CN104060619A - 水工心墙堆石坝免围堰的施工方法及结构 - Google Patents

水工心墙堆石坝免围堰的施工方法及结构 Download PDF

Info

Publication number
CN104060619A
CN104060619A CN201310094022.4A CN201310094022A CN104060619A CN 104060619 A CN104060619 A CN 104060619A CN 201310094022 A CN201310094022 A CN 201310094022A CN 104060619 A CN104060619 A CN 104060619A
Authority
CN
China
Prior art keywords
area
rockfill
upstream
core wall
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310094022.4A
Other languages
English (en)
Other versions
CN104060619B (zh
Inventor
田业军
龙起煌
湛正刚
熊忠明
蔡大咏
童文辉
张合作
程瑞林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN201310094022.4A priority Critical patent/CN104060619B/zh
Publication of CN104060619A publication Critical patent/CN104060619A/zh
Application granted granted Critical
Publication of CN104060619B publication Critical patent/CN104060619B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本发明公开了一种水工心墙堆石坝免围堰的施工方法,该方法包括以下步骤:填筑上游及下游混合抛石区(4)、填筑过渡堆石区(3)、填筑细堆石区(2)、填筑上游大块石护坡区(5)、施工心墙防渗区(1)。本发明还公开了按照该方法施工得到的免围堰的心墙堆石坝结构。本发明不需要在大坝上、下游修筑防渗围堰,不需要对大坝基础进行开挖和处理,减少基坑抽水,提高建筑物开挖石料的利用率,后期不需拆除围堰,简化了施工工艺,节省了工期,节约了工程投资。

Description

水工心墙堆石坝免围堰的施工方法及结构
技术领域
本发明涉及一种水工心墙堆石坝免围堰的施工方法及结构,特别适用于低水头、宽河床的堆石坝结构,属于水利水电工程心墙堆石坝施工技术领域。
背景技术
在水利水电工程中,因灌溉取水或发电等需要,通常要筑坝形成水库,众多在建和拟建的大坝都选择堆石坝。常规的堆石坝都需要在上、下游修筑防渗围堰,待围堰闭气后再将基坑的水抽干,然后进行堆石坝的基础开挖和填筑施工,后期再拆除上、下游围堰,尤其是在水头底且河床宽的大、中型工程,上、下游围堰的填筑、防渗及拆除工程量较大,其工序相对较复杂,工期较长,投资较大。本专利通过一种免围堰的心墙堆石坝结构,可以有效解决以上问题。
发明内容
本发明的目的是提供一种取消上、下游围堰的堆石坝新施工方法及结构,从而无需在上、下游修筑防渗围堰,无需对坝基进行开挖和处理,大量利用建筑物开挖料,以解决在没有围堰保护的情况下直接进行堆石坝填筑施工的技术问题,达到节省工期,节约投资的目的。
为实现本发明的目的,本发明的水工心墙堆石坝免围堰是这样施工的:
1)、填筑上游及下游混合抛石区,直接从河岸向河床逐步抛填建筑物开挖石料至水面线1m以上,直至将河床截断,然后逐步加高,水上部分施工时要求采用机具进行碾压;
2)、填筑过渡堆石区,顺着上游混合抛石区下游坡面及下游混合抛石区上游坡面进行填筑过渡堆石区,水下部分施工时直接进行抛填,水上部分施工时要求采用机具进行碾压;
3)、填筑细堆石区,将人工制备成的细堆石料填筑在过渡堆石料区之间,水下部分施工时直接进行抛填,水上部分施工时要求采用机具进行碾压;
4)、填筑上游大块石护坡区,水下采用直接抛填,水上施工时错缝填筑;
5)、施工心墙防渗区,在坝顶进行钻孔,采用水泥、膨润土等与水拌制成的胶凝材料在钻孔内进行灌注形成防渗幕墙,心墙底部需深入坝基相对不透水层或基岩。
按照前述的方法施工得到的免围堰的心墙堆石坝结构,它由位于坝体中间的倒三角形或梯形结构的细堆石区及该细堆石区上游和下游对称设置的正三角形或梯形结构的混合堆石区组成,细堆石区与其上下游的混合堆石区之间还设有过渡堆石区,在所述细堆石区的中部设有心墙防渗层,在位于上游面的所述混合堆石区的上游坡面设有大块石护坡区。
进一步的,前述的心墙防渗区是采用水泥、膨润土等与水拌制成的胶凝材料在坝顶通过钻孔灌注形成的防渗幕墙。
更进一步的,前述的细堆石区、过渡堆石区均是人工制备成的级配堆石料。
更进一步的,前述的上游及下游混合抛石区可采用建筑物开挖的所有石料。
更进一步的,前述的心墙防渗区与所述细堆石区上、下游的过渡堆石区均不接触。
更进一步的,前述的细堆石区的材料粒径为0~60mm,所述过渡堆石区的材料粒径为0~450mm。
更进一步的,前述的混合抛石区粒径为0~1000mm。
更进一步的,前述的大块石护坡区采用爆破开挖的大块石料,粒径为700~1000mm。
本发明的有益效果:与现有技术相比,由于采用了本发明的三个三角形或梯形堆石区的重合结构及过渡结构,并且设置了大块石护坡区的缓冲结构,与中心的心墙防渗区组合成重重防冲防渗的结构,因此,本发明不需要在大坝上、下游修筑防渗围堰,不需要对大坝基础进行开挖和处理,减少基坑抽水,提高建筑物开挖石料的利用率,后期不需拆除围堰,简化了施工工艺,节省了工期,节约了工程投资。
附图说明
图1是本发明的心墙堆石坝结构示意图。
附图中的标记为:1-心墙防渗区、2-细堆石区、3-过渡堆石区、4-混合抛石区、5-大块石护坡区。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明。
看图1,本发明的免围堰的心墙堆石坝结构是由位于坝体中间的倒三角形或梯形结构的细堆石区2及该细堆石区2上游和下游对称设置的正三角形或梯形结构的混合堆石区4组成,细堆石区2与其上下游的混合堆石区4之间还设有过渡堆石区3,在所述细堆石区2的中部设有心墙防渗层1,在位于上游面的所述混合堆石区4的上游坡面设有大块石护坡区5。
第一步:填筑上游及下游混合抛石区4,施工时直接从河岸向河床逐步抛填建筑物开挖石料至水面线1m以上,直至将河床截断,然后逐步加高,水上部分施工时要求采用机具进行碾压,每铺层厚度不超过1.0m,,满足孔隙率小于22%的要求。具体实施时,可选择先施工上游混合抛石区4,也可选择先施工下游混合抛石区4,也可同时施工上游及下游混合抛石区4。上游抛石区4下游坝脚与下游抛石区4上游坝趾之间需保证5~10m的距离。
第二步:填筑过渡堆石区3,施工时顺着上游混合抛石区4下游坡面及下游混合抛石区4上游坡面进行填筑过渡堆石区3,厚度为2~3m,水下部分施工时直接进行抛填,水上部分施工时要求采用机具进行碾压,每铺层厚度不超过0.5m,压实后满足孔隙率小于22%的要求。
第三步:填筑细堆石区2,施工时将人工制备成的细堆石料填筑在过渡堆石料区3之间,水下部分施工时直接进行抛填,水上部分施工时要求采用机具进行碾压,每铺层厚度不超过1.0m,压实后满足孔隙率小于20%的要求,渗透系数小于10-3~10-4cm/s。
第四步:填筑上游大块石护坡区5,厚度一般为1~2m,水下采用直接抛填,水上施工时要求错缝填筑,外观均匀平整。
第五步:施工心墙防渗区1,施工时在坝顶进行钻孔,采用水泥、膨润土等与水拌制成的胶凝材料在钻孔内进行灌注形成防渗幕墙,防渗幕墙渗透系数要求小于1×10-6cm/s,心墙底部需深入坝基相对不透水层或基岩。
当然,以上只是本发明的具体应用范例,本发明还有其他的实施方式,凡采用等同替换或等效变换形成的实施方式,均落在本发明所要求的保护范围之内。

Claims (9)

1.一种水工心墙堆石坝免围堰的施工方法,其特征在于该方法包括以下步骤:
1)、填筑上游及下游混合抛石区(4),直接从河岸向河床逐步抛填建筑物开挖石料至水面线1m以上,直至将河床截断,然后逐步加高,水上部分施工时要求采用机具进行碾压;
2)、填筑过渡堆石区(3),顺着上游混合抛石区(4)下游坡面及下游混合抛石区(4)上游坡面进行填筑过渡堆石区(3),水下部分施工时直接进行抛填,水上部分施工时要求采用机具进行碾压;
3)、填筑细堆石区(2),将人工制备成的细堆石料填筑在过渡堆石料区(3)之间,水下部分施工时直接进行抛填,水上部分施工时要求采用机具进行碾压;
4)、填筑上游大块石护坡区(5),水下采用直接抛填,水上施工时错缝填筑;
5)、施工心墙防渗区(1),在坝顶进行钻孔,采用水泥、膨润土等与水拌制成的胶凝材料在钻孔内进行灌注形成防渗幕墙,心墙底部需深入坝基相对不透水层或基岩。
2.一种按照权利要求1的方式施工的免围堰的心墙堆石坝结构,其特征在于:它由位于坝体中间的倒三角形或梯形结构的细堆石区(2)及该细堆石区(2)上游和下游对称设置的正三角形或梯形结构的混合堆石区(4)组成,细堆石区(2)与其上下游的混合堆石区(4)之间还设有过渡堆石区(3),在所述细堆石区(2)的中部设有心墙防渗层(1),在位于上游面的所述混合堆石区(4)的上游坡面设有大块石护坡区(5)。
3.根据权利要求2所述的免围堰的心墙堆石坝结构,其特征在于:所述的心墙防渗区(1)是采用水泥、膨润土等与水拌制成的胶凝材料在坝顶通过钻孔灌注形成的防渗幕墙。
4.根据权利要求2所述的免围堰的心墙堆石坝结构,其特征在于:所述的细堆石区(2)、过渡堆石区(3)均是人工制备成的级配堆石料。
5.根据权利要求2所述的免围堰的心墙堆石坝结构,其特征在于:所述的上游及下游混合抛石区(4)可采用建筑物开挖的所有石料。
6.根据权利要求2所述的免围堰的心墙堆石坝结构,其特征在于:所述的心墙防渗区(1)与所述细堆石区(2)上、下游的过渡堆石区(3)均不接触。
7.根据权利要求4所述的免围堰的心墙堆石坝结构,其特征在于:所述细堆石区(2)的材料粒径为0~60mm,所述过渡堆石区(3)的材料粒径为0~450mm。
8.根据权利要求5所述的免围堰的心墙堆石坝结构,其特征在于:所述混合抛石区(4)粒径为0~1000mm。
9.根据权利要求2所述的免围堰的心墙堆石坝结构,其特征在于:所述大块石护坡区(5)采用爆破开挖的大块石料,粒径为700~1000mm。
CN201310094022.4A 2013-03-22 2013-03-22 水工心墙堆石坝免围堰的施工方法及结构 Active CN104060619B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310094022.4A CN104060619B (zh) 2013-03-22 2013-03-22 水工心墙堆石坝免围堰的施工方法及结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310094022.4A CN104060619B (zh) 2013-03-22 2013-03-22 水工心墙堆石坝免围堰的施工方法及结构

Publications (2)

Publication Number Publication Date
CN104060619A true CN104060619A (zh) 2014-09-24
CN104060619B CN104060619B (zh) 2017-02-22

Family

ID=51548533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310094022.4A Active CN104060619B (zh) 2013-03-22 2013-03-22 水工心墙堆石坝免围堰的施工方法及结构

Country Status (1)

Country Link
CN (1) CN104060619B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887769A (zh) * 2016-05-18 2016-08-24 王燏斌 一种大坝施工法
CN105926543A (zh) * 2016-05-18 2016-09-07 王燏斌 一种大坝施工法
CN105951682A (zh) * 2016-05-18 2016-09-21 王燏斌 一种大坝施工法
CN108677980A (zh) * 2018-07-12 2018-10-19 中国电建集团贵阳勘测设计研究院有限公司 一种兼顾交通功能的上游围堰加高方法及结构
CN109026152A (zh) * 2018-08-27 2018-12-18 清华大学 一种包含心墙堆石挡水坝结构的露天煤矿地下水库
CN110363855A (zh) * 2019-07-22 2019-10-22 四川大学 堆石坝透明化建模方法
CN116716852A (zh) * 2023-08-02 2023-09-08 中水君信工程勘察设计有限公司 一种沥青混凝土心墙堆石坝分区结构

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09100524A (ja) * 1995-10-06 1997-04-15 Fujita Corp フィルダムの造成方法
JPH09184126A (ja) * 1995-12-28 1997-07-15 Fujita Corp ロックフィルダムの造成方法
JPH09221735A (ja) * 1996-02-19 1997-08-26 Hazama Gumi Ltd フィルダム堤体の免震構造

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09100524A (ja) * 1995-10-06 1997-04-15 Fujita Corp フィルダムの造成方法
JPH09184126A (ja) * 1995-12-28 1997-07-15 Fujita Corp ロックフィルダムの造成方法
JPH09221735A (ja) * 1996-02-19 1997-08-26 Hazama Gumi Ltd フィルダム堤体の免震構造

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴红梅等: ""水中填土"在港河堵坝工程施工技术的应用", 《上海水务》 *
巍文俊: "瀑布沟砾石土心墙堆石坝施工技术综述", 《水电与新能源》 *
杨超: "世界混凝土面板堆石坝的发展与回顾", 《水利水电科技进展》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887769A (zh) * 2016-05-18 2016-08-24 王燏斌 一种大坝施工法
CN105926543A (zh) * 2016-05-18 2016-09-07 王燏斌 一种大坝施工法
CN105951682A (zh) * 2016-05-18 2016-09-21 王燏斌 一种大坝施工法
CN108677980A (zh) * 2018-07-12 2018-10-19 中国电建集团贵阳勘测设计研究院有限公司 一种兼顾交通功能的上游围堰加高方法及结构
CN108677980B (zh) * 2018-07-12 2023-10-31 中国电建集团贵阳勘测设计研究院有限公司 一种兼顾交通功能的上游围堰加高方法及结构
CN109026152A (zh) * 2018-08-27 2018-12-18 清华大学 一种包含心墙堆石挡水坝结构的露天煤矿地下水库
CN109026152B (zh) * 2018-08-27 2024-04-19 清华大学 一种包含心墙堆石挡水坝结构的露天煤矿地下水库
CN110363855A (zh) * 2019-07-22 2019-10-22 四川大学 堆石坝透明化建模方法
CN116716852A (zh) * 2023-08-02 2023-09-08 中水君信工程勘察设计有限公司 一种沥青混凝土心墙堆石坝分区结构

Also Published As

Publication number Publication date
CN104060619B (zh) 2017-02-22

Similar Documents

Publication Publication Date Title
CN104060619A (zh) 水工心墙堆石坝免围堰的施工方法及结构
CN110820695B (zh) 控制堰塞坝溃坝洪峰流量的结构及方法
CN105464056A (zh) 一种适应土石坝沉降的防渗结构
CN204282308U (zh) 一种适应深厚覆盖层的格宾石笼复合材料坝
CN206204880U (zh) 一种预防河道冲刷的边坡综合治理结构
CN106400744B (zh) 一种预防河道冲刷的边坡综合治理结构及其施工方法
CN205382466U (zh) 一种混凝土面板堆石坝
CN110761307B (zh) 一种土石围堰渗水处理结构及施工方法
CN203383193U (zh) 免围堰的心墙堆石坝结构
CN104594297B (zh) 一种双层面板堆石坝及其施工方法
CN111472326A (zh) 一种深厚覆盖层上修筑重力坝的方法及其结构
CN105569062A (zh) 渗透弱化减排降水法
CN107761668B (zh) 一种滨海滨库造地型护岸结构及其建筑方法
CN208949902U (zh) 一种河床式桥梁承台基坑防渗围堰
CN207228038U (zh) 一种泥石流沟内大型弃渣场的防治体系
CN104695455B (zh) 大流量高水头防冲刷、防渗过水围堰结构及其施工方法
CN204825787U (zh) 石笼挡墙防护结构
CN217974211U (zh) 一种改良柴坝生态保滩结构
CN212388475U (zh) 一种防止混凝土坝岸坡坝段开裂渗漏水的结构
CN204715304U (zh) 一种围堰护坡结构
CN210216332U (zh) 峡谷区水电工程导流洞全洞段检修用挡水坝结构
CN210262945U (zh) 一种胶凝砂砾石支墩坝结构
CN208395782U (zh) 采用动态停淤库容分离泥石流的排导结构
CN112176804A (zh) 一种富水软土区抗沉降保水路基结构及设计方法
CN207567719U (zh) 一种煤矸石废弃料填筑的堤坝

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 550081 Guizhou Province, Guiyang City Lake District Xingqian Road No. 16

Patentee after: POWERCHINA GUIYANG ENGINEERING CORPORATION LIMITED

Address before: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Patentee before: HydroChina Guiyang Engineering Corp.