CN109299843A - A kind of Risk Pre-control analysis intelligent management - Google Patents

A kind of Risk Pre-control analysis intelligent management Download PDF

Info

Publication number
CN109299843A
CN109299843A CN201810033483.3A CN201810033483A CN109299843A CN 109299843 A CN109299843 A CN 109299843A CN 201810033483 A CN201810033483 A CN 201810033483A CN 109299843 A CN109299843 A CN 109299843A
Authority
CN
China
Prior art keywords
risk
analysis
control
measure
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810033483.3A
Other languages
Chinese (zh)
Inventor
王智勇
雷明亮
李铸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Lin Yi Mdt Infotech Ltd
Original Assignee
Shanghai Lin Yi Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Lin Yi Mdt Infotech Ltd filed Critical Shanghai Lin Yi Mdt Infotech Ltd
Priority to CN201810033483.3A priority Critical patent/CN109299843A/en
Publication of CN109299843A publication Critical patent/CN109299843A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of Risk Pre-controls to analyze intelligent management, comprising the following steps: and first, server and application system are installed and complete software and hardware networking, terminal PC is connected by network transmission with application system;Second, in application system, data management is carried out to risk factor, hazard analysis and HACCP and control measure respectively;Third from activity, operating environment and using the angle of tool, summarizes risk factor, hazard analysis and HACCP and control measure in application system, forms risk measure job analysis library.The present invention has rational design, structure is simple, in operation practice, the dangerous point of power industry and pre-control analysis can be organically combined with intelligent building block system risk management system, centralization, standardization and standardization and general management are carried out to operating risk administrative analysis library, operation can be analyzed for the Preventive Control of Dangerous Spot of enterprise and systematization and standardized incorporated by reference and Added Management are provided.

Description

A kind of Risk Pre-control analysis intelligent management
Technical field
The present invention relates to a kind of management method, specifically a kind of Risk Pre-control analyzes intelligent management.
Background technique
In recent years, risk pre-control management is carried out in China energetically in terms of electricity safety production.In power industry, many enterprises Industry has also all actively developed dangerous identifing source, Danger recognition and Risk Pre-control work, and electric power enterprise, which is being deepened, pushes risk pre- Keyholed back plate reason.Most of Risk Pre-control method of power industry is to use risk assessment and pre-control method based on job task, is adopted Identification of dangerous source, hazard analysis and risk assessment are carried out with risk working system, formulates safety work standard.
In electricity safety production operation, dangerous point and pre-control analysis are most important.Current Preventive Control of Dangerous Spot analysis, enterprise Industry is combined with own characteristic and carries out Analysis about Dangerous Point, and industry is that dangerous point progress job evaluation thought has been published a large amount of books Nationality has also delivered many academic papers.In live actual job, staff by feat of working experience, in conjunction with business administration spy Point and operating mode carry out writing dangerous point and Pre-control measures in a manner of brainstorming with reference to a large amount of books, to a certain extent Reduce the probability of happening of peril, safety in production achieves certain achievement.
But in operation practice, the analysis of electrical hazards pre-control is not due to carrying out organic knot with intellectualized management system It closes, or lacks the intelligent management mode of centralization, standardization and the systematization of operating risk administrative analysis, result in enterprise's work Dangerous point is write as personnel and Pre-control measures are more unilateral, and content is not also general.Furthermore the dangerous point of enterprise and control measure are blind It writes to mesh, lacks the reference of standardization and systematization, there is security risks for production operation activity.
Summary of the invention
The purpose of the present invention is to provide a kind of Risk Pre-controls to analyze intelligent management, to solve in above-mentioned background technique The problem of proposition.
To achieve the above object, the invention provides the following technical scheme:
A kind of Risk Pre-control analysis intelligent management, comprising the following steps: first, server and application system are installed simultaneously Software and hardware networking is completed, terminal PC is connected by network transmission with application system;Second, in application system, respectively to danger Dangerous factor, hazard analysis and HACCP and control measure carry out data management;Third, in application system, from activity, operating environment and Using the angle of tool, risk factor, hazard analysis and HACCP and control measure are summarized, form risk measure job analysis library; 4th, when the java standard library of two tickets is write, reference is carried out to risk measure job analysis library;5th, it is carried out to two tickets When the measures analysis of dangerous point, reference is carried out to risk measure job analysis library;6th, handle dangerous point and the pre-control of two tickets Data are analyzed, are applied in operation field.
As a further solution of the present invention: the application system is intelligent building block system risk management system.
As a further solution of the present invention: use job task decomposition texture, respectively from activity, operating environment and Using the angle of tool, risk factor, hazard analysis and HACCP and control measure are summarized, form risk measure job analysis library.
As a further solution of the present invention: by the reference to risk measure job analysis library, forming standard two The Preventive Control of Dangerous Spot measures analysis data of ticket, two ticket of practical application, final output are printed and are used in operation field.
As further scheme of the invention: two ticket includes work ticket and operation order.
Compared with prior art, the beneficial effects of the present invention are: the present invention has rational design, structure is simple, in operation practice In, the dangerous point of power industry and pre-control analysis can be organically combined with intelligent building block system risk management system, to operation Analysis of risk management library carries out centralization, standardization and standardization and general management, can analyze for the Preventive Control of Dangerous Spot of enterprise Operation provides systematization and standardized incorporated by reference and Added Management.
Detailed description of the invention
Fig. 1 is the flow chart that Risk Pre-control analyzes intelligent management.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, in the embodiment of the present invention, a kind of Risk Pre-control analysis intelligent management, comprising the following steps: the One, server and application system are installed and complete software and hardware networking, terminal PC is connected by network transmission with application system;The Two, in application system, data management is carried out to risk factor, hazard analysis and HACCP and control measure respectively;Third, in application system In, from activity, operating environment and using the angle of tool, risk factor, hazard analysis and HACCP and control measure are summarized, Form risk measure job analysis library;4th, when the java standard library of two tickets is write, risk measure job analysis library is referred to Reference;5th, when carrying out dangerous point measures analysis to two tickets, reference is carried out to risk measure job analysis library;6th, Dangerous point and the pre-control analysis data for handling two tickets, are applied in operation field.
The application system is intelligent building block system risk management system.
Using job task decomposition texture, respectively from activity, operating environment and using tool angle, to it is dangerous because Element, hazard analysis and HACCP and control measure are summarized, and risk measure job analysis library is formed.
By the reference to risk measure job analysis library, the dangerous point of two ticket of standard, two ticket of practical application is formed Pre-control measures analyze data, and final output is printed and used in operation field.
Two ticket includes work ticket and operation order.
Embodiment:
Process of the invention is as shown in Figure 1, comprising the following steps: and first, server and application system are installed and completed soft Hardware networking, terminal PC are connected by network transmission with application system;Second, in application system, respectively to risk factor, Hazard analysis and HACCP and control measure carry out data management;Third from activity, operating environment and uses work in application system The angle of tool summarizes risk factor, hazard analysis and HACCP and control measure, forms risk measure job analysis library;4th, When the java standard library of two tickets (i.e. work ticket, operation order) is write, reference can be carried out to risk measure job analysis library;5th, When the carry out dangerous point measures analysis of two tickets (i.e. work ticket, operation order), risk measure job analysis library can be carried out to refer to and drawn With;6th, dangerous point and the pre-control analysis data of two tickets are handled, is printed out and is applied in field operation.
In the implementation of the present invention, in operation practice, the dangerous point of power industry and pre-control analysis can be with intelligence Energy building block system risk management system is organically combined, and carries out centralization, standardization and standard to operating risk administrative analysis library Change and general management, systematization and standardized incorporated by reference and auxiliary can be provided for the dangerous point of enterprise and pre-control analysis operation Management is helped, we use job task decomposition texture, respectively from activity, operating environment and using the angle of tool, to danger Dangerous factor, hazard analysis and HACCP and control measure are summarized, and risk measure job analysis library is formed.To risk measure job analysis library Reference, formed two ticket of standard, two ticket of practical application Preventive Control of Dangerous Spot measures analysis data, final application to electric power give birth to It produces in operation.
The present invention is to carry out intelligent analysis management, including risk measure job analysis library, standard to dangerous point and pre-control Two ticket Analysis about Dangerous Point handle two ticket Analysis about Dangerous Point, three aspect.The applying step and data of this three aspect are introduced separately below Calculating process.
One, risk measure job analysis library
The present invention is to carry out intelligent analysis management to dangerous point and pre-control, and intelligentized risk measure job analysis library is answered Key step is as follows:
1, according to people to the thinking habit of operation safety, Hazard Recognition is divided into working environment, activity, using work Tool and safeguard procedures, Hazard Recognition in system are defined in a manner of icon by visualizing.
In system data operation, it is designed as the storage table of " risk job class " to the Hazard Recognition of operation safety, stores The storage information of table includes sorting code number, specific name.It is with " risk job class " storage table that working environment, operation is living It moves, be refined as subtle specific name, such as operating environment respectively again using tool and safeguard procedures angle to be satisfied with operation Scene needs.
2, it on the assessment strategy of dangerous point, is managed in terms of Consideration, hazard analysis and HACCP and control measure respectively.
In system data operation, dangerous point appraisal procedure is separately designed as " risk factors management ", " hazard analysis and HACCP pipe The storage table of reason " and " control measure management ".Wherein, the storage information of " risk factors management " table includes factor coding, factor Title and icon sorting code number.Icon sorting code number carries out equivalence with the sorting code number in risk job class table and is associated with;" harm The storage information of consequence management " table includes harm coding, hazard analysis and HACCP title and factor coding.Factor coding and risk factors pipe The factor coding managed in table carries out equivalent association;The storage information of " control measure management " table includes measure codes, measure title It is encoded with harm.Harm coding carries out equivalence with the harm coding in hazard analysis and HACCP management table and is associated with;
3, Macro or mass analysis is carried out to above 1 and 2, forms intelligent Preventive Control of Dangerous Spot analysis management library.
In system data operation, pass through " risk job class ", " risk factors management ", " hazard analysis and HACCP management " and " control Associate field in measure management processed " storage table carries out level connection, organically combines data and take together, and forms intelligence Change Preventive Control of Dangerous Spot analysis management library (example: the data operation structure in 1 risk measure job analysis library of table).
The data operation structure in risk measure job analysis library
Table 1
Two, two ticket Analysis about Dangerous Point of standard
In operation practice work, the innovative strategy of intelligent building block system risk analysis management system is intelligent dangerous point and pre- Administrative analysis library is controlled, in standard two ticket Analysis about Dangerous Point using upper, is mainly reflected in level of organization safety measure, standard of compiling The Preventive Control of Dangerous Spot of operational order analyzes link, and it is identical that level of organization safety measure and compilation operation, which are instructed in applying step, , steps are as follows for the groundwork of intelligent Application:
1, according to the range and range of job task application, the operation that job task presses professional different definition standard is appointed Business.
In system data operation, to standard operation task definition storage table, the storage information of storage table includes that standard is made Industry coding, standard operation title, device coding, establishment people, establishment time, keyword, state, type, standard fare ticket type type.It writes Personnel pass through intelligent building block system risk analysis management system and carry out level of organization job task.
2, in the Analysis about Dangerous Point and assessment strategy of two ticket of standard, by task unit respectively from working environment, work Industry activity, for the use of tool and personal protection, select to select and be suitable for this item in intelligent risk work measure analysis library The risk icon of operation unit.Writer will analyze library with risk work measure, to standard operation task choosing dangerous point Pre-control measures.
According to standard operation needs, operator needs to click on working environment in interface, activity, using work The corresponding button in terms of tool and personal protection in region, to select the risk operation icon for being suitable for this item operation, then is clicked The risk operation icon selected, system arrange the consideration factor, hazard analysis and HACCP and the control that load in risk work measure analysis library The normal data applied after choosing the normal data of needs in the normal data project table listed, clicks the corresponding button, will be warp The Preventive Control of Dangerous Spot measure selected is stored into this item standard operation task.
The data operation structure of standard security measures, as shown in table 2.
The data operation structure of standard operating instruction, as shown in table 3.
3, in the risk icon selected, after carrying out level assessment, including Consideration, harm to dangerous point in terms by terms Fruit, control measure, finally summarize for suitable for this item operation unit dangerous point and Pre-control measures data.
According to repeatedly selecting for the Preventive Control of Dangerous Spot measure in step 2, the danger of this item standard operation task is ultimately formed Danger point Pre-control measures.
The data operation structure of standard security measures
Table 2
Note: the Preventive Control of Dangerous Spot in table 2 analyzes data, selects to generate from risk measure job analysis library.
The data operation structure of standard operating instruction
Table 3
Note: the Preventive Control of Dangerous Spot in table 3 analyzes data, selects to generate from risk measure job analysis library.
Three, two ticket Analysis about Dangerous Point are handled
In operation practice work, the innovative strategy of intelligent building block system risk analysis management system is intelligent dangerous point and pre- Control administrative analysis library, handle two ticket Analysis about Dangerous Point using upper, be mainly reflected in and write work ticket and compilation operation ticket Preventive Control of Dangerous Spot analyzes link, and writing work ticket and compilation operation ticket is identical, the master of intelligent Application in applying step Want work step as follows:
1, according to the characteristics of job task and work complexity, work operations are resolved into several bill of assignment Member, staff implement Analysis about Dangerous Point to the task unit after decomposition in terms by terms.
In system data operation, storage table is defined to task, wherein the storage information of work ticket includes that operation is compiled The contents such as code, tasks name, device coding, planned start time, planned end time, job site;Operation order is deposited Storing up information includes task encoding, operation task title, device coding, time started, end time, operation order type, operator Etc. contents.Writer passes through intelligent building block system risk analysis management system and carries out authorized strength work task.
2, in the Analysis about Dangerous Point and assessment strategy for handling two tickets, by task unit respectively from working environment, work Industry activity, for the use of tool and personal protection, select to select and be suitable for this item in intelligent risk work measure analysis library The risk icon of operation unit.Writer will analyze library with risk work measure, select Preventive Control of Dangerous Spot to job task Measure.
According to job task needs, operator needs to click on working environment in interface, activity, using work The corresponding button in terms of tool and personal protection in region, to select the risk operation icon for being suitable for this item operation, then is clicked The risk operation icon selected, system arrange the consideration factor, hazard analysis and HACCP and the control that load in risk work measure analysis library The normal data applied after choosing the normal data of needs in the normal data project table listed, clicks the corresponding button, will be warp The Preventive Control of Dangerous Spot measure selected is stored into this item job task.
In addition to two ticket Analysis about Dangerous Point and assessment can be generated in risk work measure analysis library, system can also be from standard It is generated in the dangerous point assessment of two tickets.
The data operation structure of work ticket is handled, as shown in table 4.
The data operation structure of operation order is handled, as shown in table 5.
Handle the data operation structure of work ticket
Table 4
Note: the Preventive Control of Dangerous Spot in table 4 analyzes data, selects to generate from risk measure job analysis library, can also be from mark It is generated in quasi- two ticket dangerous point measures.
Handle the data operation structure of operation order
Table 5
Note: the Preventive Control of Dangerous Spot in table 5 analyzes data, selects to generate from risk measure job analysis library.It can also be from mark It is generated in the dangerous point measure of quasi- two tickets.
3, in the risk icon selected, after carrying out level assessment, including Consideration, harm to dangerous point in terms by terms Fruit, control measure, finally summarize for suitable for this item operation unit dangerous point and Pre-control measures data.
According to repeatedly selecting for the Preventive Control of Dangerous Spot measure in step 2, the danger of this item standard operation task is ultimately formed Danger point Pre-control measures.
4, in the performance of work of work ticket, operation order, dangerous point and Pre-control measures ticket are output to the action data summarized, Carry out the practical application at scene.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (5)

1. a kind of Risk Pre-control analyzes intelligent management, which comprises the following steps: first, install server and Application system simultaneously completes software and hardware networking, and terminal PC is connected by network transmission with application system;Second, in application system In, data management is carried out to risk factor, hazard analysis and HACCP and control measure respectively;Third, it is living from operation in application system Dynamic, operating environment and the angle for using tool, summarize risk factor, hazard analysis and HACCP and control measure, form risk and arrange Apply job analysis library;4th, when the java standard library of two tickets is write, reference is carried out to risk measure job analysis library;5th, When carrying out dangerous point measures analysis to two tickets, reference is carried out to risk measure job analysis library;6th, handle two tickets Dangerous point and pre-control analyze data, are applied in operation field.
2. Risk Pre-control according to claim 1 analyzes intelligent management, which is characterized in that the application system is Intelligent building block system risk management system.
3. Risk Pre-control according to claim 1 analyzes intelligent management, which is characterized in that decomposed using job task Structure, respectively from activity, operating environment and using tool angle, to risk factor, hazard analysis and HACCP and control measure into Row summarizes, and forms risk measure job analysis library.
4. Risk Pre-control according to claim 1 analyzes intelligent management, which is characterized in that by making to risk measure Industry analyzes the reference in library, forms the Preventive Control of Dangerous Spot measures analysis data of two ticket of standard, two ticket of practical application, final output It prints and uses in operation field.
5. Risk Pre-control according to claim 1 or 2 or 3 or 4 analyzes intelligent management, which is characterized in that described two Ticket includes work ticket and operation order.
CN201810033483.3A 2018-01-12 2018-01-12 A kind of Risk Pre-control analysis intelligent management Pending CN109299843A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810033483.3A CN109299843A (en) 2018-01-12 2018-01-12 A kind of Risk Pre-control analysis intelligent management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810033483.3A CN109299843A (en) 2018-01-12 2018-01-12 A kind of Risk Pre-control analysis intelligent management

Publications (1)

Publication Number Publication Date
CN109299843A true CN109299843A (en) 2019-02-01

Family

ID=65168127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810033483.3A Pending CN109299843A (en) 2018-01-12 2018-01-12 A kind of Risk Pre-control analysis intelligent management

Country Status (1)

Country Link
CN (1) CN109299843A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112270496A (en) * 2020-11-16 2021-01-26 河北云酷科技有限公司 Industrial field on-site operation risk pre-control method
CN114764641A (en) * 2022-04-29 2022-07-19 中国能源建设集团广东省电力设计研究院有限公司 Two-ticket management method, system, computer equipment and medium based on security verification
US11914719B1 (en) 2020-04-15 2024-02-27 Wells Fargo Bank, N.A. Systems and methods for cyberthreat-risk education and awareness

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150057821A1 (en) * 2006-07-19 2015-02-26 Causam Energy, Inc. Real-Time Predictive Systems for Intelligent Energy Monitoring and Management of Electrical Electrical Power Networks
CN106156343A (en) * 2016-07-21 2016-11-23 中国地质大学(武汉) A kind of deep foundation pit construction Scheme Security evaluation knowledge base and automatic safe reviewing method
CN107341550A (en) * 2017-05-03 2017-11-10 北京海顿中科技术有限公司 Failure/hidden danger KBS and method for building up

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150057821A1 (en) * 2006-07-19 2015-02-26 Causam Energy, Inc. Real-Time Predictive Systems for Intelligent Energy Monitoring and Management of Electrical Electrical Power Networks
CN106156343A (en) * 2016-07-21 2016-11-23 中国地质大学(武汉) A kind of deep foundation pit construction Scheme Security evaluation knowledge base and automatic safe reviewing method
CN107341550A (en) * 2017-05-03 2017-11-10 北京海顿中科技术有限公司 Failure/hidden danger KBS and method for building up

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11914719B1 (en) 2020-04-15 2024-02-27 Wells Fargo Bank, N.A. Systems and methods for cyberthreat-risk education and awareness
CN112270496A (en) * 2020-11-16 2021-01-26 河北云酷科技有限公司 Industrial field on-site operation risk pre-control method
CN114764641A (en) * 2022-04-29 2022-07-19 中国能源建设集团广东省电力设计研究院有限公司 Two-ticket management method, system, computer equipment and medium based on security verification
CN114764641B (en) * 2022-04-29 2023-11-14 中国能源建设集团广东省电力设计研究院有限公司 Two-ticket management method, system, computer equipment and medium based on security verification

Similar Documents

Publication Publication Date Title
CN1690684B (en) Methods and systems for monitoring and diagnosing machinery
CN103389705B (en) Operation supervise and control system and operation supervise and control method
CN109299843A (en) A kind of Risk Pre-control analysis intelligent management
CN108604225A (en) It is created by the collaborative document that multiple and different team carry out
CN104573971A (en) Metal mine underground safety digital management system based on radio frequency and WIFI technology
CN111176642B (en) Interactive visualization processing system based on plane graph and application method
CN103106368A (en) Vulnerability scanning method for grade protection
CN109377021A (en) Construction method, system and the relevant apparatus of business structure in a kind of business system
CN104461708A (en) Method and system for processing task information
Yin et al. Extending the problem frames approach for capturing non-functional requirements
EP1967994A1 (en) A system for capturing project information over a network
Picchi System view of lean construction application opportunities
CN107730069A (en) The method and apparatus of standard construction flow
US20050216881A1 (en) Software structure driven approach for implementing workflow
CN111144739A (en) Paperless examination and evaluation system
US20150073850A1 (en) Assessing Staffing Coverage for Software Applications
CN108111626A (en) Micro- application system of substation's production scene standardized work
CN113127630A (en) Power visualization data resource management platform system
Motta Towards a strategy for supporting the engineering of IoT software systems
CN109726178A (en) Interactive application method, apparatus, computer equipment and the storage medium of unstructured document
Dyussenov et al. E-Government Policy Implementation in Thailand: Success or Failure?
Dioha et al. Beyond dollars and cents: why socio-political factors matter in energy system modeling
CN109409825A (en) Pass through the method, device and equipment of mobile terminal accessing information system
Sharma et al. Technical use of Smart Contracts in Blockchain-Based Project Management
Redlein et al. Relationship of emerging technologies and their influence on Facility Services

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190201

RJ01 Rejection of invention patent application after publication