CN109284973A - A kind of machinery plant reckons by the piece Working hours management system - Google Patents
A kind of machinery plant reckons by the piece Working hours management system Download PDFInfo
- Publication number
- CN109284973A CN109284973A CN201810971738.0A CN201810971738A CN109284973A CN 109284973 A CN109284973 A CN 109284973A CN 201810971738 A CN201810971738 A CN 201810971738A CN 109284973 A CN109284973 A CN 109284973A
- Authority
- CN
- China
- Prior art keywords
- worker
- information
- unit
- dimensional code
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 claims abstract description 48
- 238000012795 verification Methods 0.000 claims abstract description 26
- 238000012545 processing Methods 0.000 claims abstract description 19
- 238000003860 storage Methods 0.000 claims abstract description 14
- 238000000034 method Methods 0.000 claims abstract description 9
- 230000004044 response Effects 0.000 claims description 12
- 238000001514 detection method Methods 0.000 claims description 6
- 230000008569 process Effects 0.000 claims description 3
- 230000018199 S phase Effects 0.000 claims 1
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000003786 synthesis reaction Methods 0.000 claims 1
- 239000002131 composite material Substances 0.000 abstract description 3
- 238000011156 evaluation Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 241000282414 Homo sapiens Species 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 239000000284 extract Substances 0.000 description 2
- 238000000151 deposition Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
- G06Q10/1053—Employment or hiring
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device
- G06K17/0025—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- General Engineering & Computer Science (AREA)
- Primary Health Care (AREA)
- Health & Medical Sciences (AREA)
- Computer Networks & Wireless Communication (AREA)
- Manufacturing & Machinery (AREA)
- Data Mining & Analysis (AREA)
- General Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
It reckons by the piece Working hours management system the invention discloses a kind of machinery plant, belong to statistical technique field, card information generating unit, company's relevant information storage unit, the double-deck association two dimensional code generation unit, bilayer are associated with two dimensional code printing application unit, the double-deck association two dimensional code verifies recognition unit, acquisition timing starting terminates and state resource unit, resource access starting timing unit and integrated data processing unit.By the way that the verification information of worker is fitted on the two dimensional code of product, complete one yard of dual-purpose purpose, the statistics to workpiece can be completed before factory, it is specifically what which worker manufactured which workpiece, which can be matched, simultaneously, quickly workpiece can also be counted simultaneously, by photographing to record data come evaluation time, photographing to record to working condition simultaneously, the more accurately working time of record employee, simultaneously when calculating wage, it is calculated using the workpiece of working time and manufacture, the composite labour wage for completing worker calculates, so that the wage calculated is more fair.
Description
Technical field
It reckons by the piece Working hours management system the present invention relates to statistical technique domain more particularly to a kind of machinery plant.
Background technique
In production enterprise, for clear employee's production work target, the maximum capacity of employee's operation is played, improves production
Efficiency, the wages accounting mode reckoned by the piece using individual.We take the method manually counted before to count individual and reckon by the piece quantity,
Embodiment is simply described below: 1, daily personal production capacity is filled in " personal day production capacity table " by Manufacturing Worker oneself, table by
Squad leader's unified payment every morning;2, require data true, accurate when employee fills in " personal day production capacity table ";It writes clearly, no
It alters easily;3, " personal day production capacity table " is sent at squad leader when coming off duty on the same day;4, squad leader daily will be to " a day for human beings of the previous day
Production capacity table " data are audited, confirm it is errorless after fill in " production line daily output statistical form ";5, squad leader is After Publication " production
Line daily output statistical form " before next day 9:00 production statistics is given, data inputting is carried out by production statistics.6, wages calculate assistant director
The data monthly summarized by production statistics person manually calculate the wages of every worker at the production line.This method manually counted, is being grasped
Data statistics amount is big in work, and link of changing hands is more, and wages are calculated laborious time-consuming.
It existing timing simultaneously and reckons by the piece and can only select one such calculation, so that often will appear calculating
Mode is unfair for worker, it is therefore desirable to reckoning by the piece and timing while carrying out, so that calculation is more fair,
It reckons by the piece simultaneously more easy and more accurate with timing course.
Summary of the invention
It reckons by the piece Working hours management system the purpose of the present invention is to provide a kind of machinery plant, solves existing factory's time and piece counting point
Open calculating to worker unfairness, while reckon by the piece with timing can only separate computations the technical issues of.
A kind of machinery plant reckons by the piece Working hours management system, including worker's work number input unit, worker's information management unit, product
Information management unit, two-dimensional code authentication information generation unit, company's relevant information storage unit, the double-deck association two dimensional code generate single
Member, bilayer association two dimensional code verifying recognition unit, obtains timing starting end and shape at the double-deck association two dimensional code printing application unit
State resource unit, resource access starting timing unit and integrated data processing unit,
Worker's work number input unit, worker's information management unit and Product Information Management unit are verified with two dimensional code
Information generating unit connection, worker's work number input unit are used for work user input work number on and off duty, work number information are transmitted to
Two-dimensional code authentication information generation unit, while the number of packages and time that this day produces, worker's information management are checked down for worker
Unit users store the information of all employees of entire factory, and are fed back according to two-dimensional code authentication information generation unit solicited message
Corresponding worker's essential information, the Product Information Management unit is for storing entire factory product information produced, according to two
The product information that corresponding worker is done is fed back in the request of dimension code verification information generation unit, and product information is transmitted to two dimensional code and is tested
Demonstrate,prove information generating unit, the product information that the two-dimensional code authentication information generation unit manufactures employee information and corresponding worker into
Row production two-dimensional code authentication information, and two-dimensional code authentication information is transmitted to the double-deck association two dimensional code generation unit, the bilayer closes
Connection two dimensional code generation unit is connect with two-dimensional code authentication information generation unit and company's relevant information storage unit respectively, the public affairs
Department's relevant information storage unit is used to store the essential information of production company, and is associated with two dimensional code generation unit according to bilayer
Request feed back corresponding information, bilayer is generated with two-dimensional code authentication information according to company's information and is associated with two dimensional code, the bilayer
Association two dimensional code printing application unit is connect with bilayer association two dimensional code generation unit, is generated for receiving the double-deck association two dimensional code
The bilayer of unit is associated with two dimensional code and prints and is pasted on the product produced automatically, and the double-deck association two dimensional code, which is verified, to be identified
Unit is used to scan the double-deck association two dimensional code on product, identification read the two-dimensional code authentication information of the double-deck association two dimensional code and with
The data comparison of storage inside obtains the information of production people, and production people's information is transmitted to integrated data processing list
Member, the acquisition timing starting terminates and state resource unit is connect with resource access starting timing unit, for obtaining worker
It goes into operation, the resource information of power cut-off and working condition, and the information of acquisition is transmitted to resource access starting timing unit, it is described
Resource access starting timing unit be used to receive the resource information of the incoming worker's work number of worker's work number input unit and acquisition into
When row starting timing, end timing and working condition detection button, and the data of detection are transmitted to integrated data processing unit, it is described
Integrated data processing unit is used to calculate working hour, workpiece and the wage of worker.
Further, the two-dimensional code authentication information generation unit includes that identifying code production module and verifying code encryption generate
Verification information module, the identifying code production module is used to obtain employee information and the product information of corresponding worker manufacture is led to
It crosses hash algorithm to handle to obtain initial authentication code, the verifying code encryption generates verification information module and adds by accidental enciphering algorithm
It is close to be verified information.
Further, the specific formula of the accidental enciphering algorithm are as follows:
In formula,Indicate that i-th maps the subsequent value of iteration n times, i=1,2,3....b-1, a-1, b, a, u is setting
Value, and u ∈ (1.64,2),It is the numerical value of type double precision with u, a=1,2,3......, b=1,2,3......, initially
Value is authenticity verification code, xn+1For identifying code.
Further, the double-deck association two dimensional code verifying recognition unit includes the double-deck association Response Code scan module, knows
Other matching module and number of packages statistical module, the double-deck association Response Code scan module is connect with identification matching module, described double
Layer association Response Code scan module is used to scan the double-deck association two dimensional code on product, and extracts the verifying of the double-deck association two dimensional code
Information is transmitted to identification matching module, and identification matching module is connect with number of packages statistical module, and the identification matching module is for storing
The incoming worker's verification information of two-dimensional code authentication information generation unit believes the verifying of the double-deck association Response Code scan module identification
It ceases and is matched with worker's verification information of storage, which worker's manufacture when determining the product, and the worker for manufacturing the product
Information is transmitted to number of packages statistical module, and the number of packages statistical module counts the manufacture product number of packages of worker, and statistics
Data are transmitted to integrated data processing unit.
Further, the acquisition timing starting terminates and state resource unit includes timing starting photo module, timing
Terminate photo module and time status photo module, the timing starting photo module, in working, is pressed for worker by working
Button, while the worker that takes pictures presses the image of working button, and the image taken pictures is transmitted to resource access starting timing unit, the meter
When terminate photo module for worker when next, press button of coming off duty, while the worker that takes pictures presses the image of next button, and handle bat
According to image be transmitted to resource access starting timing unit, worker's state of going to work is clapped in time status photo module timing
According to, at the same identify worker whether in post, and the data taken pictures be transmitted to resource access starting timing unit.
Further, the integrated data processing unit calculates the process of wage are as follows: and wage=((workpiece number/same day is average
Humanware number) * workpiece percentage radix+* time, radix time) * worker's day wage, wherein workpiece percentage radix, time cardinal sum work
Man day wage is known quantity.
Present invention employs above-mentioned technical proposal, the present invention is had following technical effect that
The present invention by the way that the verification information of worker is fitted on the two dimensional code of product so that complete one yard it is dual-purpose
Purpose can complete the statistics to workpiece before factory, while can match which workpiece is specifically what which worker manufactured, together
When quickly workpiece can also be counted, reach extraordinary effect, and in the calculating to worker's time, by taking pictures
Record data come evaluation time, while photographing to record to working condition, so that preferably worker is supervised, it is more acurrate
Working time of record employee calculated using the workpiece of working time and manufacture while when calculating wage, completion worker
Composite labour wage calculate so that calculate wage it is more fair.
Detailed description of the invention
Fig. 1 is system block diagram of the invention.
Fig. 2 is two-dimensional code authentication information generation unit module frame chart of the invention.
Fig. 3 is the double-deck association two dimensional code verifying recognition unit module frame chart of the invention.
Fig. 4 is that acquisition timing starting of the invention terminates and state resource unit module block diagram.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, referring to the drawings and preferred reality is enumerated
Example is applied, the present invention is described in more detail.However, it is necessary to illustrate, many details listed in specification are only to be
Reader is set to have a thorough explanation to one or more aspects of the present invention, it can also be with even without these specific details
Realize the aspects of the invention.
The system block diagram of Working hours management system as shown in Figure 1, a kind of machinery plant according to the present invention reckons by the piece, including worker's work
Number input unit, worker's information management unit, Product Information Management unit, two-dimensional code authentication information generation unit, company are related
Information memory cell, the double-deck association two dimensional code generation unit, the double-deck association two dimensional code printing application unit, the double-deck association two dimensional code
Verify recognition unit, acquisition timing starting terminates and state resource unit, resource access start at timing unit and integrated data
Manage unit.
Worker's work number input unit, worker's information management unit and Product Information Management unit are and two-dimensional code authentication information
Generation unit connection, worker's work number input unit are used for work user input work number on and off duty, work number information are transmitted to two dimension
Code verification information generation unit, while the number of packages and time that this day produces are checked down for worker.Worker's work number input unit is touching
Display screen is touched, for work user input data and data is checked, achievees the effect that human-computer interaction.Worker information management unit user
The information of all employees of entire factory is stored, and corresponding work is fed back according to two-dimensional code authentication information generation unit solicited message
People's essential information, the Product Information Management unit are verified for storing entire factory product information produced according to two dimensional code
The product information that corresponding worker is done is fed back in the request of information generating unit, and product information is transmitted to two-dimensional code authentication information life
At unit, the product information that employee information and corresponding worker manufacture is carried out production two by the two-dimensional code authentication information generation unit
Code verification information is tieed up, and two-dimensional code authentication information is transmitted to the double-deck association two dimensional code generation unit, the double-deck association two dimensional code
Generation unit is connect with two-dimensional code authentication information generation unit and company's relevant information storage unit respectively, company's correlation letter
Breath storage unit is used to store the essential information of production company, and please negate according to the double-deck association two dimensional code generation unit
Corresponding information is presented, bilayer is generated with two-dimensional code authentication information according to company's information and is associated with two dimensional code, the double-deck association two dimension
Code printing application unit is connect with bilayer association two dimensional code generation unit, for receiving the double of the double-deck association two dimensional code generation unit
Layer is associated with two dimensional code and prints and is pasted on the product produced automatically, and the double-deck association two dimensional code verifying recognition unit is used for
The double-deck association two dimensional code on product is scanned, the two-dimensional code authentication information and and storage inside of the double-deck association two dimensional code are read in identification
Data comparison, obtain the information of production people, and production people's information is transmitted to integrated data processing unit, it is described to obtain
It takes timing starting end and state resource unit to connect with resource access starting timing unit, goes into operation, terminates for obtaining worker
The resource information of work and working condition, and the information of acquisition is transmitted to resource access starting timing unit, the resource access
Starting timing unit carries out based on starting by receiving the resource information of the incoming worker's work number of worker's work number input unit and acquisition
When, when terminating timing and working condition detection button, and the data of detection are transmitted to integrated data processing unit, the integrated data
Processing unit is used to calculate working hour, workpiece and the wage of worker.
By the way that the verification information of worker is fitted on the two dimensional code of product, so that one yard of dual-purpose purpose is completed,
The statistics to workpiece can be completed before factory, while can match which workpiece is specifically what which worker manufactured, simultaneously also
Quickly workpiece can be counted, reach extraordinary effect.Two dimensional code is after factory statistics scanning, and worker's message part is certainly
Dynamic failure, remaining is exactly the specific recommended information two dimensional code of company, with the two-dimensional barcode information on existing commodity just as.Right
When the calculating of worker's time, by photographing to record data come evaluation time, while photographing to record to working condition, so that more
Good supervises worker, more accurately records the working time of employee, while when calculating wage, using working time and system
The workpiece made is calculated, and the composite labour wage for completing worker calculates, so that the wage calculated is more fair.
In the embodiment of the present invention, the two-dimensional code authentication information generation unit includes that identifying code production module and identifying code add
The dense product information for being used to obtain employee information and corresponding worker manufactures at verification information module, the identifying code production module
It carries out handling to obtain initial authentication code by hash algorithm, the verifying code encryption generates verification information module and passes through accidental enciphering
Algorithm for encryption is verified information.The specific formula of the accidental enciphering algorithm are as follows:
In formula,Indicate that i-th maps the subsequent value of iteration n times, i=1,2,3....b-1, a-1, b, a, u is setting
Value, and u ∈ (1.64,2),It is the numerical value of type double precision with u, a=1,2,3......, b=1,2,3......, initially
Value is authenticity verification code, xn+1For identifying code.
It is handled by the product information manufactured to hash algorithm to employee information and corresponding worker, so that output
Result data position be identical, and the product and worker's information of production can be bound, can thus in statistics
To identify well, and when there is the underproof situation of substandard products, corresponding worker can be found, to the quality for improving product
It is very important.
In the embodiment of the present invention, bilayer association two dimensional code verifying recognition unit include the double-deck association Response Code scan module,
Identify matching module and number of packages statistical module, the double-deck association Response Code scan module is connect with identification matching module, described
Bilayer association Response Code scan module is used to scan the double-deck association two dimensional code on product, and extracts testing for the double-deck association two dimensional code
Card information is transmitted to identification matching module, and identification matching module is connect with number of packages statistical module, and the identification matching module is for depositing
The incoming worker's verification information of two-dimensional code authentication information generation unit is stored up, the verifying of the double-deck association Response Code scan module identification
Information is matched with worker's verification information of storage, which worker's manufacture when determining the product, and the work for manufacturing the product
People's information is transmitted to number of packages statistical module, and the number of packages statistical module counts the manufacture product number of packages of worker, and statistics
Data be transmitted to integrated data processing unit.
By the way that bilayer association two-dimensional code scanning identification, wherein scanning recognition is the letter of scanning recognition first layer when first
Data, as verification code information are ceased, reckon by the piece to the product that worker manufactures by extracting verification code information, while by current
After verifying, the identifying code failure or no failure of the level can also be to disclose specific manufacturer with user, have more
Good public credibility.Which worker's manufacture identification matching module is specifically for inquiring the identifying code, and the commodity are then included into this
Worker under one's name, also with regard to when reckon by the piece, calculating wage is then carried out by subsequent integrated data processing unit.
In the embodiment of the present invention, obtaining timing starting terminates to include timing starting photo module, meter with state resource unit
When terminate photo module and time status photo module, the timing starting photo module for worker in working, by working
Button, while the worker that takes pictures presses the image of working button, and the image taken pictures is transmitted to resource access starting timing unit, it is described
Timing terminates photo module and is used for worker when next, presses next button, while the worker that takes pictures presses the image of next button, and handle
The image taken pictures is transmitted to resource access starting timing unit, and the time status photo module timing carries out worker's working state
Take pictures, at the same identify worker whether in post, and the data taken pictures be transmitted to resource access starting timing unit.
Start timing by taking pictures by clocking in, can effectively prevent the fraud of user, is supervised in nobody
When control, situations such as checking card for people, and meanwhile taking pictures to the state timing of worker's working, it prevents from leaving station among worker, it is lazy
Situations such as, preferably worker is managed, when can be realized bales catch, while the acquisition evidence of timing, so that worker is more
Convince, the time of calculating is more accurate.
In the embodiment of the present invention, integrated data processing unit calculates the process of wage are as follows: wage=((workpiece number/work as balance
Equal humanware number) * workpiece percentage radix+* time, radix time) * worker day wage, wherein workpiece percentage radix, time cardinal sum
Worker day wage is known quantity.By the way that time and workpiece are calculated, the work passion of worker can be excited, while also can
Enough obstructed to the work processing duration of same product, calculating wage is more reasonable, more fair.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, without departing from the principle of the present invention, it can also make several improvements and retouch, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (6)
- The Working hours management system 1. a kind of machinery plant reckons by the piece, it is characterised in that: including worker's work number input unit, worker's information management Unit, Product Information Management unit, two-dimensional code authentication information generation unit, company's relevant information storage unit, the double-deck association two Dimension code generation unit, bilayer association two dimensional code, which print application unit, the double-deck association two dimensional code verifies recognition unit, obtain timing opens It is dynamic to terminate to start timing unit and integrated data processing unit with state resource unit, resource access,Worker's work number input unit, worker's information management unit and Product Information Management unit are and two-dimensional code authentication information Generation unit connection, worker's work number input unit are used for work user input work number on and off duty, work number information are transmitted to two dimension Code verification information generation unit, while the number of packages and time that this day produces, worker's information management unit are checked down for worker User stores the information of all employees of entire factory, and is fed back accordingly according to two-dimensional code authentication information generation unit solicited message Worker's essential information, the Product Information Management unit is for storing entire factory product information produced, according to two dimensional code The product information that corresponding worker is done is fed back in the request of verification information generation unit, and product information is transmitted to two dimensional code verifying letter Generation unit is ceased, the two-dimensional code authentication information generation unit gives birth to the product information that employee information and corresponding worker manufacture Two-dimensional code authentication information is produced, and two-dimensional code authentication information is transmitted to the double-deck association two dimensional code generation unit, the double-deck association two Dimension code generation unit is connect with two-dimensional code authentication information generation unit and company's relevant information storage unit respectively, company's phase Close the essential information that information memory cell is used to store production company, and asking according to the double-deck association two dimensional code generation unit It negates and presents corresponding information, bilayer is generated with two-dimensional code authentication information according to company's information and is associated with two dimensional code, the double-deck association Two dimensional code prints application unit and connect with bilayer association two dimensional code generation unit, for receiving the double-deck association two dimensional code generation unit The double-deck association two dimensional code and printing be pasted on product produce automatically, the bilayer is associated with two dimensional code verifying recognition unit For scanning the double-deck association two dimensional code on product, identification read the two-dimensional code authentication information of the double-deck association two dimensional code and with inside The data comparison of storage obtains the information of production people, and production people's information is transmitted to integrated data processing unit, institute Acquisition timing starting end and state resource unit is stated to connect with resource access starting timing unit, go into operation for obtaining worker, The resource information of power cut-off and working condition, and the information of acquisition is transmitted to resource access starting timing unit, the resource Access starting timing unit is used to receive the incoming worker's work number of worker's work number input unit and the resource information of acquisition opens When dynamic timing, end timing and working condition detection button, and the data of detection are transmitted to integrated data processing unit, the synthesis Data processing unit is used to calculate working hour, workpiece and the wage of worker.
- The Working hours management system 2. a kind of machinery plant according to claim 1 reckons by the piece, it is characterised in that: the two dimensional code verifying Information generating unit includes that identifying code production module and verifying code encryption generate verification information module, and the identifying code produces module Product information for obtaining employee information and corresponding worker manufacture carries out handling to obtain initial authentication code, institute by hash algorithm It states verifying code encryption generation verification information module and information is verified by accidental enciphering algorithm for encryption.
- The Working hours management system 3. a kind of machinery plant according to claim 2 reckons by the piece, it is characterised in that: the accidental enciphering is calculated The specific formula of method are as follows:In formula,Indicate that i-th maps the subsequent value of iteration n times, i=1,2,3....b-1, a-1, b, a, u is setting value, and u ∈ (1.64,2),It is the numerical value of type double precision with u, a=1,2,3......, b=1,2,3......, initial value is true Pseudo- identifying code, xn+1For identifying code.
- The Working hours management system 4. a kind of machinery plant according to claim 1 reckons by the piece, it is characterised in that: the double-deck association two Tieing up code verifying recognition unit includes that bilayer is associated with Response Code scan module, identification matching module and number of packages statistical module, described double Layer association Response Code scan module is connect with identification matching module, and the double-deck association Response Code scan module is for scanning product On the double-deck association two dimensional code, and the verification information for extracting the double-deck association two dimensional code is transmitted to identification matching module, identification matching mould Block is connect with number of packages statistical module, and the identification matching module is used to store the incoming worker of two-dimensional code authentication information generation unit Verification information matches the verification information of the double-deck association Response Code scan module identification with worker's verification information of storage, Which worker's manufacture when determining the product, and the worker's information for manufacturing the product is transmitted to number of packages statistical module, the number of packages system Meter module counts the manufacture product number of packages of worker, and the data of statistics are transmitted to integrated data processing unit.
- The Working hours management system 5. a kind of machinery plant according to claim 1 reckons by the piece, it is characterised in that: the acquisition timing is opened It is dynamic to terminate to include that timing starts photo module, timing terminates photo module and time status photo module with state resource unit, The timing starting photo module, in working, presses working button, while the worker that takes pictures presses the image of working button for worker, And the image taken pictures is transmitted to resource access starting timing unit, the timing terminates photo module for worker when next, Next button is pressed, while the worker that takes pictures presses the image of next button, and the image taken pictures is transmitted to resource access starting timing list Member, time status photo module timing take pictures to worker's state of going to work, at the same identify worker whether in post, and handle The data taken pictures are transmitted to resource access starting timing unit.
- The Working hours management system 6. a kind of machinery plant according to claim 1 reckons by the piece, it is characterised in that: at the integrated data Manage the process that unit calculates wage are as follows: wage=((workpiece number/same day be averaged humanware number) * workpiece percentage radix+time time * Radix) * worker day wage, wherein workpiece percentage radix, time cardinal sum worker day wage are known quantity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810971738.0A CN109284973B (en) | 2018-08-24 | 2018-08-24 | Management system for counting work hours of machinery factory |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810971738.0A CN109284973B (en) | 2018-08-24 | 2018-08-24 | Management system for counting work hours of machinery factory |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109284973A true CN109284973A (en) | 2019-01-29 |
CN109284973B CN109284973B (en) | 2022-05-17 |
Family
ID=65183509
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810971738.0A Active CN109284973B (en) | 2018-08-24 | 2018-08-24 | Management system for counting work hours of machinery factory |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109284973B (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6671810B1 (en) * | 1997-09-18 | 2003-12-30 | Intel Corporation | Method and system for establishing secure communication over computer networks |
CN102571330A (en) * | 2012-02-01 | 2012-07-11 | 王勇 | Method for constructing block encryption algorithm based on random function |
CN103078742A (en) * | 2013-01-10 | 2013-05-01 | 天地融科技股份有限公司 | Generation method and system of digital certificate |
CN104574090A (en) * | 2013-10-09 | 2015-04-29 | 无锡中科方德软件有限公司 | Anti-fake method combining tracing code with random encryption password |
CN104636889A (en) * | 2015-03-10 | 2015-05-20 | 刘升 | Personnel information comprehensive management system |
CN104636782A (en) * | 2015-02-15 | 2015-05-20 | 中国工商银行股份有限公司 | Method and device for encrypting corporate logo |
CN104994070A (en) * | 2015-05-27 | 2015-10-21 | 福州惟实信息科技有限公司 | Information transmission method capable of verifying information source based on encrypted double-layered two-dimension bar code |
CN106428852A (en) * | 2016-10-14 | 2017-02-22 | 福建金闽再造烟叶发展有限公司 | Tobacco sheet packaging quantity determination method and system |
CN107545608A (en) * | 2016-06-28 | 2018-01-05 | 荣昌区昌州街道全福蜡烛加工厂 | A kind of production line easy detection punch card system |
CN107767082A (en) * | 2017-11-16 | 2018-03-06 | 上海延鑫汽车座椅配件有限公司 | A kind of employee individual suitable for enterprise production management reckons by the piece system and method |
-
2018
- 2018-08-24 CN CN201810971738.0A patent/CN109284973B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6671810B1 (en) * | 1997-09-18 | 2003-12-30 | Intel Corporation | Method and system for establishing secure communication over computer networks |
CN102571330A (en) * | 2012-02-01 | 2012-07-11 | 王勇 | Method for constructing block encryption algorithm based on random function |
CN103078742A (en) * | 2013-01-10 | 2013-05-01 | 天地融科技股份有限公司 | Generation method and system of digital certificate |
CN104574090A (en) * | 2013-10-09 | 2015-04-29 | 无锡中科方德软件有限公司 | Anti-fake method combining tracing code with random encryption password |
CN104636782A (en) * | 2015-02-15 | 2015-05-20 | 中国工商银行股份有限公司 | Method and device for encrypting corporate logo |
CN104636889A (en) * | 2015-03-10 | 2015-05-20 | 刘升 | Personnel information comprehensive management system |
CN104994070A (en) * | 2015-05-27 | 2015-10-21 | 福州惟实信息科技有限公司 | Information transmission method capable of verifying information source based on encrypted double-layered two-dimension bar code |
CN107545608A (en) * | 2016-06-28 | 2018-01-05 | 荣昌区昌州街道全福蜡烛加工厂 | A kind of production line easy detection punch card system |
CN106428852A (en) * | 2016-10-14 | 2017-02-22 | 福建金闽再造烟叶发展有限公司 | Tobacco sheet packaging quantity determination method and system |
CN107767082A (en) * | 2017-11-16 | 2018-03-06 | 上海延鑫汽车座椅配件有限公司 | A kind of employee individual suitable for enterprise production management reckons by the piece system and method |
Non-Patent Citations (2)
Title |
---|
张本东 等: "机加工车间工时管理系统的开发与应用", 《金属加工》 * |
韩金洋: "计件工资管理系统的研究与设计", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
Also Published As
Publication number | Publication date |
---|---|
CN109284973B (en) | 2022-05-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190188732A1 (en) | System and method for ensuring credibility of items in a supply chain management | |
CN105009147A (en) | Information code, method for generating information code, device for reading information code, and system for using information code | |
US11875589B2 (en) | Article dual material-digital anti-forgery protection | |
CN110246005A (en) | Rent method and device based on block chain | |
CN110223138A (en) | Household rent method and device based on block chain | |
CN108573140A (en) | Intelligent seal and it establishes server and the intelligent seal service system based on block chain technology beyond the clouds | |
CN109522986A (en) | A kind of book management system based on wechat small routine | |
CN109559010A (en) | Goods and materials distribution method, device, computer equipment and storage medium | |
WO2022057108A1 (en) | Federated-learning-based personal qualification evaluation method, apparatus and system, and storage medium | |
CN101159095A (en) | Multi-function electric meter reading system based on computer visual sense | |
CN109835084B (en) | Application of novel anti-counterfeiting material in anti-counterfeiting payment, currency anti-counterfeiting, bank card and the like | |
WO2019127889A1 (en) | Data check method and apparatus, computer device, and readable storage medium | |
CN109377282A (en) | Real estate Land Appraisal production management method and system, computer equipment and storage medium | |
CN107292970A (en) | A kind of electronic ticket generation and verification method and system | |
CN109785021A (en) | Charge calculation invoice system between a kind of electricity power enterprise and electric power enterprise | |
US20170161754A1 (en) | Counter fraud systems | |
CN111489136A (en) | Enterprise salary management system | |
Seftyanto et al. | Design of Blockchain-based electronic election system using Hyperledger: Case of Indonesia | |
CN113971270A (en) | Identity recognition method and system based on block chain | |
CN101452504A (en) | Medical diagnosis management system and method thereof | |
CN108171481A (en) | Intellectual property business management system and method | |
JP2021077293A (en) | Computer program and information processing method | |
CN109784833A (en) | A kind of generation method and equipment of income statement | |
CN109284973A (en) | A kind of machinery plant reckons by the piece Working hours management system | |
CN111460507A (en) | Block chain-based security service system and application thereof in autonomous community |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |