CN109203058A - A kind of environment friendly plastic rubber new material equipment - Google Patents

A kind of environment friendly plastic rubber new material equipment Download PDF

Info

Publication number
CN109203058A
CN109203058A CN201810854122.5A CN201810854122A CN109203058A CN 109203058 A CN109203058 A CN 109203058A CN 201810854122 A CN201810854122 A CN 201810854122A CN 109203058 A CN109203058 A CN 109203058A
Authority
CN
China
Prior art keywords
sliding
chamber
switching chamber
connects
slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810854122.5A
Other languages
Chinese (zh)
Inventor
潘荣静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Dust Environmental Protection Technology Co Ltd
Original Assignee
Foshan Dust Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Dust Environmental Protection Technology Co Ltd filed Critical Foshan Dust Environmental Protection Technology Co Ltd
Priority to CN201810854122.5A priority Critical patent/CN109203058A/en
Publication of CN109203058A publication Critical patent/CN109203058A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D5/00Arrangements for operating and controlling machines or devices for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D5/02Means for moving the cutting member into its operative position for cutting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D5/00Arrangements for operating and controlling machines or devices for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D5/08Means for actuating the cutting member to effect the cut
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26FPERFORATING; PUNCHING; CUTTING-OUT; STAMPING-OUT; SEVERING BY MEANS OTHER THAN CUTTING
    • B26F1/00Perforating; Punching; Cutting-out; Stamping-out; Apparatus therefor
    • B26F1/16Perforating by tool or tools of the drill type

Abstract

The invention discloses a kind of environment friendly plastic rubber new material equipment, including pedestal, be symmetrical set in the base top end face strut and be set to left and right two struts between sliding frame, the sliding frame bottom is fixed with peace and connects block, the peace, which connects, is equipped with the downward sliding slot of port in block, it is slipped in the sliding slot and the first trolley shoe is installed, the first electricity favourable turn is equipped in the first trolley shoe bottom end face, the first electricity favourable turn bottom has been connected by power drill head, the sliding chamber for communicating with the sliding slot and extending upwards is equipped in the sliding frame, the sliding seat being equipped with above first trolley shoe is slipped in the sliding chamber, pre-and post perforative first switching chamber is equipped in the sliding seat, left and right elongation is provided with the second switching chamber in the sliding frame on rear side of the sliding chamber, the second switching chamber and institute It states to be rotatably assorted between sliding chamber and the first Coupling Shaft that front and back extends is installed.

Description

A kind of environment friendly plastic rubber new material equipment
Technical field
The present invention relates to new material technology field, specifically a kind of environment friendly plastic rubber new material equipment.
Background technique
Environment friendly plastic rubber new material uses in modern manufacturing industry and its extensively, these environment friendly plastic rubber new materials are processing When need to carry out punch operation, and the perforating device Setting pattern in tradition is single, and needs manpower is excessive to come into operation, together When cannot achieve multiple groups drilling operation on same straight line, processing efficiency greatly reduces, there are larger drawback, needs to change Into.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of environment friendly plastic rubber new material equipment, are able to solve above-mentioned existing In the art the problem of.
The present invention is achieved through the following technical solutions: including pedestal, being symmetrical set in the base top The strut of end face and the sliding frame being set between two struts in left and right, the sliding frame bottom is fixed with peace and connects Block, the peace connect and are equipped with the downward sliding slot of port in block, slip in the sliding slot and be equipped with the first trolley shoe, and described first The first electricity favourable turn is equipped in trolley shoe bottom end face, the first electricity favourable turn bottom has been connected by power drill head, the sliding frame In be equipped with the sliding chamber that communicates with the sliding slot and extend upwards, slipped in the sliding chamber be equipped with it is sliding positioned at described first The sliding seat above block is connect, pre-and post perforative first switching chamber, the cunning on rear side of the sliding chamber are equipped in the sliding seat It connects left and right elongation in frame and is provided with the second switching chamber, be rotatably assorted before being equipped between the second switching chamber and the sliding chamber The first Coupling Shaft extended afterwards, on rear side of first Coupling Shaft elongation end protrude into the second switching chamber and be fixedly installed on The second electricity favourable turn on rear side of the second switching chamber in inner wall is connected by power, solid in the first Coupling Shaft in the second switching chamber Surely be equipped with the first toe joint wheel, on front side of first Coupling Shaft elongation end through the first switching chamber and on front side of the sliding chamber End wall is rotatably assorted connection, is fixed with transfer panel, the transfer panel in first Coupling Shaft in the first switching chamber It is fixed with sector gear in outer circle, is symmetrically arranged in described first switching chamber or so inner wall and to be matched with the sector gear Toe joint item slips the second trolley shoe being equipped with above the sliding seat, second trolley shoe top in the sliding chamber End surface is elasticly connected with the third trolley shoe with the sliding chamber sliding connection by the first spring element, and the third is sliding It connects block top end surface and is rotatably assorted and the first cone pulley is installed, be equipped in inner wall on the right side of the sliding chamber above first cone pulley First peace connects chamber, and first peace, which connects to be rotatably assorted in chamber by bearing, is equipped with the first reducing sleeve, in first reducing sleeve Equipped with communicating with the sliding chamber and port is towards right hole slot, the is fixed on first reducing sleeve in the sliding chamber Two cone pulleys are equipped with the second peace in the sliding chamber inner left wall above first cone pulley and connect chamber, and second peace connects in chamber It is rotatably assorted by bearing and the second reducing sleeve is installed, be equipped with and communicated with the sliding chamber and port court in second reducing sleeve Left spiral hole is fitted with the spiral bar of left and right elongation in the spiral hole, and elongation end stretches out institute on the left of the spiral bar It states outside sliding frame left end face and is fixedly connected with the strut inner side end in left side, elongation end runs through on the right side of the spiral bar The sliding chamber and the hole slot are simultaneously fixedly connected, second turn in the sliding chamber with the strut inner side end on right side It is fixed with third cone pulley in female connector, is equipped with transmission device and adsorbent equipment in the sliding frame, the sliding frame is equipped with Lighting device, the lighting device include peace fishplate bar and lamp body.
Further technical solution, the transmission device include being disposed through first peace to connect in chamber or more end wall Third switching chamber and the 4th switching chamber being set to immediately below third switching chamber, in the 4th switching chamber inner left wall Equipped with the 5th switching chamber, is communicated between third switching chamber and the 4th switching chamber and be provided with first and connect slot, described the The first driving wheel being fixedly connected with first reducing sleeve, the 4th switching chamber and the described 5th are provided in three switching chambers It is rotatably assorted between switching chamber and the second Coupling Shaft is installed, fix the second transmission in the second Coupling Shaft in the 4th switching chamber Wheel, transmission is connected with first connected in slot positioned at described first between first driving wheel and second driving wheel Transmission belt is fixed with the 4th cone pulley in second Coupling Shaft in the 5th switching chamber, the 5th switching chamber and institute It states to be rotatably assorted between the second switching chamber and third Coupling Shaft is installed, it is solid in the third Coupling Shaft in the 5th switching chamber It is fixed to be equipped with the 5th cone pulley being cooperatively connected with the 4th cone pulley, it is fixed in the third Coupling Shaft in the second switching chamber Equipped with the second toe joint wheel being cooperatively connected with the first toe joint wheel.
Further technical solution, the adsorbent equipment include the holding tank being set in the sliding frame left bottom end And it is set to the 6th switching chamber above the holding tank, the holding tank inner bottom wall, which is equipped with, communicates external adsorption tube, institute It states sliding frame left end face bottom and is fixed with containing box, communicate that be provided with third logical between the containing box and the holding tank Access slot is rotatably assorted between the holding tank and the 6th switching chamber and is equipped with the 4th Coupling Shaft, the institute in the holding tank It states and is fixed with turbofan in the 4th Coupling Shaft, be fixed with the 6th cone in the 4th Coupling Shaft in the 6th switching chamber Wheel.
Further technical solution, second peace connect chamber and are provided through the 7th switching chamber in end wall up and down, and described the It is equipped with the third driving wheel being fixedly connected with second reducing sleeve in seven switching chambers, is set in the 6th switching chamber inner left wall There is eight revolution to connect chamber, the 6th switching chamber and the eight revolution connect to be rotatably assorted between chamber and be equipped with the 5th Coupling Shaft, described It is fixed with the 7th cone pulley being cooperatively connected with the 6th cone pulley in the 5th Coupling Shaft in 6th switching chamber, described the Eight revolution connects and is fixed with the 4th driving wheel in the 5th Coupling Shaft in chamber, and the 7th switching chamber and the eight revolution connect chamber Between communicate and be provided with second and connect slot, transmission, which is connected with, between the third driving wheel and the 4th driving wheel is located at Described second connects the second transmission belt in slot.
Further technical solution is symmetrically arranged with first in the sliding slot left hand end wall and connects slot, and described first connects Slipped in slot and first be fixedly connected with first trolley shoe is installed connects block, described first connect slot inner bottom wall be equipped with Described first connects the second spring element that block offsets, and second is symmetrically arranged in the sliding chamber left hand end wall and connects slot, and described Two connect to slip in slot and are equipped with second be fixedly connected with second trolley shoe and connect block, and described second connects slot inner roof wall Equipped with connecting the third spring element that block offsets with described second.
Further technical solution, the sliding seat top is fixed with top arm, and the sliding seat bottom fixation is set There is lower top arm
Further technical solution, the sliding frame inner top are equipped with the perforative sliding hole in left and right, slip and match in the sliding hole Close the sliding-contacted rod for being equipped with left and right elongation, at left and right sides of the sliding-contacted rod elongation end respectively with the two strut inner ends in left and right Face is fixedly connected, and the base top end face, which is located between two struts in left and right, is symmetrically arranged with fixed device.
Further technical solution, the peace fishplate bar is fixedly installed on the sliding frame front end face, and the lamp body is set It is placed in the peace fishplate bar bottom.
The beneficial effects of the present invention are:
Apparatus of the present invention are fixed on pedestal by fixed device when in use, by plastic material, then open the first electricity simultaneously Favourable turn and the second electricity favourable turn, the second electricity favourable turn rotation latter aspect can be by second described in the first toe joint wheel drive Toe joint wheel, the 5th cone pulley, the 4th cone pulley, the second driving wheel, the first driving wheel, the first reducing sleeve and second cone pulley turn It is dynamic, on the other hand it can drive the transfer panel that the sector gear is driven to rotate clockwise by first Coupling Shaft, it is described Sector gear can be meshed after rotating clockwise with the toe joint item on right side, under driving the sliding seat drive described Top arm slide downward, the lower top arm slide downward can press the active force that first trolley shoe overcomes second spring element Slide downward can drive the drill head to move down after the first trolley shoe slide downward, and in the first electricity favourable turn rotation After the drill head can be driven to rotate, so that punch operation can be realized, when the sector gear and the toe joint item on right side are de- From rear, under the action of second spring element, the sliding seat resets, and the drill head is completely disengaged with plastic material, institute Stating can engage after sector gear continues to rotate with the toe joint item in left side, so as to drive the sliding seat upward sliding, institute The third trolley shoe can be driven to overcome institute by the upper top arm press second trolley shoe after stating sliding seat upward sliding State the active force upward sliding of third spring element, after the third trolley shoe upward sliding can when described in the first cone pulley and described the Two cone pulleys and the third cone pulley are meshed, and first cone pulley thus can be driven to drive described the by second cone pulley The rotation of third hand tap wheel can drive second reducing sleeve to rotate, by second reducing sleeve and institute after the third cone pulley rotation It states spiral hole to be threadedly engaged, the second reducing sleeve can drive the sliding frame to slide to the right after the rotation, thus can drive described Drill head is moved to next punch position, and mobile punch operation thus back and forth can be realized, be greatly improved perforating efficiency and Punch effect;
And the 4th driving wheel can be driven to rotate by the third driving wheel after second reducing sleeve rotation, described the After the rotation of four driving wheels the 7th cone pulley, the 6th cone pulley, the 4th Coupling Shaft and institute can be driven by the 5th Coupling Shaft Turbofan rotation is stated, break flour generated when punching can be aspirated through to the adsorption tube after the turbofan rotation and suck the storage In case, unified collection is carried out, to be greatly improved the spatter property in drill process;
Since the second trolley shoe in the present invention and the third trolley shoe are by the first spring element elastic connection, as a result, described After sector gear drives the sliding seat upward sliding, and the sector gear and the toe joint item in left side without departing from when, institute It states the first cone pulley to be meshed with second cone pulley and the third cone pulley, the sector gear continues to drive described sliding First spring element can be pressed after seat upward sliding, thus can guarantee the engagement duration of first cone pulley, to can ensure that The drill head enters next punch position.
Apparatus of the present invention structure is simple, and high degree of automation, can be big, it can be achieved that mobile punch operation in same level It is big to improve perforating efficiency and punching effect, while there is cleaning function, the spatter property being greatly improved in drill process.
Detailed description of the invention
The present invention is described in detail by following specific embodiments and drawings for ease of explanation,.
Fig. 1 is a kind of overall structure diagram of environment friendly plastic rubber new material equipment of the invention.
Fig. 2 is the schematic diagram of internal structure that frame is slipped in Fig. 1.
Fig. 3 is arrow direction schematic diagram in Fig. 2.
Specific embodiment
As shown in Figure 1-3, a kind of environment friendly plastic rubber new material equipment of the invention, including pedestal 10, be symmetrical set in The strut 11 of 10 top end surface of pedestal and the sliding frame 14 being set between two struts 11 in left and right, it is described sliding 14 bottom of frame is fixed with peace and connects block 15, and the peace, which connects, is equipped with the downward sliding slot 151 of port, the sliding slot 151 in block 15 In slip the first trolley shoe 69 be installed, be equipped with the first electricity favourable turn 48 in 69 bottom end face of the first trolley shoe, described first 48 bottoms of electricity favourable turn have been connected by power drill head 49, are equipped in the sliding frame 14 and communicate with the sliding slot 151 and stretch upwards Long sliding chamber 17 slips the sliding seat 57 being equipped with above first trolley shoe 69 in the sliding chamber 17, described Pre-and post perforative first switching chamber 59, left and right elongation in the sliding frame 14 of sliding 17 rear side of chamber are equipped in sliding seat 57 It is provided with the second switching chamber 72, is rotatably assorted between the second switching chamber 72 and the sliding chamber 17 and is equipped with what front and back extended First Coupling Shaft 66, the 66 rear side elongation end of the first Coupling Shaft protrude into it is described second switching chamber 72 in and be fixedly installed on institute The the second electricity favourable turn 73 stated in 72 rear side inner wall of the second switching chamber is connected by power, the first Coupling Shaft in the second switching chamber 72 Be fixed with the first toe joint wheel 74 on 66, the 66 front side elongation end of the first Coupling Shaft through the first switching chamber 59 and with institute It states sliding 17 front side end wall of chamber to be rotatably assorted connection, be fixed in first Coupling Shaft 66 in the first switching chamber 59 Transfer panel 67, is fixed with sector gear 65 in 67 outer circle of transfer panel, symmetrical in the first switching 59 or so inner wall of chamber Equipped with the toe joint item matched with the sector gear 65, slips and be equipped on the sliding seat 57 in the sliding chamber 17 Second trolley shoe 55 of side, 55 top end surface of the second trolley shoe is elasticly connected with by the first spring element 54 slips with described The third trolley shoe 31 that chamber 17 is slidably connected, 31 top end surface of third trolley shoe, which is rotatably assorted, is equipped with the first cone pulley 30, the first peace is equipped in the sliding 17 right side inner wall of chamber of first cone pulley, 30 top and connects chamber, and first peace connects in chamber Be rotatably assorted by bearing and the first reducing sleeve 23 be installed, in first reducing sleeve 23 be equipped with communicated with the sliding chamber 17 and Port is fixed with the second cone pulley 22 towards right hole slot 24 on first reducing sleeve 23 in the sliding chamber 17, and described the It is equipped with the second peace in sliding 17 inner left wall of chamber of one cone pulley, 30 top and connects chamber, second peace connects in chamber to be turned by bearing It is dynamic to be fitted with the second reducing sleeve 18, it is equipped with and is communicated with the sliding chamber 17 and port is towards left in second reducing sleeve 18 Spiral hole 19, the spiral bar 20 of left and right elongation is fitted in the spiral hole 19, and the 20 left side elongation end of spiral bar is stretched 14 left end face of sliding frame is outer out and is fixedly connected with 11 inner side end of the strut in left side, 20 right side of spiral bar Elongation end is fixedly connected through the sliding chamber 17 and the hole slot 24 and with 11 inner side end of the strut on right side, described It is fixed with third cone pulley 21 on the second reducing sleeve 18 in sliding chamber 17, is equipped with transmission device and suction in the sliding frame 14 Adsorption device, the sliding frame 14 are equipped with lighting device, and the lighting device includes peace fishplate bar 141 and lamp body 142.
Valuably, the transmission device includes being disposed through described first to pacify the third switching chamber connect in chamber or more end wall 50 and the 4th switching chamber 70 that is set to immediately below third switching chamber 50, it sets in the 4th switching 70 inner left wall of chamber There is the 5th switching chamber 63, communicated between third switching chamber 50 and the 4th switching chamber 70 and be provided with first and connect slot 52, The first driving wheel 51 being fixedly connected with first reducing sleeve 23, the 4th switching are provided in the third switching chamber 50 It is rotatably assorted between chamber 70 and the 5th switching chamber 63 and second Coupling Shaft 60 is installed, second in the 4th switching chamber 70 The second driving wheel 61 is fixed in Coupling Shaft 60, is driven and is cooperatively connected between first driving wheel 51 and second driving wheel 61 Have and be located at described first and connect the first transmission belt 53 in slot 52, in second Coupling Shaft 60 in the 5th switching chamber 63 It is fixed with the 4th cone pulley 62, is rotatably assorted between the 5th switching chamber 63 and the second switching chamber 72 and third turn is installed Spindle 71, it is described 5th switching chamber 63 in the third Coupling Shaft 71 on be fixed with and the 4th cone pulley 62 be cooperatively connected The 5th cone pulley 64, it is described second switching chamber 72 in the third Coupling Shaft 71 on be fixed with and the first toe joint wheel 74 The second toe joint wheel 75 being cooperatively connected.
Valuably, the adsorbent equipment includes the holding tank 43 being set in the 11 left bottom end of sliding frame and sets It is placed in the 6th switching chamber 36 of 43 top of holding tank, 43 inner bottom wall of holding tank, which is equipped with, communicates external adsorption tube 16, The 14 left end face bottom of sliding frame is fixed with containing box 13, communicates and sets between the containing box 13 and the holding tank 43 It is equipped with third and connects slot 42, be rotatably assorted between the holding tank 43 and the 6th switching chamber 36 and the 4th Coupling Shaft is installed 41, turbofan 44 is fixed in the 4th Coupling Shaft 41 in the holding tank 43, it is described in the 6th switching chamber 36 The 6th cone pulley 40 is fixed in 4th Coupling Shaft 41.
Valuably, second peace connects and is provided through the 7th switching chamber 26 in chamber or more end wall, the 7th switching chamber It is equipped with the third driving wheel 27 being fixedly connected with second reducing sleeve 18 in 26, is set in the 6th switching 36 inner left wall of chamber There is eight revolution to connect chamber 35, the 6th switching chamber 36 and the eight revolution connect to be rotatably assorted between chamber 35 and be equipped with the 5th Coupling Shaft 38, the to be cooperatively connected with the 6th cone pulley 40 is fixed in the 5th Coupling Shaft 38 in the 6th switching chamber 36 Seven cone pulleys 39, the eight revolution connect and are fixed with the 4th driving wheel 37 in the 5th Coupling Shaft 38 in chamber 35, and the described 7th Switching chamber 26 connects to communicate between chamber 35 with the eight revolution and is provided with second and connects slot 28, the third driving wheel 27 and described the Transmission is connected with the second transmission belt 29 connected in slot 28 positioned at described second between four driving wheels 37.
Valuably, it is symmetrically arranged with first in 151 left hand end wall of sliding slot and connects slot 47, described first connects in slot 47 Sliding to be equipped with first be fixedly connected with first trolley shoe 69 and connect block 45, described first, which connects 47 inner bottom wall of slot, is equipped with The second spring element 46 that block 45 offsets is connected with described first, second is symmetrically arranged in sliding 17 left hand end wall of chamber and connects slot 32, described second connects to slip in slot 32 and is equipped with second be fixedly connected with second trolley shoe 55 and connects block 34, described Second, which connects 32 inner roof wall of slot, is equipped with and with described second connects the third spring element 33 that block 34 offsets.
Valuably, top arm 56 is fixed at the top of the sliding seat 57, and 57 bottom of sliding seat is fixed with down Top arm 68.
Valuably, 14 inner top of sliding frame is equipped with the perforative sliding hole in left and right, slips and is fitted in the sliding hole Left and right elongation sliding-contacted rod 25,25 left and right sides elongation end of sliding-contacted rod respectively with left and right two 11 inner side ends of strut It is fixedly connected, 10 top end surface of pedestal, which is located between two struts 11 in left and right, is symmetrically arranged with fixed device 12.
Valuably, the peace fishplate bar 141 is fixedly installed on 14 front end face of sliding frame, and the lamp body 142 is arranged In 141 bottom of peace fishplate bar, lighting demand when present apparatus night time operation can be met by the lamp body 142.
When original state, under the action of second spring element 46 and third spring element 33, described first is sliding It connects block 69 and second trolley shoe 55 to offset with the lower top arm 68 and the upper top arm 56 respectively, the sliding seat 57 By limitation move, the sector gear 65 with control two toe joint items be separated, while first cone pulley 30 with it is described Second cone pulley 22 and the third cone pulley 21 are detached from cooperation.
It is fixed on pedestal in use, plastic material is passed through fixed device 12, then opens the first electricity favourable turn 48 simultaneously And the second electricity favourable turn 73, the 73 rotation latter aspects of the second electricity favourable turn can drive described the by the first toe joint wheel 74 Two toe joint wheels 75, the 5th cone pulley 64, the 4th cone pulley 62, the second driving wheel 61, the first driving wheel 51, the first reducing sleeve 23 and institute The rotation of the second cone pulley 22 is stated, on the other hand the transfer panel 67 can be driven to drive the sector by first Coupling Shaft 66 Wheel 65 rotates clockwise, and the sector gear 65 can be meshed after rotating clockwise with the toe joint item on right side, so as to drive It moves the sliding seat 57 and drives 68 slide downward of lower top arm, it is sliding that lower 68 slide downward of top arm can press described first Block 69 overcomes the active force slide downward of second spring element 47, can drive after 69 slide downward of the first trolley shoe described Drill head 49 moves down, and the drill head 49 can be driven to rotate after 48 rotation of the first electricity favourable turn, so that punching can be realized Operation, it is described under the action of the second spring element 47 after the sector gear 65 and the toe joint item disengaging on right side Sliding seat 57 resets, and the drill head 49 is completely disengaged with plastic material, and the sector gear 65 can be with left side after continuing to rotate The toe joint item engagement, so as to drive 57 upward sliding of sliding seat, can pass through after sliding 57 upward sliding of seat The upper top arm 56 presses the work that second trolley shoe 55 drives the third trolley shoe 31 to overcome the third spring element 33 Firmly upward sliding, after 31 upward sliding of third trolley shoe can when described in the first cone pulley 30 and second cone pulley 22 and The third cone pulley 21 is meshed, and thus can drive first cone pulley 30 that the third is driven to bore by second cone pulley 22 21 rotation of wheel, the third cone pulley 21 can drive second reducing sleeve 18 to rotate after rotating, due to second reducing sleeve 18 It is threadedly engaged with the spiral hole 19, the second reducing sleeve 18 can drive the sliding frame 14 to slide to the right after the rotation, thus The drill head 49 can be driven to be moved to next punch position, mobile punch operation thus back and forth can be realized;
And the 4th driving wheel 37 can be driven to rotate by the third driving wheel 27 after second reducing sleeve 18 rotation, The 7th cone pulley 39, the 6th cone pulley 40, the can be driven after 4th driving wheel 37 rotation by the 5th Coupling Shaft 38 Four Coupling Shafts 41 and the turbofan 44 rotate, and break flour generated when punching can be aspirated through institute after rotating by the turbofan 44 It states adsorption tube 16 to suck in the containing box 13, carries out unified collection;
Since the second trolley shoe 55 and the third trolley shoe 31 are by 54 elastic connection of the first spring element in the present invention, as a result, After the sector gear 65 drives 57 upward sliding of sliding seat, and the toe joint item of the sector gear 65 and left side Without departing from when, first cone pulley 30 i.e. be meshed with second cone pulley 22 and the third cone pulley 21, the sector Wheel 65 continues that first spring element 54 can be pressed after driving 57 upward sliding of sliding seat, thus can guarantee first cone The engagement duration of wheel 30, to can ensure that the drill head 49 enters next punch position.
The beneficial effects of the present invention are:
Apparatus of the present invention are fixed on pedestal by fixed device when in use, by plastic material, then open the first electricity simultaneously Favourable turn and the second electricity favourable turn, the second electricity favourable turn rotation latter aspect can be by second described in the first toe joint wheel drive Toe joint wheel, the 5th cone pulley, the 4th cone pulley, the second driving wheel, the first driving wheel, the first reducing sleeve and second cone pulley turn It is dynamic, on the other hand it can drive the transfer panel that the sector gear is driven to rotate clockwise by first Coupling Shaft, it is described Sector gear can be meshed after rotating clockwise with the toe joint item on right side, under driving the sliding seat drive described Top arm slide downward, the lower top arm slide downward can press the active force that first trolley shoe overcomes second spring element Slide downward can drive the drill head to move down after the first trolley shoe slide downward, and in the first electricity favourable turn rotation After the drill head can be driven to rotate, so that punch operation can be realized, when the sector gear and the toe joint item on right side are de- From rear, under the action of second spring element, the sliding seat resets, and the drill head is completely disengaged with plastic material, institute Stating can engage after sector gear continues to rotate with the toe joint item in left side, so as to drive the sliding seat upward sliding, institute The third trolley shoe can be driven to overcome institute by the upper top arm press second trolley shoe after stating sliding seat upward sliding State the active force upward sliding of third spring element, after the third trolley shoe upward sliding can when described in the first cone pulley and described the Two cone pulleys and the third cone pulley are meshed, and first cone pulley thus can be driven to drive described the by second cone pulley The rotation of third hand tap wheel can drive second reducing sleeve to rotate, by second reducing sleeve and institute after the third cone pulley rotation It states spiral hole to be threadedly engaged, the second reducing sleeve can drive the sliding frame to slide to the right after the rotation, thus can drive described Drill head is moved to next punch position, and mobile punch operation thus back and forth can be realized, be greatly improved perforating efficiency and Punch effect;
And the 4th driving wheel can be driven to rotate by the third driving wheel after second reducing sleeve rotation, described the After the rotation of four driving wheels the 7th cone pulley, the 6th cone pulley, the 4th Coupling Shaft and institute can be driven by the 5th Coupling Shaft Turbofan rotation is stated, break flour generated when punching can be aspirated through to the adsorption tube after the turbofan rotation and suck the storage In case, unified collection is carried out, to be greatly improved the spatter property in drill process;
Since the second trolley shoe in the present invention and the third trolley shoe are by the first spring element elastic connection, as a result, described After sector gear drives the sliding seat upward sliding, and the sector gear and the toe joint item in left side without departing from when, institute It states the first cone pulley to be meshed with second cone pulley and the third cone pulley, the sector gear continues to drive described sliding First spring element can be pressed after seat upward sliding, thus can guarantee the engagement duration of first cone pulley, to can ensure that The drill head enters next punch position.
Apparatus of the present invention structure is simple, and high degree of automation, can be big, it can be achieved that mobile punch operation in same level It is big to improve perforating efficiency and punching effect, while there is cleaning function, the spatter property being greatly improved in drill process.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention Protection scope should be determined by the scope of protection defined in the claims.

Claims (8)

1. a kind of environment friendly plastic rubber new material equipment, including pedestal, be symmetrical set the strut in the base top end face with And it is set to the sliding frame between two struts in left and right, it is characterised in that: the sliding frame bottom is fixed with peace and connects block, The peace connects and is equipped with the downward sliding slot of port in block, slips in the sliding slot and is equipped with the first trolley shoe, and described first is sliding It connects and is equipped with the first electricity favourable turn in block bottom end face, the first electricity favourable turn bottom has been connected by power drill head, in the sliding frame It slips to be equipped with equipped with the sliding chamber for communicating with the sliding slot and extending upwards, in the sliding chamber and be slipped positioned at described first Sliding seat above block is equipped with pre-and post perforative first switching chamber in the sliding seat, described sliding on rear side of the sliding chamber Left and right elongation is provided with the second switching chamber in frame, is rotatably assorted between the second switching chamber and the sliding chamber and is equipped with front and back First Coupling Shaft of elongation, on rear side of first Coupling Shaft elongation end protrude into the second switching chamber and be fixedly installed on institute The second electricity favourable turn on rear side of the second switching chamber in inner wall is stated to be connected by power, it is fixed in the first Coupling Shaft in the second switching chamber Equipped with the first toe joint wheel, on front side of first Coupling Shaft elongation end through the first switching chamber and with the sliding chamber front side end Wall is rotatably assorted connection, is fixed with transfer panel in first Coupling Shaft in the first switching chamber, outside the transfer panel It is fixed with sector gear on circle, is symmetrically arranged with the tooth matched with the sector gear in described first switching chamber or so inner wall Narrow bars, slip the second trolley shoe being equipped with above the sliding seat in the sliding chamber, at the top of second trolley shoe End face is elasticly connected with the third trolley shoe with the sliding chamber sliding connection by the first spring element, and the third is sliding Block top end surface, which is rotatably assorted, is equipped with the first cone pulley, is equipped with the on the right side of the sliding chamber above first cone pulley in inner wall One peace connects chamber, and first peace, which connects to be rotatably assorted in chamber by bearing, is equipped with the first reducing sleeve, sets in first reducing sleeve Have and communicated with the sliding chamber and port is towards right hole slot, is fixed with second on first reducing sleeve in the sliding chamber Cone pulley is equipped with the second peace in the sliding chamber inner left wall above first cone pulley and connects chamber, and second peace, which connects in chamber, leads to It crosses bearing and is rotatably assorted and the second reducing sleeve is installed, be equipped with and communicated with the sliding chamber and port is towards a left side in second reducing sleeve Spiral hole, the spiral bar of left and right elongation is fitted in the spiral hole, described in elongation end stretches out on the left of the spiral bar Sliding frame left end face is outer and is fixedly connected with the strut inner side end in left side, and elongation end runs through institute on the right side of the spiral bar It states sliding chamber and the hole slot and is fixedly connected with the strut inner side end on right side, the second switching in the sliding chamber It puts on and is fixed with third cone pulley, transmission device and adsorbent equipment are equipped in the sliding frame, the sliding frame, which is equipped with, to be shone Bright device, the lighting device include peace fishplate bar and lamp body.
2. a kind of environment friendly plastic rubber new material equipment according to claim 1, it is characterised in that: the transmission device includes passing through It wears and is placed in first peace and connects third switching chamber of the chamber up and down in end wall and be set to immediately below the third switching chamber 4th switching chamber, is equipped with the 5th switching chamber in the 4th switching chamber inner left wall, third switching chamber with described 4th turn It connects to communicate between chamber and is provided with first and connects slot, be provided in the third switching chamber and be fixedly connected with first reducing sleeve First driving wheel is rotatably assorted between the 4th switching chamber and the 5th switching chamber and is equipped with the second Coupling Shaft, and described the The second driving wheel is fixed in the second Coupling Shaft in four switching chambers, is driven between first driving wheel and second driving wheel It is connected with and is located at described first and connects the first transmission belt in slot, in second Coupling Shaft in the 5th switching chamber It is fixed with the 4th cone pulley, is rotatably assorted between the 5th switching chamber and the second switching chamber and third Coupling Shaft is installed, The 5th cone pulley being cooperatively connected with the 4th cone pulley, institute are fixed in the third Coupling Shaft in the 5th switching chamber State the second toe joint wheel for being fixed in the third Coupling Shaft in the second switching chamber and being cooperatively connected with the first toe joint wheel.
3. a kind of environment friendly plastic rubber new material equipment according to claim 1, it is characterised in that: the adsorbent equipment includes setting The holding tank being placed in the sliding frame left bottom end and the 6th switching chamber being set to above the holding tank, the appearance Slot inner bottom wall of receiving, which is equipped with, communicates external adsorption tube, and the sliding frame left end face bottom is fixed with containing box, the storage It is communicated between case and the holding tank and is provided with third and connects slot, be rotatably assorted between the holding tank and the 6th switching chamber 4th Coupling Shaft is installed, is fixed with turbofan in the 4th Coupling Shaft in the holding tank, in the 6th switching chamber The 4th Coupling Shaft on be fixed with the 6th cone pulley.
4. a kind of environment friendly plastic rubber new material equipment according to claim 1, it is characterised in that: second peace connects chamber or more It is provided through the 7th switching chamber in end wall, is equipped with the third being fixedly connected with second reducing sleeve in the 7th switching chamber Driving wheel is equipped with eight revolution in the 6th switching chamber inner left wall and connects chamber, and the 6th switching chamber and the eight revolution connect chamber Between be rotatably assorted the 5th Coupling Shaft be installed, be fixed in the 5th Coupling Shaft in the 6th switching chamber with it is described The 7th cone pulley that 6th cone pulley is cooperatively connected, the eight revolution, which connects, is fixed with the 4th transmission in the 5th Coupling Shaft in chamber Wheel, the 7th switching chamber, which connects to communicate between chamber with the eight revolution, to be provided with second and connects slot, the third driving wheel and institute It states transmission between the 4th driving wheel and is connected with the second transmission belt connected in slot positioned at described second.
5. a kind of environment friendly plastic rubber new material equipment according to claim 1, it is characterised in that: the sliding slot left hand end wall In be symmetrically arranged with first and connect slot, described first connects to slip in slot and is equipped with first be fixedly connected with first trolley shoe Block is connected, described first connects slot inner bottom wall equipped with the second spring element that block offsets is connected with described first, and the sliding chamber is left It is symmetrically arranged with second in right end wall and connects slot, described second connects sliding be equipped in slot is fixedly connected with second trolley shoe Second connect block, described second, which connects slot inner roof wall, is equipped with and connects the third spring element that block offsets with described second.
6. a kind of environment friendly plastic rubber new material equipment according to claim 1, it is characterised in that: fixed at the top of the sliding seat Equipped with upper top arm, and the sliding seat bottom is fixed with lower top arm.
7. a kind of environment friendly plastic rubber new material equipment according to claim 1, it is characterised in that: the sliding frame inner top is set There is the perforative sliding hole in left and right, slips the sliding-contacted rod for being fitted with left and right elongation, described sliding-contacted rod or so in the sliding hole Two sides elongation end is fixedly connected with the two strut inner side ends in left and right respectively, and the base top end face is located at left and right two Fixed device is symmetrically arranged between the strut.
8. a kind of environment friendly plastic rubber new material equipment according to claim 1, it is characterised in that: the peace fishplate bar fixed setting In the sliding frame front end face, and the lamp body is set to the peace fishplate bar bottom.
CN201810854122.5A 2018-07-30 2018-07-30 A kind of environment friendly plastic rubber new material equipment Withdrawn CN109203058A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810854122.5A CN109203058A (en) 2018-07-30 2018-07-30 A kind of environment friendly plastic rubber new material equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810854122.5A CN109203058A (en) 2018-07-30 2018-07-30 A kind of environment friendly plastic rubber new material equipment

Publications (1)

Publication Number Publication Date
CN109203058A true CN109203058A (en) 2019-01-15

Family

ID=64990288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810854122.5A Withdrawn CN109203058A (en) 2018-07-30 2018-07-30 A kind of environment friendly plastic rubber new material equipment

Country Status (1)

Country Link
CN (1) CN109203058A (en)

Similar Documents

Publication Publication Date Title
CN107097301A (en) A kind of plate drilling device of automatic switchover drill bit
CN108784255A (en) A kind of follow-on letter box arrangement
CN110665819B (en) Fruit and vegetable processing device
CN207593508U (en) Intelligent multiplexing section curved surface polishing machine
CN109203058A (en) A kind of environment friendly plastic rubber new material equipment
CN108032209B (en) A kind of full-automatic semi-conducting material milling apparatus
CN108994952A (en) A kind of hydrate colour environmental protection super abrasive plastic cement race track material
CN107857116A (en) Manipulator for bending part
CN109079904A (en) A kind of high-end environmentally friendly super abrasive plastic cement race track material
CN109109080A (en) A kind of advanced super abrasive plastic cement race track material
CN108788876A (en) A kind of pipe fitting drilling device
CN108839381A (en) A kind of novel carton customization machine
CN108943839A (en) A kind of advanced carton customization machine
CN109177304A (en) A kind of efficient carton customization machine
CN108889972A (en) A kind of supporter
CN108501102A (en) A kind of assembling light guiding plate device
CN209258509U (en) A kind of vacuum packaging bag sealing device easy to remove
CN109226810A (en) A kind of high-end aluminum processing technology equipment
CN108907757A (en) A kind of hard alloy pipe fitting
CN108971555A (en) A kind of novel hard alloy pipe fitting
CN109047828A (en) A kind of letter box arrangement
CN108971554A (en) A kind of Novel shelf
CN108312051B (en) A kind of improved automatic semiconductor material milling apparatus
CN108941658A (en) A kind of high-end lift clothes rack device
CN108971553A (en) A kind of aluminum material production equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190115

WW01 Invention patent application withdrawn after publication