CN109267682A - A kind of connection structure on straight building floor - Google Patents
A kind of connection structure on straight building floor Download PDFInfo
- Publication number
- CN109267682A CN109267682A CN201811333865.4A CN201811333865A CN109267682A CN 109267682 A CN109267682 A CN 109267682A CN 201811333865 A CN201811333865 A CN 201811333865A CN 109267682 A CN109267682 A CN 109267682A
- Authority
- CN
- China
- Prior art keywords
- building floor
- fixed
- block
- box set
- connection structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/023—Separate connecting devices for prefabricated floor-slabs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/04—Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The present invention relates to building fields, more particularly to a kind of connection structure on straight building floor.It includes the first building floor, the second building floor, is provided with a fixed anchor block and a fixed box set in the first building floor and the second building floor;Or both in one in it is pre-buried there are two fixed anchor blocks, there are two fixed box sets for setting in another;It is provided with mounting groove in fixed box set, is provided on the building floor surface of fixed box set and is correspondingly arranged on the mounting hole for being connected to mounting groove;Connector is connected and fixed box set and fixed anchor block;Cover board is removably installed on the building floor for being embedded with fixed box set.Fixation anchor block and the fixed box set being connected in by connector in the first wallboard and the second wallboard, simplify assembled step between the first wallboard and the second wallboard, improve the bonding strength between the first wallboard and the second wallboard, the setting of mounting groove and mounting hole, so that convenient in assembly squeeze into connector out of fixed box set.
Description
Technical field
The present invention relates to building fields, more particularly to a kind of connection structure on straight building floor.
Background technique
In order to avoid construction pollution and construction efficiency is improved, assembled architecture wall is more and more welcomed by the people.
Prefabricated assembled wall in connection, is connected by connection bolt and steel plate connecting plate in the prior art
It connects, is connect steel plate connector with the pre-embedded steel slab in pre-cast concrete walling using high-strength bolt.But such connection type needs
Open up more bolt hole, manufacturing procedure is complicated, and if multiple bolts hole when meeting the requirement being aligned simultaneously, pre-embedded steel slab aperture
Required precision is higher, and for for its bolt hole, installation accuracy requires height simultaneously, installation effectiveness is low.
It is, therefore, desirable to provide a kind of connection structure on straight building floor, is able to solve existing in the prior art prefabricated
Assembled wall connecting complex procedures, installation accuracy require problem high, that installation effectiveness is low.
Summary of the invention
It is an object of the invention to propose a kind of connection structure on straight building floor, prefabricated assembled wall can be reduced
Process is connected, installation accuracy is reduced and requires and improve installation effectiveness.
To achieve this purpose, the present invention adopts the following technical scheme:
A kind of connection structure on straight building floor is provided, the first building floor and second including the horizontal setting that reclines is built
Floor is built,
A fixed anchor block is embedded in the first building floor and second building floor and is provided with one
Fixed box set;Or both in one in it is pre-buried there are two fixed anchor blocks, there are two fixed box sets for setting in another;
It is provided with mounting groove in each fixed box set, is provided on the building floor surface of fixed box set and is correspondingly arranged
There is the mounting hole for being connected to the mounting groove;
Connector, one end of each connector pass through the fixed box set and another building ground in a building floor
The fixed anchor block connection in plate, the other end are fixed in the mounting groove;
Two cover boards are removably installed on the building floor for being embedded with fixed box set, for blocking two institutes
State mounting hole.
Preferably, the respectively interior receipts face in two parallel sides and abutment face that the fixed anchor block is opposite, described solid
The cross-sectional area for determining anchor block is gradually increased from the abutment face to the interior receipts face, the abutment face and first building floor
The lateral surface on second building that reclines floor is concordant.
Preferably, the fixed anchor block is trapezium structure.
Preferably, the fixed box set includes fixed block, recline block and the connection fixed block and the block that reclines
Guide pipe;
The mounting groove is set on the fixed block, and via hole is provided on the block that reclines, and the via hole passes through described
The lumen of guide pipe is connected to the mounting groove, and the connector is arranged in the lumen.
Preferably, the block that reclines is away from the side of the fixed block and the second building floor plaster by described first
The lateral surface for building floor is concordant.
Preferably, being provided with hook on the fixed block, the hook hooking is in perpendicular in second building floor
Straight reinforcing bar.
Preferably, the notch on the fixed block around the mounting groove is provided with convex edge, the convex edge is posted by institute
State the horizontal reinforcement in the second building floor.
Preferably, the connector is the screw rod of steel, the diameter of the screw rod is 5mm~15mm, the screw rod
Surface is coated with erosion shield, and the head of the screw rod is posted by the inner wall of the mounting groove.
Preferably, the guide pipe and the connector be provided with it is multiple, and the two correspond cooperation.
Preferably, being provided with magnetite on the cover board.
The invention has the advantages that:
It is connected in fixation anchor block and fixed box set in the first building floor and the second building floor by connector,
Assembled step between the first building floor and the second building floor is simplified, the first building floor and the second building floor are improved
Between bonding strength, the setting of mounting groove and mounting hole, so that convenient in assembly squeeze into connector out of fixed box set, just
In carrying out assembly to the first building floor and the second building floor at the construction field (site), installation error and operation difficulty are reduced,
On the basis of this, the setting of dismountable cover board is overhauled convenient for the later period of construction personnel and maintenance.
The setting of anchor block and fixed box set is connected and fixed by connector, when carrying out assembled to wallboard, connection type letter
It is single, it can be realized pure dry method connection, construction period be effectively shortened, in addition, can neatly carry out public affairs in consolidation service
Difference compensation is repaired, without carrying out additional technical training, connector and the cooperation for fixing anchor block and fixed box set to operator,
So that be connected with enough flexibilities between wallboard, improve can load bearing intensity and Resisting fractre ability.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the connection structure on straight building floor described in the embodiment of the present invention;
Fig. 2 is the structural schematic diagram of fixation anchor block described in the embodiment of the present invention;
Fig. 3 is the top view of fixation box set described in the embodiment of the present invention;
Fig. 4 is the structural schematic diagram of fixation box set described in the embodiment of the present invention;
Fig. 5 is the structural schematic diagram of cover board described in the embodiment of the present invention.
In figure:
1, the first building floor;
2, fixed anchor block;21, abutment face;
3, the second building floor;
4, fixed box set;40, mounting groove;41, fixed block;42, recline block;43, guide pipe;44, it links up with;45, convex edge;
5, connector;
6, cover board;61, magnetite.
Specific embodiment
To keep the technical problems solved, the adopted technical scheme and the technical effect achieved by the invention clearer, below
In conjunction with attached drawing and pass through specific embodiment to further illustrate the technical scheme of the present invention.It is understood that this place is retouched
The specific embodiment stated is used only for explaining the present invention rather than limiting the invention.It also should be noted that in order to just
Only the parts related to the present invention are shown in description, attached drawing and it is not all.
The connection structure that a kind of straight building floor is provided in the present embodiment specifically includes as shown in Figs. 1-5: the
The one fixed anchor block 2, second in 1, two, floor of building builds 3, two, floor fixed box set 4, connector 5 and cover board 6.Fixed anchor block
2 are respectively provided in the first building floor 1 and the second building floor 3 with fixed box set 4, and connector 5 will fixed anchor block 2 and fixing sleeve
Box 4 connects, so that the first building floor 1 and the second building floor 3 be connected.
In the present invention, the fixation anchor in the first building floor 1 and the second building floor 3 is connected in by connector 5
Block 2 and fixed box set 4 simplify assembled step between the first building floor 1 and the second building floor 3, improve the first building
Floor 1 and second building floor 3 between bonding strength, the setting of mounting groove 40 and mounting hole so that in assembly facilitate from
Connector 5 is squeezed into fixed box set 4, convenient for carrying out assembly to the first building floor 1 and the second building floor 3 at the construction field (site),
Installation error and operation difficulty are reduced, on this basis, the setting of dismountable cover board 6 is overhauled convenient for the later period of construction personnel
And maintenance.
There are two fixed box sets 4, or one fixed box set 4 of setting and a pre-buried fixation for setting in first building floor 1
Anchor block 2 or pre-buried two fixed anchor blocks 2;And second building floor 3 on correspond to pre-buried two fixed anchor blocks 2 or it is pre-buried one consolidate
Determine one fixed box set 4 of anchor block 2 and setting, or two fixed box sets 4 of setting.But no matter the second building floor 3 and first is built
Build how floor 1 specifically connects, all should ensure that the second building floor 3 recline the first building floor 1 setting and with first building
Floor 1 is in same level.
In the present embodiment, for ease of description, fixed with the fixed box set 4 of setting one and pre-buried one in the second building floor 3
Anchor block 2, first, which builds pre-buried one fixed anchor block 2 and setting one in floor 1, fixes for box set 4, to the straight company for building floor
Binding structure is specifically described.
Second building floor 3 and the first building floor 1 pre-buried fluted former when prepared by factory, will at assembled scene
Groove former takes out, and fixed box set 4 is then installed on groove and forms completion installation, groove former table at pre-buried position
Face is flat and smooth or is coated with release agent, taking-up when facilitating on-site consolidation.The fixed field erected setting of box set 4, avoids and is transporting
Damage during defeated.Specifically, fixed box set 4 can also be on the first building floor 1 and the second building ground in addition to in-site installation
It is pre-buried in advance in the concrete component of plate 3.
Specifically, as in Figure 2-4, fixed box set 4 includes fixed block 41, recline block 42 and connection fixing block 41 and patch
By the guide pipe 43 of block 42.Mounting groove 40 is set on fixed block 41, is provided with via hole on the block 42 that reclines, via hole passes through guide pipe
43 lumen is connected to mounting groove 40, and guide pipe 43 is sheathed on the outside of connector 5, and connector 5 sequentially passes through mounting groove 40, pipe
It is connected after chamber and via hole with fixed anchor block 2.The setting of above-mentioned guide pipe 43 avoids dislocation when connector 5 is squeezed into.
The block 42 that reclines away from side and the second building floor 3 of fixed block 41 recline the first building floor 1 lateral surface it is flat
Together, first building floor 1 with second building floor 3 be posted by connecting when, recline block 42 with fixation anchor block 2 abutment face 21 against
Together, so that connector 5 is not necessarily to the first building floor 1 when floor 1 and the second building floor 3 are built in connection first
It is destroyed with the second building floor 3.Above-mentioned abutment face 21 and the block 42 that reclines leak outside relative to the first wallboard 1 and the second wallboard 3
Setting, positioning when being easily installed, so that the connection of connector 5 is more accurate and reliable.
In the present embodiment, hook 44 is provided on fixed block 41,44 hookings of hook are in perpendicular in the second building floor 3
Straight reinforcing bar.Notch on fixed block 41 around mounting groove 40 is provided with convex edge 45, and convex edge 45 extends outwardly relative to mounting groove 40,
Convex edge 45 is posted by the horizontal reinforcement in the second building floor 3.The setting of above-mentioned hook 44 and convex edge 45, so that fixed box set 4
Setting in the second building floor 3 is stronger.
Connector 5 is the screw rod of steel, and the diameter of screw rod is that (select diameter in the present embodiment is 10mm's to 5-15mm
Screw rod), the surface of screw rod is coated with erosion shield, and the head of screw rod is posted by the inner wall of mounting groove 40, plays to fixing sleeve
The hook of box 4 acts on, and screw flight portion is bolted in fixed anchor block 2, for being connected and fixed anchor block 2.
Guide pipe 43 and connector 5 cooperate one by one, be respectively set there are three.The setting of three connectors 5, to fixed anchor block
2 is stronger with the connection of fixed box set 4, and at this time when a connector 5 fails, other two connector 5 can also continue
To the effect of connection.Certainly be not limited to the quantity of above-mentioned restriction in other embodiments, can also be four or four with
On guide pipe 43.
Magnetite 61 is provided on cover board 6, in the present embodiment, there are four the settings of magnetite 61, uniformly distributed in the plate face of cover board 6
Setting, to save cost, it may be arranged as two, in addition to this, may be arranged as any.Above-mentioned setting, so that
It is completed on the first building floor 1 and the second building floor 3 connection, and builds to be plastered, decorated on floor 3 etc. second and make
After industry, the position of cover board 6 can be found by iron block, and the later period is facilitated to overhaul and safeguard.
In the present embodiment, fixed anchor block 2 is prepared by polyurethane combined fiberglass, and fixed box set 4 passes through injection molding
It forms and obtains.
Note that the above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The industry
Technical staff it should be appreciated that the present invention is not limited to the embodiments described above, described in above embodiment and specification
Merely illustrate the principles of the invention, without departing from the spirit and scope of the present invention, the present invention also have various change and
It improves, these changes and improvements all fall within the protetion scope of the claimed invention, and claimed range of the invention is by appended
Claims and its equivalent thereof.
Claims (10)
1. a kind of connection structure on straight building floor, the first building floor (1) and the second building including the horizontal setting that reclines
Floor (3), which is characterized in that
It is embedded with a fixed anchor block (2) in first building floor (1) and second building floor (3) and is provided with
One fixed box set (4);Or both in one in it is pre-buried there are two fixed anchor block (2), there are two fixed for setting in another
Box set (4);
Mounting groove (40) are provided on each fixed box set (4), it is right on the building floor surface of fixed box set (4) to be provided with
The mounting hole for being connected to the mounting groove (40) should be provided with;
Connector (5), one end of each connector (5) pass through the fixed box set (4) and another that one is built in floor
Fixed anchor block (2) connection in floor is built, the other end is fixed in the mounting groove (40);
Two cover boards (6), are removably installed on the building floor for being embedded with fixed box set (4), for blocking two
The mounting hole.
2. the connection structure on straight building floor according to claim 1, which is characterized in that fixed anchor block (2) phase
Pair two parallel sides be respectively in receipts face and abutment face (21), the cross-sectional area of the fixed anchor block (2) is from the patch
It is gradually increased by face (21) to the interior receipts face, the abutment face (21) and first building floor (1) recline described second
The lateral surface for building floor (3) is concordant.
3. the connection structure on straight building floor according to claim 2, which is characterized in that the fixed anchor block (2) is
Trapezium structure.
4. the connection structure on straight building floor according to claim 1, which is characterized in that fixed box set (4) packet
Include the guide pipe (43) of fixed block (41), the block that reclines (42) and the connection fixed block (41) and the block that reclines (42);
The mounting groove (40) is set on the fixed block (41), is provided with via hole, the via hole on the block that reclines (42)
It is connected to the mounting groove (40) by the lumen of the guide pipe (43), the connector (5) is arranged in the lumen.
5. the connection structure on straight building floor according to claim 4, which is characterized in that the block that reclines (42) is deviated from
The side of the fixed block (41) with it is described second building floor (3) recline it is described first building the lateral surface of floor (1) it is concordant.
6. the connection structure on straight building floor according to claim 4, which is characterized in that set on the fixed block (41)
It is equipped with hook (44), hook (44) hooking is in the vertical reinforcing bar in second building floor (3).
7. the connection structure on straight building floor according to claim 4, which is characterized in that enclosed on the fixed block (41)
It is provided with convex edge (45) around the notch of the mounting groove (40), the convex edge (45) is posted by second building floor (3)
Horizontal reinforcement.
8. the connection structure on straight building floor according to claim 4, which is characterized in that the connector (5) is steel
The diameter of the screw rod of matter, the screw rod is 5mm~15mm, and the surface of the screw rod is coated with erosion shield, the screw rod
Head is posted by the inner wall of the mounting groove (40).
9. the connection structure on straight building floor according to claim 4, which is characterized in that the guide pipe (43) and institute
State connector (5) be provided with it is multiple, and the two correspond cooperation.
10. the connection structure on -9 any straight building floors according to claim 1, which is characterized in that the cover board (6)
On be provided with magnetite (61).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811333865.4A CN109267682A (en) | 2018-11-09 | 2018-11-09 | A kind of connection structure on straight building floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811333865.4A CN109267682A (en) | 2018-11-09 | 2018-11-09 | A kind of connection structure on straight building floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109267682A true CN109267682A (en) | 2019-01-25 |
Family
ID=65193390
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811333865.4A Withdrawn CN109267682A (en) | 2018-11-09 | 2018-11-09 | A kind of connection structure on straight building floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109267682A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284642A (en) * | 2019-06-25 | 2019-09-27 | 长安大学 | A kind of hollow two-way floor forming method of full bolt assembled and its node |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201679137U (en) * | 2010-04-07 | 2010-12-22 | 燕山大学 | Multifunctional building block capable of identifying positions of preformed holes |
US20130031857A1 (en) * | 2011-08-01 | 2013-02-07 | Tincher Terry J | Anchor system for securing a concrete wall panel to a supporting concrete foundation |
CN103362244A (en) * | 2013-06-25 | 2013-10-23 | 山东华宇职业技术学院 | Indoor wall building block provided with prefabricated screw hole for hanging object |
CN103541427A (en) * | 2013-11-04 | 2014-01-29 | 长沙远大住宅工业有限公司 | Box-shaped structural building system and method |
CN204401800U (en) * | 2015-01-14 | 2015-06-17 | 北京建筑大学 | Gas concrete built-in fitting node |
WO2016146543A1 (en) * | 2015-03-13 | 2016-09-22 | ZPP International GmbH | Reinforced concrete component |
DE202017006769U1 (en) * | 2017-10-13 | 2018-04-30 | NV-Connect UG (haftungsbeschränkt) | Anchor element and concrete component with anchoring element |
CN209082792U (en) * | 2018-11-09 | 2019-07-09 | 中欧云建科技发展有限公司 | A kind of connection structure on straight building floor |
-
2018
- 2018-11-09 CN CN201811333865.4A patent/CN109267682A/en not_active Withdrawn
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201679137U (en) * | 2010-04-07 | 2010-12-22 | 燕山大学 | Multifunctional building block capable of identifying positions of preformed holes |
US20130031857A1 (en) * | 2011-08-01 | 2013-02-07 | Tincher Terry J | Anchor system for securing a concrete wall panel to a supporting concrete foundation |
CN103362244A (en) * | 2013-06-25 | 2013-10-23 | 山东华宇职业技术学院 | Indoor wall building block provided with prefabricated screw hole for hanging object |
CN103541427A (en) * | 2013-11-04 | 2014-01-29 | 长沙远大住宅工业有限公司 | Box-shaped structural building system and method |
CN204401800U (en) * | 2015-01-14 | 2015-06-17 | 北京建筑大学 | Gas concrete built-in fitting node |
WO2016146543A1 (en) * | 2015-03-13 | 2016-09-22 | ZPP International GmbH | Reinforced concrete component |
DE202017006769U1 (en) * | 2017-10-13 | 2018-04-30 | NV-Connect UG (haftungsbeschränkt) | Anchor element and concrete component with anchoring element |
CN209082792U (en) * | 2018-11-09 | 2019-07-09 | 中欧云建科技发展有限公司 | A kind of connection structure on straight building floor |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284642A (en) * | 2019-06-25 | 2019-09-27 | 长安大学 | A kind of hollow two-way floor forming method of full bolt assembled and its node |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109736353A (en) | Construction method of composite single-side formwork deep foundation pit basement outer wall | |
CN105714961A (en) | Cast-in-situ dismantling-free assembling-type heat-preservation external formwork assembly, external wall structure and construction method | |
CN205444882U (en) | Cast -in -placely build that prefabricated dismounting -free is whole to be assembled assembly of heat preservation exterior sheathing and use outer die carrier | |
CN104863290A (en) | Combined wall formed by single prefabricated wall sections and construction method | |
CN109138228A (en) | Construction wall and its method of construction | |
CN110821022A (en) | Full-prefabricated high-strength PC floor in steel construction that can install fast | |
CN109610708A (en) | A kind of the bidirectional laminated slab bottom plate and construction method of close piece connection | |
CN104863296A (en) | Integrally modular steel bar truss floor plate and construction method thereof | |
CN209129149U (en) | A kind of connection structure of straight building wall board | |
CN209082792U (en) | A kind of connection structure on straight building floor | |
CN109267682A (en) | A kind of connection structure on straight building floor | |
CN204282685U (en) | A kind of assembling stair | |
CN209129148U (en) | A kind of T shape connection structure for building floor and building wall board | |
CN105040823A (en) | Partition plate and floor beam connecting structure for scissors staircase and construction method of partition plate and floor beam connecting structure | |
CN116397779B (en) | Connecting device for assembled connecting column and construction method | |
CN218374567U (en) | Can fix a position ALC wallboard reinforced structure that can exempt from to plaster | |
CN209082687U (en) | A kind of connection structure of right angle building wall board | |
CN102587665B (en) | Pouring method of coupled shear wall structure | |
CN204753834U (en) | Partition plate of scissors stair and connection structure of floor roof beam | |
CN109267647A (en) | A kind of connection structure of right angle building wall board | |
US20220220733A1 (en) | A modular structural system and construction method thereof | |
CN209129150U (en) | A kind of connection structure of L-type building wall board | |
CN114059707A (en) | High strength building engineering concrete wallboard | |
CN104563281B (en) | A kind of prefabricated balcony structure and its construction method | |
CN209082688U (en) | A kind of cross connection structure for building floor and building wall board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190125 |