CN109236274B - Well selection method for water plugging of high-water-content oil well - Google Patents

Well selection method for water plugging of high-water-content oil well Download PDF

Info

Publication number
CN109236274B
CN109236274B CN201811296419.0A CN201811296419A CN109236274B CN 109236274 B CN109236274 B CN 109236274B CN 201811296419 A CN201811296419 A CN 201811296419A CN 109236274 B CN109236274 B CN 109236274B
Authority
CN
China
Prior art keywords
water
water content
well
oil well
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811296419.0A
Other languages
Chinese (zh)
Other versions
CN109236274A (en
Inventor
吴天江
陆红军
杨海恩
唐凡
陈荣环
张�荣
刘保彻
程辰
薛芳芳
曹荣荣
徐春梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201811296419.0A priority Critical patent/CN109236274B/en
Publication of CN109236274A publication Critical patent/CN109236274A/en
Application granted granted Critical
Publication of CN109236274B publication Critical patent/CN109236274B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Mining

Abstract

The invention discloses a well selection method for water plugging of a high-water-content oil well, which is used for evaluating the water content and the flooding degree of the oil well by adopting a water content rising index and is used for a well selection decision for water plugging of the oil well. Firstly, a data sequence of the water content of the oil well and corresponding time is obtained, a relation curve of the data sequence is drawn, then mathematical calculation is carried out on a relation function of the water content changing along with time, and finally a water content rising index is obtained. The water content rising index reflects the water content and the flooding degree of the oil well and the development degree of the dominant water flow channel in the oil layer area controlled by the oil well. The larger the water content rising index is, the higher the water shutoff priority is. The water content rise index calculation method has the advantages of simple data and convenient calculation, and is strong in pertinence and practicability for water plugging and well selection of the oil well.

Description

Well selection method for water plugging of high-water-content oil well
Technical Field
The invention belongs to the technical field of oil extraction processes, and particularly relates to a well selection method for water plugging of a high-water-content oil well.
Background
In the process of water injection development of an oil field, the water content of an oil well can continuously rise along with time. Due to the existence of reservoir heterogeneity and cracks, the uneven propulsion of injected water is easy to form a dominant water flow channel or suddenly advance along the cracks, which is easy to cause the accelerated rise of the water content of the oil well and even water logging. The water plugging technology of the oil well is an important means for treating the oil well with high water content (the water content is more than or equal to 60 percent) and keeping the yield stable.
In the implementation process of water shutoff of the oil well, scientific well selection is a foundation and is also an important technical link for implementation of water shutoff of the oil well. At present, the technical means of well selection and loop section for water plugging of an oil well is single, and the parameter of the water content of the oil well is used for carrying out intuitive decision on the basis of the production dynamics of a water injection well and the oil well. The higher the water content of the oil well, the more water plugging needs to be implemented. The water content reflects the water control urgency degree of the production face in the current stage of the oil well to a certain extent, reflects the development degree of a dominant water flow channel in the oil layer water injection development process, and has certain adaptability by being used as a water plugging and well selecting basis and water plugging priority judgment. However, the water content used as a decision for selecting a water plugging well has two disadvantages, one is that the water content can only reflect the current condition of the oil well and cannot reflect the dynamic change condition of the oil well along with time since the production is put into operation; and secondly, when the water content of the oil well is the same, the priority level of water plugging is difficult to be quickly judged.
In fact, the change of the water content along with time in the production process of the oil well is complex, the water content is increased, decreased and fluctuated in different periods, and the change amplitude is different.
Disclosure of Invention
The invention aims to provide a well selection method for water plugging of a high-water-content oil well, so as to solve the problems.
In order to achieve the purpose, the invention adopts the following technical scheme:
a well selection method for water plugging of a high water content oil well comprises the following steps:
step 1, the total number of oil wells produced in a target block is M, and water plugging is carried out on N oil wells when T and T are greater than 0 and N is less than M; recording data sequences of water contents and corresponding time of all M oil wells within 0-T production time;
step 2, respectively drawing curves of the M oil well data sequences recorded in the step 1 by taking time as an abscissa and taking water content as an ordinate;
step 3, recording water content according to the curve drawn in the step 2The relation function of the rate and the time is f (t), and t is the production time; respectively calculating the water content rising index F of the oil wells with M portswcA value;
step 4, raising the water content index F of the oil well with M portswcAnd sequencing the values from large to small, and sequentially selecting the corresponding N oil wells, namely the wells for preferably plugging water.
Further, the unit of time T in step 1 is day, month or year.
Further, step 3 water content rising index
Figure BDA0001851297460000021
Wherein the content of the first and second substances,
Figure BDA0001851297460000022
the water content of the oil well is expressed from f within the production time of 0 to T0Rises to fTIs integrated.
Further, f0Water content at 0 time, fTAnd the water content of the oil well at the time T is corresponding to the water content of the oil well.
Further, the water content increase index F in the step 3wcThe significance of (A) is as follows: fwcThe larger the value is, the higher the water content and the flooding degree of the oil well are, the more developed an oil layer water drive dominant channel controlled by the oil well is, and the higher the water plugging priority is; conversely, the lower the water shutoff priority.
Compared with the prior art, the invention has the following technical effects:
according to the method, the area integral is carried out on the relation function of the water content changing along with the time by utilizing the related data of the water content and the time in the production process of the oil well, the corresponding mathematical calculation is carried out, and finally the water content rising index of the oil well is obtained.
Drawings
FIG. 1 is a schematic representation of the water cut of an oil well as the time of production;
FIG. 2W 24-09 well water cut curve;
FIG. 3W 24-07 well water cut curve;
FIG. 4W 20-115 well water cut curve;
FIG. 5X 78-30 well water cut curve;
FIG. 6X 75-30 well water cut curve;
FIG. 7X 74-43 well water cut curve;
FIG. 8X 65-12 well water cut curves.
Detailed Description
The invention is further described below with reference to the accompanying drawings:
referring to fig. 1 to 8, a method for selecting a high water content oil well for water plugging includes the following steps:
step 1, the total number of oil wells produced in a target block is M, and water plugging is carried out on N oil wells when T and T are greater than 0 and N is less than M; recording data sequences of water contents and corresponding time of all M oil wells within 0-T production time;
step 2, respectively drawing curves of the M oil well data sequences recorded in the step 1 by taking time as an abscissa and taking water content as an ordinate;
step 3, recording a relation function of the water content and the time as f ═ f (t) according to the curve drawn in the step 2, and recording t as the production time; respectively calculating the water content rising index F of the oil wells with M portswcA value;
step 4, raising the water content index F of the oil well with M portswcAnd sequencing the values from large to small, and sequentially selecting the corresponding N oil wells, namely the wells for preferably plugging water.
The unit of the time T in the step 1 is day, month or year.
Step 3 Water content rising index
Figure BDA0001851297460000031
Wherein the content of the first and second substances,
Figure BDA0001851297460000032
the water content of the oil well is expressed from f within the production time of 0 to T0Rises to fTIs integrated.
f0Water content at 0 time, fTAnd the water content corresponding to the oil well at the moment T.
Water content increase index F of step 3wcThe significance of is that: fwcThe larger the value is, the higher the water content and the flooding degree of the oil well are, the more developed an oil layer water drive dominant channel controlled by the oil well is, and the higher the water plugging priority is; conversely, the lower the water shutoff priority.
FIG. 1 is a plot of water cut f (T) of a well versus production time T, where the X-axis is time and the Y-axis is water cut. Corresponding water content is from f within 0-T0Rises to fT. For illustration, the following auxiliary lines are required: the crossing time point T is a point a intersected by a straight line (a dotted line) parallel to the Y axis and the water content curve and connected with afT. Is passing through f0The point is taken as a straight line (dotted line) perpendicular to the Y-axis and compared to the straight line aT to the point b.
The water content is from f within 0 to T0Rises to fTIs integrated to obtain
Figure BDA0001851297460000041
The mathematical meaning is expressed as 0f in FIG. 10area enclosed by aT. Calculating f0The value of T is 0f in FIG. 10bT, the rectangular area enclosed by the bT. Then
Figure BDA0001851297460000042
I.e. the area of the shaded portion in fig. 1.
Symbol F for water content ratio rising indexwcAnd then:
Figure BDA0001851297460000043
Fwcthe mathematical meaning of (a) is expressed as the ratio of the shaded area in figure 1 to the time of the production cycle T. During time T, FwcThe larger the value is, the higher the water content and the flooding degree of the oil well are, the more developed an oil layer water drive dominant channel controlled by the oil well is, and the higher the water plugging priority is; inverse directionThe lower the water shutoff priority. According to the big to small pairs FwcAnd sequencing the values, and sequentially corresponding the oil wells which need to be blocked.
Example 1:
in block 3 high water content oil wells, 2 wells were selected as water shutoff implementing wells. And (5) carrying out specific example well selection on the water plugging of the 3 oil wells in the block.
1) The initial water content of the target well w24-09 is 27%, and the water content is 85% after 7 years of production; the initial water content of the target well w24-07 is 32%, and the water content is 84% after 7 years of production; the initial water content of the target well w20-115 is 62%, and the water content after 7 years of production is 85%. The water content data sequence corresponding to the three oil wells is shown in the following table 1.
TABLE 1
Figure BDA0001851297460000044
Figure BDA0001851297460000051
2) And (3) drawing a curve by taking the production time as an abscissa and the water content as an ordinate according to the data sequence recorded in the step 1) in the table 1. The w24-09 well corresponds to FIG. 2, the w24-07 well corresponds to FIG. 3, and the w20-115 well corresponds to FIG. 4.
3) Calculating the water content rising index F according to the curve chart drawn in the step 2)wcThe value is obtained. The ratio of the shaded area to the production time in FIGS. 2, 3 and 4 is the water content increase index
Figure BDA0001851297460000052
Wherein the content of the first and second substances,
Figure BDA0001851297460000053
the initial water content is f to 7 years0Rises to fTIs the integral of the change curve of (a), which is the shaded area in fig. 2, fig. 3 and fig. 4, respectively; f. of0The T value is the rectangular area in the lower portion of the hatching in fig. 2, 3, and 4, respectively. Finally obtaining the F of the w24-09 wellwcF for wells 0.404, w24-07wcF for 0.247, w20-115 wellwcIs 0.101.
4) When the water content is equivalent after 7 years of production (85% for w24-09 well, 84% for w24-07 well and 85% for w20-115 well), F of three wellswcThe values are w24-09, w24-07 and w20-115 from large to small. According to FwcThe meaning of the characterization shows that the higher the water content and the water flooding degree of the w24-09 well and the w24-07 well, the more developed the oil layer water drive dominant channel controlled by the oil well, and the higher the water plugging priority. Therefore, the w24-09 well and the w24-07 well are preferably selected to carry out water plugging.
Example 2
In block 2 high water cut oil wells, 1 well was selected as the water shutoff implementation well. And (5) carrying out specific example well selection on the water plugging of the 2 oil wells in the block.
1) The initial water content of the target well x78-30 is 15%, and the water content is 94% after 18 months of production; the initial water content of the target well x75-30 is 18%, and the water content after 18 months of production is 96%. The water cut data sequence for both wells is shown in table 2 below.
TABLE 2
Figure BDA0001851297460000061
2) And (3) drawing a curve by taking the production time as an abscissa and the water content as an ordinate according to the data sequence recorded in the step 1) in the table 2. The x78-30 wells correspond to FIG. 5 and the x75-30 wells correspond to FIG. 6.
3) Calculating the water content rising index F according to the curve chart drawn in the step 2)wcThe value is obtained. The ratio of the shaded area to the production time in FIGS. 5 and 6 is the water content increase index
Figure BDA0001851297460000071
Wherein the content of the first and second substances,
Figure BDA0001851297460000072
the initial water content is f within 0-18 months0Rises to fTIs the integral of the change curve of (a), which is the shaded area in fig. 5 and 6, respectively; f. of0The T value is the lower part of the shadow in FIG. 5 and FIG. 6, respectivelyA rectangular area. Finally obtaining F of x78-30 wellwcF for 0.442, x75-30 wellswcIs 0.370.
4) When the water content was comparable after 18 months of production (94% for x78-30 wells and 96% for x75-30 wells), F was calculated for both wellswcThe values are ordered sequentially from large to small. F for x78-30 wellwcLarge value, x75-30 well FwcThe value is small. According to FwcThe meaning of the characterization indicates that the water content and the water flooding degree of the x78-30 well are high, the water drive dominant channel of an oil layer controlled by the oil well develops, and the water plugging priority is high. Therefore, the x78-30 well is preferably selected to carry out water plugging.
Example 3:
in block 2 high water cut oil wells, 1 well was selected as the water shutoff implementation well. And (4) carrying out specific example well selection on the water plugging of 2 oil wells in the block.
1) The initial water content of the target well x74-43 is 19%, and the water content is 94% after 5 years of production; the initial water content of the target well x65-12 is 17%, and the water content after 9 years of production is 92%. The water cut data sequence for the two wells is shown in table 3 below.
TABLE 3
Figure BDA0001851297460000073
Figure BDA0001851297460000081
2) The data sequence recorded in the step 1) in the table 3 is plotted by taking the production time as an abscissa and the water content as an ordinate. The x74-43 wells correspond to FIG. 7, and the x65-12 wells correspond to FIG. 8.
3) Calculating the water content rising index F according to the curve chart drawn in the step 2)wcThe value is obtained. The ratio of the shaded area to the production time in FIGS. 7 and 8 is the water content increase index
Figure BDA0001851297460000082
Wherein the content of the first and second substances,
Figure BDA0001851297460000083
the initial water content is f to 5 years and 0 to 9 years0Rises to fTIs the integral of the change curve of (a), which is the shaded area in fig. 7 and fig. 8, respectively; f. of0The T value is the rectangular area in the lower portion of the hatching in fig. 7 and 8, respectively. Finally obtaining F of x74-43 wellwcF for 0.547, x65-12 wellwcIs 0.608.
4) When the water content of the x74-43 well is equivalent to that of the x65-12 well after 5 years of production (94% for the x74-43 well and 92% for the x65-12 well), F of the two wells is calculatedwcThe values are ordered sequentially from large to small. F for x65-12 wellwcLarge value, x74-43 well FwcThe value is small. According to FwcThe meaning of the characterization indicates that the water content and the water flooding degree of the x65-12 well are high, the water drive dominant channel of an oil layer controlled by the oil well develops, and the water plugging priority is high. Therefore, the x65-12 well is preferably selected to implement water shutoff.
The water content rising index calculation method provided by the invention has the advantages that the data required by calculation is convenient to record, the calculation is simple, the operation is strong, the operation is easy, compared with the traditional water content method, the water drive condition of the oil layer and the dynamic change rule of the water content are more accurately reflected by the method, and the method has the characteristics of rapidness, simplicity, convenience and strong practicability when being used for the decision of water plugging and well selection of the oil well.
The above examples are merely illustrative of the present invention and should not be construed as limiting the scope of the invention, which is intended to be covered by the claims and any design similar or equivalent to the scope of the invention.

Claims (4)

1. A well selection method for water plugging of a high-water-content oil well is characterized by comprising the following steps:
step 1, the total number of oil wells produced in a target block is M, and water plugging is carried out on N oil wells when T and T are greater than 0 and N is less than M; recording data sequences of water contents and corresponding time of all M oil wells within 0-T production time;
step 2, respectively drawing curves of the M oil well data sequences recorded in the step 1 by taking time as an abscissa and taking water content as an ordinate;
step 3, recording the water content and the time according to the curve drawn in the step 2The relation function is f ═ f (t), and t is the production time; respectively calculating the water content rising index F of the oil wells with M portswcA value;
step 4, raising the water content index F of the oil well with M portswcSorting the values from large to small, and sequentially selecting corresponding N oil wells, namely wells for preferentially plugging water;
step 3 Water content rising index
Figure FDA0003272201150000011
Wherein the content of the first and second substances,
Figure FDA0003272201150000012
the water content of the oil well is expressed from f within the production time of 0 to T0Rises to fTIs integrated.
2. The well selection method for water plugging of the high water content oil well according to the claim 1, wherein the time T unit in the step 1 is day, month or year.
3. The method for water shutoff of high water content oil well as defined in claim 1, wherein f0Water content at 0 time, fTAnd the water content of the oil well at the time T is corresponding to the water content of the oil well.
4. The well selection method for water plugging of the oil well with high water content according to the claim 1, characterized in that the water content rising index F of the step 3wcThe significance of is that: fwcThe larger the value is, the higher the water content and the flooding degree of the oil well are, the more developed an oil layer water drive dominant channel controlled by the oil well is, and the higher the water plugging priority is; conversely, the lower the water shutoff priority.
CN201811296419.0A 2018-11-01 2018-11-01 Well selection method for water plugging of high-water-content oil well Active CN109236274B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811296419.0A CN109236274B (en) 2018-11-01 2018-11-01 Well selection method for water plugging of high-water-content oil well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811296419.0A CN109236274B (en) 2018-11-01 2018-11-01 Well selection method for water plugging of high-water-content oil well

Publications (2)

Publication Number Publication Date
CN109236274A CN109236274A (en) 2019-01-18
CN109236274B true CN109236274B (en) 2022-05-10

Family

ID=65080408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811296419.0A Active CN109236274B (en) 2018-11-01 2018-11-01 Well selection method for water plugging of high-water-content oil well

Country Status (1)

Country Link
CN (1) CN109236274B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439503B (en) * 2019-08-14 2021-08-10 西安石油大学 Selective water plugging method for fractured low-permeability reservoir multi-section plug oil well
CN110617041B (en) * 2019-10-09 2022-01-04 中国石油天然气股份有限公司 Water injection well water absorption profile adjusting method

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1295422C (en) * 2001-08-27 2007-01-17 石油大学(华东) Edge water scheduling technique for oil field using edge water to displace oil
CN1560428A (en) * 2004-02-25 2005-01-05 石油大学(华东) Disision method of water plugging for bottom-water oil reservoir well
EP2305767A1 (en) * 2009-10-02 2011-04-06 Services Pétroliers Schlumberger Method and compositon to prevent fluid mixing in pipe
CN102720485B (en) * 2012-07-20 2015-04-22 中国石油天然气股份有限公司 Prediction method of water cut increasing rate of water field with medium-high water content
CN103821474B (en) * 2012-11-16 2016-08-10 中国石油天然气股份有限公司 A kind of extra-low-permeability reservoir depth profile control method
CN103075142B (en) * 2013-01-14 2016-06-22 中国石油大学(华东) A kind of waterflooding oil field water blockoff oil well well choosing method
CN103225500B (en) * 2013-05-02 2014-11-19 中国石油大学(华东) Novel water flooding layer logging evaluation method applying three parameters self-consistent iterative algorithm
CN103244087B (en) * 2013-05-21 2016-01-20 中国石油大学(北京) A kind of low-permeability oil deposit profile control and water plugging selects well decision-making technique
EP3152397B1 (en) * 2014-06-09 2020-01-15 Welltracer Technology, LLC Gas lift analysis and troubleshooting
CN104099074B (en) * 2014-06-10 2017-02-15 中国石油集团川庆钻探工程有限公司工程技术研究院 Volume fracturing reconstruction crack plugging agent and water plugging construction method
RU2569101C1 (en) * 2014-12-02 2015-11-20 Открытое акционерное общество "Татнефть" им. В.Д.Шашина Method of decrease of water inflow to horizontal wells
CN105178909A (en) * 2015-09-11 2015-12-23 中国石油天然气股份有限公司 Continuous water-plugging process tubing string and method for horizontal wells
CN107035348B (en) * 2017-05-08 2019-05-07 中国石油天然气股份有限公司 A kind of oil field profile control multiplicity well choosing method and device
CN107676064B (en) * 2017-10-18 2020-05-08 中国石油天然气股份有限公司 Water-drive reservoir water content prediction method and prediction device thereof
CN108518219B (en) * 2018-03-29 2021-08-31 中国石油天然气股份有限公司 Evaluation method for oil field scale extract well selection based on natural energy development

Also Published As

Publication number Publication date
CN109236274A (en) 2019-01-18

Similar Documents

Publication Publication Date Title
CN109236274B (en) Well selection method for water plugging of high-water-content oil well
CN105626006B (en) Low-permeability oil deposit CO2Drive technical limit well space and determine method
CN106932324B (en) A kind of method of determining High water cut sandstone oil reservoir reservoir permeability changing rule
CN108444884B (en) Oil phase relative permeability curve characterization method based on Harris model
CN109958413B (en) Dynamic flow unit dividing method for oil reservoir in ultrahigh water cut period
CN111852417B (en) Rapid inversion method and device for gas channeling channel of carbon dioxide flooding reservoir
CN106761618A (en) For the profile control method for determination of amount and its device of water injection well
CN107965315A (en) A kind of low-permeability oil deposit PRODUCTION FORECASTING METHODS
CN111091293A (en) Dynamic early warning method for oil reservoir development
CN104481473A (en) Gas drive reservoir injection and recovery method and device
CN104747154B (en) Method for using oil displacement efficiency ratios for improving steam drive remaining oil research accuracy
CN203685148U (en) Layered oil production pipe
CN107869334A (en) Multilayer sandstone oil reservoir is in the series of strata restructuring of middle-late waterflooding stage and recovery method
CN105257265A (en) Method for optimizing CO2 injection rate to increase recovery ratio through CO2 displacement of reservoir oil
CN112502677A (en) Water injection development effect evaluation method based on multiple linear regression
CN110424944B (en) Method for establishing oil-water phase-permeation-simulated curve of giant-thick carbonate oil reservoir
CN108119110A (en) A kind of polymer displacement of reservoir oil tech effect prediction method
CN114548568A (en) Gas injection huff-puff parameter collaborative optimization method for tight shale oil reservoir
Li et al. Research and practice of chemical flooding on offshore heavy oilfield in Bohai Bay of China
CN111143994B (en) Optimization method for core oil saturation monitoring point layout mode
CN107869333B (en) Method for quantitatively regulating parameters, regulating flow line and regulating flow line of oil-water well
CN113971395A (en) Oil field production data processing method and device
CN113653474B (en) Method for realizing green development of high-water-content old oil field
CN111322054A (en) Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage
CN118029984A (en) Based on CO2Well pattern optimization method for incomplete miscible displacement characteristics

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant