CN109261864A - A kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process - Google Patents

A kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process Download PDF

Info

Publication number
CN109261864A
CN109261864A CN201811148588.XA CN201811148588A CN109261864A CN 109261864 A CN109261864 A CN 109261864A CN 201811148588 A CN201811148588 A CN 201811148588A CN 109261864 A CN109261864 A CN 109261864A
Authority
CN
China
Prior art keywords
cronidur30
stainless steel
bearing ring
high nitrogen
nitrogen stainless
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811148588.XA
Other languages
Chinese (zh)
Inventor
周淑梅
孙振淋
王大勇
安敏
袁超
王伟錡
付中元
夏云志
穆强
吴玉成
于遨海
于祎航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinese Hangfa Harbin Bearing Co Ltd
AVIC Harbin Bearing Co Ltd
Original Assignee
Chinese Hangfa Harbin Bearing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinese Hangfa Harbin Bearing Co Ltd filed Critical Chinese Hangfa Harbin Bearing Co Ltd
Priority to CN201811148588.XA priority Critical patent/CN109261864A/en
Publication of CN109261864A publication Critical patent/CN109261864A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/002Hybrid process, e.g. forging following casting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21HMAKING PARTICULAR METAL OBJECTS BY ROLLING, e.g. SCREWS, WHEELS, RINGS, BARRELS, BALLS
    • B21H1/00Making articles shaped as bodies of revolution
    • B21H1/06Making articles shaped as bodies of revolution rings of restricted axial length
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/02Die forging; Trimming by making use of special dies ; Punching during forging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/06Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
    • B21J5/08Upsetting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/04Making machine elements ball-races or sliding bearing races

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Rolling Contact Bearings (AREA)
  • Forging (AREA)

Abstract

A kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process, belong to bearing parts manufacture field, the present invention solves that forging and molding can not be carried out to Cronidur30 high nitrogen stainless steel bearing ring in the prior art, to make the problem low with the service life of the bearing ring of Cronidur30 high nitrogen stainless steel material and reliability, method primary operational of the invention is that will expect that section is put into carry out preheating heating in chamber type electric resistance furnace, material after preheating heating is subjected to jumping-up with hammer, punching, flat height, material section is returned in chamber type electric resistance furnace again later and is kept the temperature, material section after heat preservation is put on machine for rolling ring, grind and expands to forging's block dimension, it is cold that mist is carried out after grinding eventually.Present invention is mainly used for the forging and moldings of Cronidur30 high nitrogen stainless steel bearing ring blank.

Description

A kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process
Technical field
The present invention relates to a kind of bearing parts manufacture field, in particular to a kind of Cronidur30 high nitrogen stainless steel bearing holder (housing, cover) Enclose blank forging manufacturing process.
Background technique
For bearing ring (outer diameter >=52mm, internal diameter >=30mm) usually by forging and molding, different bearing materials forges work Skill is also different, in conventional bearings manufacture material, Cr4Mo4V type high temp steel, have high rigidity, high tenacity, the performances such as high temperature resistant, but Corrosion resistance is poor;9Cr18 class stainless steel has high rigidity, and high tenacity is corrosion-resistant, but non-refractory;GCr15 class bearing steel It is that not only non-refractory but also not corrosion-resistant, Cronidur30 high nitrogen stainless steel be high pressure nitriding iron --- chromium --- molybdenum --- steel alloy Stainless steel, be combined with the new material of the existing high-quality performance of all kinds of bearing materials, have high rigidity, high tenacity, high temperature resistant, resist The comprehensive performances such as corrosion, are the preferred materials of high-end bearing mnanufacture, because Cronidur30 high nitrogen stainless steel is as new material, There are no perfect forging technology can forge to it in the prior art, so with Cronidur30 high nitrogen stainless steel work It is substantially reduced for the bearing ring service life and reliability of material.
Summary of the invention
The present invention is to solve that forging and molding can not be carried out to Cronidur30 high nitrogen stainless steel bearing parts in the prior art, To make the problem low with the service life of the bearing ring of Cronidur30 high nitrogen stainless steel material and reliability, Jin Erti A kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process out.
A kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process of the invention, mainly takes Technical solution is as follows:
Step 1: putting material section into chamber type electric resistance furnace effective heating area and preheat, and preheating temperature is 780 DEG C~820 DEG C, Preheating time is 25min~70min;
Step 2: the material section after preheating is carried out to whole heat treatment in chamber type electric resistance furnace, chamber type electric resistance furnace is warming up to 1220 DEG C~1260 DEG C, soaking time is 20min~65min;
Step 3: the material section after heat eventually being taken out, is transferred on press machine, carries out jumping-up with hammering into shape on press machine, punching, Flat height, final forging temperature are 900 DEG C~1100 DEG C;
Step 4: the material section after finish-forging is sent to chamber type electric resistance furnace effective heating area, furnace temperature remains 1130 DEG C~1170 DEG C, soaking time is 5min~30min;
Step 5: the material section after heat preservation being taken out from chamber type electric resistance furnace, and is put it on machine for rolling ring, stone roller expansion is carried out, To forging's block dimension, grinding temperature eventually is 900 DEG C~1100 DEG C;
Step 6: it is cold that the material section after grinding eventually is subjected to mist.
Compared with the prior art, the invention has the following beneficial effects:
One, forging forming method of the invention can make this new material of Cronidur30 high nitrogen stainless steel be used for longevity The processing and manufacturing of life and high reliability bearing ring, the service life compared to the bearing ring of traditional material at least improve 30%.
Two, hard after the forging annealing that forging forming method of the invention can be such that Cronidur30 high nitrogen stainless steel forges Degree can achieve HB190~HB255.
Detailed description of the invention
Fig. 1 forging and forming technology curve graph.
Specific embodiment
Specific embodiment 1: embodiment is described with reference to Fig. 1, a kind of Cronidur30 described in this city embodiment The realization process of high nitrogen stainless steel bearing ring blank forging manufacturing process are as follows:
Step 1: putting material section into chamber type electric resistance furnace effective heating area and preheat, and preheating temperature is 780 DEG C~820 DEG C, Preheating time is 25min~70min;
Step 2: the material section after preheating is carried out to whole heat treatment in chamber type electric resistance furnace, chamber type electric resistance furnace is warming up to 1220 DEG C~1260 DEG C, soaking time is 20min~65min;
Step 3: the material section after heat eventually being taken out, is transferred on press machine, carries out jumping-up with hammering into shape on press machine, punching, Flat height, final forging temperature are 900 DEG C~1100 DEG C;
Step 4: the material section after finish-forging is sent to chamber type electric resistance furnace effective heating area, furnace temperature remains 1130 DEG C~1170 DEG C, soaking time is 5min~30min;
Step 5: the material section after heat preservation being taken out from chamber type electric resistance furnace, and is put it on machine for rolling ring, stone roller expansion is carried out, To forging's block dimension, grinding temperature eventually is 900 DEG C~1100 DEG C;
Step 6: it is cold that the material section after grinding eventually is subjected to mist.
Specific embodiment 2: being illustrated with reference to Fig. 1, present embodiment puts material section into box electricity described in step 3 Resistance furnace effective heating area is preheated, and guarantees that temperature is 800 DEG C, soaking time 35min, other undisclosed technologies and step with Specific embodiment one is identical.
Such setting can guarantee that material section while reaching best pre-heat effect, saves energy to greatest extent, will not Cause excessive thermal losses.
Specific embodiment 3: being illustrated with reference to Fig. 1, present embodiment the material section after preheating existing described in step 4 1230 DEG C, soaking time 28min are warming up in chamber type electric resistance furnace, technologies and step and specific embodiment two is not disclosed in other It is identical.
Specific embodiment 4: being illustrated with reference to Fig. 1, present embodiment sends material ring back to box electricity described in step 6 Furnace effective heating area is hindered, furnace temperature is 1150 DEG C, soaking time 7min, and technologies and step and specific embodiment is not disclosed in other Three is identical.
The better ductility of workpiece after can guaranteeing forging is arranged such, expands process for subsequent stone roller and prepares, in this ring Under border, the energy being lost while ductility being made to reach preferably is minimum.
Specific embodiment 5: present embodiment is Step 1: Step 2: box resistance described in step 4 and step 5 Furnace is RX3-90-12 chamber type electric resistance furnace, other undisclosed technologies and step are identical as specific embodiment four.
It is hammered into shape specific embodiment 6: present embodiment is hammered into shape described in step 1 for 1500kg.Other undisclosed technologies and Step is identical as specific embodiment five.
Specific embodiment 7: present embodiment machine for rolling ring described in step 1 is D51-250 machine for rolling ring.Other are not public It is identical as specific embodiment six to open technology and step.
Specific embodiment 8: final forging temperature of the present embodiment described in step 3 is 950 DEG C.Other undisclosed skills Art and step are identical as specific embodiment seven.
Specific embodiment 9: whole grind temperature of the present embodiment described in step 5 is 950 DEG C.Other undisclosed skills Art and step are identical as specific embodiment eight.
Specific embodiment 10: referring to a kind of forging forming method of Cronidur30 high nitrogen stainless steel in present embodiment The application for obtaining material section, by side described in specific embodiment one, two, three, four, five, six, seven or eight any specific embodiments Method obtains material section and is used to process the bearing ring that bearing designation is 176116 bearings.
Embodiment one
The present embodiment provides a kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process, specifically press It is carried out according to following steps:
Step 1: putting material section into RX3-90-12 chamber type electric resistance furnace effective heating area and preheat, preheating temperature 800 DEG C, preheating time 40min;
Step 2: the material section after preheating is carried out to whole heat treatment in RX3-90-12 chamber type electric resistance furnace, by chamber type electric resistance furnace 1240 DEG C are warming up to, soaking time 35min;
Step 3: the material section after heat eventually being taken out, is transferred on press machine, carries out jumping-up with hammering into shape on press machine, punching, Flat height, final forging temperature are 950 DEG C;
Step 4: being sent to RX3-90-12 chamber type electric resistance furnace effective heating area for the material section after finish-forging, and furnace temperature is 1150 DEG C, Soaking time is 15min;
Step 5: the material section after heat preservation being taken out from RX3-90-12 chamber type electric resistance furnace, and is put it on machine for rolling ring, Stone roller expansion is carried out, until forging's block dimension, grinding temperature eventually is 950 DEG C;
Step 6: it is cold that the material section after grinding eventually is subjected to mist.
The model 176116 of Cronidur30 high nitrogen stainless steel bearing ring blank manufactured in the present embodiment, model 176116 bearing ring blank forging does not crack, and the hardness forged after completing annealing reaches HB220, can satisfy The requirement of subsequent mechanical processing, while the service life of the forging of model 176116 and reliability also greatly improve.
The present invention is disclosed as above with preferable case study on implementation, and however, it is not intended to limit the invention, any to be familiar with this profession Technical staff, without departing from the scope of the present invention, when the structure and technology contents that can use the disclosure above are done A little change or it is modified to the equivalence enforcement case of equivalent variations out, but it is all without departing from technical solution of the present invention Hold, any simple modification, equivalent change and modification done according to the technical essence of the invention to the above case study on implementation still belong to Technical solution of the present invention range.

Claims (10)

1. a kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process, it is characterised in that: the method Realization process are as follows:
Step 1: putting material section into chamber type electric resistance furnace effective heating area and preheat, and preheating temperature is 780 DEG C~820 DEG C, preheating Time is 25min~70min;
Step 2: the material section after preheating is carried out to whole heat treatment in chamber type electric resistance furnace, chamber type electric resistance furnace is warming up to 1220 DEG C ~1260 DEG C, soaking time is 20min~65min;
Step 3: the material section after heat eventually being taken out, is transferred on press machine, carries out jumping-up with hammer on press machine, and height is put down in punching Degree, final forging temperature are 900 DEG C~1100 DEG C;
Step 4: being sent to chamber type electric resistance furnace effective heating area for the material section after finish-forging, and furnace temperature remains 1130 DEG C~1170 DEG C, protects The warm time is 5min~30min;
Step 5: the material section after heat preservation being taken out from chamber type electric resistance furnace, and is put it on machine for rolling ring, stone roller expansion is carried out, until forging Part size, grinding temperature eventually is 900 DEG C~1100 DEG C;
Step 6: it is cold that the material section after grinding eventually is subjected to mist.
2. a kind of processing side of Cronidur30 high nitrogen stainless steel bearing ring forging and molding according to claim 1 Method, it is characterised in that: it is described in step 1 to expect that section is put chamber type electric resistance furnace effective heating area into and preheated, guarantee that temperature is 800 DEG C, soaking time 35min.
3. a kind of processing side of Cronidur30 high nitrogen stainless steel bearing ring forging and molding according to claim 2 Method, it is characterised in that: the material section after preheating is heated up to 1230 DEG C in chamber type electric resistance furnace described in step 2, soaking time For 28min.
4. a kind of processing of Cronidur30 high nitrogen stainless steel bearing ring blank forging forming according to claim 3 Method, it is characterised in that: send material section back to chamber type electric resistance furnace effective heating area described in step 4, furnace temperature guarantees to be 1150 DEG C, soaking time 7min.
5. a kind of processing of Cronidur30 high nitrogen stainless steel bearing ring blank forging forming according to claim 4 Method, it is characterised in that: Step 1: Step 2: chamber type electric resistance furnace described in step 4 and step 5 is that RX3-90-12 is box Resistance furnace.
6. a kind of processing of Cronidur30 high nitrogen stainless steel bearing ring blank forging forming according to claim 5 Method, it is characterised in that: hammer described in step 3 is that 1500kg is hammered into shape.
7. a kind of processing of Cronidur30 high nitrogen stainless steel bearing ring blank forging forming according to claim 7 Method, it is characterised in that: machine for rolling ring described in step 5 is D51-250 machine for rolling ring.
8. a kind of processing of Cronidur30 high nitrogen stainless steel bearing ring blank forging forming according to claim 8 Method, it is characterised in that: final forging temperature described in step 3 is 950 DEG C.
9. a kind of processing of Cronidur30 high nitrogen stainless steel bearing ring blank forging forming according to claim 8 Method, it is characterised in that: it is 950 DEG C that end described in step 5, which grinds temperature,.
10. a kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process obtains the application of material section, feature It is, claim 1,2,3,4,5,6,7 or 8 any claim the methods is obtained and expect that section is used to process bearing designation and is The bearing ring of 176116 bearings.
CN201811148588.XA 2018-09-29 2018-09-29 A kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process Pending CN109261864A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811148588.XA CN109261864A (en) 2018-09-29 2018-09-29 A kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811148588.XA CN109261864A (en) 2018-09-29 2018-09-29 A kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process

Publications (1)

Publication Number Publication Date
CN109261864A true CN109261864A (en) 2019-01-25

Family

ID=65195762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811148588.XA Pending CN109261864A (en) 2018-09-29 2018-09-29 A kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process

Country Status (1)

Country Link
CN (1) CN109261864A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110102696A (en) * 2019-04-30 2019-08-09 大连海泰轴承制造有限公司 A kind of bearing ring forging process temperature control method
CN110871234A (en) * 2019-11-22 2020-03-10 宁波江丰电子材料股份有限公司 Machining and forming method of annular back plate
CN111745104A (en) * 2020-07-02 2020-10-09 无锡航亚科技股份有限公司 Forging method for improving grain size of high-nitrogen stainless steel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101109415A (en) * 2006-07-18 2008-01-23 洛阳轴研科技股份有限公司 Two-in-one method for processing narrow series thin-wall bearing ferrule
CN101417379A (en) * 2007-10-27 2009-04-29 襄阳汽车轴承股份有限公司 Tapered roller bearing ring double extension-sleeve forging technique
CN101947630A (en) * 2010-09-17 2011-01-19 洛阳轴研科技股份有限公司 Controlled-forging controlled-cooling processing technology of bearing ring prepared by GCr15
CN103706793A (en) * 2013-12-18 2014-04-09 潍坊学院 Preparation method of low-nickel high-nitrogen austenitic stainless steel product
CN104033488A (en) * 2014-06-18 2014-09-10 洛阳轴研科技股份有限公司 Design method of miniature ball bearing for ultra-high-speed abrasive drilling
CN106521407A (en) * 2016-08-23 2017-03-22 清华大学 Treatment method for cronidur30 bearing steel, reinforced cronidur30 bearing steel and bearing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101109415A (en) * 2006-07-18 2008-01-23 洛阳轴研科技股份有限公司 Two-in-one method for processing narrow series thin-wall bearing ferrule
CN101417379A (en) * 2007-10-27 2009-04-29 襄阳汽车轴承股份有限公司 Tapered roller bearing ring double extension-sleeve forging technique
CN101947630A (en) * 2010-09-17 2011-01-19 洛阳轴研科技股份有限公司 Controlled-forging controlled-cooling processing technology of bearing ring prepared by GCr15
CN103706793A (en) * 2013-12-18 2014-04-09 潍坊学院 Preparation method of low-nickel high-nitrogen austenitic stainless steel product
CN104033488A (en) * 2014-06-18 2014-09-10 洛阳轴研科技股份有限公司 Design method of miniature ball bearing for ultra-high-speed abrasive drilling
CN106521407A (en) * 2016-08-23 2017-03-22 清华大学 Treatment method for cronidur30 bearing steel, reinforced cronidur30 bearing steel and bearing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冯小川等: "40Cr15Mo2VNA 钢轴承套圈锻造工艺改进", 《轴承》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110102696A (en) * 2019-04-30 2019-08-09 大连海泰轴承制造有限公司 A kind of bearing ring forging process temperature control method
CN110871234A (en) * 2019-11-22 2020-03-10 宁波江丰电子材料股份有限公司 Machining and forming method of annular back plate
CN111745104A (en) * 2020-07-02 2020-10-09 无锡航亚科技股份有限公司 Forging method for improving grain size of high-nitrogen stainless steel
CN111745104B (en) * 2020-07-02 2022-04-29 无锡航亚科技股份有限公司 Forging method for improving grain size of high-nitrogen stainless steel

Similar Documents

Publication Publication Date Title
CN109261864A (en) A kind of Cronidur30 high nitrogen stainless steel bearing ring blank forging manufacturing process
CN101403032B (en) Thermal treatment process for quick cutting steel composite roll
CN105986074A (en) Die steel processing technology
CN104087742A (en) Differential temperature heat treatment method for centrifugal compound high-chromium steel roller
CN102513799A (en) Ring rolling method for flange of megawatt wind generation set tower
CN107866665B (en) Million MW class nuclear power unit high intensity retaining ring manufacturing process
CN106111874B (en) A kind of processing method of automobile-use bearing forging
CN103317319B (en) Material is the production and processing method that Cr12Mo1V1 digs that limit is cut
CN105349940A (en) Carburizing and carbonitriding combined heat treatment method for hot forging marking die steel
CN107321900A (en) A kind of GH4169 alloy discs die-forging of forge pieces forming method
CN106040955A (en) Forging process of gear shaft
CN107866660A (en) A kind of die steel processing technology
CN107740012A (en) A kind of aerolite forging part preparation method
CN106906340A (en) A kind of fine grain heat treatment method
CN109182699A (en) A kind of processing technology of die steel
CN113801982B (en) Pressure quenching die and process for large-diameter thin-arc-plate carburized gear
CN102380920B (en) Machining method of air valve forming die
CN107150205A (en) Method for scrapping large forged back -up roll circular regeneration
CN106040953A (en) Forging process of large wind power spindle
CN104826980A (en) Forging process of gear ring
CN103789688A (en) Heat treatment method of cold work die steel used for blanking die
CN109594024A (en) A kind of manufacturing process of high-wearing feature gear
CN105695699A (en) Micro-deformation vacuum heat treatment process for 40CrNi steel gear
CN102000759A (en) Combined forging die and manufacturing method thereof
CN111570606B (en) Fine blanking die with integral strength and work hardening of blanking surface and fine blanking method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190125