CN109224598A - A kind of Environmental Cities polluted water pretreatment apparatus in resource reclaim field - Google Patents
A kind of Environmental Cities polluted water pretreatment apparatus in resource reclaim field Download PDFInfo
- Publication number
- CN109224598A CN109224598A CN201811275112.2A CN201811275112A CN109224598A CN 109224598 A CN109224598 A CN 109224598A CN 201811275112 A CN201811275112 A CN 201811275112A CN 109224598 A CN109224598 A CN 109224598A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- spring
- filter screen
- frame
- filter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D33/00—Filters with filtering elements which move during the filtering operation
- B01D33/35—Filters with filtering elements which move during the filtering operation with multiple filtering elements characterised by their mutual disposition
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D33/00—Filters with filtering elements which move during the filtering operation
- B01D33/44—Regenerating the filter material in the filter
- B01D33/46—Regenerating the filter material in the filter by scrapers, brushes nozzles or the like acting on the cake-side of the filtering element
- B01D33/466—Regenerating the filter material in the filter by scrapers, brushes nozzles or the like acting on the cake-side of the filtering element scrapers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D33/00—Filters with filtering elements which move during the filtering operation
- B01D33/44—Regenerating the filter material in the filter
- B01D33/48—Regenerating the filter material in the filter by flushing, e.g. counter-current air-bumps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D33/00—Filters with filtering elements which move during the filtering operation
- B01D33/80—Accessories
- B01D33/801—Driving means, shaft packing systems or the like
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Filtration Of Liquid (AREA)
Abstract
A kind of Environmental Cities polluted water pretreatment apparatus in resource reclaim field, including frame device, the electric cylinders device being set on the right side of the frame device, the sloping plate unit being contained in the frame device, the anchoring below the sloping plate unit, the filter device below the anchoring, the positioning device being set on the filter device, the purification device below the positioning device, the driving device below the purification device.The present invention can be realized to the sufficiently effective purified treatment of municipal sewage, and clean-up effect is significant, easy to operate;And can be effectively by the granule foreign separating treatment in municipal sewage, impurity-eliminating effect is significant, and can effectively prevent filter opening and be blocked, and guarantees that removal of impurities continues efficiently to carry out;Filter opening can be driven adequately to move simultaneously, so that being filtered into the mode of active filtering purification, so as to significantly improve the efficiency of filtering, save the time.
Description
Technical field
The present invention relates to technical field of resource recovery, pre- more particularly, to a kind of Environmental Cities sewage in resource reclaim field
Processing equipment.
Background technique
With the quickening of urbanization process, the sewage that city generates also gradually increases, it is therefore desirable to purify to it
Processing, to realize the recycling of resource.Existing urban wastewater treatment equipment cannot achieve remove sufficiently effective to sewage and live together
Reason, can not significantly separate the impurity in municipal sewage, impurity-eliminating effect is undesirable, and due in municipal sewage
Grain impurity is more, so that impurity is easy to the filter opening of blocking strainer during sewage purification, so that sewage and impurity can deposit
In the inside of purification device, going on smoothly for purification is influenced, or even the service life of purification device can be shortened, and the mistake of purification
Strainer is stationary in journey, so that mode during being filtered into passively, influences the effect of filtration, purification, waste time.
Therefore, it is necessary to provide the new technical solution of one kind to overcome drawbacks described above.
Summary of the invention
The purpose of the present invention is to provide the environmentally friendly cities that one kind can effectively solve the resource reclaim field of above-mentioned technical problem
City's polluted water pretreatment apparatus.
For the purpose for reaching the present invention, adopt the following technical scheme that
A kind of Environmental Cities polluted water pretreatment apparatus in resource reclaim field, including frame device, it is set to the framework
Electric cylinders device on the right side of device, the sloping plate unit being contained in the frame device, the bracing wire below the sloping plate unit
Device, the filter device below the anchoring, the positioning device being set on the filter device, be located at it is described fixed
Purification device below the device of position, the driving device below the purification device, the frame device include framework, setting
In the sealing block in the framework, the discharge pipe below the framework, the first valve being set on the discharge pipe, position
Exhaust tube on the left of the framework, the second valve, is located at the intracorporal concentration of the frame at the blower being set on the exhaust tube
Frame, the baffle being contained in the collection center, the first filter screen being set on the baffle, the electric cylinders device includes fixing
Plate, the locating piece being set in first electric cylinders, the first catch bar, is located at the first electric cylinders above the fixed plate
The first magnet above first catch bar, the first spring at left and right sides of first catch bar, the inclined plate dress
It sets including inclined plate, the second filter screen above the inclined plate, the locating rack below second filter screen, be set to
Second spring, the first pull ring on the locating rack, the third filter screen above second filter screen, be set to it is described
Water spray frame on third filter screen, the water pump being set on the pipeline, is set to institute at the pipeline being set on the water spray frame
The first support on water pump is stated, the anchoring includes the first fixed link, is set to the first of first fixed link left end
Idler wheel acts against the first bracing wire on first idler wheel, the first posting below first fixed link, is contained in
Third spring in first posting, the second magnet on the left of the third spring are located at the second magnet left side
The first movement bar of side, the second pull ring above the first movement bar, the third below the first movement bar
Pull ring, the second bracing wire being set on the third pull ring, the filter device include filter frame, are located on the left of the filter frame
The 4th spring, the transverse slat above the filter frame, the 4th pull ring being set to below the transverse slat, be contained in the mistake
Scraping plate in filter frame, the second fixed link being contained in the filter frame, is set the 5th spring below the scraping plate
It is placed in the second idler wheel of second fixed link upper end, acts against the third bracing wire on second idler wheel, the positioning device
Including the 6th spring, the first locating rod at left and right sides of the 6th spring, act against liter in first locating rod
It drops frame, the 4th filter screen below the lifting frame, the third fixed link below the 4th filter screen, be located at institute
It states the second posting on the right side of lifting frame, the third magnet being contained in second posting, be located at the third magnet right side
7th spring of side, the 4th fixed link below second posting, the on the left of the 4th fixed link the 8th
Spring, the purification device include the 5th filter screen, the third posting at left and right sides of the 5th filter screen, are located at institute
It states the 5th fixed link above the 5th filter screen, the 9th spring being set in the 5th fixed link, be located at the 5th mistake
The 4th posting below strainer, the tenth spring being contained in the 4th posting, below the tenth spring
Second mobile bar, the 6th filter screen below second mobile bar, the shell being set on the 6th filter screen, position
The 11st spring at left and right sides of second mobile bar and the block that strikes off for being set to the 11st spring end, the drive
Dynamic device include the second electric cylinders, the second support being set on the right side of second electric cylinders, be set in second electric cylinders
Two catch bars, the movable stand being set on described smooth piece, are located at the shifting at smooth piece be set on second catch bar
Restriction bar on the right side of moving frame, the 12nd spring above the movable stand, the link block for being set to the movable stand left end.
Compared with prior art, the invention has the following beneficial effects: the dirts of the Environmental Cities in resource reclaim field of the present invention
Water pretreatment equipment can be realized to the sufficiently effective purified treatment of municipal sewage, and clean-up effect is significant, easy to operate;And it can
With effectively by the granule foreign separating treatment in municipal sewage, impurity-eliminating effect is significant, and can effectively prevent filter opening quilt
Blocking guarantees that removal of impurities continues efficiently to carry out;Filter opening can be driven adequately to move simultaneously, so that being filtered into active filtering purification
Mode save the time so as to significantly improve the efficiency of filtering.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the Environmental Cities polluted water pretreatment apparatus in resource reclaim field of the present invention.
Specific embodiment
It is made below in conjunction with Environmental Cities polluted water pretreatment apparatus of the attached drawing to resource reclaim field of the present invention clearly complete
Whole explanation.
As shown in Figure 1, the Environmental Cities polluted water pretreatment apparatus in resource reclaim field of the present invention includes frame device 1, sets
The electric cylinders device 2 for being placed in 1 right side of the frame device, the sloping plate unit 3 being contained in the frame device 1, be located at it is described tiltedly
The anchoring 4 of 3 lower section of panel assembly, is set on the filter device 5 filter device 5 below the anchoring 4
Positioning device 6, the purification device 7 positioned at 6 lower section of the positioning device, the driving device positioned at 7 lower section of purification device
8。
As shown in Figure 1, the frame device 1 includes framework 11, the sealing block 12 being set in the framework 11, is located at institute
State the discharge pipe 13 below framework 11, the first valve 14 being set on the discharge pipe 13, positioned at 11 left side of framework
Exhaust tube 15, the blower 16 being set on the exhaust tube 15, the second valve 17, the collection center 18 in the framework 11,
The baffle 19 being contained in the collection center 18, the first filter screen 10 being set on the baffle 19.The framework 11 is in sky
The cuboid of the heart, the upper end of the framework 11, which is equipped with opening, makes its longitudinal section in concave shape, and the framework 11, which is equipped with, is located at it
The first through hole 111 of left surface, the second through-hole 112 and third through-hole 113 positioned at its lower surface, second through-hole 112 are in
Rectangular, the first through hole 111 and third through-hole 113 are rounded.The sealing block 12 is in cuboid, and the sealing block 12 accommodates
It is fixedly connected in second through-hole 112 and with the framework 11, the sealing block 12 is made of sealing material.The row
The upper end of outlet pipe 13 is directed at the third through-hole 113 and is fixedly connected with the lower surface of the framework 11, so that the discharge pipe
13 inside is communicated with the inside of the framework 11.First valve 14 is set on the discharge pipe 13, can be used for controlling
Make the flow of water in the discharge pipe 13.The right end of the exhaust tube 15 be aligned the first through hole 111 and with the framework 11
Left surface be fixedly connected so that the inside of the exhaust tube 15 is communicated with the inside of the framework 11.The blower 16 and electricity
Source is (not shown) to be electrically connected, and provides electric energy for it, and the blower 16 is equipped with switch (not shown), facilitate control its open or
Person closes.Second valve 17 can control the flow of gas in the exhaust tube 15.The collection center 18 is in hollow length
The left surface of cube and left and right surface communicates, the collection center 18 is fixedly connected with 11 inner surface of framework, the collection center
18 are located at the right side of the first through hole 111, so that the first through hole 111 is communicated with the inside of the collection center 18.It is described
Baffle 19 is in cuboid, and the baffle 19 is contained in the collection center 18 and is fixedly connected with its inner surface, the baffle 19
It is equipped with the fourth hole 191 through its left and right surface, the fourth hole 191 is square.First filter screen 10 is in length
Cube, first filter screen 10 are contained in the fourth hole 191 and are fixedly connected with the baffle 19.
As shown in Figure 1, the electric cylinders device 2 include fixed plate 21, the first electric cylinders 22 above the fixed plate 21,
It is set to the locating piece 23 in first electric cylinders 22, the first catch bar 24, first above first catch bar 24
Magnet 25, the first spring 26 positioned at 24 left and right sides of the first catch bar.The fixed plate 21 is in cuboid, the fixation
The left end of plate 21 is fixedly connected with the framework 11.First electric cylinders 22 and power supply electric connection (not shown), provide for it
Electric energy, first electric cylinders 22 are equipped with switch (not shown), and facilitating control, it is turned on or off, first electric cylinders 22 with
The fixed plate 21 is fixedly connected.The locating piece 23 is in cuboid, the locating piece 23 and the fixed company of first electric cylinders 22
It connects.First catch bar 24 is in a vertical shape, and the lower end of first catch bar 24 is connect with first electric cylinders 22, so that institute
Stating the first electric cylinders 22 can drive first catch bar 24 to move up and down, and first catch bar 24 runs through the locating piece 23
Upper and lower surface and with its sliding contact, allow first catch bar 24 is stable to move up and down.First magnet
25 are in cuboid and are horizontally arranged, and the upper end of first catch bar 24 is fixedly connected with first magnet 25, and described first
The left end of magnet 25 act against on the right surface of the framework 11 and with its sliding contact.There are two first spring 26 is set,
The lower end of first spring 26 is fixedly connected with the locating piece 23, the upper end of first spring 26 and first magnet
25 are fixedly connected.
As shown in Figure 1, the sloping plate unit 3 includes inclined plate 31, the second filter screen 32 above the inclined plate 31, position
In the locating rack 33 of second filter screen, 32 lower section, the second spring 34 being set on the locating rack 33, the first pull ring 35,
Third filter screen 36 above second filter screen 32, is set the water spray frame 37 being set on the third filter screen 36
The pipeline 38 that is placed on the water spray frame 37, the water pump 39 being set on the pipeline 38, be set on the water pump 39 the
One bracket 30.The inclined plate 31 is oblique, and the upper end of the inclined plate 31 is fixedly connected with 11 inner surface of framework.Described
Two filter screens 32 are in cuboid, second filter screen 32 act against on the inclined plate 31 and with its sliding contact so that described
Second filter screen 32 can horizontally slip on the inclined plate 31.The locating rack 33 is L-shaped, the left end of the locating rack 33 with
Second filter screen 32 is fixedly connected, and the right end of the locating rack 33 is acted against on the lower surface of the inclined plate 31 and slided with it
Dynamic contact, since second filter screen 32 clamps the inclined plate 31 with the locating rack 33, so that second filtering
Net 32 and locating rack 33 stable on the inclined plate 31 can move left and right.The right end and the inclined plate of the second spring 34
31 left end is fixedly connected, and the left end of the second spring 34 is fixedly connected with the locating rack 33, to play support to it
Effect.First pull ring 35 is in semi-annular shape, and the both ends of first pull ring 35 are fixedly connected with the locating rack 33.It is described
Third filter screen 36 is in cuboid, and the third filter screen 36 is oblique, the lower end of the third filter screen 36 and described the
Two filter screens 32 are fixedly connected, and the third filter screen 36 is located at the right side of the collection center 18.The water spray frame 37 is in hollow
Cuboid, the water spray frame 37 is oblique, and the left end of the water spray frame 37 is fixedly connected with the third filter screen 36, institute
It states water spray frame 37 and is equipped with several fifth holes 371 positioned at its lower surface and the 6th through-hole 372 on surface disposed thereon, it is described
Fifth hole 371 be equipped with several and it is rounded, the 6th through-hole 372 is rounded.Described in the lower end aligned of the pipeline 38
It 6th through-hole 372 and is fixedly connected with the upper surface of the water spray frame 37, so that the inside of the pipeline 38 and the water spray frame
37 inside communicates.The water pump 39 and power supply electric connection (not shown), provide electric energy for it, the water pump 39 is equipped with and opens
It closes (not shown), facilitating control, it is turned on or off.One end of the first support 30 is fixedly connected with the water spray frame 37,
The other end of the first support 30 is fixedly connected with the water pump 39.
As shown in Figure 1, the anchoring 4 includes the first fixed link 41, is set to 41 left end of the first fixed link
First idler wheel 42 acts against the first bracing wire 43 on first idler wheel 42, first below first fixed link 41
Posting 44, the third spring 45 being contained in first posting 44, the second magnetic positioned at 45 left side of third spring
Iron 46, first movement bar 47, the second pull ring above the first movement bar 47 positioned at 46 left side of the second magnet
48, the third pull ring 49 below the first movement bar 47, the second bracing wire 40 being set on the third pull ring 49.Institute
The first fixed link 41 is stated in cuboid, the right end of first fixed link 41 is fixedly connected with 11 inner surface of framework, described
The left end of first fixed link 41 is equipped with the first groove.First idler wheel 42 is in cylindrical body, and first idler wheel 42 is contained in institute
It states in the first groove and is pivotally connected with first fixed link 41, allow first idler wheel 42 in first groove
Interior rotation.The upper end of first bracing wire 43 is fixedly connected with first pull ring 35, and first bracing wire 43 passes through described the
It one groove and acts against on first idler wheel 42.First posting 44 is communicated in hollow cuboid and left and right surface,
The right end of first posting 44 is fixedly connected with 11 inner surface of framework.The third spring 45 is contained in described first
In posting 44, the right end of the third spring 45 is fixedly connected with 11 inner surface of framework.Second magnet 46 is in length
Cube, second magnet 46 are contained in first posting 44 and connect with 44 inner surface of the first posting sliding
Touching, second magnet 46 is moved left and right in first posting 44, the left end of the third spring 45 with
The right end of second magnet 46 is fixedly connected, and the right end of second magnet 46 and the left end of first magnet 25 are same
One magnetic pole.The first movement bar 47 is in cuboid, the left end of the right end of the first movement bar 47 and second magnet 46
Be fixedly connected, the right end of the first movement bar 47 be contained in first posting 44 and with its inner surface sliding contact,
Allow the first movement bar 47 is stable to move left and right.Second pull ring 48 is in bending, second pull ring 48
In semi-annular shape, the both ends of second pull ring 48 are fixedly connected with the first movement bar 47, under first bracing wire 43
End is fixedly connected with second pull ring 48.The third pull ring 49 is in semi-annular shape, the both ends of the third pull ring 49 and institute
The lower surface for stating first movement bar 47 is fixedly connected.The upper end of second bracing wire 40 is fixedly connected with the third pull ring 49.
As shown in Figure 1, the filter device 5 include filter frame 51, positioned at 51 left side of the filter frame the 4th spring 52,
Transverse slat 53 above the filter frame 51, is contained in the filtering at the 4th pull ring 54 for being set to 53 lower section of transverse slat
Scraping plate 55 in frame 51, positioned at 55 lower section of scraping plate the 5th spring 56, be contained in the filter frame 51 second
Fixed link 57, the second idler wheel 58 for being set to 57 upper end of the second fixed link act against third on second idler wheel 58
Bracing wire 59.The filter frame 51 is in hollow cuboid, and the upper end of the filter frame 51, which is equipped with opening, makes its longitudinal section in character cut in bas-relief
Shape, the filter frame 51 are equipped with filter opening, can be filtered to sewage.4th spring 52 is equipped with several, and the described 4th
The left end of spring 52 is fixedly connected with 11 inner surface of framework, and the right end and the filter frame 51 of the 4th spring 52 are fixed
Connection, to play a supporting role to it.The transverse slat 53 in cuboid and horizontal positioned, the left end of the transverse slat 53 with it is described
11 inner surface of framework is fixedly connected, the filter frame 51 act against on the lower surface of the transverse slat 53 and with its sliding contact.Institute
The 4th pull ring 54 is stated in semi-annular shape, the both ends of the 4th pull ring 54 are fixedly connected with the transverse slat 53.The scraping plate 55
In cuboid, the scraping plate 55 be contained in the filter frame 51 and with the 51 inner surface sliding contact of filter frame so that
The scraping plate 55 can move up and down in the filter frame 51, to strike off the impurity on 51 inner cavity side of filter frame, prevent
Only its block filter frame 51 filter opening, the scraping plate 55 be equipped with through its upper and lower surface the 7th through-hole 551, the described 7th
Through-hole 551 is square.5th spring 56 is equipped with several, table in the lower end of the 5th spring 56 and the filter frame 51
Face is fixedly connected, and the upper end of the 5th spring 56 is fixedly connected with the scraping plate 55, to play a supporting role to it.Institute
The second fixed link 57 is stated in cuboid, the lower end of second fixed link 57 is fixedly connected with 51 inner surface of filter frame, institute
The upper end for stating the second fixed link 57 is equipped with the second groove.Second idler wheel 58 is in cylindrical body, and second idler wheel 58 is contained in
It is pivotally connected in second groove and with second fixed link 57, allows second idler wheel 58 recessed described second
Rotation in slot.The left end of the third bracing wire 59 is fixedly connected with the 4th pull ring 54, and the third bracing wire 59 passes through described
It 7th through-hole 551 and the second groove and acts against on second idler wheel 58, the right end of the third pull ring 59 strikes off with described
The lower surface of plate 55 is fixedly connected.
As shown in Figure 1, the positioning device 6 includes the 6th spring 61, positioned at the of 61 left and right sides of the 6th spring
A positioning rod 62 acts against the lifting frame 63 in first locating rod 62, the 4th filtering positioned at 63 lower section of lifting frame
Net 64, the third fixed link 65 positioned at 64 lower section of the 4th filter screen, the second posting positioned at 63 right side of lifting frame
66, the third magnet 67 in second posting 66, the 7th spring 68 positioned at 67 right side of third magnet, position are contained in
The 4th fixed link 69 in 66 lower section of the second posting, the 8th spring 60 positioned at 69 left side of the 4th fixed link.Institute
The 6th spring 61 is stated equipped with several, the upper end of the 6th spring 61 is fixedly connected with the filter frame 51.Described first is fixed
There are two position bar 62 is set, first locating rod 62 is in cuboid, the upper end of first locating rod 62 and the filter frame 51
Lower surface be fixedly connected.The lifting frame 63 is communicated in hollow cuboid and upper and lower surface, the lower end of the filter frame 51
Be contained in the lifting frame 63 and with its inner surface sliding contact, the side of first locating rod 62 acts against the lifting
On 63 inner surface of frame and with its sliding contact, allow the lifting frame 63 be stable and move up and down.4th filter screen
64 be in cuboid, and the lower surface of the lifting frame 63 is fixedly connected with the upper surface of the 4th filter screen 64, the 4th mistake
Strainer 64 is equipped with filter opening, and to be filtered to sewage, the lower end of the 6th spring 61 and the 4th filter screen 64 are solid
Fixed connection, to play a supporting role to it.The third fixed link 65 be in cuboid, the upper end of the third fixed link 65 with
4th filter screen 64 is fixedly connected.Second posting 66 is in hollow cuboid and left and right surface communicates, and described the
The right surface of two postings 66 is fixedly connected with 11 inner surface of framework.The third magnet 67 is in cuboid, the third
The left end of magnet 67 is fixedly connected with the filter frame 51, and the right end of the third magnet 67 is contained in second posting 66
It is interior and with its inner surface sliding contact, the third magnet 67 is moved left and right in second posting 66, institute
The left end of the right end and first magnet 25 of stating third magnet 67 is same magnetic pole.7th spring 68 is contained in described
In two postings 66, the left end of the 7th spring 68 is fixedly connected with the right end of the third magnet 67, the 7th spring
68 right end is fixedly connected with 11 inner surface of framework.4th fixed link 69 in cuboid and it is vertical place, described the
The upper end of four fixed links 69 is fixedly connected with second posting 66.The right end of 8th spring 60 and the described 4th is fixed
Bar 69 is fixedly connected, and the left end of the 8th spring 60 is fixedly connected with the filter frame 51.
As shown in Figure 1, the purification device 7 includes the 5th filter screen 71, is located at 71 left and right sides of the 5th filter screen
Third posting 72, the 5th fixed link 73 above the 5th filter screen 71, be set to the 5th fixed link 73
On the 9th spring 74, positioned at 71 lower section of the 5th filter screen the 4th posting 75, be contained in the 4th posting 75
Interior the tenth spring 76, positioned at 76 lower section of the tenth spring the second mobile bar 77, be located at 77 lower section of the second mobile bar
The 6th filter screen 78, be set on the 6th filter screen 78 shell 79, be located at second mobile bar, 77 left and right sides
The 11st spring 701 and be set to 701 end of the 11st spring strike off block 70.5th filter screen 71 is in rectangular
Body, the 5th filter screen 71 be contained in the framework 11 and with the 11 inner surface sliding contact of framework.The third is fixed
Position frame 72 is in hollow cuboid, and the third posting 72 sets there are two and is located at the left and right of the 5th filter screen 71
Two sides, one end of the third posting 72 are fixedly connected with 11 inner surface of framework, one end of the 5th filter screen 71
It is contained in the third posting 72 and with its inner surface sliding contact, the left side for allowing the 5th filter screen 71 stable
It moves right, and third posting 72 can strike off the impurity on the 5th filter screen 71.5th fixed link 73 is in length
The lower end of cube, the 5th fixed link 73 is fixedly connected with the 5th filter screen 71.The right end of 9th spring 74 with
5th fixed link 73 is fixedly connected, and the left end of the 9th spring 74 is fixedly connected with the third fixed link 65.It is described
4th posting 75 is communicated in hollow cuboid and upper and lower surface, the upper end of the 4th posting 75 and the 5th filtering
The lower surface of net 71 is fixedly connected.Tenth spring 76 is contained in the 4th posting 75, the tenth spring 76
Upper end is fixedly connected with the 5th filter screen 71.Second mobile bar 77 be in cuboid, second mobile bar 77 it is upper
End be contained in the 4th posting 75 and with its inner surface sliding contact, the lower end and described second of the tenth spring 76
The upper end of mobile bar 77 is fixedly connected.6th filter screen 78 be in cuboid, the lower end of second mobile bar 77 with it is described
6th filter screen 78 is fixedly connected, and the 6th filter screen 78 is equipped with filter opening, can be filtered to sewage.The shell 79 is in
Hollow cuboid and upper and lower surface communicates, and the upper surface of the lower surface of the shell 79 and the 6th filter screen 78 is fixed to be connected
It connects, the upper surface of the shell 79 can act against on the third posting 72.There are two 11st spring 701 is set,
One end of 11st spring 701 is fixedly connected with second mobile bar 77.It is described to strike off there are two block 70 sets, it is described to scrape
Except block 70 is in cuboid, the lower surface for striking off block 70 act against on the 6th filter screen 78 and with its sliding contact, institute
The other end for stating the 11st spring 701 is fixedly connected with the block 70 that strikes off.
As shown in Figure 1, the driving device 8 includes the second electric cylinders 81, is set to the second of 81 right side of the second electric cylinders
Bracket 82, the second catch bar 83 being set in second electric cylinders 81, be set on second catch bar 83 smooth piece
84, it is set to the movable stand 85 on described smooth piece 84, the restriction bar 86 on the right side of the movable stand 85, is located at the movement
12nd spring 87 of 85 top of frame, the link block 88 for being set to 85 left end of movable stand.Second electric cylinders 81 and power supply
It is (not shown) to be electrically connected, electric energy is provided for it, second electric cylinders 81 are equipped with switch (not shown), facilitate its opening of control
Or it closes.The second support 82 is in bending, and one end of the second support 82 is fixedly connected with the framework 11, described
The other end of second support 82 is fixedly connected with second electric cylinders 81.Second catch bar 83 is in a vertical shape, and described second
The lower end of catch bar 83 is connect with second electric cylinders 81, and second electric cylinders 81 is allowed to drive second catch bar 83
Move up and down, second catch bar 83 through the sealing block 12 upper and lower surface and with its sliding contact so that described the
Two catch bars 83 can be stable move up and down, second catch bar 83 be equipped with through its left and right surface the 8th through-hole
831, the 8th through-hole 831 is square.Described smooth piece 84 is in cuboid, and described smooth piece 84 is contained in the 8th through-hole
It is fixedly connected in 831 and with second catch bar 83, described smooth piece 84 is made of lubricious material.The movable stand 85 is in
L-type, the movable stand 85 through described smooth piece 84 left and right surface and with its sliding contact so that the movable stand 85 can be with
Stable moves left and right.The restriction bar 86 is in cuboid and vertical placement, the right end of the movable stand 85 and the restriction bar
86 are fixedly connected.The right end of 12nd spring 87 is fixedly connected with the restriction bar 86, a left side for the 12nd spring 87
End is fixedly connected with described smooth piece 84.The link block 88 is in cuboid, the left end of the movable stand 85 and the link block
88 are fixedly connected, and the link block 88 is fixedly connected with the 6th filter screen 78.
As shown in Figure 1, the Environmental Cities polluted water pretreatment apparatus in the resource reclaim field of the present invention will be in use, first will
Then the upper ends of pipeline 38 open the switch of the water pump 39 in pond, so that the water in pond enters the pipe
In road 38, sprayed downwards then into the water spray frame 37, then from the 6th through-hole 372, and concentrate on described second
Between filter screen 32 and third filter screen 36, then sewage is after the filtering of second filter screen 32 and third filter screen 36
It flow on the transverse slat 53.Then sewage is flowed into the filter frame 51 by the right end of transverse slat 53, and passes through described the
Seven through-holes 551 enter the lower section of scraping plate 55, and then a part of sewage enters institute by the filtering of the bottom wall of filter frame 51
It states in lifting frame 63, remaining sewage enters the lower section of the 4th filter screen 64 by the side wall filtering of filter frame 51, into
Enter to the sewage in the lifting frame 63 and is entered below after the filtering of the 4th filter screen 64.Then described in sewage passes through
It enters after the filtering of 5th filter screen 17 in the shell 79, is then entered after the filtering of the 6th filter screen 78
Below, it is finally discharged by the discharge pipe 13.In order to realize to sewage progress dynamic filtration and filter opening be prevented to be blocked, this
When can open second valve 17, and the switch of blower 16 is opened, so that extraneous air is drawn into the pumping
In pipe 15, then it is drawn into the collection center 18, is then sprayed to the right after the filtering of first filter screen 10, and
And can directly be sprayed on the third filter screen 36, to blow the impurity being adhered on third filter screen 36 off, prevent
It blocks filter opening, and can drive the abundant flowing of sewage, promotes the quick progress of purification, improves efficiency, and saves the time.So
The switch of first electric cylinders 22 is opened afterwards, so that first catch bar 24 constantly moves up and down, first magnet 25
It constantly moves up and down therewith, when first magnet 25 moves up, first magnet 25 is moved to second magnet
46 right end, since the left end of first magnet 25 and the right end of second magnet 46 are same magnetic pole, in homopolar-repulsion
Under the action of second magnet 46 is moved to the left, second pull ring 48 and third pull ring 49 are moved to the left, and are then led to
Crossing first bracing wire 43 makes first pull ring 35, locating rack 33, the second filter screen 32, third filter screen 36 in inclined plate 31
On move right, while by second bracing wire 40 filter frame 51 is moved to the left, the filter frame 51 is to moving to left
When dynamic, the third bracing wire 59 is loosened, and the 5th spring 56 of the compression at this time pushes up the scraping plate 55, so that described
Scraping plate 55 moves up in the filter frame 51, and the lifting frame 63, third fixed link 65 are moved to the left therewith, so
By the 9th spring 74 and the 5th fixed link 73 the 5th filter screen 71 is moved to the left afterwards, first magnet 25
When moving down, the third spring 45 of stretching pulls to the right second magnet 46, so that the first movement bar 47 moves right
It is dynamic, it is resetted so that second filter screen 32 and third filter screen 36 are gradual to the left, and the 4th spring 52 of compression
The filter frame 51 is pushed to the right, so that the filter frame 51 moves right, then passes through the lifting frame 63, the 4th filter screen
64, third fixed link 65, the 9th spring 74 and the 5th fixed link 73 make the 5th filter screen 71 move right, and gradual
It resets, the 6th filter screen 78 and shell 79 move right and gradually reset, and then first magnet 25 moves down
When to the right side of the third magnet 67, since the left end of the first magnet 25 and the right end of the third magnet 67 are same magnetic
Pole, so that the third magnet 67 is moved to the left, then the filter frame 51 is moved to the left, and then the 5th filter screen 71,
6th filter screen 78 and shell 79 are moved to the left, since first magnet 25 periodically moves up and down, so that described second
Filter screen 32 and third filter screen 36 constantly move up and down on inclined plate 31, imitate so as to accelerate it to the filtering of sewage
Rate saves the time, its filter opening is prevented to be blocked, and since third filter screen 36 is oblique so that from the 6th through-hole 372 to
The sewage of lower ejection directly flows on third filter screen 36, and the impurity so as to be adhered on third filter screen 36 rinses
Fall, prevent its filter opening to be blocked, allow to continue efficiently to filter, and sewage can flow on the second filter screen 32,
So as to rinse out the impurity being adhered on the second filter screen 32, prevents its filter opening to be blocked, guarantee that purification filtering continues
It is efficient to carry out, while filter frame 51 moves left and right so that scraping plate 55 moves up and down in the filter frame 51, so as to
Automatically to strike off the impurity on 51 intracavity sidewall of filter frame, the filter opening of its side wall is prevented to be blocked, guarantees that its filtering continues height
The progress of effect, while the left and right flowing of its internal sewage can be driven, the progress of purification is accelerated, the time is saved, improves efficiency,
And the 6th filter screen 78 and moving left and right for shell 79 strike off the left and right shifting on the 6th filter screen 78 of block 70 described in drive
It is dynamic, so as to strike off the impurity being adhered on the 6th filter screen 78, prevents the filter opening of the 6th filter screen 78 to be blocked, guarantee it
Continue efficiently to filter, then open the switch of second electric cylinders 81, so that second catch bar 83 first moves down so
After move up, so periodically move up and down so that the 6th filter screen 78 and shell 79 constantly move left and right it is same
When can move up and down, so as to significantly make sewage pass through the filter opening of the 6th filter screen 78 as soon as possible, save the time, mention
High efficiency, and the filter opening of the 6th filter screen 78 is significantly prevented to be blocked, guarantee continues efficient purification filtering and carries out.Extremely
This, the Environmental Cities polluted water pretreatment apparatus use process in resource reclaim field of the present invention is described.
Claims (9)
1. a kind of Environmental Cities polluted water pretreatment apparatus in resource reclaim field, including frame device, it is set to the framework dress
The electric cylinders device for setting right side, the sloping plate unit being contained in the frame device, the bracing wire dress below the sloping plate unit
It sets, the filter device below the anchoring, the positioning device being set on the filter device, be located at the positioning
Purification device below device, the driving device below the purification device, it is characterised in that: the frame device includes
Framework, the sealing block being set in the framework, the discharge pipe below the framework, be set on the discharge pipe
One valve, the blower being set on the exhaust tube, the second valve, is located at the frame at the exhaust tube on the left of the framework
Intracorporal collection center, the baffle being contained in the collection center, the first filter screen being set on the baffle, the electric cylinders dress
It sets and is pushed away including fixed plate, the first electric cylinders above the fixed plate, the locating piece being set in first electric cylinders, first
Lever, the first magnet above first catch bar, the first spring at left and right sides of first catch bar, institute
Stating sloping plate unit includes inclined plate, the second filter screen above the inclined plate, the positioning below second filter screen
Frame, the second spring being set on the locating rack, the first pull ring, the third filter screen above second filter screen,
The water spray frame that is set on the third filter screen, the pipeline being set on the water spray frame, the water being set on the pipeline
The first support for pumping, being set on the water pump, the anchoring include the first fixed link, are set to first fixed link
First idler wheel of left end acts against the first bracing wire on first idler wheel, is first below first fixed link fixed
Position frame, the third spring being contained in first posting, the second magnet on the left of the third spring, be located at it is described
First movement bar on the left of second magnet, is located at the first movement bar at the second pull ring above the first movement bar
The third pull ring of lower section, the second bracing wire being set on the third pull ring, the filter device include filter frame, positioned at described
The 4th spring on the left of filter frame, the 4th pull ring being set to below the transverse slat, is received the transverse slat above the filter frame
The scraping plate being dissolved in the filter frame, the 5th spring below the scraping plate, be contained in the filter frame
Two fixed links, the second idler wheel for being set to second fixed link upper end act against third bracing wire on second idler wheel, institute
State that positioning device includes the 6th spring, the first locating rod at left and right sides of the 6th spring, to act against described first fixed
Lifting frame on the bar of position, the 4th filter screen below the lifting frame, the third below the 4th filter screen are solid
Fixed pole, the second posting on the right side of the lifting frame, the third magnet being contained in second posting, be located at it is described
The 7th spring on the right side of third magnet, is located at the 4th fixed link at the 4th fixed link below second posting
8th spring in left side, the purification device include that the 5th filter screen, third at left and right sides of the 5th filter screen are fixed
Position frame, the 9th spring being set in the 5th fixed link, is located at the 5th fixed link above the 5th filter screen
The 4th posting below 5th filter screen, is located at the described tenth at the tenth spring being contained in the 4th posting
The second mobile bar below spring, is set to the 6th filter screen at the 6th filter screen below second mobile bar
On shell, the 11st spring at left and right sides of second mobile bar and be set to scraping for the 11st spring end
Except block, the driving device includes the second electric cylinders, the second support being set on the right side of second electric cylinders, is set to described second
The second catch bar in electric cylinders, smooth piece be set on second catch bar, the movable stand being set on described smooth piece,
Restriction bar on the right side of the movable stand, the 12nd spring above the movable stand are set to the movable stand left side
The link block at end.
2. the Environmental Cities polluted water pretreatment apparatus in resource reclaim field as described in claim 1, it is characterised in that: the frame
Body is in hollow cuboid, and the framework is equipped with the first through hole positioned at its left surface, the second through-hole positioned at its lower surface
And third through-hole, the sealing block are contained in second through-hole and are fixedly connected with the framework, the discharge pipe it is upper
End is directed at the third through-hole and is fixedly connected with the lower surface of the framework, and the right end alignment described first of the exhaust tube is logical
It hole and is fixedly connected with the left surface of the framework, the left surface of the collection center is fixedly connected with the framework inner surface, institute
It states baffle to be contained in the collection center and be fixedly connected with its inner surface, the baffle is equipped with the through its left and right surface
Four through-holes, first filter screen are contained in the fourth hole and are fixedly connected with the baffle.
3. the Environmental Cities polluted water pretreatment apparatus in resource reclaim field as claimed in claim 2, it is characterised in that: described solid
The left end of fixed board is fixedly connected with the framework, and first electric cylinders are fixedly connected with the fixed plate, the locating piece and institute
It states the first electric cylinders to be fixedly connected, the lower end of first catch bar is connect with first electric cylinders, and first catch bar runs through
The upper and lower surface of the locating piece and with its sliding contact, the upper end of first catch bar and first magnet are fixed to be connected
Connect, the left end of first magnet act against on the right surface of the framework and with its sliding contact, under first spring
End be fixedly connected with the locating piece, the upper end of first spring is fixedly connected with first magnet, the inclined plate it is upper
End is fixedly connected with the framework inner surface, second filter screen act against on the inclined plate and with its sliding contact, it is described
The left end of locating rack is fixedly connected with second filter screen.
4. the Environmental Cities polluted water pretreatment apparatus in resource reclaim field as claimed in claim 3, it is characterised in that: described fixed
The right end of position frame act against on the lower surface of the inclined plate and with its sliding contact, the right end of the second spring and the inclined plate
Left end be fixedly connected, the left end of the second spring is fixedly connected with the locating rack, the both ends of first pull ring and institute
It states locating rack to be fixedly connected, the lower end of the third filter screen is fixedly connected with second filter screen, a left side for the water spray frame
End is fixedly connected with the third filter screen, and the water spray frame is equipped with positioned at several fifth holes of its lower surface and positioned at it
6th through-hole of upper surface, the 6th through-hole described in the lower end aligned of the pipeline and with the upper surface of the water spray frame is fixed connects
It connects, one end of the first support is fixedly connected with the water spray frame, and the other end of the first support is fixed with the water pump
Connection, the right end of first fixed link is fixedly connected with the framework inner surface, and the left end of first fixed link is equipped with the
One groove, first idler wheel are contained in first groove and are pivotally connected with first fixed link, and described first draws
The upper end of line is fixedly connected with first pull ring.
5. the Environmental Cities polluted water pretreatment apparatus in resource reclaim field as claimed in claim 4, it is characterised in that: described
One is drawstring through first groove and acts against on first idler wheel, in the right end of first posting and the framework
Surface is fixedly connected, and the right end of the third spring is fixedly connected with the framework inner surface, and second magnet is contained in institute
State in the first posting and with the first posting inner surface sliding contact, the left end of the third spring and second magnetic
The right end of iron is fixedly connected, and the right end of the first movement bar is fixedly connected with the left end of second magnet, and described first moves
The right end of lever be contained in first posting and with its inner surface sliding contact, the both ends of second pull ring with it is described
First movement bar is fixedly connected, and the lower end of first bracing wire is fixedly connected with second pull ring, and the two of the third pull ring
End is fixedly connected with the lower surface of the first movement bar, and the upper end of second bracing wire is fixedly connected with the third pull ring,
The left end of 4th spring is fixedly connected with the framework inner surface, and the right end of the 4th spring is fixed with the filter frame
Connection, the left end of the transverse slat is fixedly connected with the framework inner surface.
6. the Environmental Cities polluted water pretreatment apparatus in resource reclaim field as claimed in claim 5, it is characterised in that: the mistake
Filter frame acts against on the lower surface of the transverse slat and fixes and connect with its sliding contact, the both ends of the 4th pull ring and the transverse slat
Connect, the scraping plate be contained in the filter frame and with the filter frame inner surface sliding contact, the scraping plate is equipped with
Through the 7th through-hole of its upper and lower surface, the lower end of the 5th spring is fixedly connected with the filter frame inner surface, and described
The upper end of five springs is fixedly connected with the scraping plate, the lower end of second fixed link and the fixed company of the filter frame inner surface
Connect, the upper end of second fixed link is equipped with the second groove, second idler wheel be contained in second groove and with it is described
Second fixed link is pivotally connected, and the left end of the third bracing wire is fixedly connected with the 4th pull ring, and the third is drawstring through
It 7th through-hole and the second groove and acts against on second idler wheel, the right end of the third pull ring and the scraping plate
Lower surface is fixedly connected, and the upper end of the 6th spring is fixedly connected with the filter frame, the upper end of first locating rod with
The lower surface of the filter frame is fixedly connected.
7. the Environmental Cities polluted water pretreatment apparatus in resource reclaim field as claimed in claim 6, it is characterised in that: the mistake
The lower end of filter frame be contained in the lifting frame and with its inner surface sliding contact, the side of first locating rod acts against institute
It states on lifting frame inner surface and is fixed with its sliding contact, the lower surface of the lifting frame and the upper surface of the 4th filter screen
Connection, the lower end of the 6th spring is fixedly connected with the 4th filter screen, the upper end of the third fixed link and described the
Four filter screens are fixedly connected, and the right surface of second posting is fixedly connected with the framework inner surface, the third magnet
Left end be fixedly connected with the filter frame, the right end of the third magnet be contained in second posting and with table in it
The left end of face sliding contact, the 7th spring is fixedly connected with the right end of the third magnet, the right end of the 7th spring
It being fixedly connected with the framework inner surface, the upper end of the 4th fixed link is fixedly connected with second posting, and described
The right end of eight springs is fixedly connected with the 4th fixed link, and the left end of the 8th spring is fixedly connected with the filter frame.
8. the Environmental Cities polluted water pretreatment apparatus in resource reclaim field as claimed in claim 7, it is characterised in that: described
Five filter screens be contained in the framework and with the framework inner surface sliding contact, one end of the third posting with it is described
Framework inner surface is fixedly connected, and one end of the 5th filter screen is contained in the third posting and slides with its inner surface
Contact, the lower end of the 5th fixed link is fixedly connected with the 5th filter screen, the right end of the 9th spring and described the
Five fixed links are fixedly connected, and the left end of the 9th spring is fixedly connected with the third fixed link, the 4th posting
Upper end is fixedly connected with the lower surface of the 5th filter screen, and the tenth spring is contained in the 4th posting, described
The upper end of tenth spring is fixedly connected with the 5th filter screen, and the upper end of second mobile bar is contained in the 4th positioning
In frame and with its inner surface sliding contact, the lower end of the tenth spring is fixedly connected with the upper end of second mobile bar, institute
The lower end for stating the second mobile bar is fixedly connected with the 6th filter screen, the lower surface of the shell and the 6th filter screen
Upper surface is fixedly connected, and one end of the 11st spring is fixedly connected with second mobile bar, the following table for striking off block
Face act against on the 6th filter screen and with its sliding contact, the other end and the block that strikes off of the 11st spring fix
Connection.
9. the Environmental Cities polluted water pretreatment apparatus in resource reclaim field as claimed in claim 8, it is characterised in that: described
One end of two brackets is fixedly connected with the framework, and the other end of the second support is fixedly connected with second electric cylinders, institute
The lower end for stating the second catch bar is connect with second electric cylinders, second catch bar through the sealing block upper and lower surface and
With its sliding contact, second catch bar is equipped with the 8th through-hole through its left and right surface, and described smooth piece is contained in institute
State in the 8th through-hole and be fixedly connected with second catch bar, the movable stand through described smooth piece left and right surface and with
Its sliding contact, the right end of the movable stand are fixedly connected with the restriction bar, the right end of the 12nd spring and the limit
Fixed pole is fixedly connected, and the left end of the 12nd spring is fixedly connected with described smooth piece, the left end of the movable stand with it is described
Link block is fixedly connected, and the link block is fixedly connected with the 6th filter screen.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811275112.2A CN109224598A (en) | 2018-10-30 | 2018-10-30 | A kind of Environmental Cities polluted water pretreatment apparatus in resource reclaim field |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811275112.2A CN109224598A (en) | 2018-10-30 | 2018-10-30 | A kind of Environmental Cities polluted water pretreatment apparatus in resource reclaim field |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109224598A true CN109224598A (en) | 2019-01-18 |
Family
ID=65079259
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811275112.2A Withdrawn CN109224598A (en) | 2018-10-30 | 2018-10-30 | A kind of Environmental Cities polluted water pretreatment apparatus in resource reclaim field |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109224598A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109764649A (en) * | 2019-01-21 | 2019-05-17 | 张舒维 | A kind of novel Masterbatch dehumidification equipment of new material manufacture field |
CN109772107A (en) * | 2019-03-22 | 2019-05-21 | 青岛明珠钢结构有限公司 | A kind of processing system for petrochemical industry exhaust gas |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1996011046A1 (en) * | 1994-10-05 | 1996-04-18 | Denitral S.A. | Method and station for filtering a liquid or gas containing suspended matter |
CN104801093A (en) * | 2015-03-31 | 2015-07-29 | 宁波方太厨具有限公司 | Ceramic filter element automatic cleaning device |
CN106180024A (en) * | 2016-08-30 | 2016-12-07 | 张大伟 | A kind of auxiliary degreasing agent degreasing plant |
CN107639093A (en) * | 2017-10-20 | 2018-01-30 | 马良彬 | A kind of hospital laboratory sampling test tube high-efficiency washing device |
CN207016516U (en) * | 2017-08-03 | 2018-02-16 | 北京汇恒环保工程股份有限公司 | A kind of dirt removal device for fine grid |
CN207259176U (en) * | 2017-08-31 | 2018-04-20 | 南京源恒环境研究所有限公司 | A kind of biogas slurry waste water treatment screw press filter |
CN107998742A (en) * | 2017-12-20 | 2018-05-08 | 佛山科学技术学院 | A kind of working environment-friendly sewage processing equipment in construction site |
CN108043105A (en) * | 2017-12-20 | 2018-05-18 | 佛山科学技术学院 | A kind of separation equipment for building sewage treatment field |
-
2018
- 2018-10-30 CN CN201811275112.2A patent/CN109224598A/en not_active Withdrawn
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1996011046A1 (en) * | 1994-10-05 | 1996-04-18 | Denitral S.A. | Method and station for filtering a liquid or gas containing suspended matter |
CN104801093A (en) * | 2015-03-31 | 2015-07-29 | 宁波方太厨具有限公司 | Ceramic filter element automatic cleaning device |
CN106180024A (en) * | 2016-08-30 | 2016-12-07 | 张大伟 | A kind of auxiliary degreasing agent degreasing plant |
CN207016516U (en) * | 2017-08-03 | 2018-02-16 | 北京汇恒环保工程股份有限公司 | A kind of dirt removal device for fine grid |
CN207259176U (en) * | 2017-08-31 | 2018-04-20 | 南京源恒环境研究所有限公司 | A kind of biogas slurry waste water treatment screw press filter |
CN107639093A (en) * | 2017-10-20 | 2018-01-30 | 马良彬 | A kind of hospital laboratory sampling test tube high-efficiency washing device |
CN107998742A (en) * | 2017-12-20 | 2018-05-08 | 佛山科学技术学院 | A kind of working environment-friendly sewage processing equipment in construction site |
CN108043105A (en) * | 2017-12-20 | 2018-05-18 | 佛山科学技术学院 | A kind of separation equipment for building sewage treatment field |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109764649A (en) * | 2019-01-21 | 2019-05-17 | 张舒维 | A kind of novel Masterbatch dehumidification equipment of new material manufacture field |
CN109772107A (en) * | 2019-03-22 | 2019-05-21 | 青岛明珠钢结构有限公司 | A kind of processing system for petrochemical industry exhaust gas |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109224598A (en) | A kind of Environmental Cities polluted water pretreatment apparatus in resource reclaim field | |
CN113519438A (en) | Low-energy-consumption high-efficiency in-situ air-lift type circulating water purification culture system | |
CN106223401B (en) | A kind of rainwater-collecting filter | |
CN109126350A (en) | Air cleaner is used in a kind of workshop processing of environmental protection | |
CN111747597A (en) | Sewage treatment plant for construction convenient to clearance silt | |
CN214734586U (en) | Portable device for removing floating algae in water body | |
CN108568156A (en) | A kind of sewage disposal impurity separating equipment in municipal works field | |
CN106512545B (en) | A kind of purification filtering system for sewage disposal | |
CN215828522U (en) | Novel sewage treatment sedimentation tank | |
CN106606915B (en) | A kind of efficient industrial fumes energy-saving and purifying system | |
CN213912532U (en) | Rural area construction integration sewage treatment device | |
CN109107370A (en) | A kind of new and effective fume treatment desulphurization plant of environmental protection | |
CN112979024B (en) | Building district rainwater recycling system | |
CN108585312A (en) | A kind of purification of multifunctional building rainwater-collecting and reuse means | |
CN108975532B (en) | Vertical separation aeration equipment for impurity removal of sewage | |
CN202844699U (en) | Bag-type filtering basin for sewage disposal by separated basin oxidation | |
CN106223402B (en) | A kind of rainwater-collecting purification system | |
CN211920940U (en) | Air-float sewage treatment device | |
CN205061809U (en) | Integration aeration filter equipment | |
CN202638088U (en) | Blowback bag type filter unit | |
CN214936832U (en) | Circular-structure denitrification deep-bed filter | |
CN207726758U (en) | A kind of building effluent cycle purifier | |
CN212375087U (en) | Sewage treatment device for waterwheel | |
CN219744108U (en) | Slaughter waste recycling system | |
CN217247084U (en) | Water conservancy and hydropower engineering's waste water extraction device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190118 |
|
WW01 | Invention patent application withdrawn after publication |