CN109235209A - A kind of concrete road shoulder construction equipment for cutting - Google Patents

A kind of concrete road shoulder construction equipment for cutting Download PDF

Info

Publication number
CN109235209A
CN109235209A CN201811308997.1A CN201811308997A CN109235209A CN 109235209 A CN109235209 A CN 109235209A CN 201811308997 A CN201811308997 A CN 201811308997A CN 109235209 A CN109235209 A CN 109235209A
Authority
CN
China
Prior art keywords
fixedly connected
cutting
concrete road
road shoulder
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811308997.1A
Other languages
Chinese (zh)
Inventor
吴要亮
刘松
简正彬
曾作良
闫忠志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
Road and Bridge Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical Road and Bridge Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority to CN201811308997.1A priority Critical patent/CN109235209A/en
Publication of CN109235209A publication Critical patent/CN109235209A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
    • E01C19/506Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes for kerbs, gutters or similar structures, e.g. raised portions, median barriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses a kind of concrete road shoulder construction equipments for cutting, it includes holder device, running gear, template system and cloth system, the lower part of the holder device is connected with running gear, template system is equipped in the side of holder device, the side of the template system is equipped with cloth system, is placed with several clump weights on the top of holder device.Template inclination angle can be adjusted by this construction equipment, no pull rod setting can guarantee the concrete road shoulder construction quality of cutting, and construction equipment structure is simple, easy to use, can be improved the hardened verge construction efficiency of cutting, shortens the construction period;By using this equipment construction concrete road shoulder, equipment processing, maintenance cost are low, can be recycled, and save construction cost, achieve good effect.

Description

A kind of concrete road shoulder construction equipment for cutting
Technical field
The present invention relates to a kind of concreting outfits more particularly to a kind of concrete shoulder work for cutting to set It is standby, belong to highway construction equipment technical field.
Background technique
Currently, the construction of the hardened verges such as highway, municipal administration, railway adds pull rod construction using template substantially, pull rod is all made of pre-buried Weld is used for fixed form, needs to open up tie rod hole in template, cause in concreting process, template spillage at tie rod hole And pull rod can not take out, and influence concrete pouring quality;Moreover, template line style not can guarantee, the concrete surface after pouring at " waveform ", seriously affects presentation quality, this is the technical issues that need to address.
Summary of the invention
The technical problem to be solved by the present invention is providing a kind of concrete road shoulder construction equipment for cutting, pass through this Construction equipment can adjust template inclination angle, and no pull rod setting can guarantee the concrete road shoulder construction quality of cutting, solve State there are the problem of.
The technical solution of the present invention is as follows: a kind of concrete road shoulder construction equipment for cutting, it includes holder device (2), the lower part of running gear (3), template system (4) and cloth system (5), the holder device (2) is connected with running gear (3), template system (4) being equipped in the side of holder device (2), the side of the template system (4) is equipped with cloth system (5), Several clump weights (1) is placed on the top of holder device (2).
The holder device (2) includes cross tube (21), sheer pole (26), vertical bar (22), brace (23) and platform board (25), the cross tube (21) and sheer pole (26) are two channel steels being arranged symmetrically or square steel structure, cross tube (21) position In sheer pole (26) top and cross tube (21) it is longer than sheer pole (26), between cross tube (21) and the end of sheer pole (26) Vertical bar (22) are fixedly connected with, are fixedly connected with channel steel (24), upper cross between cross tube (21), sheer pole (26) and vertical bar (22) It is fixedly connected with brace (23) between bar (21) and sheer pole (26), is fixedly connected with platform board above cross tube (21) (25), on the movable placement platform plate (25) of clump weight (1).
The running gear (3) includes traveling wheel (32), adjustment bar (32) and support arm (33), and the traveling wheel (31) is solid Surely it is connected to the both ends bottom of sheer pole (26) and arranges in pairs, can walk on the basis of the shoulder of ditch, the support arm (33) is solid Surely it is connected to the middle part bottom of sheer pole (26) and extend into ditch, be fixedly connected with horizontal adjustment on support arm (34) Bar (32), the both ends of adjustment bar (32) are retractable structure and contact with ditch wall.
The template system (4) includes template (41), telescopic device (42) and connecting plate (43), and the connecting plate (43) is solid Surely it is connected on cross tube (21) and brace (23), the side of the template (41) is fixedly connected with gusset (44), telescopic device (42) both ends are hinged with gusset (44) and connecting plate (43) respectively.
The cloth system (5) includes side plate (54), siding (53) and bottom plate (51), and the bottom plate (51) is in tilted layout, Several supporting legs (52) being placed on wire casing wall are fixedly connected with below bottom plate (51), it is symmetrically solid in the side of bottom plate (51) Surely it is connected with siding (53), the elongated end of siding (53) is fixedly connected with side plate (54), the top and bottom end of the side plate (54) It is contacted respectively with channel steel (24) and template (41).
The adjustment bar (32) includes swivel nut (332), screw rod (333) and support plate (331), and the swivel nut (332) is fixed It is connected on support arm (33), two screw rods (333) is symmetrically arranged in swivel nut (332), in the end hinged support of screw rod (333) Plate (331), support plate (331) are contacted with ditch cell wall.
The telescopic device (42) is oil cylinder structure of hydraulic.
The beneficial effects of the present invention are: compared with prior art, using technical solution of the present invention, passing through this construction equipment Template inclination angle can be adjusted, no pull rod setting can guarantee the concrete road shoulder construction quality of cutting;Construction equipment structure letter It is single, easy to use, it can be improved the hardened verge construction efficiency of cutting, shorten the construction period;By using this equipment construction coagulation Earth shoulder, equipment processing, maintenance cost are low, can be recycled, and save construction cost, improve the efficiency of construction, achieve very Good using effect.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is A partial enlarged view of the present invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below with reference to this specification attached drawing to this hair It is bright to be described in further detail.
Embodiment 1: as shown in attached drawing 1~2, a kind of concrete road shoulder construction equipment for cutting, it includes that branch is rack-mounted (2), running gear (3), template system (4) and cloth system (5) are set, the lower part of the holder device (2) is connected with Running System It unites (3), is equipped with template system (4) in the side of holder device (2), the side of the template system (4) is equipped with cloth system (5), several clump weights (1) is placed on the top of holder device (2).Clump weight (1), use is small in size, the big material of weight It it is fabricated to regular shape, is placed on holder device (2), be used for center rest device (2), overcome and generated when concreting Lateral pressure and buoyancy.
Further, holder device (2) includes cross tube (21), sheer pole (26), vertical bar (22), brace (23) and platform Plate (25), the cross tube (21) and sheer pole (26) are two channel steels being arranged symmetrically or square steel structure, cross tube (21) Positioned at sheer pole (26) top and cross tube (21) it is longer than sheer pole (26), the ends of cross tube (21) and sheer pole (26) it Between be fixedly connected with vertical bar (22), be fixedly connected with channel steel (24) between cross tube (21), sheer pole (26) and vertical bar (22), on It is fixedly connected with brace (23) between cross bar (21) and sheer pole (26), is fixedly connected with platform board above cross tube (21) (25), on the movable placement platform plate (25) of clump weight (1).
Further, running gear (3) includes traveling wheel (32), adjustment bar (32) and support arm (33), the traveling wheel (31) it is fixedly connected on the both ends bottom of sheer pole (26) and arranges in pairs, can walk on the basis of the shoulder of ditch, the support arm (33) it is fixedly connected on the middle part bottom of sheer pole (26) and extend into ditch, be fixedly connected with level on support arm (34) Adjustment bar (32), the both ends of adjustment bar (32) are retractable structure and to contact with ditch wall.Running gear (3) guarantee is set It is standby to be supported on ditch groove top up train and equipment equipment after the completion of concreting fast move, the two of adjustment bar (32) End is supported on water groove inner wall, and equipment in casting process is prevented to be displaced, and adjustment bar (32) is a kind of telescopic device, coagulation Soil can be held out against when pouring, and it is recoverable to adjust bar (32) after the completion of concreting, be ready for equipment walking.
Further, template system (4) includes template (41), telescopic device (42) and connecting plate (43), the connecting plate (43) it is fixedly connected on cross tube (21) and brace (23), the side of the template (41) is fixedly connected with gusset (44), stretches The both ends of compression apparatus (42) are hinged with gusset (44) and connecting plate (43) respectively.Template (41) is inclined by the way that telescopic device 42 is adjustable Rake angle guarantees concreting line style, concrete can be rapidly separated after the completion of concreting, carries out standard for equipment walking It is standby.
Further, cloth system (5) includes side plate (54), siding (53) and bottom plate (51), bottom plate (51) inclination Arrangement, is fixedly connected with several supporting legs (52) being placed on wire casing wall, in the side of bottom plate (51) below bottom plate (51) It is symmetrically fixedly connected with siding (53), the elongated end of siding (53) is fixedly connected with side plate (54), the top of the side plate (54) It is contacted respectively with channel steel (24) and template (41) with bottom end.Cloth system (5) is placed on the top of wire casing and contacts with template 41, There is plug hole between 51 side of bottom plate and side plate 54, the lower section entrance of template 41 can be flowed into for concrete.
Further, adjustment bar (32) includes swivel nut (332), screw rod (333) and support plate (331), the swivel nut (332) It is fixedly connected on support arm (33), is symmetrically arranged with two screw rods (333) in swivel nut (332), it is hinged in the end of screw rod (333) Support plate (331), support plate (331) are contacted with ditch cell wall.
Further, telescopic device (42) is oil cylinder structure of hydraulic.It is hydraulic jack in the present embodiment, it is easy to adjust.
Template inclination angle can be adjusted by this construction equipment, no pull rod setting can guarantee that the concrete road shoulder of cutting is applied Working medium amount;Construction equipment structure is simple, easy to use, can be improved the hardened verge construction efficiency of cutting, shortens the construction period;It is logical It crosses using this equipment construction concrete road shoulder, equipment processing, maintenance cost are low, can be recycled, and save construction cost, improve The efficiency of construction achieves good using effect.
Place is not described in detail by the present invention, is the well-known technique of those skilled in the art of the present technique.Finally, it is stated that the above reality It applies example to be only used to illustrate the technical scheme of the present invention and not to limit it, although having carried out specifically the present invention referring to preferred embodiment It is bright, those skilled in the art should understand that, can with modification or equivalent replacement of the technical solution of the present invention are made, and The objective and range for not departing from technical solution of the present invention, are intended to be within the scope of the claims of the invention.

Claims (7)

1. a kind of concrete road shoulder construction equipment for cutting, it is characterised in that: it includes holder device (2), running gear (3), the lower part of template system (4) and cloth system (5), the holder device (2) is connected with running gear (3), rack-mounted propping up The side for setting (2) is equipped with template system (4), and the side of the template system (4) is equipped with cloth system (5), in holder device (2) Top be placed with several clump weights (1).
2. the concrete road shoulder construction equipment according to claim 1 for cutting, it is characterised in that: the holder device (2) include cross tube (21), sheer pole (26), vertical bar (22), brace (23) and platform board (25), the cross tube (21) and under Cross bar (26) is two channel steels being arranged symmetrically or square steel structure, and cross tube (21) is located at the top of sheer pole (26) and upper cross Bar (21) is longer than sheer pole (26), vertical bar (22) is fixedly connected between cross tube (21) and the end of sheer pole (26), upper It is fixedly connected channel steel (24) between cross bar (21), sheer pole (26) and vertical bar (22), between cross tube (21) and sheer pole (26) Brace (23) are fixedly connected with, are fixedly connected with above cross tube (21) platform board (25), clump weight (1) activity placement platform On plate (25).
3. the concrete road shoulder construction equipment according to claim 1 for cutting, it is characterised in that: the running gear It (3) include that traveling wheel (32), adjustment bar (32) and support arm (33), the traveling wheel (31) are fixedly connected on sheer pole (26) Both ends bottom is simultaneously arranged in pairs, can be walked on the basis of the shoulder of ditch, and the support arm (33) is fixedly connected on sheer pole (26) Middle part bottom is simultaneously extend into ditch, and horizontal adjustment bar (32), the adjustment bar are fixedly connected on support arm (34) (32) both ends are retractable structure and contact with ditch wall.
4. the concrete road shoulder construction equipment according to claim 1 for cutting, it is characterised in that: the template system (4) include template (41), telescopic device (42) and connecting plate (43), the connecting plate (43) be fixedly connected on cross tube (21) and On brace (23), the side of the template (41) is fixedly connected with gusset (44), the both ends of telescopic device (42) respectively with gusset (44) and connecting plate (43) is hinged.
5. the concrete road shoulder construction equipment according to claim 1 for cutting, it is characterised in that: the cloth system It (5) include side plate (54), siding (53) and bottom plate (51), the bottom plate (51) is in tilted layout, fixes in the lower section of bottom plate (51) Several supporting legs (52) being placed on wire casing wall are connected with, are symmetrically fixedly connected with siding (53), wall in the side of bottom plate (51) The elongated end of plate (53) is fixedly connected with side plate (54), the top and bottom end of the side plate (54) respectively with channel steel (24) and template (41) it contacts.
6. the concrete road shoulder construction equipment according to claim 3 for cutting, it is characterised in that: the adjustment bar It (32) include swivel nut (332), screw rod (333) and support plate (331), the swivel nut (332) is fixedly connected on support arm (33), Two screw rods (333) are symmetrically arranged in swivel nut (332), in the end hinged support plate (331) of screw rod (333), support plate (331) It is contacted with ditch cell wall.
7. the concrete road shoulder construction equipment according to claim 3 for cutting, it is characterised in that: the telescopic device It (42) is oil cylinder structure of hydraulic.
CN201811308997.1A 2018-11-05 2018-11-05 A kind of concrete road shoulder construction equipment for cutting Pending CN109235209A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811308997.1A CN109235209A (en) 2018-11-05 2018-11-05 A kind of concrete road shoulder construction equipment for cutting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811308997.1A CN109235209A (en) 2018-11-05 2018-11-05 A kind of concrete road shoulder construction equipment for cutting

Publications (1)

Publication Number Publication Date
CN109235209A true CN109235209A (en) 2019-01-18

Family

ID=65076601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811308997.1A Pending CN109235209A (en) 2018-11-05 2018-11-05 A kind of concrete road shoulder construction equipment for cutting

Country Status (1)

Country Link
CN (1) CN109235209A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158423A (en) * 2019-06-10 2019-08-23 刘凌晓 Cement pavement template fitting machine

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030000991A (en) * 2001-06-28 2003-01-06 동국엔지니어링 주식회사 Furnishing device of the bracket for a bridge construction
CN201610511U (en) * 2010-03-02 2010-10-20 中国水电建设集团路桥工程有限公司 High-speed railway roadbed shoulder concrete construction sliding formwork trolley
CN201943045U (en) * 2010-12-08 2011-08-24 中国水利水电第七工程局有限公司 Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall
CN205638481U (en) * 2016-04-14 2016-10-12 中铁二局集团有限公司 Tunnel invert fills slot and removes mould
CN107313589A (en) * 2017-08-04 2017-11-03 上海建工五建集团有限公司 Outer wall of basement one side steel form support system and its construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030000991A (en) * 2001-06-28 2003-01-06 동국엔지니어링 주식회사 Furnishing device of the bracket for a bridge construction
CN201610511U (en) * 2010-03-02 2010-10-20 中国水电建设集团路桥工程有限公司 High-speed railway roadbed shoulder concrete construction sliding formwork trolley
CN201943045U (en) * 2010-12-08 2011-08-24 中国水利水电第七工程局有限公司 Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall
CN205638481U (en) * 2016-04-14 2016-10-12 中铁二局集团有限公司 Tunnel invert fills slot and removes mould
CN107313589A (en) * 2017-08-04 2017-11-03 上海建工五建集团有限公司 Outer wall of basement one side steel form support system and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158423A (en) * 2019-06-10 2019-08-23 刘凌晓 Cement pavement template fitting machine

Similar Documents

Publication Publication Date Title
CN204825676U (en) A hang basket device that is used for widen bridge floor variable cross section case roof beam cantilever to pour
CN203081466U (en) Integrated moving framework for inverted arch of tunnel
CN206352309U (en) A kind of large span frame piping lane hydraulic internal mold is from walking system device
CN208869891U (en) One kind, which is dragged, holds formula steel rail microadjuster
CN209537993U (en) A kind of concrete road shoulder construction equipment for cutting
CN109235209A (en) A kind of concrete road shoulder construction equipment for cutting
CN205576749U (en) Pontic roof beam structure promotes and rackwork
CN103835239B (en) Adjustable height floats pier
CN205997128U (en) Concrete box girder pour internal model
CN205259074U (en) Basket traveling system is hung to triangle
CN208949882U (en) The adjustable pile foundation steel pile casting positioning device of a kind of diameter
CN106978783B (en) Hanging basket for pouring inclined web type continuous beam cantilever
CN208762878U (en) A kind of mobile formwork for building
CN211397592U (en) Adjustable template of high-speed railway double-track tunnel lining trolley
CN208305334U (en) A kind of box beam precast pedestal with concrete wedge block
CN209537992U (en) A kind of concrete road shoulder constructing device for embankment
CN208090240U (en) A kind of phospecting apparatus fixed frame of adjustable-angle
CN102198691A (en) Hydraulic inner die for segmented box girder
CN109235208A (en) A kind of concrete road shoulder constructing device for embankment
CN205576926U (en) Device is pour to road bed concrete bank protection
CN209368825U (en) A kind of solid mechanical device of stake for building
CN209039928U (en) It is a kind of for the quick levelling device of paver
CN206971267U (en) The mobile device of underground pipe gallery formwork
CN209307859U (en) Assembled adjustable steel tube column bracket
CN209652760U (en) A kind of cast-in-place boom support of post and beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination