CN202072422U CN2011201768941U CN201120176894U CN202072422U CN 202072422 U CN202072422 U CN 202072422U CN 2011201768941 U CN2011201768941 U CN 2011201768941U CN 201120176894 U CN201120176894 U CN 201120176894U CN 202072422 U CN202072422 U CN 202072422U
Authority
CN
China
Prior art keywords
base
adapter plate
armed lever
overhaul
hoisting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201768941U
Other languages
Chinese (zh)
Inventor
余昌雄
谢文胜
周卫
龚良波
吴振
向隆文
尤全
周耀文
曹金勇
屈万金
王宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YIDU DAMING ELECTRIC INDUSTRY Co Ltd
State Grid Corp of China SGCC
Original Assignee
HUBEI ELECTRIC POWER CO LTDYIDU POWER SUPPLY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI ELECTRIC POWER CO LTDYIDU POWER SUPPLY CO LTD filed Critical HUBEI ELECTRIC POWER CO LTDYIDU POWER SUPPLY CO LTD
Priority to CN2011201768941U priority Critical patent/CN202072422U/en
Application granted granted Critical
Publication of CN202072422U publication Critical patent/CN202072422U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

A miniature lifting device for power distribution line maintenance comprises a base. A reversible ratchet wheel mechanism is arranged on the base and connected with a crank; the base is connected with an arm lever; one end of the arm lever is provided with a pulley component; the arm lever is a telescopic lever; and a pull wire passing through the telescopic lever is wound on the reversible ratchet wheel mechanism and connected with a hook through the pulley component. The miniature lifting device is light in weight, safe in use, flexible in operation, and time-saving and labor-saving in power distribution line maintenance. Interruption maintenance time is shortened, maintenance efficiency is improved, power supply reliability is enhanced, maintenance difficulty is reduced, and now only one person can complete operation previously difficult to complete by two or a plurality of persons through coordination.

Description

Distribution circuit overhauls miniature hoisting device
Technical field
The utility model relates to a kind of distribution circuit and overhauls miniature hoisting device, is used for distribution circuit maintenance hoisting heavy.
Background technology
The line maintenance personnel run into the work of changing the impaired porcelain vase of straight line electric pole through regular meeting when distribution circuit is overhauled or rushes to repair.Existing method generally be the line maintenance personnel by pickaback, method such as election mentions lead and breaks away from impaired porcelain vase, lead is temporarily fixed on the electric pole cross-arm then, then impaired porcelain vase is changed, last be re-applied to lead on the porcelain vase after the replacing by manpower again and colligation is fixed.Yet it is big usually can to run in the circuit top shelves, big crossing span, lead downforce in the replacing process, and the single situation that can't mention lead often need increase the auxilian on bar.So just increase manpower, strengthened operating personnel's labour intensity, increased the repair time, prolonged power off time.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of distribution circuit and overhauls miniature hoisting device, overcomes problem that waste time and energy, that influence overhaul efficiency when distribution circuit overhauls hoisting heavy in the prior art.But utilize movable and fixed pulley group break-in ratchet device and lever principle to come hoisting heavy, time saving and energy saving.
For solving the problems of the technologies described above, the technical scheme that the utility model is taked is: distribution circuit overhauls miniature hoisting device, comprise base, but base is provided with the break-in ratchet device, but the break-in ratchet device connects crank, and base is connected with armed lever, and armed lever one end is provided with pulley assembly, but the break-in ratchet device is wound with backguy, and backguy is by the pulley assembly connecting shackle.
Described armed lever is scalable rod member, and backguy is by scalable rod member, by the pulley assembly connecting shackle.
Described base is provided with first adapter plate, but the break-in ratchet device be installed on first adapter plate, flexible armed lever one end connects first adapter plate, the other end connects second adapter plate, pulley assembly is installed on second adapter plate.
Described first adapter plate is provided with the hole, and flexible armed lever one end is by connecting element and hole heavy keying fit.
Described base bottom is provided with locations and position-limited trough.
Described backguy is a steel rope.
Described connecting element is latch or bolt.
Described armed lever is scalable hollow steel pipe.
The utility model distribution circuit overhauls miniature hoisting device, first adapter plate is provided with the hole, scalable hollow steel pipe one end is by latch or bolt and hole heavy keying fit, steel pipe can stretch, simultaneously can left, center, right three direction oscillation adjustment height and direction, latch below first adapter plate or bolted steel pipe usefulness, other holes are used to cooperate the steel pipe left, center, right to regulate direction on first adapter plate, when alignment holes is inserted latch or bolt can be finished fixing.
But the utility model device utilizes movable and fixed pulley assembly break-in ratchet device and lever principle to reach laborsaving effect, but partly is made up of backguy, suspension hook, pulley assembly, flexible armed lever break-in ratchet device, crank and base etc.The bottom of base is provided with locations and position-limited trough, be used for fixing on the electric pole cross-arm, suspension hook is used to hook lead or weight, but operating personal shakes crank control break-in ratchet device, drive assembly pulley by rope traction, make operating personal easily just can mention weight, change then and carry out follow-up work.
The utility model installation weight is light, safe in utilization, flexible operation, time saving and energy saving in the distribution circuit maintenance, shortens the interruption maintenance time, improves overhaul efficiency, improves power supply reliability.Reduce the difficulty of maintenance, needed two people or many people cooperation all to be difficult to the work of finishing in the past, only needed a people just can solve now.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples:
Fig. 1 is the utility model structure drawing of device.
The specific embodiment
As shown in Figure 1, distribution circuit overhauls miniature hoisting device, comprise base 1, but base 1 is provided with break-in ratchet device 2, but break-in ratchet device 2 connects crank 3, and base 1 is connected with armed lever 4, and armed lever 4 one ends are provided with pulley assembly 5, but break-in ratchet device 2 is wound with backguy, and backguy is by pulley assembly 5 connecting shackles 6.
Armed lever 4 is scalable rod member, and backguy is by scalable rod member, by pulley assembly 5 connecting shackles 6.Base 1 is provided with first adapter plate 7, but break-in ratchet device 2 be installed on first adapter plate 7, flexible armed lever 4 one ends connect first adapter plate 7, the other end connects second adapter plate 8, pulley assembly 5 is installed on second adapter plate 8.First adapter plate 7 is provided with hole 9, and flexible armed lever 4 one ends are by connecting element and hole 9 heavy keying fit.
Described base 1 bottom is provided with locations and position-limited trough.
Described backguy is a steel rope.
Described connecting element is latch or bolt.
Described armed lever 4 is scalable hollow steel pipe.
But operating personal shakes crank 3 control break-in ratchet devices 2, drives suspension hook 6 by the rope traction in the scalable hollow steel pipe through pulley assembly 5 and does line activities up and down.Wherein, base 1 bottom is made up of 3 dowel bolts and draw-in groove, is used for fixing on the electric pole cross-arm.But break-in ratchet device 2 is used for the folding and unfolding steel rope by pulley and gear combination; In the scalable hollow steel pipe steel wire penetrating is arranged, steel pipe can stretch, simultaneously can left, center, right three direction oscillation adjustment height and direction.Base 1 bottom bolt is permanent fastening steel pipe usefulness, and first adapter plate 7 is an iron plate, and the hole 9 that is provided with on it is used to cooperate the steel pipe left, center, right to regulate direction, when alignment holes inserting bolt or latch can be finished fixing.Pulley assembly 2 is welded on flexible armed lever 4 tops, makes things convenient for steel rope to pass through, and reduces resistance, reduces wearing and tearing.Suspension hook 1 uses the special wire hook, by rope traction pulling lead.
Implementation step:
1), the position-limited trough of the utility model device is stuck in place, cross-arm plane, with locations, as: screw tightening.The utility model device is adjusted to correct position, makes suspension hook hook lead.
2), shake the crank 3 of the utility model device, lead is risen, break away from porcelain vase.
3), loosening crank 3, lead is dropped on the cross-arm, do working fastening after, the beginning porcelain vase more changes jobs.
4), after porcelain vase finishes changing, lead is mentioned, put to porcelain vase, finish colligation.

Claims (8)

1. distribution circuit overhauls miniature hoisting device, comprise base (1), it is characterized in that: base (1) but be provided with break-in ratchet device (2), but break-in ratchet device (2) connects crank (3), base (1) is connected with armed lever (4), armed lever (4) one ends are provided with pulley assembly (5), but break-in ratchet device (2) is wound with backguy, and backguy is by pulley assembly (5) connecting shackle (6).
2. overhaul miniature hoisting device according to the described distribution circuit of claim 1, it is characterized in that: described armed lever (4) is scalable rod member, and backguy is by scalable rod member, by pulley assembly (5) connecting shackle (6).
3. overhaul miniature hoisting device according to the described distribution circuit of claim 1, it is characterized in that: described base (1) is provided with first adapter plate (7), but break-in ratchet device (2) is installed on first adapter plate (7), flexible armed lever (4) one ends connect first adapter plate (7), the other end connects second adapter plate (8), and pulley assembly (5) is installed on second adapter plate (8).
4. overhaul miniature hoisting device according to the described distribution circuit of claim 3, it is characterized in that: described first adapter plate (7) is provided with hole (9), and flexible armed lever (4) one ends are by connecting element and hole (9) heavy keying fit.
5. overhaul miniature hoisting device according to claim 1 or 3 described distribution circuits, it is characterized in that: described base (1) bottom is provided with locations and position-limited trough.
6. overhaul miniature hoisting device according to claim 1 or 2 described distribution circuits, it is characterized in that: described backguy is a steel rope.
7. overhaul miniature hoisting device according to the described distribution circuit of claim 4, it is characterized in that: described connecting element is latch or bolt.
8. overhaul miniature hoisting device according to claim 1 or 2 or 3 described distribution circuits, it is characterized in that: described armed lever (4) is scalable hollow steel pipe.
CN2011201768941U 2011-05-30 2011-05-30 Miniature lifting device for power distribution line maintenance Expired - Fee Related CN202072422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201768941U CN202072422U (en) 2011-05-30 2011-05-30 Miniature lifting device for power distribution line maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201768941U CN202072422U (en) 2011-05-30 2011-05-30 Miniature lifting device for power distribution line maintenance

Publications (1)

Publication Number Publication Date
CN202072422U true CN202072422U (en) 2011-12-14

Family

ID=45110529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201768941U Expired - Fee Related CN202072422U (en) 2011-05-30 2011-05-30 Miniature lifting device for power distribution line maintenance

Country Status (1)

Country Link
CN (1) CN202072422U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105197830A (en) * 2015-10-14 2015-12-30 广东电网有限责任公司佛山供电局 Lifting device for maintenance of mutual inductor
CN105610092A (en) * 2016-02-29 2016-05-25 国网新疆电力公司昌吉供电公司 Tower wire lifting and migrating device for mountain area
CN105811313A (en) * 2016-06-06 2016-07-27 国家电网公司 Linear insulator replacement tool and application method thereof
CN109301748A (en) * 2018-10-10 2019-02-01 国网新疆电力有限公司阿勒泰供电公司 Cable replacement specific purpose tool

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105197830A (en) * 2015-10-14 2015-12-30 广东电网有限责任公司佛山供电局 Lifting device for maintenance of mutual inductor
CN105610092A (en) * 2016-02-29 2016-05-25 国网新疆电力公司昌吉供电公司 Tower wire lifting and migrating device for mountain area
CN105610092B (en) * 2016-02-29 2018-05-15 国网新疆电力公司昌吉供电公司 Mountain area shaft tower conducting wire lifting moving apparatus
CN105811313A (en) * 2016-06-06 2016-07-27 国家电网公司 Linear insulator replacement tool and application method thereof
CN105811313B (en) * 2016-06-06 2018-04-17 国家电网公司 Linear insulator replacing options
CN109301748A (en) * 2018-10-10 2019-02-01 国网新疆电力有限公司阿勒泰供电公司 Cable replacement specific purpose tool

Similar Documents

Publication Publication Date Title
CN203668775U (en) Hydraulic sleeper replacing machine
CN202131995U (en) Steel wire rope compression system of rotary drilling machine
CN202072422U (en) Miniature lifting device for power distribution line maintenance
CN106938824B (en) A kind of boom hoisting of electric equipment maintenance
CN103790114A (en) Hydraulic dragging and idler wheel walking combination cable carrying crane and walking method thereof
CN103269036A (en) Tensioning resistant cross arm lifting machine
CN203998746U (en) Portable suspension installation
CN203359893U (en) Portable lift
CN205222518U (en) Outdoor equipment hoisting accessory
CN206379675U (en) Yoke plate card for live-line replacement of V-string insulator wire of tangent tower
CN205275101U (en) Portable automatic hoisting machine
CN102163824B (en) Operating tool and operation method for electrically replacing T-type mounting point suspending insulator in 110kV line steel pipe rod
CN206858092U (en) A kind of outdoor maintenance tractor of power engineering
CN2839219Y (en) Auxiliary exchanging block tray
CN203345912U (en) Portable special suspension tool
CN202333524U (en) Hoisting support for overhaul of isolating switch
CN202175522U (en) Device for hoisting concrete pole
CN201946913U (en) Working tool for electrified replacement of T-shaped hanging point suspension insulator on 110 kV line steel tube rod
CN105398991A (en) Capacitor lifting tool
CN202429946U (en) Portable testing instrument lifting device
CN205346712U (en) Transformer overhauls uses intelligent hoisting accessory
CN203065072U (en) Outdoor substation equipment hoisting device
CN103318773A (en) Transformer hoisting apparatus
CN201051622Y (en) Ground board elevator
CN202423986U (en) Spacer installation device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: YIDU DAMING ELECTRIC CO., LTD.

Free format text: FORMER OWNER: HUBEI ELECTRIC POWER COMPANY, YIDU POWER SUPPLY COMPANY

Effective date: 20121122

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121122

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121122

Address after: 42 No. 443300 Hubei city of Yichang province Yidu City Lu River City Avenue

Patentee after: Yidu Daming Electric Industry Co., Ltd.

Patentee after: State Grid Corporation of China

Address before: 443300, No. 20, Binjiang Avenue, Yidu, Hubei, Yichang

Patentee before: Hubei Electric Power Co.,Ltd.Yidu Power Supply Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111214

Termination date: 20160530