CN109235458A - 一种采用堆积体注水促滑形成大坝的方法 - Google Patents

一种采用堆积体注水促滑形成大坝的方法 Download PDF

Info

Publication number
CN109235458A
CN109235458A CN201811210073.8A CN201811210073A CN109235458A CN 109235458 A CN109235458 A CN 109235458A CN 201811210073 A CN201811210073 A CN 201811210073A CN 109235458 A CN109235458 A CN 109235458A
Authority
CN
China
Prior art keywords
water
accumulation body
sliding
dam
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811210073.8A
Other languages
English (en)
Other versions
CN109235458B (zh
Inventor
李晓梅
刘其文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Survey and Design Research Institute for Water Resources and Hydropower
Original Assignee
Guizhou Survey and Design Research Institute for Water Resources and Hydropower
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Survey and Design Research Institute for Water Resources and Hydropower filed Critical Guizhou Survey and Design Research Institute for Water Resources and Hydropower
Priority to CN201811210073.8A priority Critical patent/CN109235458B/zh
Publication of CN109235458A publication Critical patent/CN109235458A/zh
Application granted granted Critical
Publication of CN109235458B publication Critical patent/CN109235458B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

本发明公开了一种采用堆积体注水促滑形成大坝的方法,该方法是在堆积体边坡后缘基岩部位开挖安全的注水操作平台,在操作平台上钻孔并在基覆分界面上形成一排注水孔,通过间断注水,促进堆积体边坡向下滑动,滑动后截断部分河道,然后在表面挖槽埋设涵管,在滑动后的后缘基岩部位再次开挖形成注水操作平台,第二次钻孔进行注水操作,进行第二次滑动,同样在表面挖槽埋设涵管进行导流,如此反复,直至注水后边坡基本不滑动为止;剩余部分坝体采用机械分层填筑实现。本发明通过对堆积体边坡顶部注水促滑分期截断部分河床并分期埋设涵管进行导流,剩余部分机械填筑,可以达到既治理堆积体边坡又减少坝体填筑量的效果。具有显著的经济性。

Description

一种采用堆积体注水促滑形成大坝的方法
技术领域
本发明涉及一种采用堆积体注水促滑形成大坝的方法,属于堆积体边坡检测技术领域。
技术背景
目前当地材料坝采用机械分层填筑或者定向爆破形成,机械分层填筑施工速度较慢,定向爆破需要大量爆炸物,因此现有技术依然不够理想。
发明内容
本发明的目的是提供一种采用堆积体注水促滑形成大坝的方法,将堆积体边坡采用注水促滑的方式部分拦截河道后埋管导流实现部分大坝坝体的目的,可以减少大坝填筑量的同时实现堆积体边坡的治理。
本发明的技术方案如下:
堆积体边坡治理难度较大,一般都要大规模的削坡或者采用大规模的支挡措施,而堆积体边坡的主要成分是土石,是当地材料坝的主要材料,堆积体边坡的特点是随着水含量的增加,边坡稳定性会降低。
本发明利用这一特性,首先在堆积体边坡后缘基岩部位开挖安全的注水操作平台,在操作平台上钻孔在基覆分界面上形成一排注水孔,通过间断注水,促进堆积体边坡向下滑动,滑动后截断部分河道,然后在表面挖槽埋设涵管,在滑动后的后缘基岩部位再次开挖形成注水操作平台,第二次钻孔进行注水操作,进行第二次滑动,同样在表面挖槽埋设涵管进行导流,如此反复,直至注水后边坡基本不滑动为止。剩余部分坝体可以采用机械分层填筑实现。在上游继续填筑半透水的反滤层,坝体填筑完成并基本稳定后,表面喷防渗喷层,然后封堵涵管后即可蓄水发挥作用。
本发明通过对堆积体边坡顶部注水促滑分期截断部分河床并分期埋设涵管进行导流,剩余部分机械填筑,可以达到既治理堆积体边坡又减少坝体填筑量的效果。具有显著的经济性。
附图说明
图1为本发明技术原理图;
图2为本发明形成的大坝结构图。
附图标记说明:1-注水操作平台,2-注水孔,3-原始堆积体边坡坡面,4-一次促滑后堆积体边坡坡面,5-二次促滑后堆积体边坡坡面,6-机械堆筑坝体,7-一次促滑后堆积的坝体,8-导流涵管,9-二次促滑后堆积的坝体,10-防渗喷层,11-半透水反滤层。
具体实施方式
以下将结合附图和实施例对本发明进行详细的描述。
本发明是在不稳定滑坡体上通过高强度注水促滑,并发生多次滑动,在一次滑动后在顶部埋设钢管,即使后面几次滑动将管道掩埋,也可以保证导流效果。
具体的,参见图1和图2,首先,是在堆积体边坡后缘基岩部位开挖安全的注水操作平台1,在注水操作平台1上钻孔在基覆分界面上形成一排注水孔2,从图1可以看出,注水孔2的布置方向是从顶部的注水操作平台2倾斜向下,与堆积体滑动方向基本一致,请参见图1中原始堆积体边坡坡面3、一次促滑后堆积体边坡坡面4和二次促滑后堆积体边坡坡面5的走向。
通过注水孔2间断注水,促进堆积体边坡向下滑动,滑动后截断部分河道。再在表面挖槽埋设导流涵管8,在滑动后的后缘基岩部位再次开挖形成注水操作平台1,第二次钻孔形成注水孔2进行注水操作,进行第二次滑动,同样在表面挖槽埋设导流涵管8进行导流,如此反复,直至注水后边坡基本不滑动为止。从图1可以看出,整个过程依次形成一次促滑后堆积的坝体7、二次促滑后堆积的坝体9。
剩余部分坝体可以采用机械分层填筑实现,形成机械填筑坝体6。在上游继续填筑半透水反滤层11,坝体填筑完成并基本稳定后,表面喷防渗喷层10,然后封堵导流涵管8后即可蓄水发挥作用。
以上只是本发明的具体应用范例,本发明还有其他的实施方式,凡采用等同替换或等效变换形成的技术方案,均落在本发明所要求的保护范围之内。

Claims (2)

1.一种采用堆积体注水促滑形成大坝的方法,其特征在于包括如下步骤:在堆积体边坡后缘基岩部位开挖安全的注水操作平台,在操作平台上钻孔并在基覆分界面上形成一排注水孔,通过间断注水,促进堆积体边坡向下滑动,滑动后截断部分河道,然后在表面挖槽埋设涵管,在滑动后的后缘基岩部位再次开挖形成注水操作平台,第二次钻孔进行注水操作,进行第二次滑动,同样在表面挖槽埋设涵管进行导流,如此反复,直至注水后边坡基本不滑动为止;剩余部分坝体采用机械分层填筑实现。
2.根据权利要求1所述的采用堆积体注水促滑形成大坝的方法,其特征在于还包括如下步骤:在上游填筑半透水的反滤层,坝体填筑完成并稳定后,表面喷防渗喷层,然后封堵涵管后即可蓄水发挥作用。
CN201811210073.8A 2018-10-17 2018-10-17 一种采用堆积体注水促滑形成大坝的方法 Active CN109235458B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811210073.8A CN109235458B (zh) 2018-10-17 2018-10-17 一种采用堆积体注水促滑形成大坝的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811210073.8A CN109235458B (zh) 2018-10-17 2018-10-17 一种采用堆积体注水促滑形成大坝的方法

Publications (2)

Publication Number Publication Date
CN109235458A true CN109235458A (zh) 2019-01-18
CN109235458B CN109235458B (zh) 2020-10-23

Family

ID=65053052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811210073.8A Active CN109235458B (zh) 2018-10-17 2018-10-17 一种采用堆积体注水促滑形成大坝的方法

Country Status (1)

Country Link
CN (1) CN109235458B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152489A (zh) * 2021-03-16 2021-07-23 中国电建集团贵阳勘测设计研究院有限公司 一种诱导堆积体滑坡的结构及其施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU935554A1 (ru) * 1980-12-15 1982-06-15 Казахский Филиал Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им. С.Я.Жука Способ борьбы с селевыми потоками гл циального типа
JP4555807B2 (ja) * 2006-09-14 2010-10-06 財団法人ダム技術センター 押え盛土構造
CN205422812U (zh) * 2016-03-14 2016-08-03 沈阳大学 一种废弃矿山斜井回填结构

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU935554A1 (ru) * 1980-12-15 1982-06-15 Казахский Филиал Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им. С.Я.Жука Способ борьбы с селевыми потоками гл циального типа
JP4555807B2 (ja) * 2006-09-14 2010-10-06 財団法人ダム技術センター 押え盛土構造
CN205422812U (zh) * 2016-03-14 2016-08-03 沈阳大学 一种废弃矿山斜井回填结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
符文熹等: ""四川宝兴大板桥堵江滑坡作坝的可行性分析"", 《山地学报 》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152489A (zh) * 2021-03-16 2021-07-23 中国电建集团贵阳勘测设计研究院有限公司 一种诱导堆积体滑坡的结构及其施工方法

Also Published As

Publication number Publication date
CN109235458B (zh) 2020-10-23

Similar Documents

Publication Publication Date Title
CN105464056B (zh) 一种适应土石坝沉降的防渗结构
CN105201001B (zh) 一种岩溶地区大型溶洞的复合防渗结构及其施工方法
CN109024458A (zh) 一种采煤沉陷地景观护岸及水底防渗的构建方法
CN104060619A (zh) 水工心墙堆石坝免围堰的施工方法及结构
CN103015399A (zh) 可液化地基的抗震减灾系统及地基处理方法
CN207228038U (zh) 一种泥石流沟内大型弃渣场的防治体系
CN109235458A (zh) 一种采用堆积体注水促滑形成大坝的方法
CN109812271A (zh) 一种盾构过侵限箱涵的施工方法
CN204551500U (zh) 一种超厚软弱地基中新型围堰
CN203939036U (zh) 一种适用于河道的钢板桩围堰结构
CN106761914B (zh) 一种浅埋煤层矿井沟道洪水溃水水害防治方法
CN102900092B (zh) 深厚覆盖层上修建面板堆石坝的人工复合地基及施工方法
CN208949902U (zh) 一种河床式桥梁承台基坑防渗围堰
CN206829167U (zh) 一种带泄流孔的现浇箱梁支架筏板基础
CN203383193U (zh) 免围堰的心墙堆石坝结构
CN102808394B (zh) 粉细砂深覆盖层超长截流戗堤龙口护底施工方法
CN109440790A (zh) 深卸荷欠稳定岩石高边坡综合加固方法
CN208563267U (zh) 一种土石坝压坡体排水结构
CN212388474U (zh) 一种用于陡峭河谷地形的混凝土重力坝
CN203977385U (zh) 应用于采动区的自适应变形防渗渠道
CN102182867B (zh) 矿浆管道在流沙层地段的敷设方法
CN107130644A (zh) 围堰工程复合土工膜和砾质粘土组合防渗施工方法
Bulatov et al. Computing values of crack characteristics in earth dam
CN205134266U (zh) 一种大库盘水库淤滩冲沙结构
CN105133629B (zh) 一种垃圾填埋场地下水控制系统中止水帷幕的确定方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 550002 No.27 Baoshan South Road, Nanming District, Guiyang City, Guizhou Province

Patentee after: Guizhou water conservancy and Hydropower Survey, design and Research Institute Co.,Ltd.

Address before: 550002 No.27 Baoshan South Road, Nanming District, Guiyang City, Guizhou Province

Patentee before: GUIZHOU SURVEY & DESIGN Research Institute FOR WATER RESOURCES AND HYDROPOWER

CP01 Change in the name or title of a patent holder