take-off formula conducting wire hanging ladder
CN212246023U (en) Hoisting device of assembled concrete external wall panel
CN210722589U (en) Insulator for electric power
CN206742013U (en) A kind of information high-tension insulator steel foot stool
CN208077711U (en) A kind of drop-type arrester
CN208236074U (en) Power transmission tower elastic telescopic sliding sleeve cross-arm
CN2355436Y (en) Pull-up grounding device
CN102868131B (en) A kind of power transmission cable device for expelling ice and snow

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination