CN109261095A - Chemical Manufacture Multiple Cycle cooling device - Google Patents
Chemical Manufacture Multiple Cycle cooling device Download PDFInfo
- Publication number
- CN109261095A CN109261095A CN201811367788.4A CN201811367788A CN109261095A CN 109261095 A CN109261095 A CN 109261095A CN 201811367788 A CN201811367788 A CN 201811367788A CN 109261095 A CN109261095 A CN 109261095A
- Authority
- CN
- China
- Prior art keywords
- frame
- screw thread
- sealing cover
- cooling device
- chemical manufacture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01J—CHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
- B01J19/00—Chemical, physical or physico-chemical processes in general; Their relevant apparatus
- B01J19/0006—Controlling or regulating processes
- B01J19/0013—Controlling the temperature of the process
Landscapes
- Chemical & Material Sciences (AREA)
- Organic Chemistry (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Devices That Are Associated With Refrigeration Equipment (AREA)
Abstract
The invention discloses Chemical Manufacture Multiple Cycle cooling devices, including frame, placing groove, gas vent, housing sleeve, holding vessel, connecting tube, exhaust pipe, sealing cover, semiconductor cooler, the first temperature sensor, second temperature sensor, the Chemical Manufacture Multiple Cycle cooling device, clever structure, it is powerful, it is easy to operate, by using the device, industrial chemicals can be subjected to dual-cooled processing, the cooling effect of industrial chemicals is greatly improved, that is, improves the processing efficiency of industrial chemicals.
Description
Technical field
The present invention relates to cooling device more particularly to Chemical Manufacture Multiple Cycle cooling devices.
Background technique
Industrial chemicals can be divided into Organic Chemicals and Inorganic Chemicals.Organic Chemicals, which can be divided into, can be divided into alkane
Hydrocarbons and their derivates, olefin and its derivatives, alkynes and derivative, quinones, aldehydes, alcohols, ketone, phenols, ethers, anhydride,
Esters, organic acid, carboxylate, carbohydrate etc..In the prior art, many industrial chemicals generally will by crystallization, from
The processes such as the heart obtain wet product, become finished product after drying, mixing, cooling, packaging, for example, p-tert-butyl benzoic acid conduct
A kind of important industrial chemicals intermediate is exactly finished product obtained from passing through above-mentioned procedure of processing, but in cooling, usually adopts
Cooling treatment is carried out with the mode of natural cooling, such mode cooling effect is poor, the processing efficiency of product is reduced, in view of above
Defect, it is really necessary to design Chemical Manufacture Multiple Cycle cooling device.
Summary of the invention
Technical problem to be solved by the present invention lies in: Chemical Manufacture Multiple Cycle cooling device is provided, to solve background
The problem of technology proposes.
In order to solve the above technical problems, the technical scheme is that Chemical Manufacture Multiple Cycle cooling device, including frame
Frame, placing groove, gas vent, housing sleeve, holding vessel, connecting tube, exhaust pipe, sealing cover, semiconductor cooler, the first temperature sensing
Device, second temperature sensor, the placing groove are located at lower portion, and the placing groove is integrally connected with frame, described
Being vented hole number is several, and the gas vent is uniformly distributed at left and right sides of lower portion and bottom end, the exhaust
Hole is through-hole, and the housing sleeve is located at lower portion, and the housing sleeve is connected with frame screw thread, and the holding vessel is located at
Frame outer left side, the holding vessel are connected with frame screw thread, and the connecting tube is at the top of holding vessel, the connection
Pipe one end is connected with holding vessel screw thread, and the connecting tube other end is connected through frame left upper end with frame screw thread, institute
The exhaust pipe stated runs through frame right lower end, and the exhaust pipe is connected with frame screw thread, and the sealing cover is located at frame top
Portion, the sealing cover left side is connected with frame member, and is connected on the right side of the sealing cover with frame buckle, and described partly leads
Chiller is located at middle-end inside sealing cover, and the semiconductor cooler is connected with sealing cover screw thread, first temperature
Sensor is located inside housing sleeve, and first temperature sensor is connected with external threading is placed, the second temperature sensing
Device is located at sealing cover inside left bottom end, and the second temperature sensor is connected with sealing cover screw thread.
Further, the connection pipe outer wall is additionally provided with the first check valve, first check valve with connect pipe screw thread
It is connected.
Further, the connection pipe outer wall is additionally provided with the first solenoid valve, first solenoid valve with connect pipe screw thread
It is connected.
Further, the exhaust tube wall is additionally provided with second one-way valve, the second one-way valve and exhaust pipe screw thread
It is connected.
Further, the exhaust tube wall is additionally provided with second solenoid valve, the second solenoid valve and exhaust pipe screw thread
It is connected.
Further, the sealing cover inner right side lower end is additionally provided with mounting groove, the mounting groove and sealing cover one
It is connected.
Further, switch is additionally provided with inside the mounting groove, the switch is connected with mounting groove screw thread.
Further, it is additionally provided with jacking block on the right side of the frame roof, the jacking block is connected with frame screw thread.
Further, the first temperature controller, first temperature controller and frame are additionally provided on the left of the frame outer wall front end
Screw thread is connected.
Further, the second temperature controller, second temperature controller and frame are additionally provided on the right side of the frame outer wall front end
Screw thread is connected.
Compared with prior art, Chemical Manufacture Multiple Cycle cooling device, before use, staff is first by the first electromagnetism
Valve, second solenoid valve, the first temperature controller, the second temperature controller, the first temperature sensor, second temperature sensor and switch with it is outer
Boundary's power supply line is connected, in use, staff strikes out sealing cover with the hand first, allows jacking block to disappear the extruding force of switch with this
It losing, i.e., switch is in the state closed, by turning off the switch, so that second solenoid valve is opened, under the action of second one-way valve,
Outside air is prevented to be discharged into placing groove by exhaust pipe, the industrial chemicals of required cooling is put into housing sleeve again by staff, institute
The housing sleeve stated is copper material, has good guide temp, after industrial chemicals is put into, staff is first closed with hand
Sealing cover allows jacking block to carry out extruding force to switch with this, i.e., switch is in the state opened, by turning on the switch, so that second
Solenoid valve is closed, and staff opens the first temperature controller and the second temperature controller with hand again, by opening the first temperature controller and the
Two temperature controllers, so that the first temperature sensor and second temperature sensor are turned on, staff opens the first electromagnetism with hand again
Valve and semiconductor cooler, by opening the first solenoid valve, so that the liquid nitrogen in holding vessel is discharged into placing groove by connecting tube,
Under the action of the first check valve, so that the liquid nitrogen being discharged into placing groove will not be back in holding vessel by connecting tube, it is discharged into and puts
Set the liquid nitrogen in slot again from row of exhausting-gas hole to housing sleeve at, allow liquid nitrogen to carry out refrigeration processing to housing sleeve with this, at this point, by freezing
Housing sleeve afterwards carries out cooling treatment to industrial chemicals, when the temperature of housing sleeve reaches temperature set by the first temperature sensor
When value, the first solenoid valve is closed, meanwhile, by opening semiconductor cooler, so that semiconductor cooler is to the change in housing sleeve
Work raw material carries out refrigeration processing, i.e., cooling treatment is carried out to industrial chemicals, when the temperature in frame reaches second temperature sensor
When set temperature value, semiconductor cooler stops working, in the above manner, it is more to carry out the device to industrial chemicals
Weight cooling treatment, the Chemical Manufacture Multiple Cycle cooling device, clever structure is powerful, easy to operate, by using the dress
It sets, industrial chemicals can be subjected to dual-cooled processing, greatly improve the cooling effect of industrial chemicals, that is, improve chemical industry original
The processing efficiency of material, meanwhile, after the device use, staff strikes out sealing cover with the hand, at this point, jacking block is to switch
Extruding force disappears, and second solenoid valve is opened, and allows the liquid nitrogen in placing groove that the external world is discharged by exhaust pipe with this, staff again will be cold
But the industrial chemicals after takes out out of housing sleeve, and first temperature controller is connected with the first temperature sensor lead, institute
The second temperature controller stated is connected with second temperature sensor conducting wire, first temperature sensor and the first solenoid valve conducting wire phase
Even, the second temperature sensor is connected with semiconductor cooler conducting wire, first temperature controller and the second temperature control type
Number preferably ZB805, first temperature sensor and second temperature sensor model are preferably DS18B20, and described the
One solenoid valve and second solenoid valve model are preferably 2W-160-15, and mounting groove is the installation carrier of switch, the semiconductor system
Cooler model is preferably XD-240, the semiconductor cooler working principle be produced using the thermo-electrically effect of semiconductor it is cold
The device of amount, also known as thermo-electrically refrigerator.Two blocks of different metals are connected with conductor, connect direct current, then a junction temperature
It reduces, another junction temperature increases.
Detailed description of the invention
Fig. 1 is the local front sectional view of Chemical Manufacture Multiple Cycle cooling device;
Fig. 2 is the partial front elevation view of Chemical Manufacture Multiple Cycle cooling device;
Fig. 3 is the connection cross-sectional view of housing sleeve and the first temperature sensor;
Fig. 4 is the inside enlarged partial sectional view of sealing cover.
Frame 1, placing groove 2, gas vent 3, housing sleeve 4, holding vessel 5, connecting tube 6, exhaust pipe 7, sealing cover 8, semiconductor
Refrigerator 9, the first temperature sensor 10, second temperature sensor 11, jacking block 101, the first temperature controller 102, the second temperature controller
103, the first check valve 601, the first solenoid valve 602, second one-way valve 701, second solenoid valve 702, mounting groove 801, switch
802。
The following detailed description will be further explained with reference to the above drawings.
Specific embodiment
Hereinafter, a variety of specific details are elaborated, in order to provide to the saturating of the concept for constituting described embodiment basis
Thorough understanding.However, it will be apparent to those skilled in the art that described embodiment can be in these no specific details
In some or all situations get off practice.In other cases, well-known processing step is not specifically described.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, Chemical Manufacture Multiple Cycle cooling device, including frame 1, placing groove 2, exhaust
Hole 3, housing sleeve 4, holding vessel 5, connecting tube 6, exhaust pipe 7, sealing cover 8, semiconductor cooler 9, the first temperature sensor 10,
Two temperature sensors 11, the placing groove 2 are located inside frame 1, and the placing groove 2 is integrally connected with frame 1, described
3 quantity of gas vent is several, and the gas vent 3 is uniformly distributed in the 1 inside left and right sides of frame and bottom end, the row
Stomata 3 is through-hole, and the housing sleeve 4 is located inside frame 1, and the housing sleeve 4 is connected with 1 screw thread of frame, the storage
It deposits tank 5 and is located at 1 outer left side of frame, the holding vessel 5 is connected with 1 screw thread of frame, and the connecting tube 6 runs through holding vessel 5
Top, described 6 one end of connecting tube are connected with 5 screw thread of holding vessel, and 6 other end of connecting tube is on 1 left side of frame
End is connected with 1 screw thread of frame, and the exhaust pipe 7 runs through 1 right side lower end of frame, the exhaust pipe 7 and 1 screw thread phase of frame
Even, the sealing cover 8 is located at 1 top of frame, and 8 left side of sealing cover is rotatedly connected with frame 1, and the sealing cover
8 right sides are connected with the buckle of frame 1, and the semiconductor cooler 9 is located at 8 inside middle-end of sealing cover, the semiconductor refrigerating
Device 9 is connected with 8 screw thread of sealing cover, and first temperature sensor 10 is located inside housing sleeve 4, first temperature sensing
Device 10 is connected with 4 screw thread of housing sleeve, and the second temperature sensor 11 is located at 8 inside left bottom end of sealing cover, and described
Two temperature sensors 11 are connected with 8 screw thread of sealing cover, and 6 outer wall of connecting tube is additionally provided with the first check valve 601, and described
One check valve 601 is connected with 6 screw thread of connecting tube, and 6 outer wall of connecting tube is additionally provided with the first solenoid valve 602, and described first
Solenoid valve 602 is connected with 6 screw thread of connecting tube, and 7 outer wall of exhaust pipe is additionally provided with second one-way valve 701, and described second is single
It is connected to valve 701 with 7 screw thread of exhaust pipe, 7 outer wall of exhaust pipe is additionally provided with second solenoid valve 702, second electromagnetism
Valve 702 is connected with 7 screw thread of exhaust pipe, and the 8 inner right side lower end of sealing cover is additionally provided with mounting groove 801, the mounting groove
801 are integrally connected with sealing cover 8, and switch 802, the switch 802 and mounting groove are additionally provided with inside the mounting groove 801
801 screw threads are connected, and 1 top right side of frame is additionally provided with jacking block 101, and the jacking block 101 is connected with 1 screw thread of frame, institute
It is additionally provided with the first temperature controller 102 on the left of the 1 outer wall front end of frame stated, first temperature controller 102 is connected with 1 screw thread of frame,
The second temperature controller 103, second temperature controller 103 and 1 screw thread phase of frame are additionally provided on the right side of the 1 outer wall front end of frame
Even.
The Chemical Manufacture Multiple Cycle cooling device, before use, staff is first by the first solenoid valve 602, the second electromagnetism
Valve 702, the first temperature controller 102, the second temperature controller 103, the first temperature sensor 10, second temperature sensor 11 and switch
802 are connected with extraneous power supply line, in use, staff strikes out sealing cover 8 with the hand first, allow 101 pairs of jacking block switches with this
802 extruding force disappears, i.e., switch 802 is in the state closed, by turning off the switch 802, so that second solenoid valve 702 is opened
It opens, under the action of second one-way valve 701, outside air is prevented to be discharged into placing groove 2 by exhaust pipe 7, staff is again by institute
The industrial chemicals that need to be cooled down is put into housing sleeve 4, and the housing sleeve 4 is copper material, has good guide temp, when chemical industry original
After material is put into, staff first closes sealing cover 8 with hand, allows 101 pairs of switches 802 of jacking block to carry out extruding force with this, that is, opens
802 are closed in the state opened, by turning on the switch 802, so that second solenoid valve 702 is closed, staff is opened with hand again
First temperature controller 102 and the second temperature controller 103, by opening the first temperature controller 102 and the second temperature controller 103, so that first
Temperature sensor 10 and second temperature sensor 11 are turned on, and staff opens the first solenoid valve 602 with hand again and partly leads
Chiller 9, by opening the first solenoid valve 602, so that the liquid nitrogen in holding vessel 5 is discharged into placing groove 2 by connecting tube 6,
Under the action of first check valve 601, so that the liquid nitrogen being discharged into placing groove 2 will not be back in holding vessel 5 by connecting tube 6, row
Enter the liquid nitrogen in placing groove 2 again from 3 row of gas vent to housing sleeve 4 at, allow liquid nitrogen to carry out refrigeration processing to housing sleeve 4 with this, this
When, the housing sleeve 4 after being freezed carries out cooling treatment to industrial chemicals, when the temperature of housing sleeve 4 reaches the first temperature sensor
When temperature value set by 10, the first solenoid valve 602 is closed, meanwhile, by opening semiconductor cooler 9, so that semiconductor system
Cooler 9 carries out refrigeration processing to the industrial chemicals in housing sleeve 4, i.e., carries out cooling treatment to industrial chemicals, the temperature in frame 1
When degree reaches temperature value set by second temperature sensor 11, semiconductor cooler 9 stops working, in the above manner, making
It obtains the device and multiple cooling treatment is carried out to industrial chemicals, meanwhile, after the device use, staff strikes with the hand open close
Capping 8, at this point, the extruding force of 101 pairs of switches 802 of jacking block disappears, the opening of second solenoid valve 702 allows liquid in placing groove 2 with this
The external world is discharged by exhaust pipe 7 in nitrogen, and staff again takes out industrial chemicals after cooling out of housing sleeve 4, and described
One temperature controller 102 is connected with 10 conducting wire of the first temperature sensor, and second temperature controller 103 is led with second temperature sensor 11
Line be connected, first temperature sensor 10 is connected with 602 conducting wire of the first solenoid valve, the second temperature sensor 11 and
9 conducting wire of semiconductor cooler is connected, and first temperature controller 102 and 103 model of the second temperature controller is preferably ZB805, described
The first temperature sensor 10 and 11 model of second temperature sensor be preferably DS18B20, first solenoid valve 602 and
Two solenoid valves, 702 model is preferably 2W-160-15, and mounting groove 801 is the installation carrier of switch 802, the semiconductor refrigerating
9 model of device is preferably XD-240,9 working principle of semiconductor cooler be produced using the thermo-electrically effect of semiconductor it is cold
The device of amount, also known as thermo-electrically refrigerator.Two blocks of different metals are connected with conductor, connect direct current, then a junction temperature
It reduces, another junction temperature increases.
The present invention is not limited to above-mentioned specific embodiment, those skilled in the art from the above idea,
Without creative labor, the various transformation made are within the scope of the present invention.
Claims (10)
1. Chemical Manufacture Multiple Cycle cooling device, it is characterised in that including frame, placing groove, gas vent, housing sleeve, storage
Tank, connecting tube, exhaust pipe, sealing cover, semiconductor cooler, the first temperature sensor, second temperature sensor, the placement
Slot position is integrally connected in lower portion, the placing groove with frame, and the exhaust hole number is several, the exhaust
Hole is uniformly distributed at left and right sides of lower portion and bottom end, and the gas vent is through-hole, and the housing sleeve is located at frame
Inside, the housing sleeve are connected with frame screw thread, and the holding vessel is located at frame outer left side, the holding vessel and frame
Frame screw thread is connected, and at the top of holding vessel, described connecting tube one end is connected the connecting tube with holding vessel screw thread, and described
The connecting tube other end be connected with frame screw thread through frame left upper end, the exhaust pipe is through frame right lower end, institute
The exhaust pipe stated is connected with frame screw thread, and the sealing cover is located at frame roof, the sealing cover left side and frame member
It is connected, and is connected on the right side of the sealing cover with frame buckle, the semiconductor cooler is located at middle-end inside sealing cover, institute
The semiconductor cooler stated is connected with sealing cover screw thread, and first temperature sensor is located inside housing sleeve, and described
One temperature sensor is connected with external threading is placed, and the second temperature sensor is located at sealing cover inside left bottom end, described
Second temperature sensor be connected with sealing cover screw thread.
2. Chemical Manufacture Multiple Cycle cooling device as described in claim 1, it is characterised in that the connection pipe outer wall is also
Equipped with the first check valve, first check valve is connected with pipe screw thread is connect.
3. Chemical Manufacture Multiple Cycle cooling device as described in claim 1, it is characterised in that the connection pipe outer wall is also
Equipped with the first solenoid valve, first solenoid valve is connected with pipe screw thread is connect.
4. Chemical Manufacture Multiple Cycle cooling device as described in claim 1, it is characterised in that the exhaust tube wall is also
Equipped with second one-way valve, the second one-way valve is connected with exhaust pipe screw thread.
5. Chemical Manufacture Multiple Cycle cooling device as described in claim 1, it is characterised in that the exhaust tube wall is also
Equipped with second solenoid valve, the second solenoid valve is connected with exhaust pipe screw thread.
6. Chemical Manufacture Multiple Cycle cooling device as described in claim 1, it is characterised in that right inside the sealing cover
Side lower end is additionally provided with mounting groove, and the mounting groove is integrally connected with sealing cover.
7. Chemical Manufacture Multiple Cycle cooling device as described in claim 1, it is characterised in that inside the mounting groove also
Equipped with switch, the switch is connected with mounting groove screw thread.
8. Chemical Manufacture Multiple Cycle cooling device as described in claim 1, it is characterised in that on the right side of the frame roof
It is additionally provided with jacking block, the jacking block is connected with frame screw thread.
9. Chemical Manufacture Multiple Cycle cooling device as described in claim 1, it is characterised in that the frame outer wall front end
Left side is additionally provided with the first temperature controller, and first temperature controller is connected with frame screw thread.
10. Chemical Manufacture Multiple Cycle cooling device as claimed in claim 9, it is characterised in that the frame outer wall front end
Right side is additionally provided with the second temperature controller, and second temperature controller is connected with frame screw thread.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011334824.4A CN112546981A (en) | 2018-11-16 | 2018-11-16 | Chemical production multiple circulating cooling device |
CN201811367788.4A CN109261095B (en) | 2018-11-16 | 2018-11-16 | Chemical production multiple circulating cooling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811367788.4A CN109261095B (en) | 2018-11-16 | 2018-11-16 | Chemical production multiple circulating cooling device |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011334824.4A Division CN112546981A (en) | 2018-11-16 | 2018-11-16 | Chemical production multiple circulating cooling device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109261095A true CN109261095A (en) | 2019-01-25 |
CN109261095B CN109261095B (en) | 2021-01-01 |
Family
ID=65189865
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811367788.4A Active CN109261095B (en) | 2018-11-16 | 2018-11-16 | Chemical production multiple circulating cooling device |
CN202011334824.4A Withdrawn CN112546981A (en) | 2018-11-16 | 2018-11-16 | Chemical production multiple circulating cooling device |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011334824.4A Withdrawn CN112546981A (en) | 2018-11-16 | 2018-11-16 | Chemical production multiple circulating cooling device |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN109261095B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111111598A (en) * | 2020-01-17 | 2020-05-08 | 连云港职业技术学院 | A quick reaction device for processing of polymer chemical material |
CN112762645A (en) * | 2021-01-14 | 2021-05-07 | 九天起宏(江苏)检测有限公司 | Multiple circulating cooling device for chemical production and use method thereof |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113284825B (en) * | 2021-05-19 | 2022-01-25 | 智程半导体设备科技(昆山)有限公司 | Semiconductor refrigeration temperature control device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204594307U (en) * | 2015-01-04 | 2015-08-26 | 无锡方舟流体科技有限公司 | A kind of cooling tower based on technology of Internet of things |
CN206746524U (en) * | 2017-05-15 | 2017-12-15 | 珠海市高栏联合新材料有限公司 | The esterification kettle device of Intelligent adjustment temperature |
CN206956054U (en) * | 2017-04-18 | 2018-02-02 | 扬州日兴生物科技股份有限公司 | A kind of chitosan prepares chitosan oligosaccharide with anti-settling material temperature controllable enzymolysis device |
CN207197075U (en) * | 2017-09-14 | 2018-04-06 | 广州蝶贝蕾精细化工有限公司 | Temperature Control Type perfume refrigerator |
CN207367076U (en) * | 2017-10-25 | 2018-05-15 | 安徽恒达药业有限公司 | A kind of temperature regulating device being applied in menthol purification process |
CN108435118A (en) * | 2018-03-24 | 2018-08-24 | 佛山市锐创恒门窗配件有限公司 | A kind of cooling device that Production in Chemical Plant uses |
CN207881302U (en) * | 2018-01-23 | 2018-09-18 | 宜兴市永加化工有限公司 | A kind of chemical industry cooling device |
CN207985713U (en) * | 2017-12-07 | 2018-10-19 | 尹纯 | Store the container of cell suitable for liquid nitrogen container |
-
2018
- 2018-11-16 CN CN201811367788.4A patent/CN109261095B/en active Active
- 2018-11-16 CN CN202011334824.4A patent/CN112546981A/en not_active Withdrawn
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204594307U (en) * | 2015-01-04 | 2015-08-26 | 无锡方舟流体科技有限公司 | A kind of cooling tower based on technology of Internet of things |
CN206956054U (en) * | 2017-04-18 | 2018-02-02 | 扬州日兴生物科技股份有限公司 | A kind of chitosan prepares chitosan oligosaccharide with anti-settling material temperature controllable enzymolysis device |
CN206746524U (en) * | 2017-05-15 | 2017-12-15 | 珠海市高栏联合新材料有限公司 | The esterification kettle device of Intelligent adjustment temperature |
CN207197075U (en) * | 2017-09-14 | 2018-04-06 | 广州蝶贝蕾精细化工有限公司 | Temperature Control Type perfume refrigerator |
CN207367076U (en) * | 2017-10-25 | 2018-05-15 | 安徽恒达药业有限公司 | A kind of temperature regulating device being applied in menthol purification process |
CN207985713U (en) * | 2017-12-07 | 2018-10-19 | 尹纯 | Store the container of cell suitable for liquid nitrogen container |
CN207881302U (en) * | 2018-01-23 | 2018-09-18 | 宜兴市永加化工有限公司 | A kind of chemical industry cooling device |
CN108435118A (en) * | 2018-03-24 | 2018-08-24 | 佛山市锐创恒门窗配件有限公司 | A kind of cooling device that Production in Chemical Plant uses |
Non-Patent Citations (2)
Title |
---|
张宋文等: "《传感器技能》", 31 January 2014, 中国轻工业出版社 * |
潘传九: "《化工设备机械基础》", 31 July 2002, 化学工业出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111111598A (en) * | 2020-01-17 | 2020-05-08 | 连云港职业技术学院 | A quick reaction device for processing of polymer chemical material |
CN112762645A (en) * | 2021-01-14 | 2021-05-07 | 九天起宏(江苏)检测有限公司 | Multiple circulating cooling device for chemical production and use method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN109261095B (en) | 2021-01-01 |
CN112546981A (en) | 2021-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109261095A (en) | Chemical Manufacture Multiple Cycle cooling device | |
CN103366917B (en) | Refrigerating plant and high-temperature superconducting magnet refrigerating plant | |
CN209173911U (en) | Chemical Manufacture Multiple Cycle cooling device | |
CN105865143B (en) | A kind of vacuum precooling freshness retaining system and its application process | |
CN103712407A (en) | Refrigerator with functions of preserving opened wines and automatically pouring wines | |
CN202903576U (en) | Device for removing water through condensation of gas | |
CN107152823A (en) | Aquatic products instant freezer | |
CN103779033B (en) | Low-temperature cooling system | |
CN205505539U (en) | Immersive liquid is refrigerator rapidly | |
CN105630043A (en) | Intelligent grain bin and grain bin temperature and humidity control method | |
CN107598124A (en) | A kind of aluminium alloy quick-cooking type die casting | |
CN204490838U (en) | The evapo-separated machine that novel intelligent controls | |
CN214039184U (en) | Locking type low-temperature powder spraying equipment | |
CN105706740A (en) | Industrialized production and storage device for edible mushrooms | |
CN208445913U (en) | A kind of electricity-saving cabinet | |
CN206787135U (en) | Aquatic products instant freezer | |
CN107726889A (en) | A kind of power cable production heat exchanger for automatically controlling flow velocity | |
CN203249887U (en) | Electronic refrigeration-type hollow glass dew point test instrument | |
CN207262796U (en) | Integrated-type intelligent differential pressure precooling device | |
CN106584026A (en) | Production process of temperature controller for refrigerator | |
CN205606995U (en) | Fruit and vegetable fresh -keeping storehouse | |
CN216048558U (en) | Temperature control system for fresh-keeping storage of pleurotus geesteranus | |
CN204902375U (en) | Fresh -keeping freezer | |
CN206113634U (en) | Novel vacuum furnace structure | |
CN204346488U (en) | A kind of reversely hung Yong detection control device for drilling fluid cooling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201217 Address after: 751400 north section of Huanbei 6th Road, North District, Ningdong base environmental protection industrial park, Lingwu City, Yinchuan City, Ningxia Hui Autonomous Region Applicant after: NINGXIA BEST PHARMACEUTICAL CHEMICAL Co.,Ltd. Address before: 277600 Yujing garden, Xiazhen, Weishan County, Jining City, Shandong Province Applicant before: Shang Fuping |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |