CN109235476A - Deep foundation pit support earth-retaining erection water-proof method and its device - Google Patents

Deep foundation pit support earth-retaining erection water-proof method and its device Download PDF

Info

Publication number
CN109235476A
CN109235476A CN201811306225.4A CN201811306225A CN109235476A CN 109235476 A CN109235476 A CN 109235476A CN 201811306225 A CN201811306225 A CN 201811306225A CN 109235476 A CN109235476 A CN 109235476A
Authority
CN
China
Prior art keywords
slip casting
retaining
earth
foundation pit
plastic pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811306225.4A
Other languages
Chinese (zh)
Inventor
谢天宇
谢宁汉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811306225.4A priority Critical patent/CN109235476A/en
Publication of CN109235476A publication Critical patent/CN109235476A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Deep foundation pit support earth-retaining erection water-proof method of the invention includes step: S1 pulls in several slip casting perforated plastic pipes from the outside of deep basal pit side long side towards the outside of other side long side in parallel, and slip casting perforated plastic pipe is partially formed by a bindiny mechanism therebetween can breakaway-element connection;S2 pulls the drawstring being connected with bindiny mechanism to pull out a part of slip casting perforated plastic pipe of disconnection so that slip casting perforated plastic pipe partially disconnects therebetween to reuse;S3 forms the bottom breast boards of deep basal pit and the earth-retaining core wall of two long sides from the inside compaction grouting in both ends aperture of slip casting perforated plastic pipe institute shape;Vertical sealing earth-retaining perforation slip casting tube core stake is arranged in S4 on the outside of two opposite short sides of deep basal pit, forms the earth-retaining core wall of two short sides of deep basal pit.The method achieve reusing to the comprehensive supporting of deep basal pit and water proof, and to material, cost is reduced.The present invention also proposes a kind of deep foundation pit support earth-retaining water barrier device.

Description

Deep foundation pit support earth-retaining erection water-proof method and its device
Technical field
The present invention relates to foundation pit construction technology, in particular to a kind of deep foundation pit support earth-retaining erection water-proof method and its device.
Background technique
Deep basal pit refer to cutting depth be more than 5 meters (containing 5 meters) or three layers of basement or more (containing three layers) though or depth do not surpass Cross 5 meters, but geological conditions and ambient enviroment and the especially complex engineering of underground utilities.Deep basal pit builds for the basis of building and provides One space enables basis to build operation and carries out according to design in specified position.
Deep foundation pit construction must solve the problems, such as level of ground water, and at this stage, the general method drawn water using well point reduces ground Lower water level is buried a certain number of filter pipes in foundation pit surrounding, is drawn water using pumping equipment, make to be dug that is, before excavation of foundation pit Soil remain drying regime.There are drawbacks for the method that this well point is drawn water, on the one hand, this method belongs to artificial reduction water The method of position expends a large amount of manpowers, and working efficiency is low;On the other hand, this method can not thoroughly solve level of ground water Problem, after well point is drawn water, deep basal pit by underground water it is possible to influenced, to influence whole building.
Summary of the invention
To solve the deficiencies in the prior art, the present invention is directed to propose a kind of deep foundation pit support earth-retaining erection water-proof method and its dress It sets, input cost is low, and energy is permanent, efficiently solves problem of groundwater.
To achieve the above object, deep foundation pit support earth-retaining erection water-proof method of the invention comprises the following steps:
S1: several slip casting perforation are pulled in parallel from the outside of deep basal pit side long side towards the outside of other side long side Plastic tube, slip casting perforated plastic pipe is partially formed by a bindiny mechanism therebetween can breakaway-element connection;
S2: pulling the drawstring being connected with bindiny mechanism, so that slip casting perforated plastic pipe partially disconnects therebetween, pulls out A part of slip casting perforated plastic pipe disconnected is to reuse;
S3: from the inside compaction grouting in both ends aperture of slip casting perforated plastic pipe institute shape, the bottom water fender of deep basal pit is formed With the earth-retaining core wall of two long sides;
S4: vertical sealing earth-retaining perforation slip casting tube core stake is set on the outside of two opposite short sides of deep basal pit, is formed deep The earth-retaining core wall of two short sides of foundation pit.
Further, the material of slip casting is that flyash and quick lime are mixed and stirred by the weight ratio of 100:8.
Further, the material of slip casting be flyash and quick lime, staple fiber mix and stir by the weight ratio of 100:8:1 and At.
Further, when slip casting, retarder is added into injecting paste material, retarder accounts for the 2~8% of flyash weight.
Further, the perforation slip casting tube core stake of vertical sealing earth-retaining is before slip casting perforated plastic pipe carries out slip casting or slip casting After construct.
The present invention also proposes a kind of deep foundation pit support earth-retaining water barrier device, includes slip casting perforated plastic pipe, slip casting perforation modeling Expects pipe includes first part interconnected and second part, and first part and second part are formed by a bindiny mechanism and can be broken Open type connection, bindiny mechanism include the first inner ring, the second inner ring, a pair of of clamp, spring, strut, and the first inner ring, the second inner ring are solid Dingan County is located at the abutting end of first part and second part in the first part and second part, and a pair of of clamp is stuck in the In one inner ring, the second inner ring, spring and strut are arranged between a pair of of clamp, and deep foundation pit support earth-retaining water barrier device also includes one Root drawstring, connect with strut.
Further, the small concave in big bottom that is open is being presented by underground trombone slide in slip casting perforated plastic pipe below ground.
Further, bindiny mechanism is located at the bottom of concave.
Further, strut is supported between a pair of of clamp, and spring is connected between a pair of of clamp, in the assembled condition, Spring is in tensional state.
Further, clamp extends to second part from first part, and includes a horizontal edge and two vertical edges, two vertical edges The two sides of horizontal edge are vertically connected on, in the assembled condition, horizontal edge is contacted with the inner wall of the first inner ring, the second inner ring, two vertical edges Respectively with the first inner ring, the outer end face contact of the second inner ring.
The beneficial effects of the present invention are: first, the middle section of slip casting perforated plastic pipe is formed using bindiny mechanism and can be broken Open type connection, can achieve the purpose that perforate slip casting and the reuse of slip casting perforated plastic pipe, reduce and be constructed into This.Second, injecting paste material, as primary raw material, realizes the waste utilization of flyash using flyash, and staple fiber is added, and is formed High-intensitive, high rigidity injecting paste material, substantially increases the performance of injecting paste material.Third, slip casting perforated plastic pipe and vertical Sealing earth-retaining perforates the stake of slip casting tube core respectively from the two of the two sides of deep basal pit width direction and bottom and deep basal pit length direction Side carries out comprehensive supporting and water proof to deep basal pit, provides reliable and stable retaining support, and thoroughly solve underground water The problem of influencing construction.
Detailed description of the invention
With reference to the accompanying drawing the present invention is made further to describe and illustrate.
Fig. 1 is the construction top view of the deep foundation pit support earth-retaining erection water-proof method of preferred embodiment of the invention.
Fig. 2 is the schematic diagram of the slip casting perforated plastic pipe of deep foundation pit support earth-retaining water barrier device.
Fig. 3 is the schematic diagram of the bindiny mechanism of slip casting perforated plastic pipe.
Specific embodiment
Below in conjunction with attached drawing, pass through the description to the preferred embodiment of the present invention, more clearly and completely elaboration The technical solution of invention.
As depicted in figs. 1 and 2, the deep foundation pit support earth-retaining erection water-proof method of the preferred embodiment of the present invention, includes following step It is rapid:
S1: several notes are pulled in parallel from the outside of outside towards the other side long side 1b of 1 side long side 1a of deep basal pit Perforated plastic pipe 2 is starched, part can breakaway-element connection by a bindiny mechanism 3 formation therebetween for slip casting perforated plastic pipe 2.
Before step S1, the position of deep basal pit 1 is first determined, and measure the range of deep basal pit 1.Deep foundation pit support earth-retaining every Water is constructed in the periphery of deep basal pit 1, to guarantee that the surrounding of deep basal pit 1 is supported and water proof.
As shown in Fig. 2, the small concave in big bottom that is open is being presented in slip casting perforated plastic pipe 2 below ground.In construction, note Slurry outside of the perforated plastic pipe 2 from deep basal pit side long side 1a, the inclined downward towards deep basal pit pull in downwards, then along depth The width direction of foundation pit stretches to other side long side 1b from deep basal pit side long side 1a, finally towards deep basal pit other side long side 1b Outside tilt upward pull-out, thus formed a concave.The both ends of slip casting perforated plastic pipe 2 are located at deep basal pit 1 at it The two sides of width direction W, and be uniformly distributed.
S2: pulling the drawstring 4 being connected with bindiny mechanism 3, so that part disconnects slip casting perforated plastic pipe 2 therebetween, Pull out a part of slip casting perforated plastic pipe of disconnection reversely to reuse.
" reversed " herein refer to pulled in slip casting perforated plastic pipe in step S1 it is contrary.
Preferably, the gap of slip casting perforated plastic pipe 2 is located at the lower section of deep basal pit.
S3: being formed by the inside compaction grouting in aperture from 2 both ends of slip casting perforated plastic pipe, forms the bottom gear of deep basal pit 1 The earth-retaining core wall of native plate and two long sides.
The material of slip casting is mixed and stirred for flyash and quick lime by the weight ratio of 100:8, or is flyash, raw stone Ash and staple fiber are mixed and stirred by the weight ratio of 100:8:1.Flyash intensifies with quick lime generation alkali to react, and is formed high-strength Degree, high hardness material, hardness is greater than the hardness of cement, to enhance the stability of ground.The present invention is made using flyash For the primary raw material of injecting paste material, the waste utilization of flyash is realized, and greatly reduces construction cost.
When slip casting, the retarder of major ingredient flyash weight 2~8% is added in mixing, such as desulfurized gypsum etc. is used for Improve the mobility of injecting paste material.
Grouting amount, slip casting caliber, grouting pressure, Grouting Pipe position, slip casting tube spacing and slip casting time are according to geological conditions Depending on groundwater condition.
S4: vertical sealing earth-retaining perforation slip casting tube core stake 5 is set on the outside of two opposite short sides of deep basal pit 1, is formed The earth-retaining core wall of two short sides of deep basal pit 1.
Vertical sealing earth-retaining perforation slip casting tube core stake 5 can construct before slip casting perforated plastic pipe carries out slip casting, can also be with It constructs after slip casting.Vertically the stake diameter of sealing earth-retaining perforation slip casting tube core stake 5, stake spacing, stake position and stake are long according to geology item Depending on part and groundwater condition.
The injecting paste material of vertical sealing earth-retaining perforation slip casting tube core stake 5 and the injecting paste material of above-mentioned slip casting perforated plastic pipe 2 It is identical.
Excavation of foundation pit is carried out after the completion of slip casting perforated plastic pipe 2 and the perforation construction of slip casting tube core stake 5 of vertical sealing earth-retaining.
As shown in Figure 1 to Figure 3, deep foundation pit support earth-retaining water barrier device of the invention is constructed in the periphery of deep basal pit 1, It includes several slip casting perforated plastic pipes 2, slip casting perforated plastic pipe 2 extends along the width direction of deep basal pit 1, in subsurface Side carries out supporting and water proof to deep basal pit 1 in the small shape in big bottom that is open, from the two sides of 1 width direction of deep basal pit and bottom.
Slip casting perforated plastic pipe 2 includes first part 21 interconnected and second part 22,21 He of first part Second part 22 is formed by a bindiny mechanism 3 can breakaway-element connection.Bindiny mechanism 3 is located at the centre of slip casting perforated plastic pipe 2 Part, further, positioned at the bottom of 2 concave of slip casting perforated plastic pipe.Bindiny mechanism 3 includes the first inner ring 31a, the second inner ring 31b, a pair of of clamp 32, spring 33, strut 34.First inner ring 31a and the second inner ring 31b is respectively and fixedly installed to slip casting perforation modeling In the first part 21 and second part 22 of expects pipe, and it is located at the abutting end of first part 21 and second part 22.Clamp The 32 and first inner ring 31a, the second inner ring 31b cooperate, and are stuck on the first inner ring 31a, the second inner ring 31b, specifically, clamp 32 is Concave is vertically connected on the both ends of horizontal edge 32a comprising a horizontal edge 32a and two vertical edges 32b, two vertical edge 32b.In assembled state Under, clamp 32 extends to second part 22, the inner wall of horizontal edge 32a and the first inner ring 31a, the second inner ring 31b from first part 21 Contact, two vertical edge 32b, two outer end face contacts with the first inner ring 31a, the second inner ring 31b respectively, thus by first part 21 It is connected with second part 22.Strut 34 is supported between a pair of of clamp 32, support force is provided to a pair of of clamp 32, so that one Clamp 32 is separated from each other and is bonded with the first inner ring 31a, the second inner ring 31b.Spring 33 is connected between a pair of of clamp 32, In the assembled condition, spring 32 is in tensional state.
Slip casting perforated plastic pipe 2 also includes a drawstring 4, and one end of drawstring 4 is connect with strut 34, and the other end stretches out slip casting Perforated plastic pipe 2.When slip casting perforated plastic pipe 2 is arranged in below ground, drawstring 4 is pulled, drawstring 4 drives strut 34 to leave card Between son 32, clamp 32 loses the bearing of strut 34, and spring 32 is shunk, so that a pair of clamp 32 connected to it is transported in opposite directions It is dynamic, it is detached from the first inner ring 31a and the second inner ring 31b, thus, first part 21 and second part 22 disconnect.At this point, outward First part 21 or the second part 22 of slip casting perforated plastic pipe 2 are pulled out, to reuse, building materials is saved, reduces construction Cost.
Deep foundation pit support earth-retaining water barrier device also includes vertical sealing earth-retaining perforation slip casting tube core stake 5, is arranged in deep base On the outside of two short sides in hole 1, to form retaining support and core wall on the outside of the short side of deep basal pit 1.
Only preferred embodiments of the present invention will be described for above-mentioned specific embodiment, and not to guarantor of the invention Shield range is defined.Under the premise of not departing from design concept of the present invention and scope, those skilled in the art Provided verbal description, attached drawing various modifications to made by technical solution of the present invention, substitution and improvement according to the present invention, It should belong to protection category of the invention.Protection scope of the present invention is determined by claim.

Claims (10)

1. a kind of deep foundation pit support earth-retaining erection water-proof method, which is characterized in that comprise the following steps:
S1: several slip casting perforated plastics are pulled in parallel from the outside of deep basal pit side long side towards the outside of other side long side Pipe, the slip casting perforated plastic pipe is partially formed by a bindiny mechanism therebetween can breakaway-element connection;
S2: pulling the drawstring being connected with the bindiny mechanism, so that the slip casting perforated plastic pipe partially disconnects therebetween, A part of slip casting perforated plastic pipe of disconnection is pulled out to reuse;
S3: from the inside compaction grouting in both ends aperture of slip casting perforated plastic pipe institute shape, the bottom water fender of deep basal pit is formed With the earth-retaining core wall of two long sides;
S4: vertical sealing earth-retaining perforation slip casting tube core stake is set on the outside of two opposite short sides of deep basal pit, forms deep basal pit Two short sides earth-retaining core wall.
2. deep foundation pit support earth-retaining erection water-proof method as described in claim 1, which is characterized in that the material of the slip casting is fine coal Ash and quick lime are mixed and stirred by the weight ratio of 100:8.
3. deep foundation pit support earth-retaining erection water-proof method as described in claim 1, which is characterized in that the material of the slip casting is fine coal Ash is mixed and stirred with quick lime, staple fiber by the weight ratio of 100:8:1.
4. deep foundation pit support earth-retaining erection water-proof method as claimed in claim 2 or claim 3, which is characterized in that when slip casting, to injecting paste material Middle addition retarder, the retarder account for the 2~8% of flyash weight.
5. deep foundation pit support earth-retaining erection water-proof method as described in claim 1, which is characterized in that the vertical sealing earth-retaining perforation The stake of slip casting tube core is constructed before slip casting perforated plastic pipe carries out slip casting or after slip casting.
6. a kind of deep foundation pit support earth-retaining water barrier device is used for deep foundation pit support earth-retaining erection water-proof method as described in claim 1, Include slip casting perforated plastic pipe, which is characterized in that the slip casting perforated plastic pipe includes first part interconnected and second Part, the first part and second part by a bindiny mechanism formed can breakaway-element connect, the bindiny mechanism includes the One inner ring, the second inner ring, a pair of of clamp, spring, strut, first inner ring, the second inner ring are fixedly mounted on described first Point and second part in, and be located at the abutting end of the first part and second part, the pair of clamp is stuck in described first In inner ring, the second inner ring, the spring and strut are arranged between the pair of clamp, the deep foundation pit support earth-retaining water proof dress It sets also comprising a drawstring, is connect with the strut.
7. deep foundation pit support earth-retaining water barrier device as claimed in claim 6, which is characterized in that the slip casting perforated plastic pipe is logical It crosses underground trombone slide and the small concave in big bottom that is open is being presented below ground.
8. deep foundation pit support earth-retaining water barrier device as claimed in claim 7, which is characterized in that the bindiny mechanism is located at described The bottom of concave.
9. deep foundation pit support earth-retaining water barrier device as claimed in claim 8, which is characterized in that the strut is supported on described one To between clamp, the spring is connected between the pair of clamp, and in the assembled condition, the spring is in tensional state.
10. deep foundation pit support earth-retaining water barrier device as claimed in claim 9, which is characterized in that the clamp is from first part Second part is extended to, and includes a horizontal edge and two vertical edges, described two vertical edges are vertically connected on the two sides of the horizontal edge, Under assembled state, the horizontal edge is contacted with the inner wall of first inner ring, the second inner ring, and described two vertical edges are respectively with described One inner ring, the outer end face contact of the second inner ring.
CN201811306225.4A 2018-11-05 2018-11-05 Deep foundation pit support earth-retaining erection water-proof method and its device Withdrawn CN109235476A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811306225.4A CN109235476A (en) 2018-11-05 2018-11-05 Deep foundation pit support earth-retaining erection water-proof method and its device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811306225.4A CN109235476A (en) 2018-11-05 2018-11-05 Deep foundation pit support earth-retaining erection water-proof method and its device

Publications (1)

Publication Number Publication Date
CN109235476A true CN109235476A (en) 2019-01-18

Family

ID=65076895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811306225.4A Withdrawn CN109235476A (en) 2018-11-05 2018-11-05 Deep foundation pit support earth-retaining erection water-proof method and its device

Country Status (1)

Country Link
CN (1) CN109235476A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113236253A (en) * 2021-05-28 2021-08-10 辽宁科技大学 Remote automatic pipe folding and covering rock grouting method by non-bottom-pillar sublevel caving method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113236253A (en) * 2021-05-28 2021-08-10 辽宁科技大学 Remote automatic pipe folding and covering rock grouting method by non-bottom-pillar sublevel caving method

Similar Documents

Publication Publication Date Title
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN107237329A (en) Grouting device and grouting method
CN209179037U (en) Red Sandstone compound stratum base pit dewatering constructing structure under upper cobble
CN108086945B (en) Layer-penetrating drilling separation type whole-course gas extraction hole sealing device and hole sealing method thereof
CN110630211B (en) Method for blocking overburden mining-induced fracture by ultrasonic in-situ slurry making
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN209162862U (en) Deep foundation pit support earth-retaining water barrier device
CN109056701A (en) Diaphram wall seam is anti-to stream construction method
CN203702070U (en) Coal mine low pumping lane borehole slag-returning sealing apparatus
CN109235476A (en) Deep foundation pit support earth-retaining erection water-proof method and its device
CN103215945A (en) Stereo combined power drainage solidifying system and method for soft soil foundation of heterogeneous field
CN207795147U (en) A kind of layer-through drilling separate type whole process gas drainage hole sealing device
CN103742098A (en) Device and method for sealing hole by using returned slag of layer-through drill hole of low drainage roadway of coal mine
CN213014295U (en) A slip casting fills device for handling abandonment air-raid shelter
CN105569063A (en) Collecting and utilizing method for underground water on periphery of basement retaining wall and water collecting structure
CN206346221U (en) The left and right combined type piping lane built using the pavement underground space
CN102418348A (en) Construction technology of using occlusive pile to form underground continuous wall
CN204418194U (en) For high water-permeability layer of sand foundation pit dewatering device
CN207660353U (en) A kind of upright bar bracing means in earth excavation
CN202323941U (en) Retaining wall device for manual hole digging pile
CN201158823Y (en) Recoverable impact drill steel pipe downcast well
CN201635765U (en) Sand throwing device for gob under highway
CN105155622B (en) Portable feedwater piping deslagging air bleeding valve checks system
CN201047092Y (en) Cascade combined well
CN209398380U (en) A kind of prefabricated Fang Jing for oil/gas drilling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190118

WW01 Invention patent application withdrawn after publication