CN109236286A - A kind of method of novel formation pore pressure measurement while drilling - Google Patents

A kind of method of novel formation pore pressure measurement while drilling Download PDF

Info

Publication number
CN109236286A
CN109236286A CN201811237166.XA CN201811237166A CN109236286A CN 109236286 A CN109236286 A CN 109236286A CN 201811237166 A CN201811237166 A CN 201811237166A CN 109236286 A CN109236286 A CN 109236286A
Authority
CN
China
Prior art keywords
drilling
formation pore
pressure
pore pressure
bhp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811237166.XA
Other languages
Chinese (zh)
Inventor
范翔宇
郭昭学
李枝林
帅竣天
张千贵
杨玻
杨博仲
马天寿
张�杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201811237166.XA priority Critical patent/CN109236286A/en
Publication of CN109236286A publication Critical patent/CN109236286A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure

Abstract

The present invention relates to oil and gas well drilling engineering field more particularly to a kind of methods of novel formation pore pressure measurement while drilling.Its technical solution are as follows: a kind of method of novel formation pore pressure measurement while drilling after including the following steps: that 1) drill bit enters reservoir, stops drilling, stablizes surface casing pressure value PC, circulating fluid;2) surface casing pressure value P is gradually reducedC, system monitoring wellhead drilling fluid flow is monitored by micrometeor, is determined as micro- overflow when exporting mud flow rate and being greater than normal discharge mean value;3) when micro- overflow occurs in well head, bottom pressure BHP at this time is recorded by down-hole pressure monitoring while drilling system, at this time formation pore pressure PP≈ BHP, takes PP=BHP to get arrive formation pore pressure PP.The present invention provides a kind of method of novel formation pore pressure measurement while drilling easy to operate, measurement accuracy facilitates control, solve the problems, such as that existing formation pore pressure measurement method is complicated for operation, measurement accuracy is difficult to control.

Description

A kind of method of novel formation pore pressure measurement while drilling
Technical field
The present invention relates to oil and gas well drilling engineering field more particularly to a kind of novel formation pore pressure measurement while drillings Method.
Background technique
Formation pore pressure is the important parameter of oil drilling, accurately grasps formation pore pressure, is conducive to adjust drilling well Fluidity energy, it is ensured that safe wellbore construction operation.Currently, Process of Oil Well Drilling mainly has the measurement method of formation pore pressure Three kinds:
The first, it asks standpipe pressure to seek formation pore pressure again by closing well, the deficiency of this method is: boring and meet hydrocarbon show zones After the closing well of position, need that casing pressure is waited to carry out asking pressure operation again when no longer rising.After closing well, gas can constantly slip rising, Casing pressure is set to rise steadily, if the overlong time waited, casing pressure can be very high, and the formation pore pressure acquired is higher, drilling process The protection to oil-gas Layer can be unfavorable for using the drilling fluid or the higher well head pressure of control of higher density;Conversely, wait when Between it is shorter, formation pore pressure upload not exclusively, the formation pore pressure acquired is relatively low, the drilling fluid density that drilling process uses Or the well head pressure of control is relatively low, is unfavorable for the well control safety of later period drillng operation.
The second, using with brill formation pore pressure measuring instrument measurement.Which is after boring chance oil-gas Layer, and tripping in is with brill stratum Pore pressure measuring instrument measures formation pore pressure, can obtain accurate formation pore pressure, but which needs individually It makes a trip and replaces instrument, need to delay the construction operation time, and construction operation is at high cost, the popularization for being unfavorable for the technology is answered With.
Formation pore pressure is measured using logging mode after third, finishing drilling.Which is to pass through logging mode after finishing drilling Measurement formation pore pressure measures after belonging to finishing drilling funeral affairs although formation pore pressure can be obtained accurately, makees to the drilling well of this well Industry is without in all senses.
Number of patent application is that the patent of invention of CN201410778684.8 discloses a kind of determination side of formation pore pressure Method and device, wherein this method comprises: the drilling well of the mud flow rate parameter, back pressure pump intake of acquisition mud pump inlet in real time Flow quantity parameter and drilling fluid return flow;According to the mud flow rate parameter of the mud pump inlet of acquisition, the back pressure The mud flow rate parameter of pump intake and the drilling fluid return flow, calculate down-hole drilling fluids inlet flow rate and return outflow it Between size relation;According to down-hole drilling fluids inlet flow rate and the size relation and formation condition information between outflow are returned, it is real When calculate the difference of formation pore pressure and shaft bottom drilling well liquid columnpressure;According to the formation pore pressure and shaft bottom drilling fluid The difference of head of liquid and known shaft bottom drilling well head of liquid, are calculated formation pore pressure in real time.
But drilling fluid inlet flow rate and the size relation and formation condition information between outflow are returned, it calculates in real time The difference of formation pore pressure and shaft bottom drilling well liquid columnpressure, the error by flow rate conversion pressure is larger, formation pore pressure Computational accuracy it is not easy to control, and the equipment needed is more, much complex.
Summary of the invention
The present invention overcomes the deficiencies in the prior art, provide a kind of easy to operate, measurement accuracy facilitate control novelly The method of layer pore pressure measurement while drilling, solves that existing formation pore pressure measurement method is complicated for operation, measurement accuracy is difficult to The problem of control.
In order to solve the above technical problems, the invention adopts the following technical scheme:
A kind of method of novel formation pore pressure measurement while drilling, includes the following steps:
1) after drill bit enters stratum, stop drilling, stablize surface casing pressure value PC, circulating fluid;Bottom pressure BHP at this time Slightly larger than formation pore pressure PP, it is then not in micro- flooded conditions that formation fluid will not enter in well and return out ground at this time;
2) surface casing pressure value P is gradually decreasedC, system monitoring wellhead drilling fluid flow is monitored by micrometeor, when outlet is bored Well liquid flow is determined as micro- overflow when being greater than normal discharge mean value;Due to bottom pressure BHP=PH+Pf+PC, then with PCSubtract Small, BHP is also gradually reduced, wherein PHFor drilling well liquid columnpressure, PfFor cyclic pressure dissipation, PCFor surface casing pressure;
3) when bottom pressure BHP decreases below formation pore pressure PP, formation fluid start will enter well in and return out Ground when micro- overflow occurs in well head, records bottom pressure BHP at this time by down-hole pressure monitoring while drilling system, at this time earth bore Gap pressure PPSlightly larger than BHP, PP≈ BHP, takes PP=BHP to get arrive formation pore pressure;It can be by controlling surface casing pressure value PC Each reduction amount controls formation pore pressure PPMeasurement accuracy, surface casing pressure value PCEach reduction amount is smaller, formation pore Pressure PPMeasurement accuracy is higher.
As a preferred solution of the present invention, in step 2), when reducing surface casing pressure value, by step-length △ PCEquivalent reduces PC。 Equivalent reduces surface casing pressure value, facilitates control formation pore pressure PPMeasurement accuracy.
As a preferred solution of the present invention, according toConsider some safety factors, 0.01Mpa≤△PC≤ 10.05Mpa, wherein PBHPTo survey bottom pressure, PPPTo predict pore pressure, PAFor bottom pressure and Predict pore pressure average value.Then according to BHP≤PP≤ BHP+ △ Pc, the measurement accuracy of formation pore pressure depend on and △ PC, will △PCControl can correspondingly increase formation pore pressure P in suitable lesser rangePMeasurement accuracy and measurement convenience, improve and survey Amount efficiency.
As a preferred solution of the present invention, in step 2), surface casing pressure value P is reduced every timeCAfterwards, one, interval is late Time t, t >=0.01s are balanced convenient for pressure of the liquid in well in well, are that the hysteresis quality of micro- overflow time of occurrence is reserved Enough time.System comparison inlet and outlet flow curve situation of change is monitored by micrometeor, if inlet and outlet flow curve is basic It remains unchanged, i.e., rate of discharge is substantially equal to inlet flow rate, illustrates that bottom pressure is greater than formation pore pressure, needs further to drop Low surface casing pressure;It is gradually increased if rate of discharge curve deviates entrance discharge curve, illustrates that formation fluid has entered pit shaft, ground Layer pore pressure has been greater than bottom pressure.
As a preferred solution of the present invention, in step 1), when circulating fluid, drilling fluid is at least in circulation of drilling fluid system A cycle is recycled in system, is guaranteed that drilling fluid sufficiently recycles, is guaranteed the uniformity of borehole pressure.
As a preferred solution of the present invention, before step 1), according to prediction formation pore pressure, into before target zone 100 meters of adjustment drilling fluid densities, such as less than given reservoir pressure coefficient 0.02g/cm3
As a preferred solution of the present invention, before step 1), according to formation pressure monitoring and chip morphology is returned out, is applied Surface casing pressure.Under turn on pump loop condition, drilling fluid density is improved, is maintained at according to equal yield density conversion surface casing pressure value Within 10.5Mpa, to ensure that equipment operates within the scope of safe load.
As a preferred solution of the present invention, it after step 3), carries out step 4): continuing cycling through, pass through ground cyclic system The gas of system discharge intrusion pit shaft;Again surface casing pressure value P is improvedC, restore micro- overbalance drilling.
Compared with prior art, the beneficial effects of the present invention are:
1, this method is according to theory: when formation pore pressure and bottom pressure balance, PP≈ BHP=PH+Pf+PC, wherein PP It is bottom pressure, P for formation pore pressure, BHPHFor drilling well liquid columnpressure, PfFor cyclic pressure dissipation, PCFor surface casing pressure, then lead to Cross reduction surface casing pressure PC, so that bottom pressure BHP is close to formation pore pressure PP, can be using bottom pressure BHP as stratum Pore pressure PP, recorded.
Bottom pressure BHP is greater than formation pore pressure P when circulating fluidP, formation fluid will not enter well in and return out Ground is then not in micro- flooded conditions at this time.Gradually decrease surface casing pressure value PC, when bottom pressure BHP decreases below ground Layer pore pressure PP, formation fluid starts to enter in well and return out ground, when micro- overflow occurs in well head.By down-hole pressure with Monitoring system registers bottom pressure BHP at this time is bored, at this time formation pore pressure PPSlightly larger than BHP, PP≈ BHP, takes PP=BHP.It can By controlling surface casing pressure value PCEach reduction amount controls formation pore pressure PPMeasurement accuracy, surface casing pressure value PCEvery time Reduction amount it is smaller, formation pore pressure PPMeasurement accuracy is higher, and therefore, formation pore pressure measurement accuracy facilitates control, can The formation pore pressure value of corresponding precision is obtained as needed.
Method of the invention is easy to operate and precision is high, without closing well and makes a trip, easy to operate, time-consuming short;It is not required to It to be measured using with brill formation pore pressure measuring instrument, it is at low cost, it is more advantageous to field application;It can effectively prevent and control overflow With leakage, avoid underground complicated.
By the precise measurement to bottom pore pressure, adjustment rate of penetration, surface casing pressure value, property of drilling fluid can be facilitated Etc. drilling parameters, thus correspondingly increase drilling efficiency, shorten drilling period.Using the higher bottom leakage pressure of precision to drilling well Parameter is designed, and can also protect oil-gas Layer, extension ability of improving the standard, and is conducive to improve single well productivity.
2, step-length △ P is pressedCEquivalent reduces PC, facilitate control formation pore pressure PPMeasurement accuracy, according to BHP≤PP≤BHP +△PC, control △ PCBe conducive to reduce formation pore pressure PPError range.
3, due to BHP≤PP≤ BHP+ △ Pc, then the measurement accuracy of formation pore pressure depends on and △ PC, then by △ PCControl System can correspondingly increase formation pore pressure P in suitable lesser rangePMeasurement accuracy and measurement convenience, improve measurement effect Rate.
4, surface casing pressure value P is reduced every timeCAfterwards, it is spaced a lagged time t (t >=0.01s), convenient for liquid in well in well Interior pressure is balanced, and is that the hysteresis quality of micro- overflow time of occurrence reserves enough time.
5, when circulating fluid, drilling fluid at least recycles a cycle in drilling-fluid circulation system, guarantees that drilling fluid fills Divide circulation, guarantees the uniformity of borehole pressure.
6, when normal drilling, surface casing pressure value P is setC≤ 10.5Mpa, to ensure that equipment is transported within the scope of safe load Turn.
7, it after formation pore pressure measurement, continues cycling through, the gas of intrusion pit shaft is discharged by the ground circulatory system, really It is smooth to protect later period operation safety.Again surface casing pressure value P is improvedC, restore micro- overbalance drilling, avoiding, which influences normal drilling well, makees Industry.
Specific embodiment
The present invention is described in detail below.
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, is not used to limit The fixed present invention.
Embodiment one
A kind of method of novel formation pore pressure measurement while drilling, includes the following steps:
1) after drill bit enters stratum, stop drilling, stablize surface casing pressure value PC, circulating fluid;Bottom pressure BHP at this time Greater than formation pore pressure PP, it is then not in micro- flooded conditions that formation fluid will not enter in well and return out ground at this time;
2) surface casing pressure value P is gradually decreasedC, system monitoring wellhead drilling fluid flow is monitored by micrometeor, when well head bores Well liquid flow is determined as micro- overflow when being greater than normal discharge mean value;Due to bottom pressure BHP=PH+Pf+PC, then with PCSubtract Small, BHP is also gradually reduced, wherein PHFor drilling well liquid columnpressure, PfFor cyclic pressure dissipation, PCFor surface casing pressure;
3) when bottom pressure BHP decreases below formation pore pressure PP, formation fluid start will enter well in and return out Ground when micro- overflow occurs in well head, records bottom pressure BHP at this time by down-hole pressure monitoring while drilling system, at this time earth bore Gap pressure PPSlightly larger than BHP, PP≈ BHP, takes PP=BHP to get arrive formation pore pressure;It can be by controlling surface casing pressure value PC Each reduction amount controls formation pore pressure PPMeasurement accuracy, surface casing pressure value PCEach reduction amount is smaller, formation pore Pressure PPMeasurement accuracy is higher.
This method is according to theory: when formation pore pressure and bottom pressure balance, PP≈ BHP=PH+Pf+PC, wherein PPFor Formation pore pressure, BHP are bottom pressure, PHFor drilling well liquid columnpressure, PfFor cyclic pressure dissipation, PCFor surface casing pressure, then pass through Reduce surface casing pressure PC, so that bottom pressure BHP is close to formation pore pressure PP, can be using bottom pressure BHP as earth bore Gap pressure PP, recorded.
Bottom pressure BHP is greater than formation pore pressure P when circulating fluidP, formation fluid will not enter well in and return out Ground is then not in micro- flooded conditions at this time.Gradually decrease surface casing pressure value PC, when bottom pressure BHP decreases below ground Layer pore pressure PP, formation fluid starts to enter in well and return out ground, when micro- overflow occurs in well head.By down-hole pressure with Monitoring system registers bottom pressure BHP at this time is bored, at this time formation pore pressure PPSlightly larger than BHP, PP≈ BHP, takes PP=BHP.It can By controlling surface casing pressure value PCEach reduction amount controls formation pore pressure PPMeasurement accuracy, surface casing pressure value PCEvery time Reduction amount it is smaller, formation pore pressure PPMeasurement accuracy is higher, and therefore, formation pore pressure measurement accuracy facilitates control, can The formation pore pressure value of corresponding precision is obtained as needed.
Method of the invention is easy to operate and precision is high, without closing well and makes a trip, easy to operate, time-consuming short;It is not required to It to be measured using with brill formation pore pressure measuring instrument, it is at low cost, it is more advantageous to field application;It can effectively prevent and control overflow With leakage, avoid underground complicated.
By the precise measurement to formation pore pressure, adjustment rate of penetration, surface casing pressure value, property of drilling fluid can be facilitated Etc. drilling parameters, thus correspondingly increase drilling efficiency, shorten drilling period.Using the higher bottom leakage pressure of precision to drilling well Parameter is designed, and can also protect oil-gas Layer, extension ability of improving the standard, and is conducive to improve single well productivity.
Micrometeor monitors system: returning out mud flow rate using the inflow of high-precision mass flowmenter real-time monitoring, flows Amount monitoring range of flow 0.00L/s-60.00L/s, flow measurement precision ± 0.25%, repeatability be better than ± 0.1%, can into Rate of discharge difference precisely judges overflow in the case where being 1L/s, field application shows that the system is overflow than conventional mud pond liquid level monitoring Stream method shifts to an earlier date 5-10min or so.
Down-hole pressure monitoring while drilling system (PWD): being made of ground system and downhole hardware, and downhole hardware for surveying in real time Amount and transmission bottom pressure data, ground system is for return pulse signal and handles and show bottom pressure data, convenient for real When grasp bottom pressure changing rule, realize the control of fine bottom pressure.
Embodiment two
On the basis of example 1, in step 2), when reducing surface casing pressure value, by step-length △ PCEquivalent reduces PC
By step-length △ PCEquivalent reduces PC, facilitate control formation pore pressure PPMeasurement accuracy, according to BHP≤PP≤BHP+ △PC, control △ PCBe conducive to reduce formation pore pressure PPError range.
Embodiment three
On the basis of embodiment one or embodiment two, according toConsider some safety Factor, 0.01Mpa≤△ PC≤ 10.5Mpa, wherein PBHPTo survey bottom pressure, PPPTo predict pore pressure, PAFor shaft bottom pressure Power and prediction pore pressure average value.
Due to BHP≤PP≤ BHP+ △ Pc, then the measurement accuracy of formation pore pressure depends on and △ PC, then by △ PCControl In suitable lesser range, formation pore pressure P can be correspondinglyd increasePMeasurement accuracy and measurement convenience, improve measurement efficiency.
Example IV
On the basis of above-mentioned any one embodiment, in step 2), surface casing pressure value P is reduced every timeCAfterwards, it is spaced one A lagged time t (t >=0.01s), is balanced convenient for pressure of the liquid in well in well, is the lag of micro- overflow time of occurrence Property reserved enough time.System comparison inlet and outlet flow curve situation of change is monitored by micrometeor, if inlet and outlet flow is bent Line is held essentially constant, i.e., rate of discharge is substantially equal to inlet flow rate, illustrate bottom pressure be greater than formation pore pressure, need into One step reduces surface casing pressure;It is gradually increased if rate of discharge curve deviates entrance discharge curve, illustrates that formation fluid has entered Pit shaft, formation pore pressure have been greater than bottom pressure.
Embodiment five
On the basis of above-mentioned any one embodiment, in step 1), when circulating fluid, drilling fluid is at least in drilling well A cycle is recycled in fluid circulation, is guaranteed that drilling fluid sufficiently recycles, is guaranteed the uniformity of borehole pressure.
Embodiment six
On the basis of above-mentioned any one embodiment, before step 1), according to prediction formation pore pressure, it should enter 100 meters of adjustment drilling fluid densities before target zone control surface casing pressure PC≤ 10.5Mpa carries out micro- overbalance controlled pressure drilling.
Embodiment seven
On the basis of above-mentioned any one embodiment, after step 3), carries out step 4): continuing cycling through, pass through ground The gas of face circulatory system discharge intrusion pit shaft, it is ensured that later period operation safety is smooth.Again surface casing pressure value P is improvedC, restore micro- Overbalance drilling, formation pore pressure measurement terminate, and avoid influencing normal drilling operability.

Claims (7)

1. a kind of method of novel formation pore pressure measurement while drilling, which comprises the steps of:
1) after drill bit enters stratum, stop drilling, stablize surface casing pressure value PC, circulating fluid;
2) surface casing pressure value P is gradually decreasedC, system monitoring wellhead drilling fluid flow is monitored by micrometeor, when wellhead drilling fluid stream Amount is determined as micro- overflow when being greater than normal discharge mean value;
3) when micro- overflow occurs in well head, bottom pressure BHP at this time is recorded by down-hole pressure monitoring while drilling system, at this time stratum Pore pressure PP≈ BHP, takes PP=BHP to get arrive formation pore pressure PP
2. a kind of method of novel formation pore pressure measurement while drilling according to claim 1, which is characterized in that in step 2) in, when reducing surface casing pressure value, by step-length △ PCEquivalent reduces PC
3. a kind of method of novel formation pore pressure measurement while drilling according to claim 2, which is characterized in that 0.01Mpa≤△PC≤10.5MPa。
4. a kind of method of novel formation pore pressure measurement while drilling according to claim 1, which is characterized in that in step 2) in, surface casing pressure value P is reduced every timeCAfterwards, one, interval lagged time t, t >=0.01s.
5. a kind of method of novel formation pore pressure measurement while drilling according to claim 1, which is characterized in that in step 1) in, when circulating fluid, drilling fluid at least recycles a cycle in drilling-fluid circulation system.
6. a kind of method of novel formation pore pressure measurement while drilling according to claim 1, which is characterized in that in step 1) before, according to prediction formation pore pressure, into target zone before 100 meters of adjustment drilling fluid densities, control surface casing pressure PC≤ 10.5Mpa carries out micro- overbalance controlled pressure drilling.
7. a kind of method of novel formation pore pressure measurement while drilling, feature described in any one according to claim 1~6 It is, after step 3), carries out step 4): continuing cycling through, the gas of intrusion pit shaft is discharged by the ground circulatory system;Again Improve surface casing pressure value PC, restore micro- overbalance drilling.
CN201811237166.XA 2018-10-23 2018-10-23 A kind of method of novel formation pore pressure measurement while drilling Pending CN109236286A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811237166.XA CN109236286A (en) 2018-10-23 2018-10-23 A kind of method of novel formation pore pressure measurement while drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811237166.XA CN109236286A (en) 2018-10-23 2018-10-23 A kind of method of novel formation pore pressure measurement while drilling

Publications (1)

Publication Number Publication Date
CN109236286A true CN109236286A (en) 2019-01-18

Family

ID=65081498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811237166.XA Pending CN109236286A (en) 2018-10-23 2018-10-23 A kind of method of novel formation pore pressure measurement while drilling

Country Status (1)

Country Link
CN (1) CN109236286A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111927431A (en) * 2020-09-03 2020-11-13 中国石油天然气集团有限公司 Wellbore hydrocarbon concentration monitoring method
CN111927445A (en) * 2020-09-06 2020-11-13 中国石油天然气集团有限公司 Method for obtaining formation pressure while drilling based on fitting logging parameters of while-drilling rock and ore data
CN111927432A (en) * 2020-09-03 2020-11-13 中国石油天然气集团有限公司 Method for controlling stratum carbon dioxide to invade shaft
CN111997597A (en) * 2020-09-03 2020-11-27 中国石油天然气集团有限公司 Method for controlling methane in stratum to invade shaft
CN114991690A (en) * 2021-08-31 2022-09-02 中国石油天然气集团有限公司 Formation pressure test while drilling method and device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071926A (en) * 2010-12-02 2011-05-25 中国石油集团钻井工程技术研究院 Method and device for measuring full-hole annular pressure and method and device for controlling same
CN103573198A (en) * 2012-08-03 2014-02-12 中国石油化工股份有限公司 Well tube pressure and flow rate management system and method
CN106837310A (en) * 2016-12-15 2017-06-13 中法渤海地质服务有限公司 Oil well kick leakage forecasting procedure and device based on mass flow comprehensive detection

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071926A (en) * 2010-12-02 2011-05-25 中国石油集团钻井工程技术研究院 Method and device for measuring full-hole annular pressure and method and device for controlling same
CN103573198A (en) * 2012-08-03 2014-02-12 中国石油化工股份有限公司 Well tube pressure and flow rate management system and method
CN106837310A (en) * 2016-12-15 2017-06-13 中法渤海地质服务有限公司 Oil well kick leakage forecasting procedure and device based on mass flow comprehensive detection

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙海芳等: "川庆钻探工程公司精细控压钻井系统研发及应用", 《钻采工艺》 *
韩烈祥: "CQMPD精细控压钻井技术应用与思考", 《石油钻采工艺》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111927431A (en) * 2020-09-03 2020-11-13 中国石油天然气集团有限公司 Wellbore hydrocarbon concentration monitoring method
CN111927432A (en) * 2020-09-03 2020-11-13 中国石油天然气集团有限公司 Method for controlling stratum carbon dioxide to invade shaft
CN111997597A (en) * 2020-09-03 2020-11-27 中国石油天然气集团有限公司 Method for controlling methane in stratum to invade shaft
CN111927445A (en) * 2020-09-06 2020-11-13 中国石油天然气集团有限公司 Method for obtaining formation pressure while drilling based on fitting logging parameters of while-drilling rock and ore data
CN111927445B (en) * 2020-09-06 2023-10-27 中国石油天然气集团有限公司 Method for acquiring formation pressure while drilling based on rock and mineral data fitting logging parameters while drilling
CN114991690A (en) * 2021-08-31 2022-09-02 中国石油天然气集团有限公司 Formation pressure test while drilling method and device

Similar Documents

Publication Publication Date Title
CN109236286A (en) A kind of method of novel formation pore pressure measurement while drilling
CN100535380C (en) Dynamic annular pressure control apparatus and method
RU2553751C2 (en) Automatic pressure control in discharge line during drilling
CN109184674A (en) A kind of method of novel formation leakage pressure measurement while drilling
CN101139911B (en) Gas injection pressure-stabilizing drilling method
EP2368009B1 (en) Method for determining formation integrity and optimum drilling parameters during drilling
CA2500610C (en) Well control using pressure while drilling measurements
US9677337B2 (en) Testing while fracturing while drilling
CN106014387A (en) Bottom hole pressure real-time prediction and control method
US20120228027A1 (en) Method for characterizing subsurface formations using fluid pressure response during drilling operations
BRPI0413251B1 (en) DRILLING SYSTEM AND METHOD FOR DRILLING A DRILLING HOLE IN A GEOLOGICAL FORMATION
CN108825125A (en) A kind of dynamic variable element kill-job process
CA2031357A1 (en) Method of analysing and controlling a fluid influx during the drilling of a borehole
CN104847287A (en) Balanced pressure drilling pressure control device and method
CN104213906A (en) Drilling shaft pressure calibrating method
CN104481436B (en) Method and system for regulating precision pressure-control well drilling throttle valve
CN203756087U (en) Pressure-balanced drilling pressure controller
CN105178943A (en) Method for correcting well shaft pressure in real time
GB2419424A (en) Method and system for estimating the amount of supercharging in a formation
CN105672997A (en) Monitoring method for formation leakage of drilling fluid
CN107437127B (en) Oil well blowout stop stratum pressure prediction method
CN109242364A (en) A kind of volume displaced evaluating production capacity method of gas well at HTHP simulation wellbore hole
CN110230479A (en) A kind of clean control method of high angle hole oil base drilling fluid wellbore
CN111894561B (en) Stratum characteristic while-drilling interpretation method suitable for underbalanced drilling
CN111622697B (en) Deep-sea double-layer pipe well bottom three-channel pressure control system and control method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190118