CN109295957B - Geocell fixing frame and working method thereof - Google Patents

Geocell fixing frame and working method thereof Download PDF

Info

Publication number
CN109295957B
CN109295957B CN201811190494.9A CN201811190494A CN109295957B CN 109295957 B CN109295957 B CN 109295957B CN 201811190494 A CN201811190494 A CN 201811190494A CN 109295957 B CN109295957 B CN 109295957B
Authority
CN
China
Prior art keywords
fixing frame
groove
geocell
main body
frame main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811190494.9A
Other languages
Chinese (zh)
Other versions
CN109295957A (en
Inventor
叶磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Huifeng New Synthetic Materials Co ltd
Original Assignee
Anhui Huifeng New Synthetic Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Huifeng New Synthetic Materials Co ltd filed Critical Anhui Huifeng New Synthetic Materials Co ltd
Priority to CN201811190494.9A priority Critical patent/CN109295957B/en
Publication of CN109295957A publication Critical patent/CN109295957A/en
Application granted granted Critical
Publication of CN109295957B publication Critical patent/CN109295957B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/005Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a geocell fixing frame which comprises a fixing frame main body, wherein grooves are uniformly formed in the outer surface of the front end of the fixing frame main body, plugs are welded on the outer surface of the bottom end of the fixing frame main body, conical drill bits are welded on the outer surface of the bottom end of each plug, welding areas are arranged on the outer surface of the upper end of the fixing frame main body at equal intervals, a bump is fixedly arranged on the outer surface of one end, away from the grooves, of the fixing frame main body, a first mounting groove and a second mounting groove are formed in the inner side of the fixing frame main body, a sliding groove is formed in the outer surface of one side of each plug, a sliding rail is arranged in the sliding groove and close to the edge; the geocell fixing frame can fix geocells of different specifications and sizes, and effectively prevents sundries from polluting filling materials or rainwater from washing the filling materials in rainy days, so that the filling materials can be better molded in the geocells.

Description

Geocell fixing frame and working method thereof
Technical Field
The invention belongs to the technical field of geocells, and particularly relates to a fixing frame and a working method thereof, in particular to a geocell fixing frame and a working method thereof.
Background
The fixing frame is a tool for limiting the relative movement of objects, is convenient for workers to operate or process the objects, is mainly applied to the fields of building construction and part processing of various large factories, and is quite wide in application, but the existing fixing frame has certain defects in the using process, cannot well install geocells with different specifications and sizes, is complicated to assemble, and is believed to be further improved in the future so as to meet different requirements in use;
the existing geocell fixing frame has certain defects in the using process, cannot fix geocells of different specifications and sizes, is not strong in practicability, cannot effectively prevent sundries from polluting filling materials or prevent rainwater from scouring the filling materials in rainy days, enables the filling materials to be formed in the geocell and cannot be fine, and the warning effect is poor.
Disclosure of Invention
In order to overcome the technical problems, the invention aims to provide a geocell fixing frame and a working method thereof.A pulley is matched with a sliding rail, the auxiliary bolt can freely move along the bolt through the pulley and the sliding rail, and the height of the auxiliary bolt is adjusted according to geocells with different heights, so that the geocells with different heights can be fixed; the earthwork standard room fixing frame is provided with the convex block and the groove, wherein the rigid spring deforms under the action of force, then the convex block is inserted into the groove, and meanwhile, the first clamping block and the second clamping block slide into the first clamping groove and the second clamping groove respectively, so that the convex block can be fixed in the groove, a plurality of groups of fixing frame main bodies are spliced, earthwork standard rooms with different specifications and sizes can be conveniently fixed, workers can conveniently transport the earthwork standard rooms; through being provided with mounting groove and No. two mounting grooves, treat to fill and can install the mount main part with the apron through mounting groove and No. two mounting grooves after accomplishing, effectually prevent that debris from polluting filling material or rainy day rainwater from scouring away filling material for filling material runs off.
The purpose of the invention can be realized by the following technical scheme:
a geocell fixing frame comprises a fixing frame main body, wherein grooves are uniformly formed in the outer surface of the front end of the fixing frame main body, plugs are welded to the outer surface of the bottom end of the fixing frame main body, conical drill bits are welded to the outer surface of the bottom end of each plug, welding areas are arranged on the outer surface of the upper end of the fixing frame main body at equal intervals, a protruding block is fixedly installed on the outer surface of one end, away from the grooves, of the fixing frame main body, and a first mounting groove and a second mounting groove are formed in the inner side;
the outer surface of one side of the plug is provided with a sliding groove, a sliding rail is arranged in the sliding groove and close to the edge, a pulley is slidably mounted on the sliding rail, the outer surface of one end of the pulley is fixedly provided with a limiting block, the outer surface of the other end of the pulley is fixedly provided with a linking block, the outer surface of one end of the linking block, which is far away from the pulley, is provided with an auxiliary plug, and the outer surface of the bottom end of the auxiliary plug is welded with an auxiliary conical drill bit;
a first clamping block and a second clamping block are movably mounted on the outer surfaces of the two sides of the convex block respectively, a rigid spring is connected between the first clamping block and the second clamping block, and a first clamping groove and a second clamping groove are symmetrically formed in the two sides of the inner wall of the groove;
the utility model discloses a fixing frame, including fixing frame main part, plug, geotechnological check room, fixing frame main part's upper end surface scribbles fluorescent coating, be connected with geotechnological check room on the plug, and geotechnological check room is located the inside of fixing frame main part, the inside packing of geotechnological check room has the filling material.
As a further scheme of the invention: the quantity of a mounting groove and No. two mounting grooves is two sets of, and two sets of mounting groove symmetries set up and two sets of No. two mounting groove symmetries set up, and the inboard at the mount main part is installed through a mounting groove and No. two mounting grooves to the apron.
As a further scheme of the invention: the grooves and the lugs are transversely arranged in a straight line shape, the grooves are matched with the lugs, and the fixing frame main bodies are spliced through the grooves and the lugs.
As a further scheme of the invention: the rigid spring deforms under the action of force and restores to the original state after the force is eliminated, the first clamping block is matched with the first clamping groove, the second clamping block is matched with the second clamping groove, and the protruding block is fixed inside the groove through the first clamping block, the first clamping groove, the second clamping block and the second clamping groove.
As a further scheme of the invention: the pulley is matched with the sliding rail, the auxiliary plug bolt moves on the plug bolt through the pulley and the sliding rail, and the width of the limiting block is larger than that of the sliding groove.
As a further scheme of the invention: the quantity of bolt is a plurality of groups, a plurality of groups of bolts and the perpendicular setting of mount main part, the surface of conical bit and supplementary conical bit all scribbles wear-resistant coating.
As a further scheme of the invention: the geocell is stretched through a plurality of groups of bolts and is fixed on the ground.
A working method of a fixing frame is characterized by comprising the following steps:
the method comprises the following steps: the working personnel exert force on the first clamping block and the second clamping block, the rigid spring deforms under the action of the force, then the protruding block is inserted into the groove, and the first clamping block and the second clamping block slide into the first clamping groove and the second clamping groove respectively, so that the protruding block is fixed in the groove, and the splicing of the fixing frame main body is realized;
step two: inserting the plug into the pre-buried ground through a conical drill bit by the assembled fixing frame, and then inserting the auxiliary plug into the pre-buried ground through an auxiliary conical drill bit under the action of the pulley and the sliding rail to realize the fixation of the geocell;
step three: fill the packing material in the inside of geotechnological check room, will lap to install on the mount through mounting groove and No. two mounting grooves.
The invention has the beneficial effects that:
through being provided with supplementary bolt, wherein pulley and slide rail cooperation, supplementary bolt can freely remove along the bolt through pulley and slide rail, according to the height of the supplementary bolt of geotechnological check room adjustment of co-altitude to the completion is fixed to the geotechnological check room of co-altitude not, and the practicality is strong, and the staff of being convenient for carries out pre-buried to bolt and supplementary bolt with supplementary cone bit's setting.
Through being provided with lug and recess, wherein rigid spring produces the deformation under the effect of power, inserts the lug in the recess after that, and in a draw-in groove and No. two draw-in grooves were slided into respectively to a fixture block and No. two fixture blocks simultaneously for the lug can be fixed in the recess, thereby realizes the concatenation of a plurality of groups mount main parts, is convenient for fix the geotechnological check room of different specifications size, and the staff of being convenient for transports it, and is comparatively convenient.
Through being provided with mounting groove and No. two mounting grooves, treat to fill and can install the mount main part with the apron through mounting groove and No. two mounting grooves after accomplishing, effectually prevent that debris from polluting filling material or rainy day rainwater from scouring away filling material for filling material runs off.
Drawings
The invention will be further described with reference to the accompanying drawings.
Fig. 1 is a schematic view of the entire structure of a geocell fixing frame according to the present invention.
FIG. 2 is a schematic structural diagram of a fixing frame main body in the geocell fixing frame of the present invention
Fig. 3 is a partial structural view of a geocell fixing frame according to the present invention.
FIG. 4 is a schematic diagram of the connection of the projection and the groove of the geocell fixing frame according to the present invention.
Fig. 5 is a schematic view of the geocell of the present invention filled with a filling material.
In the figure 1, a fixing frame main body; 2. a groove; 3. plugging; 4. a conical drill bit; 5. a welding zone; 6. a bump; 7. a chute; 8. a slide rail; 9. a pulley; 10. a limiting block; 11. a joining block; 12. an auxiliary plug; 13. an auxiliary cone drill bit; 14. a first clamping block; 15. a second clamping block; 16. a rigid spring; 17. a first card slot; 18. a second card slot; 19. a fluorescent coating; 20. a geocell; 21. filling materials; 22. a first mounting groove; 23. and a second mounting groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1-5, the geocell fixing frame comprises a fixing frame main body 1, wherein grooves 2 are uniformly formed in the outer surface of the front end of the fixing frame main body 1, plugs 3 are welded to the outer surface of the bottom end of the fixing frame main body 1, conical drill bits 4 are welded to the outer surface of the bottom end of the plugs 3, welding areas 5 are equidistantly arranged on the outer surface of the upper end of the fixing frame main body 1, bumps 6 are fixedly mounted on the outer surface of one end, away from the grooves 2, of the fixing frame main body 1, and a first mounting groove 22 and a second mounting groove 23 are formed in the inner side of the fixing;
the outer surface of one side of the plug 3 is provided with a sliding groove 7, a sliding rail 8 is arranged in the sliding groove 7 and close to the edge, a pulley 9 is slidably mounted on the sliding rail 8, a limiting block 10 is fixedly mounted on the outer surface of one end of the pulley 9, a connecting block 11 is fixedly mounted on the outer surface of the other end of the pulley 9, an auxiliary plug 12 is mounted on the outer surface of one end, far away from the pulley 9, of the connecting block 11, and an auxiliary conical drill bit 13 is welded on the outer surface of the bottom end of the auxiliary plug 12;
a first clamping block 14 and a second clamping block 15 are movably mounted on the outer surfaces of the two sides of the protruding block 6 respectively, a rigid spring 16 is connected between the first clamping block 14 and the second clamping block 15, and a first clamping groove 17 and a second clamping groove 18 are symmetrically formed in the two sides of the inner wall of the groove 2;
the outer surface of the upper end of the fixing frame main body 1 is coated with a fluorescent coating 19, the plug 3 is connected with a geocell 20, the geocell 20 is located inside the fixing frame main body 1, and a filling material 21 is filled inside the geocell 20.
As a further scheme of the invention: the quantity of a mounting groove 22 and No. two mounting grooves 23 is two sets of, and two sets of mounting groove 22 symmetries set up and two sets of No. two mounting grooves 23 symmetries set up, and the apron is installed in the inboard of mount main part 1 through a mounting groove 22 and No. two mounting grooves 23.
As a further scheme of the invention: the grooves 2 and the lugs 6 are transversely arranged in a straight line shape, the grooves 2 are matched with the lugs 6, and the fixing frame main bodies 1 are spliced through the grooves 2 and the lugs 6.
As a further scheme of the invention: the rigid spring 16 deforms under the action of force and restores to the original shape after the force is eliminated, the first clamping block 14 is matched with the first clamping groove 17, the second clamping block 15 is matched with the second clamping groove 18, and the bump 6 is fixed inside the groove 2 through the first clamping block 14, the first clamping groove 17, the second clamping block 15 and the second clamping groove 18.
As a further scheme of the invention: the pulley 9 is matched with the slide rail 8, the auxiliary bolt 12 moves on the bolt 3 through the pulley 9 and the slide rail 8, and the width of the limiting block 10 is larger than that of the slide groove 7.
As a further scheme of the invention: the quantity of plug 3 is a plurality of groups, a plurality of groups of plug 3 set up with mount main part 1 is perpendicular, conical bit 4 and auxiliary conical bit 13's surface all scribbles wear-resistant coating.
As a further scheme of the invention: the geocell 20 is extended by a plurality of sets of plugs 3 and is fixed to the ground.
A working method of a geocell fixing frame specifically comprises the following steps:
the method comprises the following steps: the worker applies force to the first clamping block 14 and the second clamping block 15, the rigid spring 16 deforms under the force, then the projection 6 is inserted into the groove 2, and the first clamping block 14 and the second clamping block 15 slide into the first clamping groove 17 and the second clamping groove 18 respectively, so that the projection 6 is fixed in the groove 2, and the fixing frame body 1 is spliced;
step two: the assembled fixing frame inserts the plug 3 into the pre-buried ground through the conical drill bit 4, and then under the action of the pulley 9 and the slide rail 8, the auxiliary plug 12 is inserted into the pre-buried ground through the auxiliary conical drill bit 13, so that the geocell 20 is fixed;
step three: filling material 21 is filled in the geocell 20, and the cover plate is installed on the fixing frame through the first installation groove 22 and the second installation groove 23.
A geocell fixing frame, in operation, firstly, a worker applies force to a first clamping block and a second clamping block, a rigid spring deforms under the action of force, then a convex block is inserted into a groove, the first clamping block and the second clamping block slide into the first clamping groove and the second clamping groove respectively, so that the convex block is fixed in the groove, the main body of the fixing frame is spliced, according to the specification size of a geocell, a plurality of groups of fixing frame main bodies are spliced, the geocell fixing of different specifications and sizes is facilitated, the geocell fixing frame is convenient to transport and install by the worker, secondly, the spliced fixing frame is placed on the geocell, a plug is inserted into a pre-buried region through a conical drill bit, the setting of the plug can effectively prevent the shrinkage of the geocell, and the auxiliary plug is arranged, wherein a pulley is matched with a sliding rail, the auxiliary plug can freely move along the plug through the pulley and the slide rail, the height of the auxiliary plug is adjusted according to different heights of geocells, meanwhile, the auxiliary plug is inserted into the pre-buried ground through the auxiliary conical drill bit, so that the different heights of geocells are fixed, the practicability is high, the arrangement of the conical drill bit and the auxiliary conical drill bit is convenient for workers to pre-embed the plug and the auxiliary plug, the width of the limiting block is larger than that of the slide groove, the auxiliary plug is not easy to be separated from the plug, the limiting block can slide in the slide groove along with the pulley, finally, the cover plate can be installed on the fixing frame main body through the first installation groove and the second installation groove after the filling is finished, and the arrangement of the cover plate effectively prevents sundries from polluting the filling materials or rainwater from washing the filling materials in rainy days, make the filling material run off, have better effect of blockking for the filling material can be better at the indoor shaping that carries on of geotechnological check, scribbles the fluorescence coating through the upper end surface at the mount main part simultaneously, can send the light night, and the effectual passerby or the passing vehicle of preventing from above has better warning effect.
According to the invention, the auxiliary plug is arranged, wherein the pulley is matched with the sliding rail, the auxiliary plug can freely move along the plug through the pulley and the sliding rail, and the height of the auxiliary plug is adjusted according to the geocells with different heights, so that the geocells with different heights can be fixed, the practicability is strong, and the arrangement of the conical drill bit and the auxiliary conical drill bit is convenient for workers to pre-embed the plug and the auxiliary plug; the earthwork standard room fixing frame is provided with the convex block and the groove, wherein the rigid spring deforms under the action of force, then the convex block is inserted into the groove, and meanwhile, the first clamping block and the second clamping block slide into the first clamping groove and the second clamping groove respectively, so that the convex block can be fixed in the groove, a plurality of groups of fixing frame main bodies are spliced, earthwork standard rooms with different specifications and sizes can be conveniently fixed, workers can conveniently transport the earthwork standard rooms; through being provided with mounting groove and No. two mounting grooves, treat to fill and can install the mount main part with the apron through mounting groove and No. two mounting grooves after accomplishing, effectually prevent that debris from polluting filling material or rainy day rainwater from scouring away filling material for filling material runs off.
In the description herein, references to the description of "one embodiment," "an example," "a specific example" or the like are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing is merely exemplary and illustrative of the present invention and various modifications, additions and substitutions may be made by those skilled in the art to the specific embodiments described without departing from the scope of the invention as defined in the following claims.

Claims (8)

1. The geocell fixing frame is characterized by comprising a fixing frame main body (1), wherein grooves (2) are uniformly formed in the outer surface of the front end of the fixing frame main body (1), plug bolts (3) are welded on the outer surface of the bottom end of the fixing frame main body (1), conical drill bits (4) are welded on the outer surface of the bottom end of the plug bolts (3), welding areas (5) are arranged on the outer surface of the upper end of the fixing frame main body (1) at equal intervals, protruding blocks (6) are fixedly installed on the outer surface of one end, far away from the grooves (2), of the fixing frame main body (1), and a first mounting groove (22) and a second mounting groove (23) are formed in the inner side of;
the outer surface of one side of the plug (3) is provided with a sliding groove (7), a sliding rail (8) is arranged in the sliding groove (7) and close to the edge, a pulley (9) is slidably mounted on the sliding rail (8), a limiting block (10) is fixedly mounted on the outer surface of one end of the pulley (9), a connecting block (11) is fixedly mounted on the outer surface of the other end of the pulley (9), an auxiliary plug (12) is mounted on the outer surface of one end, far away from the pulley (9), of the connecting block (11), and an auxiliary conical drill bit (13) is welded on the outer surface of the bottom end of the auxiliary plug (12);
a first clamping block (14) and a second clamping block (15) are movably mounted on the outer surfaces of the two sides of the protruding block (6) respectively, a rigid spring (16) is connected between the first clamping block (14) and the second clamping block (15), and a first clamping groove (17) and a second clamping groove (18) are symmetrically formed in the two sides of the inner wall of the groove (2);
the outer surface of the upper end of the fixing frame main body (1) is coated with a fluorescent coating (19), the plug (3) is connected with a geocell (20), the geocell (20) is located inside the fixing frame main body (1), and filling materials (21) are filled inside the geocell (20).
2. The geocell fixing frame according to claim 1, wherein the number of the first mounting groove (22) and the second mounting groove (23) is two, the two first mounting grooves (22) are symmetrically arranged, the two second mounting grooves (23) are symmetrically arranged, and the cover plate is mounted on the inner side of the fixing frame main body (1) through the first mounting groove (22) and the second mounting groove (23).
3. The geocell holder of claim 1, wherein the grooves (2) and the protrusions (6) are arranged in a horizontal line, the grooves (2) and the protrusions (6) are engaged, and the holder body (1) is assembled by the grooves (2) and the protrusions (6).
4. The geocell holder according to claim 1, wherein the rigid spring (16) deforms under the action of force and returns to its original shape after the force is removed, the first engaging portion (14) engages with the first engaging groove (17), the second engaging portion (15) engages with the second engaging groove (18), and the protrusion (6) is fixed inside the groove (2) through the first engaging portion (14), the first engaging groove (17), the second engaging portion (15) and the second engaging groove (18).
5. The geocell holder of claim 1, wherein the pulley (9) is engaged with the slide rail (8), the auxiliary bolt (12) moves on the bolt (3) through the pulley (9) and the slide rail (8), and the width of the stopper (10) is greater than the width of the chute (7).
6. The geocell holder of claim 1, wherein the number of the plugs (3) is several groups, the several groups of plugs (3) are arranged perpendicular to the holder body (1), and the outer surfaces of the cone bit (4) and the auxiliary cone bit (13) are coated with wear-resistant coatings.
7. Geocell holder according to claim 1, wherein the geocell (20) is extended and fixed to the ground by groups of plugs (3).
8. A method of operating a geocell holder according to any one of claims 1-7, the method comprising the steps of:
the method comprises the following steps: a worker applies force to the first clamping block (14) and the second clamping block (15), the rigid spring (16) deforms under the action of the force, then the projection (6) is inserted into the groove (2), and the first clamping block (14) and the second clamping block (15) slide into the first clamping groove (17) and the second clamping groove (18) respectively, so that the projection (6) is fixed in the groove (2), and the fixing frame main body (1) is spliced;
step two: the assembled fixing frame inserts the plug (3) into the pre-buried ground through the conical drill bit (4), and then under the action of the pulley (9) and the sliding rail (8), the auxiliary plug (12) is inserted into the pre-buried ground through the auxiliary conical drill bit (13), so that the geocell (20) is fixed;
step three: filling materials (21) are filled in the geocell (20), and the cover plate is installed on the fixing frame through the first installation groove (22) and the second installation groove (23).
CN201811190494.9A 2018-10-12 2018-10-12 Geocell fixing frame and working method thereof Active CN109295957B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811190494.9A CN109295957B (en) 2018-10-12 2018-10-12 Geocell fixing frame and working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811190494.9A CN109295957B (en) 2018-10-12 2018-10-12 Geocell fixing frame and working method thereof

Publications (2)

Publication Number Publication Date
CN109295957A CN109295957A (en) 2019-02-01
CN109295957B true CN109295957B (en) 2020-09-08

Family

ID=65162464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811190494.9A Active CN109295957B (en) 2018-10-12 2018-10-12 Geocell fixing frame and working method thereof

Country Status (1)

Country Link
CN (1) CN109295957B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2829710B2 (en) * 1995-03-27 1998-12-02 住友軽金属工業株式会社 Protective fence
CN102677648A (en) * 2012-04-27 2012-09-19 葛南生 Simple wind sheltering and sand fixing device
KR101521438B1 (en) * 2014-09-02 2015-05-21 유흥식 Interlocking block for assembling triangle unit structure and Method for constructing drainage retaining wall to prevent landsliding using the same
CN205152934U (en) * 2015-11-20 2016-04-13 仪征市佳和土工材料有限公司 Lift adjustment formula geotechnique check room
CN106120696B (en) * 2016-06-22 2018-07-31 安徽徽风新型合成材料有限公司 A kind of weld fixture apparatus of TGXG
CN108149664B (en) * 2017-11-28 2020-01-03 安徽徽风新型合成材料有限公司 Folding type geocell mounting structure

Also Published As

Publication number Publication date
CN109295957A (en) 2019-02-01

Similar Documents

Publication Publication Date Title
CN105281645A (en) Fixing device used for adjacent installation of photovoltaic module of different thickness
CN205369605U (en) Curtain ornamental strip system
CN109295957B (en) Geocell fixing frame and working method thereof
CN206722965U (en) A kind of wind-power electricity generation main frame of achievable Fast Installation
CN205859346U (en) The comprehensive suspension bracket of adjustable pipeline
CN203097306U (en) Assembled type building wallboard installation tool
CN109403475B (en) High-performance connecting structure of stone curtain wall deformation joint
CN211714275U (en) Connecting device for building glass curtain wall
CN201574661U (en) Door window structure convenient in field installation
CN204476179U (en) Auxiliary frame construction and installation fixture
CN216865626U (en) Safe and environment-friendly curtain wall mounting structure
CN209909512U (en) Network monitoring camera mounting structure
CN203080825U (en) Sun-shade dynamic connection structure
CN211690934U (en) Automatically controlled integration cabin assembled module connection structure
CN208816135U (en) A kind of high-intensitive subway segment being easily installed alignment
CN211842483U (en) Environment-friendly cement paste particle synthetic board
CN209339044U (en) A kind of isolated column
CN218234194U (en) Exposed frame decoration strip mounting structure of building curtain wall
CN214657787U (en) Be used for construction to use erection joint spare
CN211172797U (en) Wall surface dry-hanging stone with mounting structure
CN217714015U (en) Pipeline connecting structure for municipal water supply and drainage
CN216588063U (en) Novel protection is used in civil engineering construction device
CN204919765U (en) Transformer substation uses curb drainage system
CN204266142U (en) A kind of adjustable manual banister
CN214534814U (en) Pre-buried channel assembly for pipe gallery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant