CN109208638A - A kind of novel fabricated piping lane and its method of designing and constructing - Google Patents

A kind of novel fabricated piping lane and its method of designing and constructing Download PDF

Info

Publication number
CN109208638A
CN109208638A CN201811206067.5A CN201811206067A CN109208638A CN 109208638 A CN109208638 A CN 109208638A CN 201811206067 A CN201811206067 A CN 201811206067A CN 109208638 A CN109208638 A CN 109208638A
Authority
CN
China
Prior art keywords
door
piping lane
node
shape component
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811206067.5A
Other languages
Chinese (zh)
Inventor
周玉丁
郭炳川
陈德旺
李连强
李智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201811206067.5A priority Critical patent/CN109208638A/en
Publication of CN109208638A publication Critical patent/CN109208638A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Abstract

The present invention is a kind of novel fabricated piping lane and its method of designing and constructing, piping lane includes base plate, door shape component, base plate upper surface is equipped with several buckling bases, two vertical plates of door shape component buckle into the buckling base of base plate, further include being fitted to base plate, the l-shaped member on door shape component or bar shaped board member.Construction method are as follows: analysis integrated piping lane transverse shape and size, by piping lane section criteria for classifying section, special cross section, variable diameter section;According to various cross dimensions and every linear meter(lin.m.) weight, the longitudinal divisions length of various section piping lanes is determined;Various section piping lanes are split;Fractionation combination to the various sections of piping lane, models respectively, carries out structural checking computation, finally carries out component design, fastens node, the design of door shoulder node;According to design drawing, designed component prefabricated mould;It entrusts pre-fabricated factory to produce component, the transhipment of team of organizing construction and folded spelling and carries out piping lane construction.The present invention improves the applicability of pipe gallery fabricated construction.

Description

A kind of novel fabricated piping lane and its method of designing and constructing
Technical field
The present invention relates to piping lane fabricated construction green technology field more particularly to a kind of novel fabricated piping lane and its set Count construction method.
Background technique
The method that piping lane construction at present generallys use is cast-in-place construction, segment assembled, piecemeal assembled, superimposed sheet assembly Formula.Wherein, traditional cast-in-place construction process is more, long in time limit, and there are the pollutions such as noise, fugitive dust, and quality is not easily controlled;Segment assembly Formula, monolithic elements weight, size is big, and prefabricated, transport, assembled difficulty are big, and high to equipment, site requirements, the more cabin large scales of multilayer are comprehensive Conjunction piping lane applicability is not strong, and waterproof effect is poor;Piecemeal assembled, prefabricated and transport are easier to, but itself is unstable when assembly, knot There are many point, need stand or supporting can be assembled, and piping lane overall structure quality is not easy to guarantee, the assembling construction time is long, waterproof effect Fruit is poor;Assembled is overlapped, assembly rate is not high, and there is also a large amount of cast-in-place concretes, the construction time is long at scene.
Summary of the invention
Present invention seek to address that the deficiencies in the prior art, and provide a kind of novel fabricated piping lane and its design and construction side Method.
The present invention to achieve the above object, using following technical scheme:
A kind of novel fabricated piping lane, including base plate, door shape component, the base plate upper surface are equipped with several fastenings Seat, it further includes being fitted to base plate, door shape that two vertical plates of the door shape component, which buckle into the buckling base of the base plate, L-shaped member or bar shaped board member on component.
Particularly, the side top of the door shape component is equipped with door shoulder support plate, and the l-shaped member includes connected vertically Level board and vertical plate, the level board of the l-shaped member is in the door shoulder support plate for riding over the door shape component, the L shape structure The vertical plate of part buckles into the buckling base of the base plate.
The upper surface both ends of the door shape component are respectively equipped with buckling base, level board upper surface one end of the l-shaped member Equipped with buckling base, the buckling base of the l-shaped member upper surface is located at the surface of vertical plate.
It is equipped with installation groove in the buckling base, is equipped in the installation groove and fastens node, the two of the door shape component A vertical plate bottom surface, l-shaped member vertical plate bottom surface be equipped with and fasten the node hole that is coupled of node;In the door shoulder support plate Equipped with door shoulder node, the level board bottom surface of the l-shaped member is equipped with the node hole being coupled with door shoulder node.
Particularly, the side top of the door shape component is equipped with door shoulder support plate, and bar shaped board member both ends ride upon In the door shoulder support plate of two neighboring door shape component.
The upper surface both ends of the door shape component are respectively equipped with buckling base.
It is equipped with installation groove in the buckling base, is equipped in the installation groove and fastens node, the two of the door shape component A vertical plate bottom surface is equipped with the node hole being coupled with fastening node;The door shoulder support plate is equipped with door shoulder node, the item The bottom surface both ends of shape board member are equipped with the node hole being coupled with door shoulder node.
The design and construction method of above-mentioned novel fabricated piping lane, specific steps are as follows:
S1, analysis integrated piping lane transverse shape and size, by piping lane section criteria for classifying section, special cross section, variable diameter Section;
S2, according to various cross dimensions and every linear meter(lin.m.) weight, determine the longitudinal divisions length of various section piping lanes;
S3, split to various section piping lanes: bottom plate is split as base plate, and cabin is split as a shape component, L shape structure Part, bar shaped board member;
S4, the fractionation of the various sections of piping lane is combined, models respectively, carries out structural checking computation, finally carry out component design, button Close node, the design of door shoulder node;
S5, according to design drawing, designed component prefabricated mould;
S6, commission pre-fabricated factory produce component, the transhipment of team of organizing construction and folded spelling and carry out piping lane construction, pass through pedestal Button between plate, door shape component, l-shaped member or bar shaped board member leans on, takes to form the intact pipe gallery segment of globality, Re-segmenting is spliced into pipe gallery.
The beneficial effects of the present invention are: the present invention is by pipe gallery longitudinal direction equitable subsection, it is cross-section towards be split as base plate, Door shape component, l-shaped member, bar shaped board member, by detain between four kinds of components, lean on, take etc. forms it is folded spell be different size cabin Room is reinforced using component own wt and node, forms the intact pipe gallery segment of globality, and re-segmenting is spliced into integrated pipe Corridor, improves the applicability of pipe gallery fabricated construction, and optimization mitigates monolithic prefabricated components weight, also retains certain component Geometric stiffness, designed openings formula prefabricated components had both facilitated automatic production line the factorial production, and when component transhipment, assembled, The interior space of component can be made full use of.
Detailed description of the invention
Fig. 1 is single cabin piping lane assembling figure in specific embodiment 1;
Fig. 2 is double cabins piping lane assembling figure in specific embodiment 2;
Fig. 3 is three cabin piping lane assembling figures in specific embodiment 3;
Fig. 4 is three cabin piping lane assembling figures in specific embodiment 4;
Fig. 5 is six cabin piping lane assembling figures in specific embodiment 5;
Fig. 6 is six cabin piping lane assembling figures in specific embodiment 6;
In figure: 1- base plate;2- shape components;3- buckling base;4-L shape component;5- bar shaped board member;6- shoulder supports Plate;
It is described in detail below with reference to the embodiment of the present invention referring to attached drawing.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples:
As shown in Figures 1 to 6, a kind of novel fabricated piping lane, including base plate 1, door shape component 2, on the base plate 1 Surface is equipped with several buckling bases 3, and two vertical plates of the door shape component 2 buckle into the buckling base 3 of the base plate 1, further includes It is fitted to base plate 1, the l-shaped member 4 on door shape component 2 or bar shaped board member 5.
Particularly, the side top of the door shape component 2 is equipped with door shoulder support plate 6, and the l-shaped member 4 includes vertically connecting The level board and vertical plate connect, the level board of the l-shaped member 4 is in the door shoulder support plate 6 for riding over the door shape component 2, institute The vertical plate for stating l-shaped member 4 buckles into the buckling base 3 of the base plate 1.
The upper surface both ends of the door shape component 2 are respectively equipped with buckling base 3, the level board upper surface one of the l-shaped member 4 End is equipped with buckling base 3, and the buckling base 3 of 4 upper surface of l-shaped member is located at the surface of vertical plate.
It is equipped with installation groove in the buckling base 3, is equipped in the installation groove and fastens node, the door shape component 2 Two vertical plate bottom surfaces, l-shaped member 4 vertical plate bottom surface be equipped with and fasten the node hole that is coupled of node;The door shoulder support Plate 6 is equipped with door shoulder node, and the level board bottom surface of the l-shaped member 4 is equipped with the node hole being coupled with door shoulder node.
Particularly, the side top of the door shape component 2 is equipped with door shoulder support plate 6, and 5 both ends of bar shaped board member are set up In the door shoulder support plate 6 of two neighboring door shape component 2.
The upper surface both ends of the door shape component 2 are respectively equipped with buckling base 3.
It is equipped with installation groove in the buckling base 3, is equipped in the installation groove and fastens node, the door shape component 2 Two vertical plate bottom surfaces are equipped with the node hole being coupled with fastening node;The door shoulder support plate 6 is equipped with door shoulder node, described The bottom surface both ends of bar shaped board member 5 are equipped with the node hole being coupled with door shoulder node.
The design and construction method of above-mentioned novel fabricated piping lane, specific steps are as follows:
S1, analysis integrated piping lane transverse shape and size, by piping lane section criteria for classifying section, special cross section, variable diameter Section;
S2, according to various cross dimensions and every linear meter(lin.m.) weight, determine the longitudinal divisions length of various section piping lanes;
S3, split to various section piping lanes: bottom plate is split as base plate 1, and cabin is split as a shape component 2, L shape structure Part 4, bar shaped board member 5;
S4, the fractionation of the various sections of piping lane is combined, models respectively, carries out structural checking computation, finally carry out component design, button Close node, the design of door shoulder node;
S5, according to design drawing, designed component prefabricated mould;
S6, commission pre-fabricated factory produce component, the transhipment of team of organizing construction and folded spelling and carry out piping lane construction, pass through base plate 1, the button between door shape component 2, l-shaped member 4 or bar shaped board member 5, lean on, take to form the intact pipe gallery section of globality Section, re-segmenting are spliced into pipe gallery.
Specific embodiment 1:
Single cabin piping lane can be assembled as shown in Figure 1, and piping lane section includes base plate 1 and door shape component 2, door shape component 2 two vertical plates buckle into the buckling base 3 of the base plate 1, and installation groove is equipped in buckling base 3, is equipped with button in installation groove Node is closed, two vertical plate bottom surfaces of door shape component 2 are equipped with the node hole being coupled with fastening node.
Specific embodiment 2:
Double cabin piping lanes can be assembled as shown in Figure 2, and piping lane section includes base plate 1, door shape component 2 and l-shaped member 4, two vertical plates of door shape component 2 buckle into the buckling base 3 of the base plate 1, and the side top of door shape component 2 is equipped with door shoulder branch Fagging 6, l-shaped member 4 include level board connected vertically and vertical plate, and the level board of l-shaped member 4 is by riding over a shape component 2 In door shoulder support plate 6, the vertical plate of l-shaped member 4 is buckled into the buckling base 3 of base plate 1, and installation groove, peace are equipped in buckling base 3 It fills interior be equipped with of groove and fastens node, two vertical plate bottom surfaces of door shape component 2, the vertical plate bottom surface of l-shaped member 4 are equipped with and fasten knot The node hole that point is coupled;Door shoulder support plate 6 is equipped with door shoulder node, and the level board bottom surface of l-shaped member 4 is equipped with and door shoulder knot The node hole that point is coupled.
Specific embodiment 3:
Three cabin piping lanes can be assembled as shown in Figure 3, and piping lane section includes base plate 1, door shape component 2 and two L shapes Two vertical plates of component 4, door shape component 2 buckle into the buckling base 3 of the base plate 1, and the side top of door shape component 2 is equipped with door Shoulder support plate 6, l-shaped member 4 include level board connected vertically and vertical plate, and the level board of two l-shaped members 4 is by riding over a shape In the door shoulder support plate 6 of the two sides of component 2, the vertical plate of l-shaped member 4 is buckled into the buckling base 3 of base plate 1, sets in buckling base 3 Have an installation groove, be equipped in installation groove and fasten node, two vertical plate bottom surfaces of door shape component 2, l-shaped member 4 vertical plate bottom Face is equipped with the node hole being coupled with fastening node;Door shoulder support plate 6 is equipped with door shoulder node, the level board bottom of l-shaped member 4 Face is equipped with the node hole being coupled with door shoulder node.
Specific embodiment 4:
Three cabin piping lanes can also be assembled as shown in Figure 4, and piping lane section includes 1, two door shape component 2 of base plate and item Two vertical plates of shape board member 5, door shape component 2 buckle into the buckling base 3 of the base plate 1, and the side top of door shape component 2 is set There is a shoulder support plate 6,5 both ends of bar shaped board member ride upon in the door shoulder support plate 6 of two door shape components 2, are equipped in buckling base 3 Installation groove, interior be equipped with of the installation groove fasten node, and two vertical plate bottom surfaces of door shape component 2 are equipped with and fasten node and cooperate The node hole of installation;Door shoulder support plate 6 is equipped with door shoulder node, and the bottom surface both ends of bar shaped board member 5 are equipped with matches with door shoulder node Close the node hole of installation.
Specific embodiment 5:
Six cabin piping lanes can be assembled as shown in Figure 5, and piping lane section includes 1, two door shape component 2 of base plate and four L-shaped member 4, is divided into the upper and lower setting, and two vertical plates of the door shape component 2 of lower layer buckle into the buckling base 3 of the base plate 1 Interior, the side top of door shape component 2 is equipped with door shoulder support plate 6, and l-shaped member 4 includes level board connected vertically and vertical plate, under In the door shoulder support plate 6 of two sides of the level board of two l-shaped members 4 of layer by riding over lower layer's door shape component 2, the L shape structure of lower layer The vertical plate of part 4 buckles into the buckling base 3 of base plate 1, and the upper surface both ends of the door shape component 2 of lower layer are respectively equipped with buckling base 3 And the door shape component on upper layer is erected on buckling base 3, level board upper surface one end of the l-shaped member 4 of lower layer be equipped with buckling base 3 and It is erected with the l-shaped member 4 on upper layer in buckling base, installation groove is equipped in buckling base 3, is equipped in installation groove and fastens node, door Two vertical plate bottom surfaces of shape component 2, the vertical plate bottom surface of l-shaped member 4 are equipped with the node hole being coupled with fastening node;Door shoulder Support plate 6 is equipped with door shoulder node, and the level board bottom surface of l-shaped member 4 is equipped with the node hole being coupled with door shoulder node.
Specific embodiment 6:
Six cabin piping lanes can also be assembled as shown in Figure 6, and piping lane section includes 1, four door shape component 2 and two of base plate A bar shaped board member 5, is divided into the upper and lower, and two vertical plates of two door shape components 2 of lower layer buckle into the button of the base plate 1 It closes in seat 3, the side top of two door shape components 2 of lower layer is equipped with door shoulder support plate 6, the two neighboring door shape component 2 of lower layer Door shoulder support plate 6 between be provided with a bar shaped board member 5, the upper surface both ends of the door shape component 2 of lower layer are respectively equipped with button The door shape component 2 that upper layer is equipped in seat 3 and buckling base 3 is closed, between the door shoulder support plate 6 of two door shape components 2 on upper layer It is provided with a bar shaped board member 5, installation groove is equipped in buckling base 3, is equipped in the installation groove and fastens node, door shape structure Two vertical plate bottom surfaces of part 2 are equipped with the node hole being coupled with fastening node;Door shoulder support plate 6 is equipped with door shoulder node, item The bottom surface both ends of shape board member 5 are equipped with the node hole being coupled with door shoulder node.
Compared with the traditional cast-in-place construction of pipe gallery and overlapping construction: the present invention is prefabricated using batch production, realizes labor Dynamic intensive to mechanized portions conversion, quality is easily guaranteed that;The investment for saving the facilities material such as template, bracket, reduces and builds Material consumption is built, green construction is met;The pollution such as field operation noise, fugitive dust is reduced, the various safety of field operation are reduced Risk;Shorten the field operation construction time.
Compared with the big cross section fabricated construction of existing pipe gallery: it is raw that the present invention can make full use of automatic assembly line It produces, reduces fixed base method for prefabricating ratio, improve quality, the work efficiency of element precast;Alleviate prefabricated components monolithic weight It measures, reduce transhipment, assembled difficulty;Evade the dependence to Large-scale Hoisting equipment to a certain extent, while reducing and scene is applied The requirement of work site condition;Improve the applicability of the more cabin large scale pipe gallery fabricated constructions of multilayer.
Compared with the slatted fabricated construction of existing pipe gallery: open type prefabricated components itself of the present invention have centainly Geometric stiffness, the own wt of component are capable of forming construction interim stabilization structure, evade bracket and set up, and improve assembling construction peace Quan Xing;Installation at high altitude node quantity largely is reduced, reduces assembled difficulty, assembled node quality is reduced and Pipe rack is pacified Full influence degree is easily guaranteed that the assembled quality of piping lane, shortens the assembled duration;It can use the interior sky of open type prefabricated components Between, design transhipment and the intelligent special equipment of folded spelling further increase pipe gallery wisdom construction level.
The present invention is exemplarily described above in conjunction with attached drawing, it is clear that the present invention implements not by aforesaid way Limitation, as long as using the various improvement that the inventive concept and technical scheme of the present invention carry out, or not improved direct application It is within the scope of the present invention in other occasions.

Claims (8)

1. a kind of novel fabricated piping lane, including base plate (1), door shape component (2), the base plate (1) is if upper surface is equipped with Dry buckling base (3), two vertical plates of the door shape component (2) buckle into the buckling base (3) of the base plate (1), and feature exists In further including being fitted to base plate (1), the l-shaped member (4) on door shape component (2) or bar shaped board member (5).
2. a kind of novel fabricated piping lane according to claim 1, which is characterized in that the side of the door shape component (2) Top is equipped with door shoulder support plate (6), and the l-shaped member (4) includes level board and vertical plate connected vertically, the l-shaped member (4) in the door shoulder support plate (6) for riding over the door shape component (2), the vertical plate of the l-shaped member (4) buckles into level board In the buckling base (3) of the base plate (1).
3. a kind of novel fabricated piping lane according to claim 2, which is characterized in that the upper table of the door shape component (2) Face both ends are respectively equipped with buckling base (3), and level board upper surface one end of the l-shaped member (4) is equipped with buckling base (3), the L shape The buckling base (3) of component (4) upper surface is located at the surface of vertical plate.
4. a kind of novel fabricated piping lane according to claim 3, which is characterized in that be equipped with peace in the buckling base (3) Groove is filled, is equipped in the installation groove and fastens node, two vertical plate bottom surfaces of the door shape component (2), l-shaped member (4) Vertical plate bottom surface is equipped with the node hole being coupled with fastening node;The door shoulder support plate (6) is equipped with door shoulder node, described The level board bottom surface of l-shaped member (4) is equipped with the node hole being coupled with door shoulder node.
5. a kind of novel fabricated piping lane according to claim 1, which is characterized in that the side of the door shape component (2) Top is equipped with door shoulder support plate (6), and bar shaped board member (5) both ends ride upon the door shoulder branch of two neighboring door shape component (2) On fagging (6).
6. a kind of novel fabricated piping lane according to claim 5, which is characterized in that the upper table of the door shape component (2) Face both ends are respectively equipped with buckling base (3).
7. a kind of novel fabricated piping lane according to claim 6, which is characterized in that be equipped with peace in the buckling base (3) Groove is filled, is equipped in the installation groove and fastens node, two vertical plate bottom surfaces of the door shape component (2) are equipped with and fasten node The node hole being coupled;The door shoulder support plate (6) is equipped with door shoulder node, the bottom surface both ends of the bar shaped board member (5) Equipped with the node hole being coupled with door shoulder node.
8. a kind of design and construction method of the novel fabricated piping lane as described in claim 1-7 any one, which is characterized in that Specific steps are as follows:
S1, analysis integrated piping lane transverse shape and size, by piping lane section criteria for classifying section, special cross section, variable diameter section;
S2, according to various cross dimensions and every linear meter(lin.m.) weight, determine the longitudinal divisions length of various section piping lanes;
S3, split to various section piping lanes: bottom plate is split as base plate (1), and cabin is split as a shape component (2), L shape structure Part (4), bar shaped board member (5);
S4, the fractionation of the various sections of piping lane is combined, models respectively, carries out structural checking computation, finally carried out component design, fasten knot Point, the design of door shoulder node;
S5, according to design drawing, designed component prefabricated mould;
S6, commission pre-fabricated factory produce component, and the transhipment of team of organizing construction and folded spell simultaneously carry out piping lane construction, by base plate (1), Button between door shape component (2), l-shaped member (4) or bar shaped board member (5) leans on, takes to form the intact pipe gallery of globality Segment, re-segmenting are spliced into pipe gallery.
CN201811206067.5A 2018-10-17 2018-10-17 A kind of novel fabricated piping lane and its method of designing and constructing Pending CN109208638A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811206067.5A CN109208638A (en) 2018-10-17 2018-10-17 A kind of novel fabricated piping lane and its method of designing and constructing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811206067.5A CN109208638A (en) 2018-10-17 2018-10-17 A kind of novel fabricated piping lane and its method of designing and constructing

Publications (1)

Publication Number Publication Date
CN109208638A true CN109208638A (en) 2019-01-15

Family

ID=64980478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811206067.5A Pending CN109208638A (en) 2018-10-17 2018-10-17 A kind of novel fabricated piping lane and its method of designing and constructing

Country Status (1)

Country Link
CN (1) CN109208638A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115506298A (en) * 2022-10-24 2022-12-23 中建八局发展建设有限公司 Deep-water large-span pressure pipe gallery formwork and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1375592A (en) * 1971-04-05 1974-11-27
CN203270608U (en) * 2013-04-24 2013-11-06 刘小沙 Prefabricated combined pipe rack
CN104674847A (en) * 2015-03-05 2015-06-03 东北大学 Novel assembling type precast concrete urban comprehensive pipe gallery and construction method thereof
CN206956775U (en) * 2017-05-12 2018-02-02 哈尔滨市市政工程设计院 A kind of cabin pipe gallery of plain type underground three
CN209040158U (en) * 2018-10-17 2019-06-28 中交第一航务工程局有限公司 A kind of novel fabricated piping lane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1375592A (en) * 1971-04-05 1974-11-27
CN203270608U (en) * 2013-04-24 2013-11-06 刘小沙 Prefabricated combined pipe rack
CN104674847A (en) * 2015-03-05 2015-06-03 东北大学 Novel assembling type precast concrete urban comprehensive pipe gallery and construction method thereof
CN206956775U (en) * 2017-05-12 2018-02-02 哈尔滨市市政工程设计院 A kind of cabin pipe gallery of plain type underground three
CN209040158U (en) * 2018-10-17 2019-06-28 中交第一航务工程局有限公司 A kind of novel fabricated piping lane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115506298A (en) * 2022-10-24 2022-12-23 中建八局发展建设有限公司 Deep-water large-span pressure pipe gallery formwork and construction method thereof
CN115506298B (en) * 2022-10-24 2024-01-09 中建八局发展建设有限公司 Construction method of deep water large-span pressurized pipe gallery die carrier

Similar Documents

Publication Publication Date Title
CN106592755B (en) A kind of more high-rise overall assembled steel house structural systems of modularization
CN206110319U (en) Modular unit of modularization steel construction building structure system
CN106968342B (en) Super-large span overlapping structure
CN205931799U (en) Mount is used in prefabricated wallboard transportation
CN108978875A (en) A kind of quickly dismantled shaped pile frame plate type support structure system and its engineering method
CN108505616A (en) A kind of modularization steel house suitable for high seismic intensity area
CN106193623A (en) A kind of prefabricated concrete structure construction method
CN105888102A (en) Modular assembly type L-shaped cold-formed thin-walled steel combined wall and connecting mode thereof
CN209040158U (en) A kind of novel fabricated piping lane
CN109208638A (en) A kind of novel fabricated piping lane and its method of designing and constructing
CN207553289U (en) A kind of assembled steel and concrete frame space modular structure and system
CN107587643A (en) The ceiling structure of quick grafting assembling
CN206337644U (en) Assembled architecture agent structure
CN208545827U (en) A kind of modularization steel house suitable for high seismic intensity area
CN209277286U (en) A kind of open air bamboo matter assembled Two bors d's oeuveres beam column construction
CN108193778B (en) A kind of construction method of goose egg shape steel construction
CN101270595B (en) Assembled honeycombed sheet light empty stomach building and roof structure system
CN208001659U (en) A kind of string support steel structure green house of vegetables structural system
CN207063161U (en) Assembling clean operating room
CN203699613U (en) Rapid assembly type car frame
CN205329996U (en) Square steel post for building combined
CN212271225U (en) Light assembled house
CN209539398U (en) A kind of evacuation platform of Fast Installation
CN208927574U (en) A kind of top-type children's paradise
CN208981607U (en) A kind of assembled abnormity structural system of roof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination