CN109284973A - A kind of machinery plant reckons by the piece Working hours management system - Google Patents

A kind of machinery plant reckons by the piece Working hours management system Download PDF

Info

Publication number
CN109284973A
CN109284973A CN201810971738.0A CN201810971738A CN109284973A CN 109284973 A CN109284973 A CN 109284973A CN 201810971738 A CN201810971738 A CN 201810971738A CN 109284973 A CN109284973 A CN 109284973A
Authority
CN
China
Prior art keywords
worker
information
unit
dimensional code
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810971738.0A
Other languages
Chinese (zh)
Other versions
CN109284973B (en
Inventor
吴笑盈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810971738.0A priority Critical patent/CN109284973B/en
Publication of CN109284973A publication Critical patent/CN109284973A/en
Application granted granted Critical
Publication of CN109284973B publication Critical patent/CN109284973B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/105Human resources
    • G06Q10/1053Employment or hiring
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0025Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Manufacturing & Machinery (AREA)
  • Data Mining & Analysis (AREA)
  • General Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

It reckons by the piece Working hours management system the invention discloses a kind of machinery plant, belong to statistical technique field, card information generating unit, company's relevant information storage unit, the double-deck association two dimensional code generation unit, bilayer are associated with two dimensional code printing application unit, the double-deck association two dimensional code verifies recognition unit, acquisition timing starting terminates and state resource unit, resource access starting timing unit and integrated data processing unit.By the way that the verification information of worker is fitted on the two dimensional code of product, complete one yard of dual-purpose purpose, the statistics to workpiece can be completed before factory, it is specifically what which worker manufactured which workpiece, which can be matched, simultaneously, quickly workpiece can also be counted simultaneously, by photographing to record data come evaluation time, photographing to record to working condition simultaneously, the more accurately working time of record employee, simultaneously when calculating wage, it is calculated using the workpiece of working time and manufacture, the composite labour wage for completing worker calculates, so that the wage calculated is more fair.

Description

A kind of machinery plant reckons by the piece Working hours management system
Technical field
It reckons by the piece Working hours management system the present invention relates to statistical technique domain more particularly to a kind of machinery plant.
Background technique
In production enterprise, for clear employee's production work target, the maximum capacity of employee's operation is played, improves production Efficiency, the wages accounting mode reckoned by the piece using individual.We take the method manually counted before to count individual and reckon by the piece quantity, Embodiment is simply described below: 1, daily personal production capacity is filled in " personal day production capacity table " by Manufacturing Worker oneself, table by Squad leader's unified payment every morning;2, require data true, accurate when employee fills in " personal day production capacity table ";It writes clearly, no It alters easily;3, " personal day production capacity table " is sent at squad leader when coming off duty on the same day;4, squad leader daily will be to " a day for human beings of the previous day Production capacity table " data are audited, confirm it is errorless after fill in " production line daily output statistical form ";5, squad leader is After Publication " production Line daily output statistical form " before next day 9:00 production statistics is given, data inputting is carried out by production statistics.6, wages calculate assistant director The data monthly summarized by production statistics person manually calculate the wages of every worker at the production line.This method manually counted, is being grasped Data statistics amount is big in work, and link of changing hands is more, and wages are calculated laborious time-consuming.
It existing timing simultaneously and reckons by the piece and can only select one such calculation, so that often will appear calculating Mode is unfair for worker, it is therefore desirable to reckoning by the piece and timing while carrying out, so that calculation is more fair, It reckons by the piece simultaneously more easy and more accurate with timing course.
Summary of the invention
It reckons by the piece Working hours management system the purpose of the present invention is to provide a kind of machinery plant, solves existing factory's time and piece counting point Open calculating to worker unfairness, while reckon by the piece with timing can only separate computations the technical issues of.
A kind of machinery plant reckons by the piece Working hours management system, including worker's work number input unit, worker's information management unit, product Information management unit, two-dimensional code authentication information generation unit, company's relevant information storage unit, the double-deck association two dimensional code generate single Member, bilayer association two dimensional code verifying recognition unit, obtains timing starting end and shape at the double-deck association two dimensional code printing application unit State resource unit, resource access starting timing unit and integrated data processing unit,
Worker's work number input unit, worker's information management unit and Product Information Management unit are verified with two dimensional code Information generating unit connection, worker's work number input unit are used for work user input work number on and off duty, work number information are transmitted to Two-dimensional code authentication information generation unit, while the number of packages and time that this day produces, worker's information management are checked down for worker Unit users store the information of all employees of entire factory, and are fed back according to two-dimensional code authentication information generation unit solicited message Corresponding worker's essential information, the Product Information Management unit is for storing entire factory product information produced, according to two The product information that corresponding worker is done is fed back in the request of dimension code verification information generation unit, and product information is transmitted to two dimensional code and is tested Demonstrate,prove information generating unit, the product information that the two-dimensional code authentication information generation unit manufactures employee information and corresponding worker into Row production two-dimensional code authentication information, and two-dimensional code authentication information is transmitted to the double-deck association two dimensional code generation unit, the bilayer closes Connection two dimensional code generation unit is connect with two-dimensional code authentication information generation unit and company's relevant information storage unit respectively, the public affairs Department's relevant information storage unit is used to store the essential information of production company, and is associated with two dimensional code generation unit according to bilayer Request feed back corresponding information, bilayer is generated with two-dimensional code authentication information according to company's information and is associated with two dimensional code, the bilayer Association two dimensional code printing application unit is connect with bilayer association two dimensional code generation unit, is generated for receiving the double-deck association two dimensional code The bilayer of unit is associated with two dimensional code and prints and is pasted on the product produced automatically, and the double-deck association two dimensional code, which is verified, to be identified Unit is used to scan the double-deck association two dimensional code on product, identification read the two-dimensional code authentication information of the double-deck association two dimensional code and with The data comparison of storage inside obtains the information of production people, and production people's information is transmitted to integrated data processing list Member, the acquisition timing starting terminates and state resource unit is connect with resource access starting timing unit, for obtaining worker It goes into operation, the resource information of power cut-off and working condition, and the information of acquisition is transmitted to resource access starting timing unit, it is described Resource access starting timing unit be used to receive the resource information of the incoming worker's work number of worker's work number input unit and acquisition into When row starting timing, end timing and working condition detection button, and the data of detection are transmitted to integrated data processing unit, it is described Integrated data processing unit is used to calculate working hour, workpiece and the wage of worker.
Further, the two-dimensional code authentication information generation unit includes that identifying code production module and verifying code encryption generate Verification information module, the identifying code production module is used to obtain employee information and the product information of corresponding worker manufacture is led to It crosses hash algorithm to handle to obtain initial authentication code, the verifying code encryption generates verification information module and adds by accidental enciphering algorithm It is close to be verified information.
Further, the specific formula of the accidental enciphering algorithm are as follows:
In formula,Indicate that i-th maps the subsequent value of iteration n times, i=1,2,3....b-1, a-1, b, a, u is setting Value, and u ∈ (1.64,2),It is the numerical value of type double precision with u, a=1,2,3......, b=1,2,3......, initially Value is authenticity verification code, xn+1For identifying code.
Further, the double-deck association two dimensional code verifying recognition unit includes the double-deck association Response Code scan module, knows Other matching module and number of packages statistical module, the double-deck association Response Code scan module is connect with identification matching module, described double Layer association Response Code scan module is used to scan the double-deck association two dimensional code on product, and extracts the verifying of the double-deck association two dimensional code Information is transmitted to identification matching module, and identification matching module is connect with number of packages statistical module, and the identification matching module is for storing The incoming worker's verification information of two-dimensional code authentication information generation unit believes the verifying of the double-deck association Response Code scan module identification It ceases and is matched with worker's verification information of storage, which worker's manufacture when determining the product, and the worker for manufacturing the product Information is transmitted to number of packages statistical module, and the number of packages statistical module counts the manufacture product number of packages of worker, and statistics Data are transmitted to integrated data processing unit.
Further, the acquisition timing starting terminates and state resource unit includes timing starting photo module, timing Terminate photo module and time status photo module, the timing starting photo module, in working, is pressed for worker by working Button, while the worker that takes pictures presses the image of working button, and the image taken pictures is transmitted to resource access starting timing unit, the meter When terminate photo module for worker when next, press button of coming off duty, while the worker that takes pictures presses the image of next button, and handle bat According to image be transmitted to resource access starting timing unit, worker's state of going to work is clapped in time status photo module timing According to, at the same identify worker whether in post, and the data taken pictures be transmitted to resource access starting timing unit.
Further, the integrated data processing unit calculates the process of wage are as follows: and wage=((workpiece number/same day is average Humanware number) * workpiece percentage radix+* time, radix time) * worker's day wage, wherein workpiece percentage radix, time cardinal sum work Man day wage is known quantity.
Present invention employs above-mentioned technical proposal, the present invention is had following technical effect that
The present invention by the way that the verification information of worker is fitted on the two dimensional code of product so that complete one yard it is dual-purpose Purpose can complete the statistics to workpiece before factory, while can match which workpiece is specifically what which worker manufactured, together When quickly workpiece can also be counted, reach extraordinary effect, and in the calculating to worker's time, by taking pictures Record data come evaluation time, while photographing to record to working condition, so that preferably worker is supervised, it is more acurrate Working time of record employee calculated using the workpiece of working time and manufacture while when calculating wage, completion worker Composite labour wage calculate so that calculate wage it is more fair.
Detailed description of the invention
Fig. 1 is system block diagram of the invention.
Fig. 2 is two-dimensional code authentication information generation unit module frame chart of the invention.
Fig. 3 is the double-deck association two dimensional code verifying recognition unit module frame chart of the invention.
Fig. 4 is that acquisition timing starting of the invention terminates and state resource unit module block diagram.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, referring to the drawings and preferred reality is enumerated Example is applied, the present invention is described in more detail.However, it is necessary to illustrate, many details listed in specification are only to be Reader is set to have a thorough explanation to one or more aspects of the present invention, it can also be with even without these specific details Realize the aspects of the invention.
The system block diagram of Working hours management system as shown in Figure 1, a kind of machinery plant according to the present invention reckons by the piece, including worker's work Number input unit, worker's information management unit, Product Information Management unit, two-dimensional code authentication information generation unit, company are related Information memory cell, the double-deck association two dimensional code generation unit, the double-deck association two dimensional code printing application unit, the double-deck association two dimensional code Verify recognition unit, acquisition timing starting terminates and state resource unit, resource access start at timing unit and integrated data Manage unit.
Worker's work number input unit, worker's information management unit and Product Information Management unit are and two-dimensional code authentication information Generation unit connection, worker's work number input unit are used for work user input work number on and off duty, work number information are transmitted to two dimension Code verification information generation unit, while the number of packages and time that this day produces are checked down for worker.Worker's work number input unit is touching Display screen is touched, for work user input data and data is checked, achievees the effect that human-computer interaction.Worker information management unit user The information of all employees of entire factory is stored, and corresponding work is fed back according to two-dimensional code authentication information generation unit solicited message People's essential information, the Product Information Management unit are verified for storing entire factory product information produced according to two dimensional code The product information that corresponding worker is done is fed back in the request of information generating unit, and product information is transmitted to two-dimensional code authentication information life At unit, the product information that employee information and corresponding worker manufacture is carried out production two by the two-dimensional code authentication information generation unit Code verification information is tieed up, and two-dimensional code authentication information is transmitted to the double-deck association two dimensional code generation unit, the double-deck association two dimensional code Generation unit is connect with two-dimensional code authentication information generation unit and company's relevant information storage unit respectively, company's correlation letter Breath storage unit is used to store the essential information of production company, and please negate according to the double-deck association two dimensional code generation unit Corresponding information is presented, bilayer is generated with two-dimensional code authentication information according to company's information and is associated with two dimensional code, the double-deck association two dimension Code printing application unit is connect with bilayer association two dimensional code generation unit, for receiving the double of the double-deck association two dimensional code generation unit Layer is associated with two dimensional code and prints and is pasted on the product produced automatically, and the double-deck association two dimensional code verifying recognition unit is used for The double-deck association two dimensional code on product is scanned, the two-dimensional code authentication information and and storage inside of the double-deck association two dimensional code are read in identification Data comparison, obtain the information of production people, and production people's information is transmitted to integrated data processing unit, it is described to obtain It takes timing starting end and state resource unit to connect with resource access starting timing unit, goes into operation, terminates for obtaining worker The resource information of work and working condition, and the information of acquisition is transmitted to resource access starting timing unit, the resource access Starting timing unit carries out based on starting by receiving the resource information of the incoming worker's work number of worker's work number input unit and acquisition When, when terminating timing and working condition detection button, and the data of detection are transmitted to integrated data processing unit, the integrated data Processing unit is used to calculate working hour, workpiece and the wage of worker.
By the way that the verification information of worker is fitted on the two dimensional code of product, so that one yard of dual-purpose purpose is completed, The statistics to workpiece can be completed before factory, while can match which workpiece is specifically what which worker manufactured, simultaneously also Quickly workpiece can be counted, reach extraordinary effect.Two dimensional code is after factory statistics scanning, and worker's message part is certainly Dynamic failure, remaining is exactly the specific recommended information two dimensional code of company, with the two-dimensional barcode information on existing commodity just as.Right When the calculating of worker's time, by photographing to record data come evaluation time, while photographing to record to working condition, so that more Good supervises worker, more accurately records the working time of employee, while when calculating wage, using working time and system The workpiece made is calculated, and the composite labour wage for completing worker calculates, so that the wage calculated is more fair.
In the embodiment of the present invention, the two-dimensional code authentication information generation unit includes that identifying code production module and identifying code add The dense product information for being used to obtain employee information and corresponding worker manufactures at verification information module, the identifying code production module It carries out handling to obtain initial authentication code by hash algorithm, the verifying code encryption generates verification information module and passes through accidental enciphering Algorithm for encryption is verified information.The specific formula of the accidental enciphering algorithm are as follows:
In formula,Indicate that i-th maps the subsequent value of iteration n times, i=1,2,3....b-1, a-1, b, a, u is setting Value, and u ∈ (1.64,2),It is the numerical value of type double precision with u, a=1,2,3......, b=1,2,3......, initially Value is authenticity verification code, xn+1For identifying code.
It is handled by the product information manufactured to hash algorithm to employee information and corresponding worker, so that output Result data position be identical, and the product and worker's information of production can be bound, can thus in statistics To identify well, and when there is the underproof situation of substandard products, corresponding worker can be found, to the quality for improving product It is very important.
In the embodiment of the present invention, bilayer association two dimensional code verifying recognition unit include the double-deck association Response Code scan module, Identify matching module and number of packages statistical module, the double-deck association Response Code scan module is connect with identification matching module, described Bilayer association Response Code scan module is used to scan the double-deck association two dimensional code on product, and extracts testing for the double-deck association two dimensional code Card information is transmitted to identification matching module, and identification matching module is connect with number of packages statistical module, and the identification matching module is for depositing The incoming worker's verification information of two-dimensional code authentication information generation unit is stored up, the verifying of the double-deck association Response Code scan module identification Information is matched with worker's verification information of storage, which worker's manufacture when determining the product, and the work for manufacturing the product People's information is transmitted to number of packages statistical module, and the number of packages statistical module counts the manufacture product number of packages of worker, and statistics Data be transmitted to integrated data processing unit.
By the way that bilayer association two-dimensional code scanning identification, wherein scanning recognition is the letter of scanning recognition first layer when first Data, as verification code information are ceased, reckon by the piece to the product that worker manufactures by extracting verification code information, while by current After verifying, the identifying code failure or no failure of the level can also be to disclose specific manufacturer with user, have more Good public credibility.Which worker's manufacture identification matching module is specifically for inquiring the identifying code, and the commodity are then included into this Worker under one's name, also with regard to when reckon by the piece, calculating wage is then carried out by subsequent integrated data processing unit.
In the embodiment of the present invention, obtaining timing starting terminates to include timing starting photo module, meter with state resource unit When terminate photo module and time status photo module, the timing starting photo module for worker in working, by working Button, while the worker that takes pictures presses the image of working button, and the image taken pictures is transmitted to resource access starting timing unit, it is described Timing terminates photo module and is used for worker when next, presses next button, while the worker that takes pictures presses the image of next button, and handle The image taken pictures is transmitted to resource access starting timing unit, and the time status photo module timing carries out worker's working state Take pictures, at the same identify worker whether in post, and the data taken pictures be transmitted to resource access starting timing unit.
Start timing by taking pictures by clocking in, can effectively prevent the fraud of user, is supervised in nobody When control, situations such as checking card for people, and meanwhile taking pictures to the state timing of worker's working, it prevents from leaving station among worker, it is lazy Situations such as, preferably worker is managed, when can be realized bales catch, while the acquisition evidence of timing, so that worker is more Convince, the time of calculating is more accurate.
In the embodiment of the present invention, integrated data processing unit calculates the process of wage are as follows: wage=((workpiece number/work as balance Equal humanware number) * workpiece percentage radix+* time, radix time) * worker day wage, wherein workpiece percentage radix, time cardinal sum Worker day wage is known quantity.By the way that time and workpiece are calculated, the work passion of worker can be excited, while also can Enough obstructed to the work processing duration of same product, calculating wage is more reasonable, more fair.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the principle of the present invention, it can also make several improvements and retouch, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (6)

  1. The Working hours management system 1. a kind of machinery plant reckons by the piece, it is characterised in that: including worker's work number input unit, worker's information management Unit, Product Information Management unit, two-dimensional code authentication information generation unit, company's relevant information storage unit, the double-deck association two Dimension code generation unit, bilayer association two dimensional code, which print application unit, the double-deck association two dimensional code verifies recognition unit, obtain timing opens It is dynamic to terminate to start timing unit and integrated data processing unit with state resource unit, resource access,
    Worker's work number input unit, worker's information management unit and Product Information Management unit are and two-dimensional code authentication information Generation unit connection, worker's work number input unit are used for work user input work number on and off duty, work number information are transmitted to two dimension Code verification information generation unit, while the number of packages and time that this day produces, worker's information management unit are checked down for worker User stores the information of all employees of entire factory, and is fed back accordingly according to two-dimensional code authentication information generation unit solicited message Worker's essential information, the Product Information Management unit is for storing entire factory product information produced, according to two dimensional code The product information that corresponding worker is done is fed back in the request of verification information generation unit, and product information is transmitted to two dimensional code verifying letter Generation unit is ceased, the two-dimensional code authentication information generation unit gives birth to the product information that employee information and corresponding worker manufacture Two-dimensional code authentication information is produced, and two-dimensional code authentication information is transmitted to the double-deck association two dimensional code generation unit, the double-deck association two Dimension code generation unit is connect with two-dimensional code authentication information generation unit and company's relevant information storage unit respectively, company's phase Close the essential information that information memory cell is used to store production company, and asking according to the double-deck association two dimensional code generation unit It negates and presents corresponding information, bilayer is generated with two-dimensional code authentication information according to company's information and is associated with two dimensional code, the double-deck association Two dimensional code prints application unit and connect with bilayer association two dimensional code generation unit, for receiving the double-deck association two dimensional code generation unit The double-deck association two dimensional code and printing be pasted on product produce automatically, the bilayer is associated with two dimensional code verifying recognition unit For scanning the double-deck association two dimensional code on product, identification read the two-dimensional code authentication information of the double-deck association two dimensional code and with inside The data comparison of storage obtains the information of production people, and production people's information is transmitted to integrated data processing unit, institute Acquisition timing starting end and state resource unit is stated to connect with resource access starting timing unit, go into operation for obtaining worker, The resource information of power cut-off and working condition, and the information of acquisition is transmitted to resource access starting timing unit, the resource Access starting timing unit is used to receive the incoming worker's work number of worker's work number input unit and the resource information of acquisition opens When dynamic timing, end timing and working condition detection button, and the data of detection are transmitted to integrated data processing unit, the synthesis Data processing unit is used to calculate working hour, workpiece and the wage of worker.
  2. The Working hours management system 2. a kind of machinery plant according to claim 1 reckons by the piece, it is characterised in that: the two dimensional code verifying Information generating unit includes that identifying code production module and verifying code encryption generate verification information module, and the identifying code produces module Product information for obtaining employee information and corresponding worker manufacture carries out handling to obtain initial authentication code, institute by hash algorithm It states verifying code encryption generation verification information module and information is verified by accidental enciphering algorithm for encryption.
  3. The Working hours management system 3. a kind of machinery plant according to claim 2 reckons by the piece, it is characterised in that: the accidental enciphering is calculated The specific formula of method are as follows:
    In formula,Indicate that i-th maps the subsequent value of iteration n times, i=1,2,3....b-1, a-1, b, a, u is setting value, and u ∈ (1.64,2),It is the numerical value of type double precision with u, a=1,2,3......, b=1,2,3......, initial value is true Pseudo- identifying code, xn+1For identifying code.
  4. The Working hours management system 4. a kind of machinery plant according to claim 1 reckons by the piece, it is characterised in that: the double-deck association two Tieing up code verifying recognition unit includes that bilayer is associated with Response Code scan module, identification matching module and number of packages statistical module, described double Layer association Response Code scan module is connect with identification matching module, and the double-deck association Response Code scan module is for scanning product On the double-deck association two dimensional code, and the verification information for extracting the double-deck association two dimensional code is transmitted to identification matching module, identification matching mould Block is connect with number of packages statistical module, and the identification matching module is used to store the incoming worker of two-dimensional code authentication information generation unit Verification information matches the verification information of the double-deck association Response Code scan module identification with worker's verification information of storage, Which worker's manufacture when determining the product, and the worker's information for manufacturing the product is transmitted to number of packages statistical module, the number of packages system Meter module counts the manufacture product number of packages of worker, and the data of statistics are transmitted to integrated data processing unit.
  5. The Working hours management system 5. a kind of machinery plant according to claim 1 reckons by the piece, it is characterised in that: the acquisition timing is opened It is dynamic to terminate to include that timing starts photo module, timing terminates photo module and time status photo module with state resource unit, The timing starting photo module, in working, presses working button, while the worker that takes pictures presses the image of working button for worker, And the image taken pictures is transmitted to resource access starting timing unit, the timing terminates photo module for worker when next, Next button is pressed, while the worker that takes pictures presses the image of next button, and the image taken pictures is transmitted to resource access starting timing list Member, time status photo module timing take pictures to worker's state of going to work, at the same identify worker whether in post, and handle The data taken pictures are transmitted to resource access starting timing unit.
  6. The Working hours management system 6. a kind of machinery plant according to claim 1 reckons by the piece, it is characterised in that: at the integrated data Manage the process that unit calculates wage are as follows: wage=((workpiece number/same day be averaged humanware number) * workpiece percentage radix+time time * Radix) * worker day wage, wherein workpiece percentage radix, time cardinal sum worker day wage are known quantity.
CN201810971738.0A 2018-08-24 2018-08-24 Management system for counting work hours of machinery factory Active CN109284973B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810971738.0A CN109284973B (en) 2018-08-24 2018-08-24 Management system for counting work hours of machinery factory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810971738.0A CN109284973B (en) 2018-08-24 2018-08-24 Management system for counting work hours of machinery factory

Publications (2)

Publication Number Publication Date
CN109284973A true CN109284973A (en) 2019-01-29
CN109284973B CN109284973B (en) 2022-05-17

Family

ID=65183509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810971738.0A Active CN109284973B (en) 2018-08-24 2018-08-24 Management system for counting work hours of machinery factory

Country Status (1)

Country Link
CN (1) CN109284973B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6671810B1 (en) * 1997-09-18 2003-12-30 Intel Corporation Method and system for establishing secure communication over computer networks
CN102571330A (en) * 2012-02-01 2012-07-11 王勇 Method for constructing block encryption algorithm based on random function
CN103078742A (en) * 2013-01-10 2013-05-01 天地融科技股份有限公司 Generation method and system of digital certificate
CN104574090A (en) * 2013-10-09 2015-04-29 无锡中科方德软件有限公司 Anti-fake method combining tracing code with random encryption password
CN104636782A (en) * 2015-02-15 2015-05-20 中国工商银行股份有限公司 Method and device for encrypting corporate logo
CN104636889A (en) * 2015-03-10 2015-05-20 刘升 Personnel information comprehensive management system
CN104994070A (en) * 2015-05-27 2015-10-21 福州惟实信息科技有限公司 Information transmission method capable of verifying information source based on encrypted double-layered two-dimension bar code
CN106428852A (en) * 2016-10-14 2017-02-22 福建金闽再造烟叶发展有限公司 Tobacco sheet packaging quantity determination method and system
CN107545608A (en) * 2016-06-28 2018-01-05 荣昌区昌州街道全福蜡烛加工厂 A kind of production line easy detection punch card system
CN107767082A (en) * 2017-11-16 2018-03-06 上海延鑫汽车座椅配件有限公司 A kind of employee individual suitable for enterprise production management reckons by the piece system and method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6671810B1 (en) * 1997-09-18 2003-12-30 Intel Corporation Method and system for establishing secure communication over computer networks
CN102571330A (en) * 2012-02-01 2012-07-11 王勇 Method for constructing block encryption algorithm based on random function
CN103078742A (en) * 2013-01-10 2013-05-01 天地融科技股份有限公司 Generation method and system of digital certificate
CN104574090A (en) * 2013-10-09 2015-04-29 无锡中科方德软件有限公司 Anti-fake method combining tracing code with random encryption password
CN104636782A (en) * 2015-02-15 2015-05-20 中国工商银行股份有限公司 Method and device for encrypting corporate logo
CN104636889A (en) * 2015-03-10 2015-05-20 刘升 Personnel information comprehensive management system
CN104994070A (en) * 2015-05-27 2015-10-21 福州惟实信息科技有限公司 Information transmission method capable of verifying information source based on encrypted double-layered two-dimension bar code
CN107545608A (en) * 2016-06-28 2018-01-05 荣昌区昌州街道全福蜡烛加工厂 A kind of production line easy detection punch card system
CN106428852A (en) * 2016-10-14 2017-02-22 福建金闽再造烟叶发展有限公司 Tobacco sheet packaging quantity determination method and system
CN107767082A (en) * 2017-11-16 2018-03-06 上海延鑫汽车座椅配件有限公司 A kind of employee individual suitable for enterprise production management reckons by the piece system and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张本东 等: "机加工车间工时管理系统的开发与应用", 《金属加工》 *
韩金洋: "计件工资管理系统的研究与设计", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Also Published As

Publication number Publication date
CN109284973B (en) 2022-05-17

Similar Documents

Publication Publication Date Title
CN108667632A (en) Based on the credit record sharing method and device of block chain, electronic equipment
CN104318466B (en) A kind of transaction system and transaction settlement method
CN110246005A (en) Rent method and device based on block chain
US11875589B2 (en) Article dual material-digital anti-forgery protection
CN101159095A (en) Multi-function electric meter reading system based on computer visual sense
CN110427254A (en) Task processing method, device, equipment and computer readable storage medium
CN109447723A (en) Payment control method, apparatus, computer equipment and storage medium
CN109559010A (en) Goods and materials distribution method, device, computer equipment and storage medium
WO2022057108A1 (en) Federated-learning-based personal qualification evaluation method, apparatus and system, and storage medium
CN113612741B (en) Method, device, equipment and storage medium for storing certificate of article circulation record
CN107689009A (en) Annuity data processing method, device, server and storage medium
WO2020181665A1 (en) Request information processing method and apparatus, computer device, and storage medium
CN109377282A (en) Real estate Land Appraisal production management method and system, computer equipment and storage medium
CN109785021A (en) Charge calculation invoice system between a kind of electricity power enterprise and electric power enterprise
CN109835084B (en) Application of novel anti-counterfeiting material in anti-counterfeiting payment, currency anti-counterfeiting, bank card and the like
CN113971270A (en) Identity recognition method and system based on block chain
CN104240121B (en) A kind of transaction anonymity method in ecommerce
CN101452504A (en) Medical diagnosis management system and method thereof
CN111489136A (en) Enterprise salary management system
US7225106B2 (en) Data processing system and method for processing test orders
CN109284973A (en) A kind of machinery plant reckons by the piece Working hours management system
CN108416504A (en) Trustship manages system
CN117391771A (en) Multi-task competitive production integral management system based on block chain
US20170161754A1 (en) Counter fraud systems
CN111460507A (en) Block chain-based security service system and application thereof in autonomous community

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant