CN109252553A - A kind of no uplift pile ground library float Structure and construction method - Google Patents

A kind of no uplift pile ground library float Structure and construction method Download PDF

Info

Publication number
CN109252553A
CN109252553A CN201811043852.3A CN201811043852A CN109252553A CN 109252553 A CN109252553 A CN 109252553A CN 201811043852 A CN201811043852 A CN 201811043852A CN 109252553 A CN109252553 A CN 109252553A
Authority
CN
China
Prior art keywords
gutter
ground
service sleeve
library
uplift pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811043852.3A
Other languages
Chinese (zh)
Inventor
赵卫政
高春宝
李天兵
张娴
华春忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU XINGSHA CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
JIANGSU XINGSHA CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU XINGSHA CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical JIANGSU XINGSHA CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201811043852.3A priority Critical patent/CN109252553A/en
Publication of CN109252553A publication Critical patent/CN109252553A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of no uplift pile library float Structure and construction method, the present invention is long for the construction time in the prior art, it needs to continue downwards to cut the earth, people, material, machine consumption it is big the disadvantages of, pass through pre-buried round steel sleeve, it solves disadvantage mentioned above and easy to operate, feasibility is strong, short time limit, at low cost, security and stability is preferable, the significant effect of ground library anti-floating.

Description

A kind of no uplift pile ground library float Structure and construction method
Technical field
The present invention relates to technical field of buildings, and in particular to a kind of no uplift pile ground library float Structure and construction method.
Background technique
It is many for the method for ground library anti-floating at present, such as increase base plate thickness method, pre-buried round steel sleeve method, setting perfusion Uplift pile, rock-bolt method etc..Increase base plate thickness method advantage: bottom plate volume is big, and weight is big, and the effect of ground library anti-floating is preferable; Disadvantage: the construction time is long, needs to continue downwards to cut the earth, and people, material, the consumption of machine are big.Setting perfusion uplift pile advantage: anti-floating effect Fruit is significant, safety and stability;Disadvantage: construction period length, project amount increase, and engineering cost is high, difficulty of construction is big.Rock-bolt method is excellent Point: anti-floating significant effect, safety and stability;Disadvantage: due to needing to consider that single anchor rod anti-pulling capacity characteristic value scene is tried, so Difficulty of construction is big for it, and engineering cost also greatly increases.Pre-buried round steel sleeve method the method is easy to operate, feasibility is strong, short time limit, At low cost, security and stability is preferable, the significant effect of ground library anti-floating.It may be said that several techniques respectively have superiority and inferiority.Therefore, how to make the best use of the advantages Keep away short, adopting an effective measure and making up processing disadvantages is nowadays urgent problem to be solved.
Summary of the invention
It is long for construction time in the prior art that present invention aims at the present invention, needs to continue downwards to cut the earth, people, material, The problems such as consumption of machine is big, a kind of no uplift pile is provided library float Structure and construction method.
To reach above-mentioned purpose, the technical solution adopted in the present invention is as follows:
A kind of no uplift pile ground library float Structure, including gutter, the gutter top is parallel to the ground, the draining Ditch bottom end connects service sleeve, and the service sleeve outer wall is equipped with waterstop, waterstop lower section is equipped with waterproof layer and bed course.
Further, the gutter surrounding is filled with waterproof mortar.
Further, the waterstop is with a thickness of 5mm.
Further, the service sleeve internal diameter is 100mm.
A kind of no uplift pile library float Structure construction method, comprising the following steps:
Step 1: the installation of service sleeve: first being determined before construction first pre-buried before the position of service sleeve, bed course pour The plastic tube with diameter is placed in the position of casing, and bed course takes out plastic tube after the completion of pouring, installs service sleeve;
Step 2: ground house bottom plate pours: step 1 service sleeve is constructed after the installation is completed, to waterproof layer, to waterproof After layer construction, city's roads, accurate after-pouring waterproof protective layer and ground house bottom plate are carried out to it;
Step 3: gutter is arranged in continuous concreting: carrying out mixed mud to structure and pours, is shaken by plate vibration machine It smashes, is struck off when reaching designed elevation with long floating rule in casting process, polished and be compacted with tool before mixed mud initial set, by closing It closes and receives water crack seam along the setting of Axis Cross in length and breadth gutter, snap the line establishes template on structure base slab, constructs to ground whole casting layer Template is removed after the completion, water-proofing treatment is done to the side and bottom surface in gutter;
Step 4: carrying out draining detection: in pea gravel concreten terrace whole casting layer along the direction in length and breadth of round steel sleeve and ground library week Side is arranged after gutter, it is ensured that oozes out in level of ground water house bottom plate above Ground through round steel casing and is collected to by gutter Sump;
Step 5: structural strengthening: area is reinforced in the backfill of setting basis outward in sole plate altitude range;
Step 6: service sleeve draws water, and completes construction: after the completion of backfill, the water in service sleeve being drained, filling and bottom The identical slightly expanded concrete of plate mark;After concrete hardening, water steel plate is welded in outside of sleeve, and gutter side wall is dug Hair connects slurry, is blocked with pea gravel concreten
From the above technical solution of the present invention shows that, the beneficial effects of the present invention are:
A kind of no uplift pile of the present invention library float Structure and construction method by pre-buried round steel sleeve, it is easy to operate, can Row is strong, short time limit, at low cost, and security and stability is preferable, the significant effect of ground library anti-floating.
Detailed description of the invention
Fig. 1 is pre-buried steel casing plan view of the present invention;
Fig. 2 is present invention ground library interior periphery diagrammatic cross-section;
Fig. 3 is round steel sleeve of the present invention, gutter closure diagrammatic cross-section.
In figure;1, service sleeve;2, gutter;3, waterproof mortar;4, waterstop;5, waterproof layer;6, bed course.
Specific embodiment
In order to make related personnel know more about technology contents of the invention, now specific embodiment is said in conjunction with institute's accompanying drawings It is bright as follows.
Referring to Fig.1, Fig. 2, a kind of no uplift pile ground library float Structure and construction method, comprising the following steps: reserved basis Bottom plate steel sleeve: it first determines before construction and is first placed in the position of service sleeve with straight before the position of service sleeve, bed course pour The plastic tube of diameter.Service sleeve is using the round steel sleeve of internal diameter 100mm along the arrangement of axis in length and breadth, spacing 4000mm or so.Bed course pours Plastic tube is taken out after the completion of building, and service sleeve is installed.
Pour ground house bottom plate: steel sleeve it is pre-buried finish, construction of waterproof layer finishes, surveying setting-out meets after prepare pour Build protective layer, house bottom plate.Concrete uses commerical ready-mixed concrete, in advance shrinks the swelling agent required in specification and compensation The parameters technical requirements of concrete inform mixing plant.Previous circumferential mixing plant report concrete side amount is poured, makes mixing plant abundance standby Material and transport vehicle and ground pump.The wash cement slurry of prevention of mass concrete is thicker, is struck off when reaching designed elevation with long floating rule, in initial set Preceding polished with wooden float is compacted, and receives water crack seam with closure.
Pour ground whole casting layer: along the gutter of the setting of Axis Cross in length and breadth width 200mm, the snap the line branch on structure base slab Mould.After ground whole casting layer pours, concrete reaches the template that some strength removes gutter, to the side and bottom in gutter It does 15mm thick polymer cement waterproofing mortar and carries out waterproof in face.
Gutter converges to sump: in pea gravel concreten terrace whole casting layer along the direction in length and breadth of round steel sleeve and ground library week Side is arranged after gutter, it is ensured that oozes out in level of ground water house bottom plate above Ground through round steel casing and is collected to by gutter Sump.
Basis and top plate backfill: dirt is all made of within the scope of the top plate of in sole plate altitude range and ground library and is layered back It fills out, is layered mechanical compacting compacting factor and is not less than 0.94;To reduce the buoyancy in Groundwater library, reach the effect of ground library anti-floating Fruit.
Referring to Fig. 3, indoor drainage ditch is blocked: after the completion of the backfill of on the outside of ground library and top surface, the pre-buried round steel of inside-of-refrigerator over the ground Casing and gutter is blocked in length and breadth.The water in pre-buried round steel sleeve is drained first, fills slightly expanded concrete, label is same Bottom plate;After concrete hardening reaches some strength, 5mm thickness steel plate for sealing water is fully welded on the outside of round steel sleeve in round steel sleeve top surface, The high 6mm wide 6mm of weld seam;Then gutter side wall dabbing is connect into slurry, is blocked with C30P6 pea gravel concreten, reinforce maintenance.
Although the present invention has been disclosed as a preferred embodiment, however, it is not to limit the invention.Skill belonging to the present invention Has usually intellectual in art field, without departing from the spirit and scope of the present invention, when can be used for a variety of modifications and variations.Cause This, the scope of protection of the present invention is defined by those of the claims.

Claims (5)

1. a kind of no uplift pile ground library float Structure, which is characterized in that including gutter, the gutter top and ground are flat Row, the gutter bottom end connect service sleeve, and the service sleeve outer wall is equipped with waterstop, waterstop lower section equipped with anti- Water layer and bed course.
2. a kind of no uplift pile according to claim 1 ground library float Structure, which is characterized in that the gutter surrounding is filled out Filled with waterproof mortar.
3. a kind of no uplift pile according to claim 1 ground library float Structure, which is characterized in that the waterstop with a thickness of 5mm。
4. a kind of no uplift pile according to claim 1 ground library float Structure, which is characterized in that the service sleeve internal diameter For 100mm.
5. a kind of no uplift pile library float Structure construction method, which comprises the following steps:
Step 1: the installation of service sleeve: first being determined before construction first in service sleeve before the position of service sleeve, bed course pour Position place with diameter plastic tube, bed course pour after the completion of take out plastic tube, install service sleeve;
Step 2: ground house bottom plate pours: step 1 service sleeve is constructed after the installation is completed, to waterproof layer, is applied to waterproof layer City's roads, accurate after-pouring waterproof protective layer and ground house bottom plate are carried out after work, to it;
Step 3: gutter is arranged in continuous concreting: mixed mud is carried out to structure and is poured, is vibrated by plate vibration machine, It is struck off when reaching designed elevation with long floating rule in casting process, is polished and be compacted with tool before mixed mud initial set, pass through closure It receives water crack seam and gutter is set along Axis Cross in length and breadth, snap the line establishes template on structure base slab, has constructed to ground whole casting layer Template is removed at rear, water-proofing treatment is done to the side and bottom surface in gutter;
Step 4: carrying out draining detection: being set in pea gravel concreten terrace whole casting layer along the direction in length and breadth of round steel sleeve and the periphery Di Ku After setting gutter, it is ensured that oozed out in level of ground water house bottom plate above Ground through round steel casing and pass through gutter and be collected to and catchmented Well;
Step 5: structural strengthening: area is reinforced in the backfill of setting basis outward in sole plate altitude range;
Step 6: service sleeve draws water, and completes construction: after the completion of backfill, the water in service sleeve being drained, filling and bottom plate mark Number identical slightly expanded concrete;After concrete hardening, water steel plate is welded in outside of sleeve, and gutter side wall dabbing is connect Slurry, is blocked with pea gravel concreten.
CN201811043852.3A 2018-09-07 2018-09-07 A kind of no uplift pile ground library float Structure and construction method Pending CN109252553A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811043852.3A CN109252553A (en) 2018-09-07 2018-09-07 A kind of no uplift pile ground library float Structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811043852.3A CN109252553A (en) 2018-09-07 2018-09-07 A kind of no uplift pile ground library float Structure and construction method

Publications (1)

Publication Number Publication Date
CN109252553A true CN109252553A (en) 2019-01-22

Family

ID=65047733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811043852.3A Pending CN109252553A (en) 2018-09-07 2018-09-07 A kind of no uplift pile ground library float Structure and construction method

Country Status (1)

Country Link
CN (1) CN109252553A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831921A (en) * 2010-05-12 2010-09-15 江苏兴厦建筑安装有限公司 Construction method of expansive concrete
CN104846841A (en) * 2015-05-26 2015-08-19 江苏南通三建集团有限公司 Anti-floating construction method for basements without uplift piles
CN105421499A (en) * 2015-11-24 2016-03-23 中国一冶集团有限公司 Anti-floating construction method for basement
CN205399503U (en) * 2016-03-09 2016-07-27 江苏兴厦建设工程集团有限公司 Anti floating botton board anchor slab formula of basement machinery anchor stock that excels in
CN106193132A (en) * 2016-08-31 2016-12-07 广西建工集团第五建筑工程有限责任公司 Pressure relief anti-floating system for bottom plate of deep foundation pit high-water-level building and pressure relief anti-floating method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831921A (en) * 2010-05-12 2010-09-15 江苏兴厦建筑安装有限公司 Construction method of expansive concrete
CN104846841A (en) * 2015-05-26 2015-08-19 江苏南通三建集团有限公司 Anti-floating construction method for basements without uplift piles
CN105421499A (en) * 2015-11-24 2016-03-23 中国一冶集团有限公司 Anti-floating construction method for basement
CN205399503U (en) * 2016-03-09 2016-07-27 江苏兴厦建设工程集团有限公司 Anti floating botton board anchor slab formula of basement machinery anchor stock that excels in
CN106193132A (en) * 2016-08-31 2016-12-07 广西建工集团第五建筑工程有限责任公司 Pressure relief anti-floating system for bottom plate of deep foundation pit high-water-level building and pressure relief anti-floating method thereof

Similar Documents

Publication Publication Date Title
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN103741714B (en) Underground engineering full sheltered reverse excavation construction method
CN107542108B (en) A kind of reverse construction method of building basement structure
CN207987983U (en) A kind of waterproof construction being used for underground engineering main body construction seam and post-cast strip
CN105178357A (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN103821219A (en) Top pipe construction modification inspection well construction method
CN100473790C (en) Tower crane foundation for construction and manufacturing method thereof
CN112832279B (en) Waterproof structure and method for dewatering well of underground foundation pit
CN103669374A (en) Combined supporting construction method of steel sheet pile used in silt soil slope
CN105401589B (en) A kind of GPS for frozen soil and swelled ground area monitors pier and its construction technology
CN102392549A (en) Construction working method for seamless prestressed-concrete self-waterproof clean water reservoir
CN109235493A (en) Basement beam slab is backbreak and short formwork construction method in a kind of contrary sequence method
CN109403332B (en) Method for combined excavation of layered bench sections of deep foundation pit of sandy cobble thick covering layer wide shallow valley
CN103306497B (en) Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure
CN109706952A (en) Large-scale well-sinking construction method
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN109610665A (en) Oil depot assembled fire wall construction method
CN105756100A (en) Basement post-pouring belt system and making method thereof
CN109056844B (en) Waterproof construction method for outer wall of basement of building
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN209368898U (en) A kind of no uplift pile ground library float Structure
CN207331699U (en) One kind cheats reinforced concrete barricade composite supporting construction in hole
CN214272102U (en) Waterproof construction of underground foundation ditch precipitation well
CN109252553A (en) A kind of no uplift pile ground library float Structure and construction method
CN210369276U (en) Combined water pump house of underground tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination