CN109252856A - 通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法 - Google Patents

通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法 Download PDF

Info

Publication number
CN109252856A
CN109252856A CN201811252604.XA CN201811252604A CN109252856A CN 109252856 A CN109252856 A CN 109252856A CN 201811252604 A CN201811252604 A CN 201811252604A CN 109252856 A CN109252856 A CN 109252856A
Authority
CN
China
Prior art keywords
water
test
sealing
hole
rubber stopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811252604.XA
Other languages
English (en)
Inventor
冯爱国
杨瑜泽
彭典华
徐勇
孙起孟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Original Assignee
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC filed Critical Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority to CN201811252604.XA priority Critical patent/CN109252856A/zh
Publication of CN109252856A publication Critical patent/CN109252856A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells

Abstract

本发明提供一种通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法。该止水方法依次包括钻探成孔至试验段顶;小孔径钻探成孔至试验段底;下橡皮塞止水件至试验段顶;通过钻杆自带液压系统进行垂向施压截水和侧向膨胀堵水;压水试验;停水、泄压;完成压水试验。本发明止水效果好、能精确定位试验段位置,且试验装置结构简单、操作方便,故障率低;该压水试验止水方法尤其适用试验场地复杂多变的山区和地层岩性复杂、岩芯较破碎地段,在岩芯较破碎地层中止水成功率100%,测试精度较常规孔径压水试验高2倍。

Description

通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水 方法
技术领域
本发明涉及一种通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法,属于工程勘察和工程施工检测技术领域。
背景技术
钻孔压水试验是工程勘察和水坝、隧道等地下工程施工检测常用的方法,是在做好试验段封堵的前提下,采用高压方式把水压入钻孔试验段,根据试验段岩体吸水量计算了解试验段岩体裂隙发育情况和透水性的一种原位试验。
目前国内压水试验采用的止水方法是通过止水栓塞或胶囊在水压、气压等外部供压的条件下,使止水栓塞或胶囊产生侧向膨胀被动堵水,该方法试验设备繁多笨重,不易搬运,且结构复杂,故障率高,被动堵水效果一般。
压水试验要求各试段互相衔接,不允许漏试,因此准确定位试验段位置至关重要,目前国内多通过采用预定置栓塞或气囊来确定试段位置,精确度不高,且实验过程中在外压的作用下栓塞或气囊可能整体下滑,使得试段位置变化。
发明内容
为解决上述技术不足,本发明提供一种通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法,该止水方法水效果好、能精确确定试验段位置,且试验装置结构简单、操作方便,故障率低。
本发明通过以下技术方案得以实现:所述一种通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法,其特征在于具体步骤如下:
(1)结合试验区域地层岩性特征和场地条件,在所设计的压水试验钻孔点钻设止水孔,其成孔深度至所设计的目标试验段的顶面;
(2)采用直径小于步骤(1)中止水孔孔径的的金刚石钻头从已完成的止水孔底部继续向下钻探,钻探深度至目标试验段底,形成孔径小于止水孔的目标试验孔;
(3)采用带止水件的止水钻杆完成止水件的安装,其止水件包括套设在止水钻杆上的多个橡胶塞和置于相邻两个橡胶塞之间的铁垫圈,在最上层橡胶塞的顶面也设有铁垫圈;所述橡胶塞和铁垫圈的直径大于步骤(2)中施工的目标试验孔孔径,小于或等于步骤(1)中施工的止水孔的孔径;
(4)将止水钻杆安装到钻机上,其下端对准目标试验孔,并利用钻机自带液压系统对钻杆进行垂向施压,将止水钻杆下压至目标试验孔,在下压过程中,最下层的橡皮塞下压至止水孔底面时,由于孔径的变化,其橡皮塞不继续下降,直接坐落在目标试验段顶面,精确定位试验段位置,钻机自带液压系统继续工作,在压力作用下最下层橡皮塞受压产生变形,紧贴目标试验段顶面,实现垂向截水;顶部橡皮塞和中间橡皮塞受压产生侧向膨胀,紧贴止水孔的孔壁,实现侧向堵水;
(5)在步骤(4)中止水完成后通过止水钻杆向目标试验孔压水,进行压水试验,在压水试验中其钻机液压系统持续工作,直至试验完成;
(6)压水试验完成后,停止压水、控制钻机自带液压系统对钻杆进行泄压,然后提拔出试验装置,在同一个孔中重复步骤(1)至(6)完成下一个目标试验段的压水试验,直到完成整个钻孔的压水试验。
本发明较优的技术方案:所述步骤(2)的止水件包括一个底层橡胶塞、一个顶层橡胶塞、1~3个中间橡胶塞、一个置于顶层橡胶塞上部的铁垫圈和分散设置在两相邻橡胶塞之间的多个铁垫圈,所述多个橡胶塞和铁垫圈的直径均与止水孔的孔径相等,中央位置均开设有与止水钻杆的直径相等的钻杆套孔,并通过钻杆套孔套设在止水钻杆上。
本发明较优的技术方案:所述目标试验段的试验孔孔径为75-80mm,所述止水孔的孔径为105-110mm。
本发明较优的技术方案:所述步骤(2)中的橡胶塞采用弹性和膨胀好、耐高压且变形恢复能力强的天然橡胶。
本发明的有益效果:
(1)本发明的试验段成孔采用变孔径施工,可准确定位目标试验段顶面和底面深度,一次止水成功率和试验精度较常规孔径试验均有所提高;
(2)本发明的止水件采用橡皮塞和铁垫圈间隔的方式,橡皮塞材质为弹性和膨胀性良好、耐高压且变形恢复能力强的天然橡胶,其最上层橡皮塞顶部设有铁垫圈,最下层橡皮塞底部不设铁垫圈,该止水结构物受压变形后,可截堵来自试验段顶部和侧向的渗水,并通过生产测试表明该止水结构物止水效果良好;
(3)本发明利用钻机自带液压系统,通过钻杆垂向传导试验止水压力,其试验装置结构简单、操作方便,故障率低;
本发明施工简单、止水效果好、能精确确定试验段位置,且试验装置结构简单、操作方便,故障率低;该压水试验止水方法尤其适用试验场地复杂多变的山区和地层岩性复杂、岩芯较破碎地段,生产测试表明:该止水方法在岩芯较破碎地层中止水成功率100%,测试精度较常规孔径压水试验高2倍。
附图说明
图1是本发明的流程示意图
图2是本发明中的钻孔结构示意图;
图3是本发明止水结构示意图。
图中:1-目标试验段顶;2-目标试验段底;3-顶部橡皮塞;4-中间橡皮塞;5-铁垫圈;6-底部橡皮塞;7-钻机自带液压系统。
具体实施方式
下面结合附图进一步描述本发明的技术方案,但它们并不构成对本发明的限定,仅作举例而已,同时通过说明使本发明的优点更加清楚和容易理解。
本发明提供的一种通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法,其施工流程如图1所示,具体步骤如下:
(1)结合试验区域地层岩性特征和场地条件,在所设计的压水试验钻孔点钻设止水孔,其成孔深度至所设计的目标试验段的顶面;
(2)采用直径小于步骤(1)中止水孔孔径的的金刚石钻头从已完成的止水孔底部继续向下钻探,钻探深度至目标试验段底,形成孔径小于止水孔的目标试验孔;
(3)采用带止水件的止水钻杆完成止水件的安装,其止水件包括套设在止水钻杆上的多个橡胶塞和置于相邻两个橡胶塞之间的铁垫圈,在最上层橡胶塞的顶面也设有铁垫圈;所述橡胶塞和铁垫圈的直径大于步骤(2)中施工的目标试验孔孔径,小于或等于步骤(1)中施工的止水孔的孔径;
(4)将止水钻杆安装到钻机上,其下端对准目标试验孔,并利用钻机自带液压系统对钻杆进行垂向施压,将止水钻杆下压至目标试验孔,在下压过程中,最下层的橡皮塞下压至止水孔底面时,由于孔径的变化,其橡皮塞不继续下降,直接坐落在目标试验段顶面,精确定位试验段位置,钻机自带液压系统继续工作,在压力作用下最下层橡皮塞受压产生变形,紧贴目标试验段顶面,实现垂向截水;顶部橡皮塞和中间橡皮塞受压产生侧向膨胀,紧贴止水孔的孔壁,实现侧向堵水;
(5)在步骤(4)中止水完成后通过止水钻杆向目标试验孔压水,进行压水试验,在压水试验中其钻机液压系统持续工作,直至试验完成;
(6)压水试验完成后,停止压水、控制钻机自带液压系统对钻杆进行泄压,然后提拔出试验装置,在同一个孔中重复步骤(1)至(6)完成下一个目标试验段的压水试验,直到完成整个钻孔的压水试验。
在同一个钻孔的压水试验完成后,再将钻机移至下一个钻孔点按照同样的步骤进行下一个钻孔点的压水试验。
下面结合实施例对本发明进一步说明,实施例中针对位于偏远山区,场地地形起伏较大、坡度较陡(45°~60°)的某拟建隧道,该隧道所在区域地层岩性复杂,且附近发育数条断裂构造,构造岩为强烈硅化构造角砾岩带、碎裂岩带、糜棱岩带,因此通过钻孔压水试验准确查清拟建隧道各岩层的透水率,尤其是断裂构造带发育处,评价其节理裂隙发育程度和岩体完整性,对拟建隧道的精准设计和安全施工至关重要。
拟建场地山高林密、勘探设备搬运极其困难且危险,地层岩性复杂,呈互层状,且各层岩体工程特性差异明显,断裂构造带及附近岩体呈破碎~极破碎状,目前常规的压水试验止水方法难以适应该工程要求。因此使用本发明中所述的一种通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法进行压水试验止水,该止水方法中使用的止水结构如图3所示,包括套设在止水钻杆上的顶部橡皮塞3、底部橡皮塞6、两个中间橡皮塞4,在相邻两橡皮塞之间和顶部橡皮塞3顶部均设有铁垫圈5,底部橡皮塞6的底面不设铁垫圈5,橡皮塞材质为弹性和膨胀性良好、耐高压且变形恢复能力强的天然橡胶,该止水结构物受压变形后,可截堵来自试验段顶部和侧向的渗水,生产测试表明该止水结构物止水效果良好;在进行止水时,其底部橡皮塞6直接坐落在目标试验段顶1,精确定位试验段位置;其具体施工过程如下:
(1)结合试验场地条件,分析已有钻探资料揭露的场地地层特征,在合适的位置选择直径为108mm的金刚石钻头进行钻探,钻探深度至目标试验段顶1,形成孔径108mm的止水孔;
(2)然后再选择直径为76mm的金刚石钻头自已完成目标试验段顶进行钻探,钻探深度至目标试验段底2,试验段孔径76mm;
(3)然后下带止水件的止水钻杆至目标试验段顶1,使得最下层的橡皮塞6下直接坐落在目标试验段顶1;然后保持钻机自带液压系统7继续工作,在压力作用下底部橡皮塞6受压产生变形,紧贴目标试验段顶面,实现垂向截水;顶部橡皮塞3和中间橡皮塞4受压产生侧向膨胀,紧贴止水孔的孔壁,实现侧向堵水;最后在完成试验段准确定位、且止水成功的前提下,进行压水试验。
(4)待压水试验完成后,停止压水、控制钻机自带液压系统7对钻杆进行泄压,提拔出试验装置;并在原位重复(1)至(4),直到完成整个钻孔的压水试验。
本生产项目共进行5个钻孔23个段次试验,其中采用常规止水方法进行1个钻孔3个段次试验,采用通过钻孔孔径变化的止水方法进行了4个钻孔20个段次试验:针对该项目,常规止水方法一次止水成功率较低,其中断裂构造带处止水均失败,且随着试验压力增大,止水装置多次整体下滑,影响试验精度且有一定安全隐患,仅获得了1个钻孔3个段次的试验数据,数据在一定程度上反映了试验段地层特征;通过钻孔孔径变化的止水方法在一般地层一次止水成功率100%,在断裂构造带处一次止水成功率稍低,但最终均能止水成功,且试验压力越大,止水效果越好,共获得了4个钻孔20个段次的试验数据,数据很好的反映了试验段地层特征。

Claims (4)

1.一种通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法,其特征在于具体步骤如下:
(1)结合试验区域地层岩性特征和场地条件,在所设计的压水试验钻孔点钻设止水孔,其成孔深度至所设计的目标试验段的顶面;
(2)采用直径小于步骤(1)中止水孔孔径的的金刚石钻头从已完成的止水孔底部继续向下钻探,钻探深度至目标试验段底,形成孔径小于止水孔的目标试验孔;
(3)采用带止水件的止水钻杆完成止水件的安装,其止水件包括套设在止水钻杆上的多个橡胶塞和置于相邻两个橡胶塞之间的铁垫圈,在最上层橡胶塞的顶面也设有铁垫圈;所述橡胶塞和铁垫圈的直径大于步骤(2)中施工的目标试验孔孔径,小于或等于步骤(1)中施工的止水孔的孔径;
(4)将止水钻杆安装到钻机上,其下端对准目标试验孔,并利用钻机自带液压系统对钻杆进行垂向施压,将止水钻杆下压至目标试验孔,在下压过程中,最下层的橡皮塞下压至止水孔底面时,由于孔径的变化,其橡皮塞不继续下降,直接坐落在目标试验段顶面,精确定位试验段位置,钻机自带液压系统继续工作,在压力作用下最下层橡皮塞受压产生变形,紧贴目标试验段顶面,实现垂向截水;顶部橡皮塞和中间橡皮塞受压产生侧向膨胀,紧贴止水孔的孔壁,实现侧向堵水;
(5)在步骤(4)中止水完成后通过止水钻杆向目标试验孔压水,进行压水试验,在压水试验中其钻机液压系统持续工作,直至试验完成;
(6)压水试验完成后,停止压水、控制钻机自带液压系统对钻杆进行泄压,然后提拔出试验装置,在同一个孔中重复步骤(1)至(6)完成下一个目标试验段的压水试验,直到完成整个钻孔的压水试验。
2.根据权利要求1所述的一种通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法,其特征在于:所述步骤(2)的止水件包括一个底层橡胶塞、一个顶层橡胶塞、1~3个中间橡胶塞、一个置于顶层橡胶塞上部的铁垫圈和分散设置在两相邻橡胶塞之间的多个铁垫圈,所述多个橡胶塞和铁垫圈的直径均与止水孔的孔径相等,中央位置均开设有与止水钻杆的直径相等的钻杆套孔,并通过钻杆套孔套设在止水钻杆上。
3.根据权利要求1所述的一种通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法,其特征在于:所述目标试验段的试验孔孔径为75-80mm,所述止水孔的孔径为105-110mm。
4.根据权利要求1所述的一种通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法,其特征在于:所述步骤(2)中的橡胶塞采用弹性和膨胀好、耐高压且变形恢复能力强的天然橡胶。
CN201811252604.XA 2018-10-25 2018-10-25 通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法 Pending CN109252856A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811252604.XA CN109252856A (zh) 2018-10-25 2018-10-25 通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811252604.XA CN109252856A (zh) 2018-10-25 2018-10-25 通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法

Publications (1)

Publication Number Publication Date
CN109252856A true CN109252856A (zh) 2019-01-22

Family

ID=65046221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811252604.XA Pending CN109252856A (zh) 2018-10-25 2018-10-25 通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法

Country Status (1)

Country Link
CN (1) CN109252856A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110117984A (zh) * 2019-05-09 2019-08-13 王福州 混凝土管道沉降渗漏修复方法
CN112554782A (zh) * 2020-12-11 2021-03-26 徐州中矿地科岩土工程技术有限公司 一种进行压水、测压、抽水钻孔分段隔离的方法
CN113309487A (zh) * 2021-05-24 2021-08-27 中煤科工集团西安研究院有限公司 煤矿井下定向长钻孔可回收定点注浆装置及方法
JP2022553449A (ja) * 2021-04-26 2022-12-22 中▲鉄▼九局集▲団▼第七工程有限公司 採掘跡ゾーンにおける削孔の外部拡張パイプ工法

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050241855A1 (en) * 2001-11-14 2005-11-03 Halliburton Energy Services, Inc. Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell
EP1718840A1 (en) * 2004-02-11 2006-11-08 John Williams Stripper rubber adapter
JP2007009645A (ja) * 2005-07-04 2007-01-18 Geotechnos Co Ltd 水圧破砕試験方法
CN200946481Y (zh) * 2006-07-31 2007-09-12 煤炭科学研究总院西安分院 异径钻孔楔入式封孔器
DE602005011399D1 (de) * 2005-02-10 2009-01-15 Schlumberger Technology Bv Verfahren und Vorrichtung für die Konsolidierung eines Bohrlochs
CN201391270Y (zh) * 2009-04-10 2010-01-27 浙江华东建设工程有限公司 用于常规直径钻孔压水试验封隔装置
CN202325469U (zh) * 2011-11-18 2012-07-11 中冶集团武汉勘察研究院有限公司 孔底压水试验封孔器
US20130175034A1 (en) * 2010-09-15 2013-07-11 Rise Mining Developments Pty Ltd Drill hole plugs
CA2773339A1 (en) * 2012-04-02 2013-10-02 Dale Kunz Casing integrity pressure test system
JP2013221348A (ja) * 2012-04-18 2013-10-28 Tokyu Construction Co Ltd 湧水の止水方法
CN104564031A (zh) * 2014-12-24 2015-04-29 永城煤电控股集团有限公司 裂隙岩层中煤层瓦斯压力测定方法
US20160108165A1 (en) * 2013-06-28 2016-04-21 Kureha Corporation Rubber member for downhole tools, downhole tool, and method for recovering hydrocarbon resource
CN105951704A (zh) * 2016-05-19 2016-09-21 中国电建集团成都勘测设计研究院有限公司 现场钻孔标准注水试验装置及试验方法
CN206845146U (zh) * 2017-06-20 2018-01-05 陕西地矿九0八水文地质工程地质大队 一种用于水文地质钻孔分层抽水的止水器及止水装置
CN207278254U (zh) * 2017-10-14 2018-04-27 河北省地矿局第四水文工程地质大队(沧州市海洋环境监测站) 一种分层止水器
CN108468528A (zh) * 2018-05-18 2018-08-31 河北省地矿局国土资源勘查中心 一种第四系深井分层抽水止水装置及其抽水止水方法
CN108505992A (zh) * 2018-03-12 2018-09-07 中国水利水电第十工程局有限公司 应用于砂砾石覆盖层以下基岩勘探的压水试验的方法
CN108518196A (zh) * 2018-04-08 2018-09-11 徐州大屯工程咨询有限公司 一种钻孔止水装置
CN207920574U (zh) * 2018-03-13 2018-09-28 付茂新 一种水文地质钻孔抽水止水器
CN108643901A (zh) * 2018-04-20 2018-10-12 大连理工大学 基于裂隙观测的多段式分级降压注水的观测方法
CN108678737A (zh) * 2018-04-20 2018-10-19 大连理工大学 变压可调式岩体裂隙渗透性的观测方法

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050241855A1 (en) * 2001-11-14 2005-11-03 Halliburton Energy Services, Inc. Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell
EP1718840A1 (en) * 2004-02-11 2006-11-08 John Williams Stripper rubber adapter
DE602005011399D1 (de) * 2005-02-10 2009-01-15 Schlumberger Technology Bv Verfahren und Vorrichtung für die Konsolidierung eines Bohrlochs
JP2007009645A (ja) * 2005-07-04 2007-01-18 Geotechnos Co Ltd 水圧破砕試験方法
CN200946481Y (zh) * 2006-07-31 2007-09-12 煤炭科学研究总院西安分院 异径钻孔楔入式封孔器
CN201391270Y (zh) * 2009-04-10 2010-01-27 浙江华东建设工程有限公司 用于常规直径钻孔压水试验封隔装置
US20130175034A1 (en) * 2010-09-15 2013-07-11 Rise Mining Developments Pty Ltd Drill hole plugs
CN202325469U (zh) * 2011-11-18 2012-07-11 中冶集团武汉勘察研究院有限公司 孔底压水试验封孔器
CA2773339A1 (en) * 2012-04-02 2013-10-02 Dale Kunz Casing integrity pressure test system
JP2013221348A (ja) * 2012-04-18 2013-10-28 Tokyu Construction Co Ltd 湧水の止水方法
US20160108165A1 (en) * 2013-06-28 2016-04-21 Kureha Corporation Rubber member for downhole tools, downhole tool, and method for recovering hydrocarbon resource
CN104564031A (zh) * 2014-12-24 2015-04-29 永城煤电控股集团有限公司 裂隙岩层中煤层瓦斯压力测定方法
CN105951704A (zh) * 2016-05-19 2016-09-21 中国电建集团成都勘测设计研究院有限公司 现场钻孔标准注水试验装置及试验方法
CN206845146U (zh) * 2017-06-20 2018-01-05 陕西地矿九0八水文地质工程地质大队 一种用于水文地质钻孔分层抽水的止水器及止水装置
CN207278254U (zh) * 2017-10-14 2018-04-27 河北省地矿局第四水文工程地质大队(沧州市海洋环境监测站) 一种分层止水器
CN108505992A (zh) * 2018-03-12 2018-09-07 中国水利水电第十工程局有限公司 应用于砂砾石覆盖层以下基岩勘探的压水试验的方法
CN207920574U (zh) * 2018-03-13 2018-09-28 付茂新 一种水文地质钻孔抽水止水器
CN108518196A (zh) * 2018-04-08 2018-09-11 徐州大屯工程咨询有限公司 一种钻孔止水装置
CN108643901A (zh) * 2018-04-20 2018-10-12 大连理工大学 基于裂隙观测的多段式分级降压注水的观测方法
CN108678737A (zh) * 2018-04-20 2018-10-19 大连理工大学 变压可调式岩体裂隙渗透性的观测方法
CN108468528A (zh) * 2018-05-18 2018-08-31 河北省地矿局国土资源勘查中心 一种第四系深井分层抽水止水装置及其抽水止水方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张明等: "一种新型的钻孔压水试验技术及工程应用", 《世界核地质科学》 *
彭满华等: "多段锥压式止水栓塞的研究及应用", 《2014全国工程勘察学术大会论文集》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110117984A (zh) * 2019-05-09 2019-08-13 王福州 混凝土管道沉降渗漏修复方法
CN112554782A (zh) * 2020-12-11 2021-03-26 徐州中矿地科岩土工程技术有限公司 一种进行压水、测压、抽水钻孔分段隔离的方法
CN112554782B (zh) * 2020-12-11 2024-01-30 徐州中矿地科岩土工程技术有限公司 一种进行压水、测压、抽水钻孔分段隔离的方法
JP2022553449A (ja) * 2021-04-26 2022-12-22 中▲鉄▼九局集▲団▼第七工程有限公司 採掘跡ゾーンにおける削孔の外部拡張パイプ工法
JP7292772B2 (ja) 2021-04-26 2023-06-19 中▲鉄▼九局集▲団▼第七工程有限公司 採掘跡ゾーンにおける削孔の外部拡張パイプ工法
CN113309487A (zh) * 2021-05-24 2021-08-27 中煤科工集团西安研究院有限公司 煤矿井下定向长钻孔可回收定点注浆装置及方法
CN113309487B (zh) * 2021-05-24 2023-05-09 中煤科工集团西安研究院有限公司 煤矿井下定向长钻孔可回收定点注浆装置及方法

Similar Documents

Publication Publication Date Title
CN109252856A (zh) 通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法
CN101424181B (zh) 一种煤炭地下气化通道确定、贯通方法和系统
CN112392431A (zh) 通过采动裂隙带内水平长钻孔动态保压注浆封堵裂隙防治煤层顶板水害技术
CN105134129B (zh) 基于径向强力膨胀瓦斯抽采封孔方法
CN110359898A (zh) 一种裂缝性储层预撑裂缝堵漏材料选择方法
CN201671622U (zh) 煤矿覆岩导水裂缝带仰孔观测仪
CN103670358A (zh) 水力压裂裂缝在砂泥岩薄互层地质界面断裂扩展判识方法
Huang et al. Field investigation into directional hydraulic fracturing for hard roof in Tashan Coal Mine
RU2737618C1 (ru) Способ водоудержания для ускорения самовосстановления рудничных трещин посредством химического размягчения карбонатита
CN114108609B (zh) 一种采空区多级分段精准充灌深成桩施工方法
Smith et al. The azimuth of deep, penetrating fractures in the Wattenberg field
CN111932128B (zh) 一种煤层底板承压含水层定向钻注浆层位确定方法
CN111366707B (zh) 一种模拟多类型导水通道耦合流动的试验系统及方法
CN106194185B (zh) 水压作用下厚松散含水层防砂安全煤岩柱的留设方法
CN106089174B (zh) 水压致裂化学膨胀剂充填快速掘进巷道的方法
CN109779634B (zh) 煤矿地面垂直井压裂坚硬顶板位置确定方法
Dang et al. Lessons learned and experiences gained in developing the waterflooding concept of a fractured basement-granite reservoir: A 20-year case study
CN209195389U (zh) 一种变径钻孔式压水试验止水结构
CN113203533A (zh) 一种冲击地压大的巷道的支护体效验方法及设备
CN209323579U (zh) 一种后评价深部土体袖阀管注浆加固的模拟试验装置
Zhang et al. Detection and evaluation of crack development near the fault zone under the influence of coal mining
Qi et al. Study of the height of water flowing fracture zone based on strain energy failure criterion
Xue et al. Research on damage distribution and permeability distribution of coal seam with slotted borehole
KR101270557B1 (ko) 시추공 지진계 설치를 위한 더블밸브 시스템 및 이를 이용한 시추공 그라우팅 시공방법
CN111335949B (zh) 基于水封作用方式的水幕系统优化设计方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190122

RJ01 Rejection of invention patent application after publication