CN109295869A - 水域工况下大断面箱涵改排接口装置及方法 - Google Patents
水域工况下大断面箱涵改排接口装置及方法 Download PDFInfo
- Publication number
- CN109295869A CN109295869A CN201811235347.9A CN201811235347A CN109295869A CN 109295869 A CN109295869 A CN 109295869A CN 201811235347 A CN201811235347 A CN 201811235347A CN 109295869 A CN109295869 A CN 109295869A
- Authority
- CN
- China
- Prior art keywords
- box culvert
- connector
- plate
- hole
- interface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F5/00—Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
- E01F5/005—Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Sewage (AREA)
Abstract
本发明涉及一种水域工况下大断面改排接口装置及方法,该装置的连接件端头设有导向板,连接件端尾设有限位板,连接件插入箱涵孔内,并使限位板顶住箱涵墙壁,导向板上用螺栓固定封头板,限位板上用螺栓固定封尾板,在封尾板预留的孔洞内浇筑水下混凝土,连接件管外壁和箱涵孔之间的间隙内压入混凝土浆;所述箱涵与连接件的接口处安装钢模框,钢模框内浇筑水下混凝土,形成完整的密封结构。本发明的改排接口装置与箱涵接口处通过在定型化钢模框内浇筑混凝土,极大的确保了密封效果。该方法较常规的围堰干作业施工连接井接口装置,在确保改排效果及密封功能的同时极大降低了施工成本,缩短了施工工期,可在水域工况下大断面箱涵改排接口工程中推广应用。
Description
技术领域
本发明涉及一种水域工况下大断面箱涵接口装置,尤其是一种改排接口装置及施工方法。
背景技术
随着国家最新环保政策及措施相继出台,部分现状入河(海)排放口位于国家水源保护区范围内,需对不符合要求的现状排水口进行迁建,进而引发排水路线改道,导致部分旧排水箱涵需设置改排接口装置的问题。
常规大断面箱涵改排接口装置为连接井方式,该连接井施工需在河(海)域内进行围堰干作业施工,施工范围大,工程造价高,且施工工期长,需厂内停机时间长,因此,有必要在在确保改排效果及密封功能的同时降低施工成本,提高施工效率,减少停机运行时间,研究新的接口装置及施工方法。
发明内容
本发明是要提供一种水域工况下大断面箱涵改排接口装置及施工方法,用于解决常规围堰施工连接井接口,施工成本高,工期较长,厂区停运时间长的难题。
本发明的技术方案是:一种水域工况下大断面箱涵改排接口装置,包括箱涵、连接件、钢模框,所述连接件端头设有导向板,连接件端尾设有限位板,连接件插入箱涵孔内,并使限位板顶住箱涵墙壁,导向板上用螺栓固定封头板,限位板上用螺栓固定封尾板,在封尾板预留的孔洞内浇筑水下混凝土,连接件管外壁和箱涵孔之间的间隙内压入混凝土浆;所述箱涵与连接件的接口处安装钢模框,钢模框内浇筑水下混凝土,形成完整的密封结构。
进一步,所述连接件为组合型钢结构,用于实现箱涵与改排管之间的连接及转换。
一种采用水域工况下大断面箱涵改排接口装置的施工方法,其步骤为:
1)用起重船吊装并移位连接件,使连接件插入箱涵孔内至限位板顶住箱涵墙壁;
2)潜水员水下将封头板用螺栓固定在导向板上,再将封尾板用螺栓固定在限位板上,最后用导管插入封尾板预留的孔洞内浇筑水下混凝土,在混凝土达龄期之后,再利用注浆孔对连接件管外壁和箱涵孔之间的间隙进行压浆;
3)箱涵与连接件的接口处通过在安装好的钢模框内浇筑水下混凝土,使其形成完整的密封结构。
本发明的有益效果是:
较类似工况大断面箱涵改排施工:
1、全部水下作业,无需筑岛或围堰施工,经济效益显著;
2、接口装置连接件为组合型钢结构,可提前加工,安装方便,极大得缩短了施工周期;
3、对于多孔箱涵,可逐孔实施改排,最大限度减小了改排施工期间厂区停运的影响。
因此,本发明能够解决常规围堰施工连接井接口,施工成本高,工期较长,停机时间长的难题。
附图说明
图1是本发明的水域工况下大断面箱涵改排接口装置结构示意图;
图2是本发明的水域工况下大断面箱涵改排接口装置结构剖视图。
具体实施方式
下面结合附图与实施例对本发明作进一步的说明。
如图1,2所示,一种水域工况下大断面箱涵改排接口装置,包括箱涵1、起重船2、封头板3、导向板4、限位板5、封尾板6、钢模框7、连接件8。
连接件8端头设有导向板4,端尾设有限位板5,起重船2吊装并移位连接件8,使其插入箱涵1孔内至限位板5顶住箱涵1墙壁;而后将封头板3用螺栓固定在导向板4上,再将封尾板6用螺栓固定在限位板5上,最后在封尾板6预留的孔洞内浇筑水下混凝土,并压浆。同时箱涵1与连接件8的接口处通过在安装好的钢模框7内浇筑水下混凝土,使其形成完整的密封结构。
一种水域工况下大断面箱涵改排接口装置的施工方法,适用于旧排水口迁建,大断面箱涵需要设置改排接口装置且施工时间要求短的工况,其步骤为:
(1)起重船2吊装并移位连接件8,使其插入箱涵1孔内至限位板5顶住箱涵1墙壁;
(2)潜水员水下将封头板3用螺栓固定在导向板4上,再将封尾板6用螺栓固定在限位板5上,最后用导管插入封尾板6预留的孔洞内浇筑水下混凝土。在混凝土达龄期之后,再利用注浆孔对连接件8管外壁和箱涵1孔之间的间隙进行压浆;
(3)箱涵1与连接件8的接口处通过在安装好的钢模框7内浇筑水下混凝土,使其形成完整的密封结构。
Claims (3)
1.一种水域工况下大断面箱涵改排接口装置,包括箱涵(1)、连接件(8)、钢模框(7),其特征在于:所述连接件(8)端头设有导向板(4),连接件(8)端尾设有限位板(5),连接件(8)插入箱涵(1)孔内,并使限位板(5)顶住箱涵(1)墙壁,导向板(4)上用螺栓固定封头板(3),限位板(5)上用螺栓固定封尾板(6),在封尾板(6)预留的孔洞内浇筑水下混凝土,连接件(8)管外壁和箱涵(1)孔之间的间隙内压入混凝土浆;所述箱涵(1)与连接件(8)的接口处安装钢模框(7),钢模框(7)内浇筑水下混凝土,形成完整的密封结构。
2.根据权利要求1所述的水域工况下大断面箱涵改排接口装置,其特征在于:所述连接件(8)为组合型钢结构,用于实现箱涵(1)与改排管之间的连接及转换。
3.一种采用权利要求1或2所述的水域工况下大断面箱涵改排接口装置的施工方法,其特征在于,其步骤为:
1)用起重船(2)吊装并移位连接件(8),使连接件(8)插入箱涵(1)孔内至限位板(5)顶住箱涵(1)墙壁;
2)潜水员水下将封头板(3)用螺栓固定在导向板(4)上,再将封尾板(6)用螺栓固定在限位板(5)上,最后用导管插入封尾板(6)预留的孔洞内浇筑水下混凝土,在混凝土达龄期之后,再利用注浆孔对连接件(8)管外壁和箱涵(1)孔之间的间隙进行压浆;
3)箱涵(1)与连接件(8)的接口处通过在安装好的钢模框(7)内浇筑水下混凝土,使其形成完整的密封结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811235347.9A CN109295869B (zh) | 2018-10-23 | 2018-10-23 | 水域工况下大断面箱涵改排接口装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811235347.9A CN109295869B (zh) | 2018-10-23 | 2018-10-23 | 水域工况下大断面箱涵改排接口装置及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109295869A true CN109295869A (zh) | 2019-02-01 |
CN109295869B CN109295869B (zh) | 2021-05-28 |
Family
ID=65157605
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811235347.9A Active CN109295869B (zh) | 2018-10-23 | 2018-10-23 | 水域工况下大断面箱涵改排接口装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109295869B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101225664A (zh) * | 2007-01-18 | 2008-07-23 | 中船第九设计研究院 | 一种沉箱船坞结构及其施工方法 |
CN102086634A (zh) * | 2011-01-07 | 2011-06-08 | 广东省电力设计研究院 | 一种海洋水下拼装式取水口及其施工方法 |
EP2899323A1 (en) * | 2014-01-24 | 2015-07-29 | CS-Beton s.r.o. | Slotted pipe with fire seal drainage system and its use |
CN205907695U (zh) * | 2016-04-20 | 2017-01-25 | 中铁建港航局集团路桥工程有限公司 | 一种钢吊箱封堵装置 |
CN207079698U (zh) * | 2017-08-15 | 2018-03-09 | 中铁四局集团第三建设有限公司 | 一种检查井内用分体式管道封堵系统 |
CN107975063A (zh) * | 2017-10-25 | 2018-05-01 | 上海市基础工程集团有限公司 | 大断面取排水箱涵在运营状态下临时封堵结构及施工方法 |
-
2018
- 2018-10-23 CN CN201811235347.9A patent/CN109295869B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101225664A (zh) * | 2007-01-18 | 2008-07-23 | 中船第九设计研究院 | 一种沉箱船坞结构及其施工方法 |
CN102086634A (zh) * | 2011-01-07 | 2011-06-08 | 广东省电力设计研究院 | 一种海洋水下拼装式取水口及其施工方法 |
EP2899323A1 (en) * | 2014-01-24 | 2015-07-29 | CS-Beton s.r.o. | Slotted pipe with fire seal drainage system and its use |
CN205907695U (zh) * | 2016-04-20 | 2017-01-25 | 中铁建港航局集团路桥工程有限公司 | 一种钢吊箱封堵装置 |
CN207079698U (zh) * | 2017-08-15 | 2018-03-09 | 中铁四局集团第三建设有限公司 | 一种检查井内用分体式管道封堵系统 |
CN107975063A (zh) * | 2017-10-25 | 2018-05-01 | 上海市基础工程集团有限公司 | 大断面取排水箱涵在运营状态下临时封堵结构及施工方法 |
Non-Patent Citations (1)
Title |
---|
陈奕辉等: "大断面雨水箱涵改排施工技术", 《建筑施工》 * |
Also Published As
Publication number | Publication date |
---|---|
CN109295869B (zh) | 2021-05-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104005419B (zh) | 下沉法施工的箱涵构造及施工方法 | |
CN207727600U (zh) | 降水井封堵装置 | |
CN204532364U (zh) | 全断面岩石隧道掘进机工法地铁隧道泄压式衬砌结构 | |
CN106089245B (zh) | 一种用于单护盾tbm壁后延迟注浆方法 | |
CN207469277U (zh) | 一种基坑内地下连续墙漏水点快速注浆封堵装置 | |
CN204626377U (zh) | W型钢板桩结构 | |
CN101769157B (zh) | 隧道开挖中掌子面反压处置的施工方法 | |
CN104594389A (zh) | 一种带弹性止水条的后浇带外墙封堵结构 | |
CN109295869A (zh) | 水域工况下大断面箱涵改排接口装置及方法 | |
CN209538214U (zh) | 一种地下室外墙的后浇带结构 | |
CN107246030A (zh) | 基于钢板桩堵漏装置的施工方法 | |
CN204780962U (zh) | 基础底板中深井降水井内置抗浮锚杆封堵结构 | |
CN201028170Y (zh) | 钢制承插口预应力钢筒混凝土顶管 | |
CN216342124U (zh) | 一种隧道侧下方溶洞的处置结构 | |
CN108521097A (zh) | 一种电力预制隧道及其安装方法 | |
CN201196299Y (zh) | 预制混凝土管廊 | |
CN201196300Y (zh) | 预制圆柱形钢筋骨架混凝土管廊 | |
CN204098037U (zh) | 接触灌浆单向逆止灌浆盒 | |
CN208763032U (zh) | 一种拼装式钢护筒围堰止水装置 | |
CN207436107U (zh) | 用于沉管隧道的最终接头结构形式 | |
CN112095748A (zh) | 一种新建污水管道与运行管道不停水碰接的快速施工方法 | |
CN101776181A (zh) | 顶管进洞洞口防水止浆装置及其施工方法 | |
CN203947500U (zh) | 可安装止水的地连墙锁口桩 | |
CN204252171U (zh) | 地下室伸缩缝的橡胶止水带安装固定专用工具 | |
CN101311598B (zh) | 钢筒加强钢制承插口预应力混凝土顶管 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |