CN109246838A - A kind of baseband resource managing method, device and base station - Google Patents

A kind of baseband resource managing method, device and base station Download PDF

Info

Publication number
CN109246838A
CN109246838A CN201710448546.7A CN201710448546A CN109246838A CN 109246838 A CN109246838 A CN 109246838A CN 201710448546 A CN201710448546 A CN 201710448546A CN 109246838 A CN109246838 A CN 109246838A
Authority
CN
China
Prior art keywords
utilization rate
radio link
base
threshold value
band resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710448546.7A
Other languages
Chinese (zh)
Inventor
欧阳彪
周晓华
宋茂叶
刘浩然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201710448546.7A priority Critical patent/CN109246838A/en
Publication of CN109246838A publication Critical patent/CN109246838A/en
Pending legal-status Critical Current

Links

Abstract

The embodiment of the invention discloses a kind of baseband resource managing methods, device, base station and computer storage medium, by obtaining current base-band resource utilization rate, when judging that the base-band resource utilization rate reaches preset utilization rate threshold value, obtain the ratio of the occupied base-band resource of currently-established Virtual Radio Link Yu the currently-established occupied base-band resource of real Radio Link, when according to the ratio and the judgement of base-band resource utilization rate in the presence of the Virtual Radio Link for needing to delete, delete corresponding Virtual Radio Link, the occupied base-band resource of the Virtual Radio Link is discharged for establishing new Radio Link;By actively discharging corresponding Virtual Radio Link, the problem of avoiding the more influence of the quantity real wireless link for the Virtual Radio Link currently established, the base-band resource of release can be used for the foundation of new Radio Link in time, more UE are accessed as far as possible, reducing user can not occur the case where normal communication, improve user experience.

Description

A kind of baseband resource managing method, device and base station
Technical field
The present invention relates to field of communication technology more particularly to a kind of baseband resource managing methods, device and base station.
Background technique
In order to improve CS (Circuit Switched, circuit switching) call drop and access timeout issue, using virtual radio Mode of the link in conjunction with real Radio Link assists real Radio Link demodulation ascending idle port signal by Virtual Radio Link, So as to improve Radio Link speech quality, user perceptibility is improved.Wherein, real Radio Link refers specifically to UE (User Equipment, user terminal) link concentrated is activated, there are the transmission of uplink and downlink data, and Virtual Radio Link refers specifically to Network side promotes the chain that link communication quality is established to assist demodulation of the corresponding real Radio Link to ascending idle port signal Road only exists the demodulation process of up channel, in the absence of line link.
Current base station is receiving the foundation reality Radio Link or virtual radio that network side (such as base station controller) issues Corresponding base-band resource is just directly distributed for it in the instruction of link, base station, to establish corresponding real Radio Link or virtual nothing Wired link, in current base-band resource deficiency, base station just cannot be established corresponding wireless for the link establishment instruction being currently badly in need of There is the case where link establishment failure in link.Namely during wireless link, there is no the mistakes of baseband resource managing Journey, to be unfavorable for the efficient utilization of base-band resource.On the one hand, the Virtual Radio Link that may cause foundation is excessive, then dividing The base-band resource of dispensing respective virtual Radio Link is also just higher, and the base-band resource of base station be limited (such as base band search Resource is kind of a bottleneck), therefore the foundation of real Radio Link is influenced, to influence the normal access of user terminal, reduces and use Family experience;It on the other hand, can not be to currently having built up when needing to establish new Radio Link and current base-band resource deficiency Virtual Radio Link actively discharged, can only be discharged again after the link use terminates, can not build in time Found corresponding Radio Link.
For example, base may be made when needing to establish in the presence of new real Radio Link since there is no the process of resource management The base-band resource that Virtual Radio Link is distributed at station is higher, causes current residual base-band resource insufficient, thus can not be new for this The real enough base-band resources of wireless link distribution, lead to not normally establish, and influence the normal access of UE, especially high in communication There are a large amount of real link establishment demands in peak period, can not may effectively access since base-band resource is insufficient, seriously affect user Usage experience.
Summary of the invention
A kind of baseband resource managing method, device and base station provided in an embodiment of the present invention, the technology mainly to be solved are asked Topic is: during existing wireless link, there is no the management process of base-band resource, leading to the Virtual Radio Link established Active release can not be but excessively carried out, the normal foundation of new Radio Link is influenced, to affect user experience.
In order to solve the above technical problems, the embodiment of the present invention provides a kind of baseband resource managing method, comprising:
Obtain current base-band resource utilization rate;
When judging that the base-band resource utilization rate reaches preset utilization rate threshold value, currently-established virtual radio is obtained The ratio of the occupied base-band resource of link and the currently-established occupied base-band resource of real Radio Link;
When according to the ratio and base-band resource utilization rate judgement in the presence of the Virtual Radio Link for needing to delete, delete Corresponding Virtual Radio Link discharges the occupied base-band resource of the Virtual Radio Link for establishing new radio chains Road.
The embodiment of the present invention also provides a kind of baseband resource managing device, comprising:
Module is obtained, judges that the base-band resource makes for obtaining current base-band resource utilization rate, and in processing module When reaching preset utilization rate threshold value with rate, for obtain the occupied base-band resource of currently-established Virtual Radio Link with The ratio of the currently-established occupied base-band resource of real Radio Link;
The processing module is used for according to the ratio and the base-band resource utilization rate for obtaining module and getting When judgement is in the presence of the Virtual Radio Link for needing to delete, corresponding Virtual Radio Link is deleted, the Virtual Radio Link is discharged Occupied base-band resource is for establishing new Radio Link.
The embodiment of the present invention also provides a kind of base station, comprising: communication bus, memory and processor;
The communication bus is for realizing the connection communication between the processor and the memory;
The processor is any one of aforementioned to realize for executing the baseband resource managing program stored in the memory Baseband resource managing method the step of.
The embodiment of the present invention also provides a kind of computer storage medium, is stored with computer in the computer storage medium Executable instruction, the computer executable instructions are used to execute any one of aforementioned baseband resource managing method.
The beneficial effects of the present invention are:
A kind of baseband resource managing method, device, base station and the computer storage provided according to embodiments of the present invention is situated between Matter when judging that the base-band resource utilization rate reaches preset utilization rate threshold value, is obtained by obtaining current base-band resource utilization rate The occupied base-band resource of currently-established Virtual Radio Link and the currently-established occupied base band of real Radio Link The ratio of resource, when according to the ratio and base-band resource utilization rate judgement in the presence of the Virtual Radio Link for needing to delete, Corresponding Virtual Radio Link is deleted, discharges the occupied base-band resource of the Virtual Radio Link with new wireless for establishing Link;This programme is according to the currently-established occupied base-band resource of Virtual Radio Link and currently-established real radio chains The ratio of the occupied base-band resource in road and current base-band resource utilization rate actively carry out phase to established Virtual Radio Link The release answered, the problem of avoiding the more influence of the quantity real wireless link for the Virtual Radio Link currently established, release Base-band resource can be used for the foundation of new Radio Link in time, especially in communication peak time, pass through and actively discharge Corresponding Virtual Radio Link, controls the quantity of established Virtual Radio Link, accesses more UE as far as possible, reduces user It can not occur the case where normal communication, to improve user experience.
Detailed description of the invention
Fig. 1 is the baseband resource managing method flow diagram of the embodiment of the present invention one;
Fig. 2 is the base station communication attachment structure schematic diagram of the embodiment of the present invention one;
Fig. 3 is the real wireless link flow diagram of the embodiment of the present invention one;
Fig. 4 is the Virtual Radio Link Establishing process schematic diagram of the embodiment of the present invention one;
Fig. 5 is the real wireless link flow diagram of the embodiment of the present invention two;
Fig. 6 is the Virtual Radio Link Establishing process schematic diagram of the embodiment of the present invention two;
Fig. 7 is a kind of baseband resource managing apparatus structure schematic diagram of the embodiment of the present invention three;
Fig. 8 is another baseband resource managing apparatus structure schematic diagram of the embodiment of the present invention three;
Fig. 9 is the architecture of base station schematic diagram of the embodiment of the present invention four.
Specific embodiment
The embodiment of the present invention is described in further detail below by specific embodiment combination attached drawing.
Embodiment one:
During solving existing wireless link, there is no the management processes of base-band resource, lead to foundation Virtual Radio Link excessively can not but carry out active release, influence the problem of normally foundation of new Radio Link, the present invention is real It applies example and a kind of baseband resource managing method is provided.
Referring to Figure 1, the baseband resource managing method includes the following steps:
S11: current base-band resource utilization rate is obtained;
Baseband resource managing method provided by the present embodiment specifically can be applied in the baseband resource managing of base station, when So also it can be applied in the example that other need to carry out baseband resource managing.It should be understood that a base station can make Base-band resource is limited, therefore how to be reasonably extremely important using these base-band resources.In the present embodiment, lead to It crosses and reasonable distribution is carried out to current base-band resource, is discharged to improve the utilization rate of base-band resource, to the virtual radio chain of foundation The quantity or ratio of road and real Radio Link are controlled, and guarantee to reach well on user terminal access quantity and communication quality Balance.It avoids limited base-band resource from arbitrarily being used, such as establishes excessive Virtual Radio Link, base-band resource is caused to occupy It is higher, real Radio Link can not be normally accessed, to reduce the quantity that base station is currently accessed user terminal, reduces user's end End is successfully accessed rate.
It should be understood that base-band resource is mainly used for establishing corresponding wireless communication link, wireless communication link is specific Including Virtual Radio Link and real Radio Link.Specifically, referring to Fig. 2, such as in order to realize between user 21 and user 22 Voice communication, corresponding base station 23 establishes corresponding real Radio Link firstly the need of for user 21 and user 22, passes through foundation The reality Radio Link be just able to achieve the normal voice between user 21 and user 22 call, it should be appreciated that corresponding nothing It is usually to be issued by base station controller 24 that wired link, which establishes instruction, and base station controller 24 passes through demodulation process user 21 or user 22 requests sent judge the type of service of the request, such as connect judging that user 21 and user 22 need to realize to converse When, real wireless link instruction is issued to relevant base station, the foundation of real Radio Link is realized by the base station, to realize Call connection between user 21 and user 22.
During establishing real Radio Link, the base-band resource certain for the reality wireless link distribution is needed, wherein base Band resource includes but is not limited to base band searching resource, base band demodulating resource, baseband channel resource, the number of users carried with base station The utilization rate of the increase of amount, base-band resource necessarily increases, then remaining base-band resource is just reduced therewith.
S12: it when judging that the base-band resource utilization rate reaches preset utilization rate threshold value, obtains currently-established virtual The ratio of the occupied base-band resource of Radio Link and the currently-established occupied base-band resource of real Radio Link;
Judge whether to reach preset utilization rate threshold value by the current base-band resource utilization rate of acquisition, if so, then obtaining The current occupied base-band resource of Virtual Radio Link that base station has had built up and currently-established real Radio Link The ratio of occupied base-band resource.In some instances, it obtains current base-band resource utilization rate and the ratio can be simultaneously It carries out.
Preset utilization rate threshold value can be according to practical situations flexible setting, however it is not limited to some specific numerical value. For example, preset utilization rate threshold value can be set to 50%, it that is to say that the base-band resource that the base station has currently used accounts for total base 50% with resource.It should be noted that in some specific examples, it can be according to a certain specific base-band resource utilization rate It is calculated: for example by taking base band searching resource as an example, obtaining current base band searching resource utilization rate, judge the current base band search Whether resource utilization reaches preset searching resource utilization rate threshold value.When base-band resource is base band searching resource, base band demodulating When resource, baseband channel resource etc. are a variety of, the current base-band resource utilization rate of the acquisition can be obtains each base band money respectively Multiple base-band resource utilization rates in source.
Preset utilization rate threshold value, be mainly used for control Radio Link establishes quantity, avoids limited base-band resource It cannot be utilized effectively.Specifically, then explanation is current when current base-band resource utilization rate is lower than preset utilization rate threshold value Remaining base-band resource is relatively more, at this time when receiving the instruction of corresponding wireless link, can directly establish for it Corresponding Radio Link guarantees that user terminal normally accesses or improve the communication quality of respective wireless link, makes base-band resource It can be fully used;But when current base-band resource reaches at or above the preset utilization rate threshold value, it can be said that bright Current base-band resource is remaining few, needs to carry out reasonable distribution control, avoids existing building receiving corresponding Radio Link When vertical instruction, corresponding Radio Link just is established for it simply by the presence of enough resources, it would be possible to Virtual Radio Link be caused to be built Vertical quantity is higher, to seriously affect the problem of real Radio Link normally accesses.
S13: when according to the ratio and base-band resource utilization rate judgement in the presence of the Virtual Radio Link for needing to delete, Corresponding Virtual Radio Link is deleted, discharges the occupied base-band resource of the Virtual Radio Link with new wireless for establishing Link.
According to the occupied base-band resource of currently-established Virtual Radio Link of acquisition and currently-established real nothing The ratio of the occupied base-band resource of wired link and current base-band resource utilization rate judge whether there is the virtual nothing for needing to delete Wired link, if it is determined that in the presence of then deleting corresponding Virtual Radio Link, discharging the occupied base band money of the Virtual Radio Link Source increases current base-band resource surplus with this, to promote the utilization rate of base-band resource, make for establishing new Radio Link Base-band resource can be utilized more fully.
In practical application scene, the foundation of Radio Link generally includes building for Virtual Radio Link and real Radio Link It is vertical, it is described in detail first below for the establishment process of real Radio Link:
Fig. 3 is referred to, Fig. 3 is a kind of method for building up process signal for real Radio Link that the embodiment of the present invention one provides Figure, comprising:
S31: the wireless link instruction for being used to indicate the real Radio Link of foundation that base station controller issues is received;
The wireless link instruction that base station controller issues is received specifically, can be, and to the wireless link Instruction carries out dissection process, to judge the indicated Linktype established of wireless link instruction.It is specific to receive demodulation Treatment process can be carried out using existing any way, herein with no restrictions.
S32: obtaining current base-band resource utilization rate, judges whether the base-band resource utilization rate got reaches default The first utilization rate threshold value, if so, going to step S33;If not, going to step S38;
Let it be assumed, for the purpose of illustration, that currently reception resource utilization is L, preset first utilization rate threshold value is L1, here It that is to say and judging L >=L1When, otherwise namely L < L step S33 is gone to,1When, execute step S38.It should be noted that one In a little examples, can be after receiving wireless link instruction, then carry out the acquisition of current base-band resource utilization rate with And the determination of range;It is also possible to first obtain current base-band resource utilization rate and determines its range, it is corresponding wireless receiving After link establishment instruction, further according to the base-band resource utilization rate for previously having obtained and having determined to execute subsequent step, it that is to say Simultaneously inevitable sequencing is not present in the two.
S33: obtaining the occupied base-band resource of currently-established Virtual Radio Link and currently-established reality is wireless The ratio of the occupied base-band resource of link judges that the ratio reaches preset first fractional threshold (assuming that the ratio is λ, preset first fractional threshold are λ1Namely λ >=λ1), and current base-band resource utilization rate is less than preset second utilization rate threshold When value, step S34 is gone to;If judging, current base-band resource utilization rate is less than preset second utilization rate threshold value, and the ratio When less than preset first fractional threshold, step S35 is gone to;If judging, current base-band resource utilization rate reaches preset second and makes When with rate threshold value, step S36 is gone to;
S34: determine at least there is the Virtual Radio Link for needing to delete;Delete the corresponding void for needing to delete Quasi- Radio Link;
Assuming that preset second utilization rate threshold value is L2, the ratio got is λ, and preset first fractional threshold is λ1.In the present embodiment, the second utilization rate threshold value L2Greater than the first utilization rate threshold value L1.Be greater than in current base-band resource utilization rate L etc. In preset first utilization rate threshold value L1, and it is less than preset second utilization rate threshold value L2(it that is to say L1≤ L < L2), and institute Ratio λ is stated greater than preset first fractional threshold λ1(namely λ >=λ1) when, determine the virtual radio chain that base station currently has built up At least there is a Virtual Radio Link in road to need to delete.
S35: refuse to instruct for the wireless link and establish corresponding real Radio Link;
Judge current base-band resource utilization rate be less than preset second utilization rate threshold value (that is to say L1≤ L < L2), but institute Ratio is stated less than preset first fractional threshold (namely λ < λ1) when, namely current base-band resource utilization rate reached one compared with High level, and the occupied base-band resource of Virtual Radio Link seldom (that is to say that the ratio is less than preset first ratio It is worth threshold value), therefore refuse to be that corresponding real Radio Link is established in wireless link instruction.
Alternatively, judge the base-band resource utilization rate be not up to preset third utilization rate threshold value (assuming that third use Rate threshold value is L3, that is to say L2≤ L < L3), and judge the ratio be equal to 0 when, refuse for the wireless link instruct build Found corresponding Radio Link.
Alternatively, judging that the base-band resource utilization rate reaches preset third utilization rate threshold value and (that is to say L >=L3) when, Since current base-band resource utilization rate has had reached a Limiting Level, base station current residual base-band resource is few or insufficient Think that it distributes enough resources, therefore refuses to be that corresponding Radio Link is established in wireless link instruction.
S36: judge that the base-band resource utilization rate is not up to preset third utilization rate threshold value, and judge that the ratio is big When 0, step S37 is gone to;Otherwise, step S35 is gone to;
In the present embodiment, it is assumed that third utilization rate threshold value is L3, and third utilization rate threshold value L3Greater than the second utilization rate threshold value L2
S37: determine that all Virtual Radio Links currently having built up are required to delete;The corresponding needs are deleted to delete The Virtual Radio Link removed;
Judging whether the base-band resource utilization rate reaches preset third utilization rate threshold value and (that is to say L2≤ L < L3), And the ratio be greater than 0 (namely λ > 0) when, it is determined that all Virtual Radio Links currently having built up are required to delete.
In the present embodiment, when determining in the presence of the Virtual Radio Link for needing to delete, deletion is described accordingly to need to delete Virtual Radio Link, to discharge the occupied base-band resource of the Virtual Radio Link, for establishing new Radio Link.
In the present embodiment, after deleting corresponding Virtual Radio Link, base station current residual base can also be recalculated Band resource, and go to step S32 and execute above-mentioned steps.
S38: distributing corresponding base-band resource is that corresponding real Radio Link is established in wireless link instruction.
When current base-band resource utilization rate is lower than preset first utilization rate threshold value, at this point, base band surplus resources are opposite It is more, corresponding Radio Link directly is established for wireless link instruction, makes full use of the base band surplus resources, guarantees to use Family access success rate of terminal.
It is described in detail below for the establishment process of Virtual Radio Link, refers to Fig. 4, Fig. 4 is that the present invention is implemented A kind of method for building up flow diagram for Virtual Radio Link that example one provides, comprising:
S41: what reception base station controller issued is used to indicate the wireless link instruction for establishing Virtual Radio Link;
S42: obtaining current base-band resource utilization rate, and judges whether the base-band resource utilization rate reaches the preset 4th and make With rate threshold value, if so, going to step S43;If not, going to step S44;
In the present embodiment, utilization rate threshold value includes the first utilization rate threshold value and the 4th utilization rate threshold value, it is assumed that is L4, respectively The use when real Radio Link and Virtual Radio Link are established in the wireless link instruction instruction received.It should be understood that It is that the first utilization rate threshold value and the 4th utilization rate threshold value can be set to identical, different numerical value also can be set into.
S43: obtaining the occupied base-band resource of currently-established Virtual Radio Link and currently-established reality is wireless The ratio of the occupied base-band resource of link, and judge that the ratio reaches preset second fractional threshold and (is assumed to be λ2), and should Base-band resource utilization rate is less than preset 5th utilization rate threshold value and (is assumed to be L5) when, go to step S45;Otherwise, step is gone to S46;
S44: corresponding Virtual Radio Link is established for wireless link instruction;
When current base-band resource is lower than preset 4th utilization rate threshold value, illustrate that current base band surplus resources are sufficient, it can To meet the foundation of the Virtual Radio Link well, the foundation of real Radio Link will not be affected greatly, therefore directly Corresponding base-band resource is distributed for the Virtual Radio Link, to establish Virtual Radio Link.Pass through the Virtual Radio Link It establishes, the corresponding ascending idle port signal of demodulation of corresponding real Radio Link can be assisted, to improve the communication of Radio Link Quality.
It should be understood that the foundation of Radio Link (Virtual Radio Link and real Radio Link) can use existing Meaning wireless link mode, herein with no restrictions.
S45: determining at least there is the Virtual Radio Link for needing to delete in currently-established Virtual Radio Link, And delete the Virtual Radio Link for needing to delete;
Reach preset 4th utilization rate threshold value in current base-band resource utilization rate, and is less than preset 5th utilization rate threshold Value, and when the ratio is greater than preset second fractional threshold, determine in current Virtual Radio Link at least there is one Item needs the Virtual Radio Link deleted.In the present embodiment, when determining in the presence of the Virtual Radio Link for needing to delete, it should delete Except the Virtual Radio Link of required deletion, to discharge the occupied base-band resource of the Virtual Radio Link.
In the present embodiment, after deleting the corresponding required Virtual Radio Link deleted, current base band can also be recalculated Resources left situation, and step S42 is gone to, repeat above-mentioned steps.
S46: refuse to instruct for the wireless link and establish corresponding Virtual Radio Link;
Judging that the current base-band resource utilization rate reaches preset 4th utilization rate threshold value, and be less than the described 5th to make With rate threshold value, but when the ratio is less than preset five fractional threshold;Or current base band utilization rate threshold value has reached the 5th When utilization rate threshold value (wherein the 5th utilization rate threshold value is greater than the 4th utilization rate threshold value), determine that there is no the virtual nothings new for foundation Wired link and the Virtual Radio Link deleted, therefore the base-band resource for new Virtual Radio Link distribution is less or insufficient, To which refusal is that corresponding Virtual Radio Link is established in wireless link instruction, guarantee established Virtual Radio Link Normal operation.
In the present embodiment, deleting corresponding Virtual Radio Link can be according to each Virtual Radio Link currently having built up Priority, delete the Virtual Radio Link of highest priority in each Virtual Radio Link;Wherein priority can be according to each void At least one of the quasi- occupied base-band resource grade of Radio Link, link setup time span and signal strength are calculated.
It should be understood that the height of priority be it is opposite, in the standard difference of institute's reference, the height of priority It is different, therefore the present embodiment is not necessarily limited to delete the Virtual Radio Link of highest priority.For example, in virtual nothing The occupied base-band resource higher grade of wired link, and link setup time span is longer, and signal strength is poorer, when priority is higher, answers When the Virtual Radio Link for deleting highest priority;And in the occupied base-band resource higher grade of Virtual Radio Link, link setup Time span is longer, and signal strength is poorer, when priority is lower, should delete the minimum Virtual Radio Link of priority.
It is possible to further according to the occupied base-band resource grade of each Virtual Radio Link, link setup time span and Signal strength three calculates the corresponding priority of each Virtual Radio Link currently having built up jointly:
P=aX+bY+cZ, wherein P indicates the numerical priority value of Virtual Radio Link, and X is indicated shared by the Virtual Radio Link Base-band resource level value, Y indicate that the link setup time span level value of the Virtual Radio Link, Z indicate the virtual nothing The signal strength scale numerical value of wired link, a, b, c respectively indicate the weighted factor of X, Y, Z.There is corresponding virtual nothing determining When wired link needs to delete, priority is deleted in each Virtual Radio Link most by priority calculation method that this programme provides High Virtual Radio Link, higher, the dtr signal that will wherein can occupy base-band resource well, link setup time are longer virtual Radio Link carries out delete processing, avoids such Virtual Radio Link to the occupancy of base-band resource, is conducive to improve base band money The utilization rate in source.For example, certain Virtual Radio Link signal having built up is very poor, corresponding real Radio Link is risen at all It is acted on less than due aid demodulation, but it still occupies certain base-band resource, this causes limited base-band resource Certain waste is unfavorable for improving the utilization rate of base-band resource.And the priority algorithm that this programme provides can be by this part void Quasi- Radio Link is released effectively, and the base-band resource obtained after release can also be used to establish new Radio Link, because This can effectively access more user terminals, especially in communication peak time, can dramatically improve user terminal It is successfully accessed rate, promotes the usage experience of user.
Certainly, it is not limited to the above example for the calculating of priority, can also carry out COMPREHENSIVE CALCULATING according to other correlative factors, Or a certain factor therein is selected to be calculated: for example calculating the excellent of each Virtual Radio Link only according to signal strength First grade, signal strength is weaker, and priority is higher, needs to establish corresponding Radio Link in judgement, exist needs delete it is virtual When Radio Link, the most weak Virtual Radio Link of the signal strength can be deleted, the Virtual Radio Link is avoided to provide base band The consumption without reason in source discharges the occupied base-band resource of the Virtual Radio Link, with for establishing corresponding new Radio Link, Improve the utilization rate of base-band resource.
By combining the occupied base-band resource grade of Virtual Radio Link, link setup time span, signal strength to count jointly Calculate each Virtual Radio Link
After dischargeing the Virtual Radio Link of highest priority, the utilization rate of current base-band resource can also be recalculated Situation, and judge whether to meet corresponding condition again, correlation step is repeated, is established until being instructed for the Radio Link Corresponding Radio Link is refused to establish corresponding Radio Link for it.
In some instances, a priority threshold value can also be set, in the Radio Link having built up accordingly, each nothing The priority of wired link can directly discharge the Radio Link after reaching the priority threshold value.That is to say to delete simultaneously Except all Radio Links for meeting priority threshold value, release efficiency is promoted.
In the present embodiment, the establishment process of Virtual Radio Link and real Radio Link uses two sets of corresponding utilization rates Threshold value and fractional threshold (real Radio Link uses: the first utilization rate threshold value, the second utilization rate threshold value, third utilization rate threshold value with And first fractional threshold;Virtual Radio Link uses: the 4th utilization rate threshold value, the 5th utilization rate threshold value and the second ratio threshold Value), it should be noted that two sets of utilization rate threshold values respectively used and the numerical value being specifically arranged between fractional threshold can phases Together, it can also be different.For example, the numerical value of the first utilization rate threshold value and the 4th utilization rate threshold value can be set to identical, second makes It can be set to the numerical value of rate threshold value and the 5th utilization rate threshold value identical, this is no longer going to repeat them, in other words described pre- If utilization rate threshold value and fractional threshold can be according to practical application scene flexible setting, however it is not limited to some specific numerical value.
Baseband resource managing method provided in an embodiment of the present invention, by obtaining current base-band resource utilization rate, judgement should When base-band resource utilization rate reaches preset utilization rate threshold value, the occupied base band of currently-established Virtual Radio Link is obtained The ratio of resource and the currently-established occupied base-band resource of real Radio Link, according to the ratio and the base-band resource When utilization rate judgement is in the presence of the Virtual Radio Link for needing to delete, corresponding Virtual Radio Link is deleted, discharges the virtual nothing The occupied base-band resource of wired link is for establishing new Radio Link;This programme is according to currently-established virtual radio chain The ratio and current base band of the occupied base-band resource in road and the currently-established occupied base-band resource of real Radio Link provide Source utilization rate actively discharges established Virtual Radio Link accordingly, avoids the Virtual Radio Link currently established The more influence of quantity real wireless link the problem of, the base-band resource of release can be used for new Radio Link in time It establishes, especially controls established virtual radio by actively discharging corresponding Virtual Radio Link in communication peak time The quantity of link accesses more UE as far as possible, and reducing user can not occur the case where normal communication, so that improving user makes With experience.
Embodiment two:
For a better understanding of the present invention, the present embodiment on the basis of example 1, in conjunction with specific example to this hair The baseband resource managing method that bright embodiment provides is described in detail.
Fig. 5 is referred to, with certain UMTS (Universal Mobile Telecommunications System, general shifting Dynamic communication system) site configuration co-frequency cell mentions according to embodiments of the present invention for there is the access of a large number of users terminal in peak time The baseband resource managing method of confession illustrates the specific implementation step of the baseband resource managing method of real Radio Link.
S51: the wireless link instruction that base station controller issues is received, and carries out instruction parsing;
S52: judge that wireless link instruction is used to indicate real wireless link, and current baseband board searching resource makes With rate less than 75%, then corresponding base-band resource is distributed for establishing the reality Radio Link;
Specifically, for the new real wireless link distribution relevant search resource that the needs are established, if be allocated successfully, configuration Base band completes the foundation of real Radio Link;If distribution failure, real wireless link failure.It further, can also be The response results of real wireless link success and/or failure are sent to base station controller.
S53: if judging, the current base band searching resource utilization rate of baseband board is greater than 75% but less than 85%, and λ >=25% (λ is that the currently-established occupied base-band resource of Virtual Radio Link and currently-established real Radio Link are occupied The ratio of base-band resource), calculate the priority for the Virtual Radio Link currently having built up and sequence;
Assuming that currently there is three effective Virtual Radio Links, wherein UE0Base band searching resource ratio is occupied to be 2%, build The chain time be 15ms, search signal it is very weak when, calculate UE0The value of corresponding X, Y, Z are respectively 2,1,4;UE1Base band is occupied to search When Suo Ziyuan ratio is 2%, the link setup time is 35ms, search signal is weaker, UE is calculated1The value of corresponding X, Y, Z is respectively 2,3,3;UE2When occupancy base band searching resource ratio is 4%, the link setup time is 25ms, search signal is general, UE is calculated2It is corresponding X, the value of Y, Z are respectively 4,2,2.According to priority calculation formula: P=0.5X+0.1Y+0.4Z calculates priority size UE1 <UE0<UE2, UE2Link information be filled up to Virtual Radio Link delete message in, call corresponding release module by the void Quasi- Radio Link UE2It deletes, discharges its occupied base band searching resource 4%.
S54: if judging, base band searching resource utilization rate is greater than 75% but less than 85%, but λ < 25%, determines that base station is current The Virtual Radio Link that can not delete, then refuse real link establishment, and jump procedure S51 is executed.
S55: if judging, current baseband board searching resource utilization rate has been more than 85% but less than 90%, and current virtual without The ratio of wired link and real Radio Link meets λ > 0, it is determined that needs to delete all Virtual Radio Links, namely deletes all void Cell;
But if the ratio λ of Virtual Radio Link and real Radio Link is no more than 0 (namely being equal to 0), it is determined that do not have The Virtual Radio Link that can be deleted, then refuse real wireless link, and jump procedure S51 is executed.
S56: if judging, base band searching resource utilization rate has been more than 90%, refuses real wireless link, jump procedure S51 is executed.
When judgement has Virtual Radio Link of the phase in requisition for deletion, its occupied base band searching resource is discharged, is configured Base band recalculates current base band searching resource utilization rate.
Below by taking UMTS website access of virtual Radio Link as an example, illustrate the baseband resource managing method of Virtual Radio Link The step of, refer to Fig. 6, comprising:
S61: the wireless link instruction that base station controller issues, and carry out instruction parsing;
S62: judging that wireless link instruction is used to indicate Virtual Radio Link foundation, and judges current base band search money The utilization rate in source then distributes corresponding base-band resource for establishing the Virtual Radio Link less than 75%;
Match specifically, distributing relevant search resource for the new Virtual Radio Link that the needs are established if be allocated successfully Base band is set, the foundation of Virtual Radio Link is completed;If distribution failure, Virtual Radio Link establish failure.Further, also Virtual Radio Link can be successfully established and/or the response results of failure are sent to base station controller.
S63: if judging, the current base band searching resource utilization rate of baseband board meets 75%≤L<85%, and λ>=35%, calculates The currently priority of virtual link and sequence;
Assuming that currently there is three effective virtual link UE0Occupancy base band searching resource ratio is 3%, the link setup time is When 18ms, search signal are very weak, UE is calculated0The value of corresponding X, Y, Z are respectively 3,1,4;UE1Occupy base band searching resource ratio When example is 3%, the link setup time is 46ms, search signal is weaker, UE is calculated1The value of corresponding X, Y, Z are respectively 3,4,3;UE2It accounts for Be 3% with base band searching resource ratio, the link setup time be 25ms, search signal it is general when, calculate UE2The value of corresponding X, Y, Z Respectively 3,2,2.According to priority calculation formula: P=0.4X+0.2Y+0.4Z calculates priority size UE2<UE0<UE1, UE1Link information be filled up to Virtual Radio Link delete message in, call corresponding release module by the virtual radio chain Road UE1It deletes, discharges its occupied base band searching resource 3%.
S64: if judging, base-band resource utilization rate meets 75%≤L < 85%, but λ < 35%, then then determine currently without The Virtual Radio Link that can be deleted then is refused the new Virtual Radio Link and is established, and jump procedure S61 is executed.
S65: if judging, base-band resource utilization rate meets L >=85%, refuses the new Virtual Radio Link and establishes, jumps Step S61 is executed.
When judgement has Virtual Radio Link of the phase in requisition for deletion, its occupied base band searching resource is discharged, is configured Base band recalculates current base band searching resource utilization rate.
Embodiment three:
On the basis of the embodiment of the present invention one and/or embodiment two, the embodiment of the present invention provides a kind of base-band resource pipe Device is managed, to the step of realizing baseband resource managing method described in above-described embodiment one and/or embodiment two.
Fig. 7 is referred to, baseband resource managing device 70 provided in this embodiment includes:
Module 71 is obtained, judges the base-band resource for obtaining current base-band resource utilization rate, and in processing module 72 When utilization rate reaches preset utilization rate threshold value, for obtaining the occupied base-band resource of currently-established Virtual Radio Link With the ratio of the currently-established occupied base-band resource of real Radio Link;
The base-band resource utilization rate judgement that processing module 72 is used to be got according to the ratio and the acquisition module exists When the Virtual Radio Link for needing to delete, corresponding Virtual Radio Link is deleted, discharges the occupied base of the Virtual Radio Link With resource for establishing new Radio Link.
In some instances, baseband resource managing module can also include receiving module, refer to Fig. 8, the receiving module 73 for receiving the wireless link that base station controller issues and referring to before obtaining module 71 and obtaining base-band resource utilization rate It enables, the utilization rate threshold value includes the first utilization rate threshold value;
When the wireless link instructs instruction to establish real Radio Link,
Processing module 72 is less than preset second for judging that the base-band resource utilization rate is greater than the first utilization rate threshold value Utilization rate threshold value, and the ratio be greater than preset first fractional threshold when, determine at least exist one need delete it is virtual Radio Link, wherein the second utilization rate threshold value is greater than the first utilization rate threshold value, the first fractional threshold is greater than 0;
And/or
Processing module 72 is less than preset third for judging that the base-band resource utilization rate is greater than the second utilization rate threshold value Utilization rate threshold value, and when the ratio is greater than 0, determine that all Virtual Radio Links for currently having built up are required to delete, the Three utilization rate threshold values are greater than the second utilization rate threshold value;
Processing module 72 can be also used for recalculating current base-band resource utilization rate, judge that current base band utilization rate is lower than When preset utilization rate threshold value, corresponding base-band resource is distributed to establish the indicated radio chains established of wireless link instruction Road.
When Virtual Radio Link is established in wireless link instruction instruction, processing module 72 is for judging that the base band provides Source utilization rate is greater than preset 4th utilization rate threshold value, and is less than preset 5th utilization rate threshold value, and the ratio is greater than in advance If the second fractional threshold when, determine that at least having one needs the Virtual Radio Link deleted, the 4th utilization rate threshold value is less than 5th utilization rate threshold value.
Example IV:
The embodiment of the present invention provides a kind of base station, refers to Fig. 9, and the base station 90 includes: communication bus 91, memory 92 And processor 93;
The communication bus 91 is for realizing the connection communication between the processor 93 and the memory 92;
The processor 93 is for executing the baseband resource managing program stored in the memory 92, to realize above-mentioned reality The step of applying baseband resource managing method described in example one and/or embodiment two.
It specifically includes: obtaining current base-band resource utilization rate;
When judging that the base-band resource utilization rate reaches preset utilization rate threshold value, currently-established virtual radio is obtained The ratio of the occupied base-band resource of link and the currently-established occupied base-band resource of real Radio Link;
When according to the ratio and base-band resource utilization rate judgement in the presence of the Virtual Radio Link for needing to delete, delete Corresponding Virtual Radio Link discharges the occupied base-band resource of the Virtual Radio Link for establishing new radio chains Road.
Before the processor 93 executes the step of obtaining current base-band resource utilization rate, which can also be held The baseband resource managing program stored in line storage 92 is to realize following steps:
The wireless link instruction that base station controller issues is received, the virtual radio chain for needing to delete is judged whether there is Road includes:
When the wireless link instructs instruction to establish real Radio Link, the base-band resource utilization rate is greater than described First utilization rate threshold value, and be less than preset second utilization rate threshold value, and the ratio be greater than preset first fractional threshold when, Determine at least there is the Virtual Radio Link for needing to delete;
The processor 93 can be also used for recalculating current base-band resource utilization rate, judge that current base band utilization rate is low When preset utilization rate threshold value, corresponding base-band resource is distributed to establish the indicated foundation of wireless link instruction Radio Link.
In the present embodiment, the execution of processor 93 judges whether there is the Virtual Radio Link that needs are deleted and includes:
When the wireless link instructs instruction to establish real Radio Link, the base-band resource utilization rate is greater than described Second utilization rate threshold value, and be less than preset third utilization rate threshold value, and the ratio be greater than 0 when, determination currently have built up All Virtual Radio Links be required to delete, the third utilization rate threshold value be greater than the second utilization rate threshold value.
In the present embodiment, utilization rate threshold value further includes the first utilization rate threshold value, and processor 93 is used in wireless link When instruction is that Virtual Radio Link establishes instruction, judge that the base-band resource utilization rate is greater than the 4th utilization rate threshold value, and be less than Preset 5th utilization rate threshold value, and the ratio be greater than preset second fractional threshold when, determine at least exist one needs The Virtual Radio Link of deletion, the 4th utilization rate threshold value is less than the 5th utilization rate threshold value.
Processor 93 is specifically used for the priority according to each Virtual Radio Link currently having built up, and deletes each void The Virtual Radio Link of highest priority in quasi- Radio Link;The priority is occupied according to each Virtual Radio Link At least one of base-band resource grade, link setup time span and signal strength are calculated.
Further, processor 93, which calculates priority, specifically can also be occupied according to each Virtual Radio Link What base-band resource grade, link setup time span and signal strength calculated, including be calculated according to following algorithm described Priority:
Wherein P indicates the numerical priority value of the Virtual Radio Link, and the X is indicated occupied by the Virtual Radio Link Base-band resource level value, the Y indicates the link setup time span level value of the Virtual Radio Link, and the Z is indicated The signal strength scale numerical value of the Virtual Radio Link, described a, b, c respectively indicate the weighted factor of described X, Y, Z.
Obviously, those skilled in the art should be understood that each module of the embodiments of the present invention or each step can be used General computing device realizes that they can be concentrated on a single computing device, or be distributed in multiple computing device institutes On the network of composition, optionally, they can be realized with the program code that computing device can perform, it is thus possible to by them It is stored in computer storage medium (ROM/RAM, magnetic disk, CD) and is performed by computing device, and in some cases, it can With the steps shown or described are performed in an order that is different from the one herein, or they are fabricated to each integrated circuit dies Block, or single integrated circuit module is maked multiple modules or steps in them to realize.So the present invention does not limit It is combined in any specific hardware and software.
The above content is combining specific embodiment to be further described to made by the embodiment of the present invention, cannot recognize Fixed specific implementation of the invention is only limited to these instructions.For those of ordinary skill in the art to which the present invention belongs, Without departing from the inventive concept of the premise, a number of simple deductions or replacements can also be made, all shall be regarded as belonging to the present invention Protection scope.

Claims (10)

1. a kind of baseband resource managing method, which is characterized in that the baseband resource managing method includes:
Obtain current base-band resource utilization rate;
When judging that the base-band resource utilization rate reaches preset utilization rate threshold value, currently-established Virtual Radio Link is obtained The ratio of occupied base-band resource and the currently-established occupied base-band resource of real Radio Link;
When according to the ratio and base-band resource utilization rate judgement in the presence of the Virtual Radio Link for needing to delete, delete corresponding Virtual Radio Link, discharge the occupied base-band resource of the Virtual Radio Link for establishing new Radio Link.
2. baseband resource managing method as described in claim 1, which is characterized in that the utilization rate threshold value includes the first use Rate threshold value, before the current base-band resource utilization rate of acquisition, the baseband resource managing method further include:
The wireless link instruction that base station controller issues is received, the Virtual Radio Link packet for needing to delete is judged whether there is It includes:
When the wireless link instructs instruction to establish real Radio Link, the base-band resource utilization rate is greater than described first Utilization rate threshold value, and be less than preset second utilization rate threshold value, and the ratio be greater than preset first fractional threshold when, determine At least there is the Virtual Radio Link for needing to delete;
The baseband resource managing method further include: recalculate current base-band resource utilization rate, judge current base band utilization rate When lower than preset utilization rate threshold value, distributing corresponding base-band resource, the wireless link instruction is indicated to be established to establish Radio Link.
3. baseband resource managing method as claimed in claim 2, which is characterized in that described to judge whether there is what needs were deleted Virtual Radio Link further include:
When the wireless link instructs instruction to establish real Radio Link, the base-band resource utilization rate is greater than described second Utilization rate threshold value, and be less than preset third utilization rate threshold value, and when the ratio is greater than 0, determine the institute that currently has built up There is Virtual Radio Link to be required to delete, the third utilization rate threshold value is greater than the second utilization rate threshold value.
4. baseband resource managing method as claimed in claim 2, which is characterized in that the utilization rate threshold value further includes the 4th making Judge that the base-band resource uses when wireless link instruction is that Virtual Radio Link establishes instruction with rate threshold value Rate is greater than the 4th utilization rate threshold value, and is less than preset 5th utilization rate threshold value, and the ratio is greater than preset second When fractional threshold, determine at least there is the Virtual Radio Link for needing to delete, the 4th utilization rate threshold value is less than described 5th utilization rate threshold value.
5. baseband resource managing method according to any one of claims 1-4, which is characterized in that the deletion is corresponding virtual Radio Link includes:
According to the priority for each Virtual Radio Link currently having built up, priority is deleted in each Virtual Radio Link most High Virtual Radio Link;When the priority is according to the occupied base-band resource grade of each Virtual Radio Link, link setup Between at least one of length and signal strength be calculated.
6. the baseband resource managing method stated such as claim 5, which is characterized in that the priority is according to each virtual nothing What the occupied base-band resource grade of wired link, link setup time span and signal strength calculated, including calculated according to following The priority is calculated in method:
P=aX+bY+cZ, wherein P indicates the numerical priority value of the Virtual Radio Link, and the X indicates the virtual radio chain The occupied base-band resource level value in road, the Y indicate the link setup time span level value of the Virtual Radio Link, institute Stating Z indicates the signal strength scale numerical value of the Virtual Radio Link, described a, b, c respectively indicate the weighting of described X, Y, Z because Son.
7. a kind of baseband resource managing device, which is characterized in that the baseband resource managing device includes:
Module is obtained, judges the base-band resource utilization rate for obtaining current base-band resource utilization rate, and in processing module When reaching preset utilization rate threshold value, for obtaining the occupied base-band resource of currently-established Virtual Radio Link and current The ratio of the occupied base-band resource of established reality Radio Link;
The processing module is used for according to the ratio and the base-band resource utilization rate judgement for obtaining module and getting When in the presence of the Virtual Radio Link for needing to delete, corresponding Virtual Radio Link is deleted, is discharged shared by the Virtual Radio Link Base-band resource is for establishing new Radio Link.
8. the baseband resource managing device stated such as claim 7, which is characterized in that the baseband resource managing device further include:
Receiving module, for before the acquisition module obtains base-band resource utilization rate, receiving the nothing that base station controller issues Wired link establishes instruction, and the utilization rate threshold value includes the first utilization rate threshold value;
When the wireless link instructs instruction to establish real Radio Link,
The processing module is less than preset for judging that the base-band resource utilization rate is greater than the first utilization rate threshold value The second utilization rate threshold value, and when the ratio is greater than preset first fractional threshold, determine that at least having one needs to delete Virtual Radio Link, the second utilization rate threshold value are greater than the first utilization rate threshold value, and first fractional threshold is greater than 0;
And/or
The processing module is less than preset for judging that the base-band resource utilization rate is greater than the second utilization rate threshold value Third utilization rate threshold value, and when the ratio is greater than 0, determine that all Virtual Radio Links for currently having built up are required to delete It removes, the third utilization rate threshold value is greater than the second utilization rate threshold value;
The processing module is also used to recalculate current base-band resource utilization rate, judges current base band utilization rate lower than preset When utilization rate threshold value, corresponding base-band resource is distributed to establish the indicated radio chains established of wireless link instruction Road.
9. the baseband resource managing device stated such as claim 8, which is characterized in that built in wireless link instruction instruction When vertical Virtual Radio Link, the processing module is for judging that the base-band resource utilization rate is greater than the 4th utilization rate threshold Value, and be less than preset 5th utilization rate threshold value, and the ratio be greater than preset second fractional threshold when, determination at least exist One Virtual Radio Link for needing to delete, the 4th utilization rate threshold value are less than the 5th utilization rate threshold value.
10. a kind of base station, which is characterized in that the base station includes: communication bus, memory and processor;
The communication bus is for realizing the connection communication between the processor and the memory;
The processor is for executing the baseband resource managing program stored in the memory, to realize the claims 1- The step of 6 described in any item baseband resource managing methods.
CN201710448546.7A 2017-06-14 2017-06-14 A kind of baseband resource managing method, device and base station Pending CN109246838A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710448546.7A CN109246838A (en) 2017-06-14 2017-06-14 A kind of baseband resource managing method, device and base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710448546.7A CN109246838A (en) 2017-06-14 2017-06-14 A kind of baseband resource managing method, device and base station

Publications (1)

Publication Number Publication Date
CN109246838A true CN109246838A (en) 2019-01-18

Family

ID=65083041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710448546.7A Pending CN109246838A (en) 2017-06-14 2017-06-14 A kind of baseband resource managing method, device and base station

Country Status (1)

Country Link
CN (1) CN109246838A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111194060A (en) * 2019-12-19 2020-05-22 京信通信技术(广州)有限公司 Data processing method, data processing device, computer equipment and storage medium

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111194060A (en) * 2019-12-19 2020-05-22 京信通信技术(广州)有限公司 Data processing method, data processing device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
CN100459776C (en) Access parameter adaptation and packet data resource management using detailed mobile status information
CN107734708A (en) The connection control method and device of wireless network
EP2903313A1 (en) Method and corresponding apparatus for sending and receiving trunking paging in lte system
CN101772102A (en) Selecting method for isomeric wireless network
CN102083140B (en) Method and device for balanced configuration of wireless channel
CN101868000A (en) Method, device and base station for preempting resources
CN107396409A (en) Wireless terminal frequency band switching method and wireless router
CN103299569A (en) Method, apparatus and system for radio bearer control
CN103475458A (en) Wireless resource distribution method and equipment of multi-carrier system
CN103476074B (en) A kind of resource seizing method and equipment
CN103781185A (en) Machine-type terminal access control method and device
CN103747483A (en) Regulation and control method, device and terminal for business combining
CN104427574B (en) A kind of method and device of access control
CN104662964A (en) Network access control method, device and system
CN102547879B (en) Cell selection method, terminal and wireless network controller
CN109246838A (en) A kind of baseband resource managing method, device and base station
CN104770001A (en) Service distribution method, device and system
CN101702821A (en) Admittance method, device and communication system
CN101888670B (en) Wireless resource management method, device, wireless network controller and base station
CN105578503B (en) A kind of method and device of service access
CN102572722B (en) Message transmission method and equipment based on cluster users
CN101674636B (en) Congestion control method in third generation mobile communication
US20220240334A1 (en) Wireless local area network communication method and apparatus, medium, and electronic device
CN114554563B (en) 5G network to 4G network switching method and device
CN102281596B (en) The method of voice and packet data concurrent service qos parameter, device and mobile terminal are set

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190118

WD01 Invention patent application deemed withdrawn after publication