CN109224465B - Swift current cable system convenient to installation is erect - Google Patents

Swift current cable system convenient to installation is erect Download PDF

Info

Publication number
CN109224465B
CN109224465B CN201811118002.5A CN201811118002A CN109224465B CN 109224465 B CN109224465 B CN 109224465B CN 201811118002 A CN201811118002 A CN 201811118002A CN 109224465 B CN109224465 B CN 109224465B
Authority
CN
China
Prior art keywords
steel
fixed
bearing
steel cable
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811118002.5A
Other languages
Chinese (zh)
Other versions
CN109224465A (en
Inventor
程鲲
黄杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest University of Science and Technology
Original Assignee
Southwest University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest University of Science and Technology filed Critical Southwest University of Science and Technology
Priority to CN201811118002.5A priority Critical patent/CN109224465B/en
Publication of CN109224465A publication Critical patent/CN109224465A/en
Application granted granted Critical
Publication of CN109224465B publication Critical patent/CN109224465B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63GMERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
    • A63G21/00Chutes; Helter-skelters
    • A63G21/22Suspended slideways

Landscapes

  • Emergency Lowering Means (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention discloses a cable-sliding system convenient to install and erect, which comprises: two bearing steel ropes, a plurality of fixed steel ropes, a hoop trolley, a rail and a plurality of U-shaped steel rope clamps. The two bearing steel cables are arranged in parallel, and the two ends of the bearing steel cable are fixed on two fixed points with a certain height difference; the bearing steel cables are provided with a plurality of steel cable clamps from beginning to end, the distance between the two steel cable clamps is the same, and the steel cable clamps on the two bearing steel cables are in the same position and correspond to each other one by one; two ends of the fixed steel cable are respectively fixed on a pair of steel cable clamps corresponding to the two bearing steel cables; the middle position of the fixed steel cable is used for hanging the track; the anchor ear trolley is arranged on the track and used for bearing personnel to slide on the track. The invention has the advantages that: 1. the standard components are used, welding is replaced by assembly, the cost is reduced, the processing and erection difficulties are reduced, and the later maintenance and replacement are facilitated; 2. the whole quality of the used parts is reduced, the carrying is convenient, and the device can be suitable for the installation and erection of more complex terrains.

Description

Swift current cable system convenient to installation is erect
Technical Field
The invention relates to the technical field of rope sliding equipment, in particular to a rope sliding system convenient to install and erect.
Background
The rope sliding is also called as a rope sliding, a rope falling, a flying man in the air and the like, is firstly used for mountain self-rescue and military assault operation, then is evolved into an amusement item, and is a challenging, exciting and recreational modern sports amusement item. The chute rope can cross grasslands, lakes, rivers and canyons and slide downwards from the high place at a higher speed by means of the height difference, so that tourists feel stimulation and satisfaction in the happy and surprise.
At present, the existing rope sliding system adopts steel pipes to weld and erect a portal-shaped overhead (shown in figure 1), a plurality of the overhead are fixed on the ground, and certain height difference exists among the overhead; a rail is welded by adopting steel pipes, wherein three parallel large-diameter steel pipes are arranged along the rail direction, a rib plate along the rail direction is welded on the surface of one large-diameter steel pipe, and the large-diameter steel pipe is welded on the other two large-diameter steel pipes through the rib plate and a plurality of small-diameter steel pipes, so that the rail is formed. The rail is welded and fixed on the door-shaped elevated frame, and a rail structure with a certain height difference and fluctuation in the vertical direction is formed between the elevated frames with different heights.
However, existing chute systems have the following drawbacks:
1. a large amount of materials such as steel pipes and the like are required, and a large amount of welding operation is required, so that the cost and the manufacturing difficulty are increased, and the later maintenance is troublesome.
2. The erection of the portal-like elevated and rails can be very difficult. Particularly, the device is more difficult to erect in some mountains, including the transportation of a large amount of materials, the guarantee of the operation safety of welding workers, the site selection and fixation of each portal-shaped overhead and the like.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a cable sliding system convenient to install and erect, which can effectively solve the problems existing in the prior art.
In order to achieve the above object, the present invention adopts the following technical scheme:
a lanyard system for facilitating installation and erection, comprising: two bearing steel ropes 1, a plurality of fixed steel ropes 2, a hoop trolley 3, a track 4 and a plurality of U-shaped steel rope clamps 5.
The two bearing steel cables 1 are arranged in parallel, and two ends of the bearing steel cable 1 are fixed on two fixed points with a certain height difference; the bearing steel cables 1 are provided with a plurality of steel cable clamps 5 from beginning to end, the intervals between the two steel cable clamps 5 are the same, and the steel cable clamps 5 on the two bearing steel cables 1 are in the same position and correspond to each other one by one; two ends of the fixed steel rope 2 are respectively fixed on a pair of steel rope clamps 5 corresponding to the two bearing steel ropes 1; the middle position of the fixed steel cable 2 is used for hanging the track 4; the anchor ear trolley 3 is arranged on the track 4 and is used for bearing personnel to slide on the track 4.
Further, the chute system further comprises: the steel wire clamping head 6, the bolt 7, the hanging ring 8 and the locknut 9;
the middle part of the fixed steel cable 2 is provided with a steel wire clamping head 6, and the middle part of the fixed steel cable 2 is bundled into a rope sleeve by the steel wire clamping head 6.
A plurality of bolt holes are distributed on the middle line of the track 4;
the hanging ring 8 penetrates through a rope sleeve of the fixed steel rope 2 to be fixed, and a threaded hole is formed below the hanging ring 8.
The bolt 7 passes through the bolt hole of the track 4 and then is screwed into the threaded hole of the hanging ring 8, and is loosened by the locknut 9 screwed on the bolt 7.
Compared with the prior art, the invention has the advantages that:
1. the use of various standard components and the replacement of welding by assembly lead to the reduction of the cost of the products, the difficulty of processing and erection of the products and the convenience of maintenance and replacement in the later period;
2. the whole quality of the used parts is reduced, the carrying is convenient, and the device can be suitable for the installation and erection of more complex terrains.
Drawings
FIG. 1 is a schematic diagram of a prior art chute system;
FIG. 2 is a schematic diagram of a chute system according to an embodiment of the invention;
FIG. 3 is an enlarged view of a portion of a chute system according to an embodiment of the invention;
FIG. 4 is a schematic illustration of the connection of a stationary steel cable to a rail according to an embodiment of the present invention.
Detailed Description
The present invention will be described in further detail below with reference to the accompanying drawings and by way of examples to make the objects, technical solutions and advantages of the present invention more apparent.
As shown in fig. 2 and 3, a cable system for facilitating installation and erection includes: the two bearing steel cables 1, the fixed steel cable 2, the anchor ear trolley 3, the track 4, the steel cable clamp 5, the steel wire clamp 6, the bolt 7 and the hanging ring 8.
The two bearing steel cables 1 are arranged in parallel, and the two ends of the bearing steel cable 1 are firmly and firmly fixed on two fixed points with a certain height difference; the bearing steel ropes 1 are provided with a plurality of U-shaped steel rope clamps 5 from beginning to end, the intervals between the two steel rope clamps 5 are the same, and the steel rope clamps 5 on the two bearing steel ropes 1 are in the same position and correspond to each other one by one; two ends of the fixed steel rope 2 are respectively fixed on a pair of steel rope clamps 5 corresponding to the two bearing steel ropes 1; the middle part of the fixed steel rope 2 is tied into a rope sleeve through a steel wire clamping head 6.
As shown in fig. 4, a plurality of bolt holes are distributed on the line of the track 4;
the hanging ring 8 penetrates through a rope sleeve of the fixed steel rope 2 to be fixed, and a threaded hole is formed below the hanging ring 8.
The bolt 7 passes through the bolt hole of the track 4 and then is screwed into the threaded hole of the hanging ring 8, and is loosened by the locknut 9 screwed on the bolt 7; the rail 4 is thereby fastened to the load-bearing wire rope 1 by means of a number of fastening wire ropes 2, forming a complete and load-bearing rail system.
The anchor ear trolley 3 is arranged on the track 4 and is used for bearing personnel to slide on the track 4.
Those of ordinary skill in the art will appreciate that the embodiments described herein are intended to aid the reader in understanding the practice of the invention and that the scope of the invention is not limited to such specific statements and embodiments. Those of ordinary skill in the art can make various other specific modifications and combinations from the teachings of the present disclosure without departing from the spirit thereof, and such modifications and combinations remain within the scope of the present disclosure.

Claims (1)

1. A chute cable system for facilitating installation and erection, comprising: the steel cable clamp comprises two bearing steel cables (1), a plurality of fixed steel cables (2), a hoop trolley (3), a track (4) and a plurality of steel cable clamps (5);
the two bearing steel cables (1) are arranged in parallel, and two ends of the bearing steel cables (1) are fixed on two fixed points with a certain height difference; the bearing steel cables (1) are provided with a plurality of U-shaped steel cable clamps (5) from beginning to end, the intervals between the two steel cable clamps (5) are the same, and the steel cable clamps (5) on the two bearing steel cables (1) are in the same one-to-one correspondence; two ends of the fixed steel cable (2) are respectively fixed on a pair of steel cable clamps (5) corresponding to the two bearing steel cables (1); the middle part of the fixed steel cable (2) is used for hanging the track (4); the anchor ear trolley (3) is arranged on the track (4) and is used for bearing personnel to slide on the track (4);
the chute system further comprises: the steel wire clamping head (6), a bolt (7), a hanging ring (8) and a locknut (9);
a steel wire clamping head (6) is arranged at the middle part of the fixed steel cable (2), and the middle part of the fixed steel cable (2) is bundled into a rope sleeve by the steel wire clamping head (6);
a plurality of bolt holes are distributed on the central line of the track (4);
the hanging ring (8) penetrates through a rope sleeve of the fixed steel rope (2) to be fixed, and a threaded hole is formed below the hanging ring (8);
the bolt (7) passes through the bolt hole of the track (4) and then is screwed into the threaded hole of the hanging ring (8), and is loose-proof through the locknut (9) screwed on the bolt (7);
the rail (4) is fixed to the load-bearing wire rope (1) by a plurality of fixing wire ropes (2) to form a complete rail system with bearing capacity.
CN201811118002.5A 2018-09-25 2018-09-25 Swift current cable system convenient to installation is erect Active CN109224465B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811118002.5A CN109224465B (en) 2018-09-25 2018-09-25 Swift current cable system convenient to installation is erect

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811118002.5A CN109224465B (en) 2018-09-25 2018-09-25 Swift current cable system convenient to installation is erect

Publications (2)

Publication Number Publication Date
CN109224465A CN109224465A (en) 2019-01-18
CN109224465B true CN109224465B (en) 2023-11-28

Family

ID=65056823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811118002.5A Active CN109224465B (en) 2018-09-25 2018-09-25 Swift current cable system convenient to installation is erect

Country Status (1)

Country Link
CN (1) CN109224465B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01164671A (en) * 1987-12-18 1989-06-28 Yukio Uozumi Track structure in cable system suspended railway
CH673015A5 (en) * 1986-06-18 1990-01-31 Kotsu Syst Kikaku Kk Structure of track for vehicles suspended from catenary - has rails hung from strengthening cable to exert prestress through vertical primary droppers on carrier cable
CN201736986U (en) * 2010-08-11 2011-02-09 那国君 Hanging chair-type fiber support cable of ski field
CN101991954A (en) * 2009-08-11 2011-03-30 渠仁书 Suspension cable type low-altitude flying system
WO2011114023A2 (en) * 2010-03-17 2011-09-22 Creissels Technologies Aerial urban transport installation
CN202927257U (en) * 2012-10-17 2013-05-08 陕西陕煤澄合矿业有限公司 Dangling cable dragging device
CN106422335A (en) * 2016-12-07 2017-02-22 赵树文 Overhead cable sliding component and overhead cable sliding system
CN207093464U (en) * 2017-08-28 2018-03-13 新昌县三新空调风机有限公司 A kind of Industrial fan mounting structure of structure optimization
CN108505623A (en) * 2018-04-16 2018-09-07 北京市建筑工程研究院有限责任公司 A kind of overhead cable construction method suitable for flexible double rope net system
CN208770832U (en) * 2018-09-25 2019-04-23 程鲲 A kind of overhead cable system being easily installed erection

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH673015A5 (en) * 1986-06-18 1990-01-31 Kotsu Syst Kikaku Kk Structure of track for vehicles suspended from catenary - has rails hung from strengthening cable to exert prestress through vertical primary droppers on carrier cable
JPH01164671A (en) * 1987-12-18 1989-06-28 Yukio Uozumi Track structure in cable system suspended railway
CN101991954A (en) * 2009-08-11 2011-03-30 渠仁书 Suspension cable type low-altitude flying system
WO2011114023A2 (en) * 2010-03-17 2011-09-22 Creissels Technologies Aerial urban transport installation
CN201736986U (en) * 2010-08-11 2011-02-09 那国君 Hanging chair-type fiber support cable of ski field
CN202927257U (en) * 2012-10-17 2013-05-08 陕西陕煤澄合矿业有限公司 Dangling cable dragging device
CN106422335A (en) * 2016-12-07 2017-02-22 赵树文 Overhead cable sliding component and overhead cable sliding system
CN207093464U (en) * 2017-08-28 2018-03-13 新昌县三新空调风机有限公司 A kind of Industrial fan mounting structure of structure optimization
CN108505623A (en) * 2018-04-16 2018-09-07 北京市建筑工程研究院有限责任公司 A kind of overhead cable construction method suitable for flexible double rope net system
CN208770832U (en) * 2018-09-25 2019-04-23 程鲲 A kind of overhead cable system being easily installed erection

Also Published As

Publication number Publication date
CN109224465A (en) 2019-01-18

Similar Documents

Publication Publication Date Title
CN201494438U (en) Simple and fast installation cableway for maintenance and rush repair of mountain pipeline
CN203377546U (en) High speed railway spanning construction apparatus
CN104695752B (en) Rapid rush-repair Tower System and its erection method
CN104527652A (en) Rail type rope traction aerial passenger device
CN106848938A (en) Cable testing bridge hanging installation method under a kind of High Altitude Platform
CN106184237A (en) A kind of Light-duty Quick-installation cableway
CN109224465B (en) Swift current cable system convenient to installation is erect
CN105275251A (en) Railway existing line overhead line system hard crossbeam erection method
CN107364793B (en) A kind of double towed Lift-on/Lift-off Systems
CN210714046U (en) Device for lifting inverted chimney steel inner cylinder by using steel twisted rope hydraulic pressure
CN104452594A (en) Multi-support cable guide method cable replacement device
DE102007041762B4 (en) Securing element, device and method for securing overhead lines
CN205170234U (en) Cantilever crane
CN201126954Y (en) Apparatus for hanging power supply cable of down-hole mobile equipment
CN208770832U (en) A kind of overhead cable system being easily installed erection
JP2005333789A (en) Construction method of hanging sheave type line shifting by forming net
CN107482524A (en) Power transmission line inspection robot with anti-falling function automatically up and down earth system
CN103255712B (en) Method suitable for inspecting and maintaining different steel arch bridge arches
CN208513767U (en) A kind of imderwater cutting device
CN214362941U (en) Suspension bridge catwalk manned track system
CN207120753U (en) A kind of one-way aerial passenger carrying haulage cable tensioning apparatus
CN109205469A (en) A kind of split type structure of electric block and its electric control system
CN211470564U (en) Wheel adjusting device of bridge crane
JP2020153208A (en) Suspended scaffold and erection method therefor
CN210558520U (en) Mining cable towing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200201

Address after: 621000 Fucheng District, Mianyang City, Chengdu City, Sichuan Province

Applicant after: Southwest University of Science and Technology

Address before: 621000 Southwest University of Science and Technology, Fucheng District, Sichuan, Mianyang

Applicant before: Cheng Kun

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant