CN109235616B - 一种尾矿坝排水井拱板安装方法 - Google Patents
一种尾矿坝排水井拱板安装方法 Download PDFInfo
- Publication number
- CN109235616B CN109235616B CN201811363205.0A CN201811363205A CN109235616B CN 109235616 B CN109235616 B CN 109235616B CN 201811363205 A CN201811363205 A CN 201811363205A CN 109235616 B CN109235616 B CN 109235616B
- Authority
- CN
- China
- Prior art keywords
- arch
- arch bar
- slabs
- hooks
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/041—Accessories therefor
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Load-Engaging Elements For Cranes (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
因排水井位于尾矿库库尾,处于水中,无法借助电气设备进行扣件的吊运和安装。拱板通过船运至排水井旁边,将船固定后人工搬运拱板至井架上并用水泥堆砌加高,由于船在水面不稳、拱板为水泥构件沉重,人在船上搬动重物重心不稳,稍有不慎极易造成碰伤、溺水等事故,劳动强度大,安全系数低,而发明所述的一种尾矿库排水井拱板安装方法,人可以直接在船上通过拉导链操作,杜绝了人工在船上搬动拱板带来的危险和劳动强度。
Description
技术领域:
本申请涉及尾矿库排水井技术领域,尤其涉及一种尾矿库排水井拱板安装方法。
背景技术:
尾矿库排水井是重要的防洪设施,在汛期暴雨天气库水位迅速上升时,库内水通过排水井溢流进入排洪隧洞进行排洪,以保证尾矿库的安全运行。日常随着尾矿的堆积,尾矿库水位不断上升,需要将溢流井拱板堆砌加高以防止库内水进入排水井。因排水井位于尾矿库库尾,处于水中,无法借助电气设备进行扣件的吊运和安装。拱板通过船运至排水井旁边,将船固定后人工搬运拱板至井架上并用水泥堆砌加高,由于船在水面不稳、拱板为水泥构件沉重,人在船上搬动重物重心不稳,稍有不慎极易造成碰伤、溺水等事故,劳动强度大,安全系数低。尤其是在汛期,为确保安全,汛期排水井拱板不超过水面1格,约25cm,3-5天需堆砌一次,作业频繁。
发明内容:
为了克服上述的不足,本发明提供了一种尾矿库排水井拱板安装方法。
本发明解决其技术问题所采用的技术方案:
一种尾矿库排水井拱板安装方法,包括如下步骤:
1)首先对排水井的井座进行施工,在井座上对称设置6根与其垂直设置的立柱,井座和立柱均为钢筋混凝土结构;
2)在立柱上每隔2-3米设立一层圈梁,立柱将圈梁分为6部分,这6部分的每段中部均设有挂圈。
3)排水井框架建成后,预制拱板,拱板的内外面均为弧形,6块拱板构成一个圆形,拱板的外侧设有两个对称设置的U型挂耳。
4)在圈梁上表面抹水泥砂浆,将拱板放置在两个立柱之间的圈梁上,拱板与立柱之间的间隙,用M10水泥砂填充,依次进行完成第一层的6个拱板安装;
5)在第一层拱板的上表面铺上砂浆,进行第二层拱板的铺设,按照上述方法,相邻两个圈梁之间拱板铺满,随着尾矿水位的上升,拱板的安装需要船运到排水井口。
6)用拉链穿过圈梁的挂圈,拉链的一端由人拉着,另一端暂时悬空;
7)设置三个挂钩,其中两个为圆形挂钩,一个为L型挂钩,这三个挂钩的长度一致,且一端为环形;
8)用三根长度相同的钢丝绳,两端均用锁扣设置成环形;
9)将步骤8)中的钢丝绳分别套在挂钩的环形端,钢丝绳的另一端被拉链穿过后用锁扣锁紧,这样钢丝绳就与拉链连接好;
10)将圆形的挂钩挂在拱板的U型挂耳上,另一个L型挂钩,从拱板内侧挂在其底面上,这样三个挂钩形成了三角的形状,用于稳固拱板,防止在被拉起的时候,因为拱板重心不稳,造成拱板挂耳所在面朝上,这样在防止的时候还需要额外用力将拱板旋转才能放置,放置好后将拱板与立柱之间的间隙用M10水泥砂填充;
11)由于每部分的圈梁上均对应的设有挂圈,所以没安装一块拱板,需要将拉链换到相应的挂圈上,再重复步骤10),直至拱板安装完毕,达到要求为止。
由于采用如上所述的技术方案,本发明具有如下优越性:
本发明提供的一种尾矿库排水井拱板安装方法,人可以直接在船上通过拉导链操作,杜绝了人工在船上搬动拱板带来的危险和劳动强度。
附图说明:
图1是发明中排水井的俯视图;
图2是排水井的侧视图;
图3是拱板安装在排水井后的示意图;
图中:1、井座;2、立柱;3、圈梁;4、扶梯;5、拱板;6、挂圈;7、拉链;8、挂钩;9、挂耳。
具体实施方式:
通过下面实施例可以更详细的解释本发明,公开本发明的目的旨在保护本发明范围内的一切变化和改进,本发明并不局限于下面的实施例;
结合附图所述的一种尾矿库排水井拱板安装方法,包括如下步骤:
1)首先对排水井的井座1进行施工,在井座1上对称设置6根与其垂直设置的立柱2,井座1和立柱2均为钢筋混凝土结构;
2)在立柱2上每隔2-3米设立一层圈梁3,立柱2将圈梁3分为6部分,这6部分的每段中部均设有挂圈6。
3)排水井框架建成后,预制拱板5,拱板5的内外面均为弧形,6块拱板5构成一个圆形,拱板5的外侧设有两个对称设置的U型挂耳9。
4)在圈梁3上表面抹水泥砂浆,将拱板5放置在两个立柱2之间的圈梁3上,拱板5与立柱2之间的间隙,用M10水泥砂填充,依次进行完成第一层的6个拱板安装;
5)在第一层拱板的上表面铺上砂浆,进行第二层拱板的铺设,按照上述方法,相邻两个圈梁3之间拱板铺满,随着尾矿水位的上升,拱板的安装需要船运到排水井口。
6)用拉链7穿过圈梁的挂圈6,拉链7的一端由人拉着,另一端暂时悬空;
7)设置三个挂钩8,其中两个为圆形挂钩,一个为L型挂钩,这三个挂钩8的长度一致,且一端为环形;
8)用三根长度相同的钢丝绳,两端均用锁扣设置成环形;
9)将步骤8)中的钢丝绳分别套在挂钩8的环形端,钢丝绳的另一端被拉链穿过后用锁扣锁紧,这样钢丝绳就与拉链7连接好;
10)将圆形的挂钩挂在拱板的U型挂耳9上,另一个L型挂钩,从拱板内侧挂在其底面上,这样三个挂钩形成了三角的形状,用于稳固拱板5,防止在被拉起的时候,因为拱板5重心不稳,造成拱板的挂耳所在面朝上,这样在放置的时候还需要额外用力将拱板旋转才能放置,放置好后将拱板5与立柱2之间的间隙用M10水泥砂填充;
11)由于每部分的圈梁上均对应的设有挂圈,所以没安装一块拱板,需要将拉链7换到相应的挂圈6上,再重复步骤10),直至拱板安装完毕,达到要求为止。
以上内容中未细述部份为现有技术,故未做细述。
Claims (1)
1.一种尾矿库排水井拱板安装方法,其特征在于:包括如下步骤:
1)首先对排水井的井座进行施工,在井座上对称设置6根与其垂直设置的立柱,井座和立柱均为钢筋混凝土结构;
2)在立柱上每隔2-3米设立一层圈梁,立柱将圈梁分为6部分,这6部分的每段中部均设有挂圈;
3)排水井框架建成后,预制拱板,拱板的内外面均为弧形,6块拱板构成一个圆形,拱板的外侧设有两个对称设置的U型挂耳;
4)在圈梁上表面抹水泥砂浆,将拱板放置在两个立柱之间的圈梁上,拱板与立柱之间的间隙,用M10水泥砂填充,依次进行完成第一层的6个拱板安装;
5)在第一层拱板的上表面铺上砂浆,进行第二层拱板的铺设,按照上述方法,相邻两个圈梁之间拱板铺满,随着尾矿水位的上升,拱板的安装需要船运到排水井口;
6)用拉链穿过圈梁的挂圈,拉链的一端由人拉着,另一端暂时悬空;
7)设置三个挂钩,其中两个为圆形挂钩,一个为L型挂钩,这三个挂钩的长度一致,且一端为环形;
8)用三根长度相同的钢丝绳,两端均用锁扣设置成环形;
9)将步骤8)中的钢丝绳分别套在挂钩的环形端,钢丝绳的另一端被拉链穿过后用锁扣锁紧,这样钢丝绳就与拉链连接好;
10)将圆形的挂钩挂在拱板的U型挂耳上,另一个L型挂钩,从拱板内侧挂在其底面上,这样三个挂钩形成了三角的形状,用于稳固拱板,防止在被拉起的时候,因为拱板重心不稳,造成拱板的挂耳所在面朝上,这样在放置的时候还需要额外用力将拱板旋转才能放置,放置好后将拱板与立柱之间的间隙用M10水泥砂填充;
11)由于每部分的圈梁上均对应的设有挂圈,所以每安装一块拱板,需要将拉链换到相应的挂圈上,再重复步骤10),直至拱板安装完毕,达到要求为止。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811363205.0A CN109235616B (zh) | 2018-11-16 | 2018-11-16 | 一种尾矿坝排水井拱板安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811363205.0A CN109235616B (zh) | 2018-11-16 | 2018-11-16 | 一种尾矿坝排水井拱板安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109235616A CN109235616A (zh) | 2019-01-18 |
CN109235616B true CN109235616B (zh) | 2021-02-19 |
Family
ID=65074847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811363205.0A Active CN109235616B (zh) | 2018-11-16 | 2018-11-16 | 一种尾矿坝排水井拱板安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109235616B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113863471A (zh) * | 2021-11-04 | 2021-12-31 | 中冶沈勘秦皇岛工程设计研究总院有限公司 | 一种尾矿库过渡排洪方法及系统 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004043736A1 (en) * | 2002-11-12 | 2004-05-27 | Abakay Pty Ltd | Haulage vehicle |
US20050230317A1 (en) * | 2004-04-20 | 2005-10-20 | Environmental Equipment Service Corp. | Watershed runoff drainage device & method |
CN101195460B (zh) * | 2007-12-25 | 2010-06-16 | 中铁四局集团有限公司 | 大型箱梁兜底吊装装置及其方法 |
KR20150048460A (ko) * | 2013-10-28 | 2015-05-07 | 한국가스공사 | 케이블 트렌치 커버 및 그에 따른 제조방법 |
CN203782863U (zh) * | 2014-04-06 | 2014-08-20 | 金建工程设计有限公司 | 一种框架式排水井 |
CN103924653B (zh) * | 2014-04-06 | 2016-03-30 | 金建工程设计有限公司 | 一种框架式排水井及其施工方法 |
CN103924652B (zh) * | 2014-04-06 | 2016-03-30 | 金建工程设计有限公司 | 一种窗口式排水井及其施工方法 |
CN104499560B (zh) * | 2014-12-22 | 2016-06-15 | 洛阳城市建设勘察设计院有限公司 | 组合型雨水渗井及施工方法 |
CN205776670U (zh) * | 2016-04-12 | 2016-12-07 | 中冶长天国际工程有限责任公司 | 一种框架式排水井 |
CN206308787U (zh) * | 2016-12-20 | 2017-07-07 | 金建工程设计有限公司 | 一种框架式排水井拱板安装装置 |
-
2018
- 2018-11-16 CN CN201811363205.0A patent/CN109235616B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN109235616A (zh) | 2019-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103982040A (zh) | 一种超高层建筑施工竖向综合运输装置 | |
CN104652417A (zh) | 一种高性能混凝土波形板桩和成型模具及其生产方法 | |
CN109235616B (zh) | 一种尾矿坝排水井拱板安装方法 | |
CN111501839A (zh) | 一种电缆井 | |
CN106150057B (zh) | 一种分片式液压提升爬架 | |
CN105297639B (zh) | 一种多功能液压提模系统及其施工方法 | |
CN206110635U (zh) | 支腿自动翻转式整体提升电梯井操作平台 | |
CN110106867A (zh) | 铁路车站线间人工挖孔桩施工方法 | |
US10227745B2 (en) | Method for repairing an intake for a storage dam | |
CN211200459U (zh) | 一种管廊原位保护结构 | |
CN211081970U (zh) | 装配式可复用柔性充填挡墙 | |
CN207314692U (zh) | 一种预制楼梯 | |
CN214995396U (zh) | 一种稳定型装配式楼梯 | |
CN110130280B (zh) | 一种悬挑牛腿混凝土下部模板及支撑架拆除方法 | |
CN207597749U (zh) | 一种便于吊装的预制楼梯 | |
CN204849733U (zh) | 一种高性能混凝土波形板桩和成型模具 | |
CN206538951U (zh) | 一种钢架预制楼梯 | |
CN204875663U (zh) | 一种适应于海洋潮汐的浮动码头 | |
CN216765974U (zh) | 用于底部现场施工上部装配式的地下建筑物的下沉施工装置 | |
CN112343066B (zh) | 一种红层泥岩用装配式加筋肋板的安装方法 | |
CN110847201B (zh) | 可快速装拆的沉井临时外壁系统及其施工方法 | |
CN111734481B (zh) | 40m以下溜破系统矿仓衬轨安装施工方法 | |
CN211446884U (zh) | 预制式地下连续墙拼接结构 | |
CN205206868U (zh) | 崖壁逃生通道钢结构锚梁 | |
CN216866121U (zh) | 一种装配式建筑结构楼梯间内临时钢楼梯操作平台装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |