CN109191792A - Stop well construction between a kind of underground deep space of long-range wired control construction - Google Patents
Stop well construction between a kind of underground deep space of long-range wired control construction Download PDFInfo
- Publication number
- CN109191792A CN109191792A CN201810965135.XA CN201810965135A CN109191792A CN 109191792 A CN109191792 A CN 109191792A CN 201810965135 A CN201810965135 A CN 201810965135A CN 109191792 A CN109191792 A CN 109191792A
- Authority
- CN
- China
- Prior art keywords
- construction
- pile
- long
- wired
- support pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 239000002689 soil Substances 0.000 claims abstract description 23
- XUIMIQQOPSSXEZ-UHFFFAOYSA-N Silicon Chemical compound [Si] XUIMIQQOPSSXEZ-UHFFFAOYSA-N 0.000 claims abstract description 9
- 229910052710 silicon Inorganic materials 0.000 claims abstract description 9
- 239000010703 silicon Substances 0.000 claims abstract description 9
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 4
- 238000012360 testing method Methods 0.000 claims abstract description 3
- 238000000034 method Methods 0.000 claims description 3
- 239000004567 concrete Substances 0.000 abstract description 9
- 238000012544 monitoring process Methods 0.000 abstract description 9
- 239000004568 cement Substances 0.000 abstract description 7
- 238000013480 data collection Methods 0.000 abstract description 6
- 238000007789 sealing Methods 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 abstract 1
- 238000011065 in-situ storage Methods 0.000 abstract 1
- 239000002253 acid Substances 0.000 description 2
- VDGJOQCBCPGFFD-UHFFFAOYSA-N oxygen(2-) silicon(4+) titanium(4+) Chemical compound [Si+4].[O-2].[O-2].[Ti+4] VDGJOQCBCPGFFD-UHFFFAOYSA-N 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 235000012431 wafers Nutrition 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241000209202 Bromus secalinus Species 0.000 description 1
- 241001074085 Scophthalmus aquosus Species 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 230000001939 inductive effect Effects 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000035945 sensitivity Effects 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B21/00—Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
- G08B21/02—Alarms for ensuring the safety of persons
- G08B21/10—Alarms for ensuring the safety of persons responsive to calamitous events, e.g. tornados or earthquakes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B21/00—Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
- G08B21/18—Status alarms
- G08B21/182—Level alarms, e.g. alarms responsive to variables exceeding a threshold
-
- G—PHYSICS
- G08—SIGNALLING
- G08C—TRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
- G08C19/00—Electric signal transmission systems
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
It is more than that the cement mixing pile of cutting depth 5-10m does sealing and encloses curtain that parking well construction all has as existing Soft Deep Foundation Pit technology between a kind of underground deep space of long-range wired control construction, the cast-in-situ bored pile of cutting depth 8-30m is had more than as support pile, there is armored concrete interior wall on the inside of support pile, it is characterized in that, the silicon fiml strain gauge transducer that outer soil body lateral stress is cheated in test is welded on the outside of the support pile on reinforcing bar, and it is wired to the outer data collection processor of well, then the computer terminal of distant place is connected to by conducting wire.Compared with prior art, have can resistance to shear of soil variation on the outside of wired monitoring civil engineering structure at a distance in real time avoid parking well construction from the major accidents such as collapsing once stress is more than warning data early warning immediately.
Description
Technical field
The present invention relates to the well knots that stops between building field more particularly to a kind of underground deep space of long-range wired control construction
Structure.
Background technique
It is well known that city parking difficulty is the bottleneck of current city development, especially in Deposits in Eastern Coastal China soft soil foundation city
The parking difficulty in city is even more serious, in addition, many accidents occurred in various regions architecture Foundation Pit Engineering since reform and opening-up, has studied carefully its original
Because being to cheat outer soil pressure variation because of non-real-time dynamic monitoring.One field boundary heavy rain, level of ground water rise, and cheat the mechanical property hair of the outer soil body
It is raw to change, it finds and takes measures not in time, directly contribute the generation of foundation pit collapse accident.
Summary of the invention
The present invention provides the well construction that stops between the underground deep space of long-range wired control construction a kind of, can be in China coast weak soil
The municipal construction of ground and use, can be by acquiring the lateral stress data of the soil body on the outside of hole in the construction time in real time, and passes through number
Telecommunication point is converted into according to processor, and wired to be sent to terminal computer, monitoring personnel downloads the monitoring software on computer at a distance, just
Hole outside soil stress change curve can be observed in real time, and guiding construction guarantees sidewall safety.
Parking well construction and existing Soft Deep Foundation Pit skill between a kind of underground deep space of long-range wired control construction of the present invention
It is more than that the cement mixing pile of cutting depth 5-10m does sealing and encloses curtain that art is the same, which all to be had, has more than the brill of cutting depth 8-30m
Hole pouring pile has armored concrete interior wall as support pile on the inside of support pile, which is characterized in that on the outside of the support pile on reinforcing bar
It is welded with test and cheats the silicon fiml strain gauge transducer of outer soil body lateral stress, and be wired to the outer data collection processor of well,
The computer terminal of distant place is connected to by conducting wire again.Computer downloads the detection system software, just will appear hole on computer screen
Outer resistance to shear of soil change curve, peak value exceed setting target, that is, early warning.
It can resistance to shear of soil becomes on the outside of wired monitoring civil engineering structure at a distance in real time compared with prior art, the present invention having
Change, once stress is more than warning data early warning immediately, avoids the major accidents such as parking well construction collapsing.
Detailed description of the invention
Fig. 1 is parking well construction diagrammatic cross-section of the embodiment of the present invention.
Fig. 2 is silicon fiml strain gauge transducer structural schematic diagram of the embodiment of the present invention, a top view, b sectional view.
Drawing explanation: 1 ground concrete layer, 2 soil cement water-stop curtains, 3 capping beams, 4 support piles, 5 mine pits, 6 reinforcing bars are mixed
Solidifying soil interior wall, 7 data collection processors, 8 muds, 9 argillic horizons, 10 gravel layers, 11 soil cements reinforce waterstop, and 12 elements are mixed
Solidifying grave bottom, 13 reinforced concrete floors, 14 fixed metal weld tabs, 15 inductive reactances, 16 diaphragm sides, 17 varistors, 18
Thin silicon diaphragm, 19 titanium dioxide silicon wafers, 20 vacuum chambers, 21 borosilicic acid slides.
Specific embodiment
According to Fig. 1, parking well construction embodiment construction procedure is as follows between a kind of underground deep space of long-range wired control construction:
1. showing field boundary in underground parking well construction, support pile (4) of the first construction drill bored concrete pile as parking well construction is being cheated
At longitudinal main reinforcement lower end of well (5) surrounding pile body, middle part and the upward 3-6m in lower end, equipped with the 30-50 being distributed at a certain distance
The silicon fiml strain gauge transducer of a induction soil body lateral pressure, and sensor conductor is involved from the top of support pile (4) and is connected to data
Acquisition Processor (7), then data collection processor (7) is accessed into distant place computer terminal with conducting wire;
2. in mine pit (5) back cover absolute altitude following soil layer cement mixing pile machine or the cement of whirl spraying ram machine construction 5-10m thickness
Soil reinforces waterstop (11);
3. constructing 1.2m solid cement soil water-stop curtain (2) with mixing pile machine on the outside of support pile (4);
4. in support pile (4) top pouring armored concrete capping beam (3);
5. grabbing the soil body that cone is dug in capping beam (3) to water filling in mine pit (5), and with punching, data collection processor (7) is connect
Upper power supply, monitoring system start monitoring and cheat outer resistance to shear of soil variation, and the elastic sensing element of silicon fiml sheet type sensor is solid for periphery
The thin silicon diaphragm (18) of deposit category weld tabs (14).It radial strain and is tangentially answered when thin silicon diaphragm (18) stress deformation, at center
Change reaches positive maximum value, and edge radial strain reaches negative maximum value, tangential strain zero.Separately strained with two
Titanium dioxide silicon wafer (19) is attached to respectively at positive and negative maximum strain, is connected into the half-bridge circuit of adjacent bridge arm to obtain larger sensitivity,
It is sealed in vacuum chamber (20) outer cover borosilicic acid slide (21).Strain data is processed into electric signal by data collection processor (7),
Terminal computer server is sent to by conducting wire, as long as monitoring personnel downloads the monitoring system software on host computer, is just reached
Resistance to shear of soil change curve avoids cheating once the super early warning line of curve, takes immediate steps on the outside of distant place wired monitoring mine pit (5)
Wall cave-in accident.Soil is taken to get shaft bottom absolute altitude, then underwater pouring plain concrete back cover layer (12).
6. drawing water in mine pit (5), after concrete sealing bottom layer (12) intensity reaches by current art construction reinforced bar concrete
Bottom plate (13);
7. being segmented the armored concrete interior wall (6) that formwork pours 0.8-1m thickness from bottom to top by current art, that is, complete this
The construction of invention.
Claims (1)
1. stop well construction between a kind of underground deep space of long-range wired control construction, which is characterized in that the reinforcing bar on the outside of support pile
On be welded with test and cheat the silicon fiml strain gauge transducer of outer soil body lateral stress, and be wired to well data acquisition process outside
Device, then it is connected to by conducting wire the computer terminal of distant place.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810965135.XA CN109191792A (en) | 2018-08-15 | 2018-08-15 | Stop well construction between a kind of underground deep space of long-range wired control construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810965135.XA CN109191792A (en) | 2018-08-15 | 2018-08-15 | Stop well construction between a kind of underground deep space of long-range wired control construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109191792A true CN109191792A (en) | 2019-01-11 |
Family
ID=64919646
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810965135.XA Pending CN109191792A (en) | 2018-08-15 | 2018-08-15 | Stop well construction between a kind of underground deep space of long-range wired control construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109191792A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593624A (en) * | 2019-09-27 | 2019-12-20 | 张率 | Radiation type vertical shaft underground parking lot and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101457533A (en) * | 2007-12-13 | 2009-06-17 | 上海隧道工程股份有限公司 | Foundation ditch digging real-time detection method |
CN204728302U (en) * | 2015-07-07 | 2015-10-28 | 山西省交通科学研究院 | A kind of base pit stability prior-warning device |
CN107190769A (en) * | 2016-12-08 | 2017-09-22 | 温州市城市资源开发工程有限公司 | Stop well construction between a kind of underground deep space of soft soil foundation |
CN107476618A (en) * | 2017-08-29 | 2017-12-15 | 温州市城市资源开发工程有限公司 | Stop well construction between a kind of underground deep space of big data intelligence management and control construction |
CN208766812U (en) * | 2018-08-15 | 2019-04-19 | 温州市城市资源开发工程有限公司 | Stop well construction between a kind of underground deep space of long-range wired control construction |
-
2018
- 2018-08-15 CN CN201810965135.XA patent/CN109191792A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101457533A (en) * | 2007-12-13 | 2009-06-17 | 上海隧道工程股份有限公司 | Foundation ditch digging real-time detection method |
CN204728302U (en) * | 2015-07-07 | 2015-10-28 | 山西省交通科学研究院 | A kind of base pit stability prior-warning device |
CN107190769A (en) * | 2016-12-08 | 2017-09-22 | 温州市城市资源开发工程有限公司 | Stop well construction between a kind of underground deep space of soft soil foundation |
CN107476618A (en) * | 2017-08-29 | 2017-12-15 | 温州市城市资源开发工程有限公司 | Stop well construction between a kind of underground deep space of big data intelligence management and control construction |
CN208766812U (en) * | 2018-08-15 | 2019-04-19 | 温州市城市资源开发工程有限公司 | Stop well construction between a kind of underground deep space of long-range wired control construction |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593624A (en) * | 2019-09-27 | 2019-12-20 | 张率 | Radiation type vertical shaft underground parking lot and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105239563A (en) | Dry-method hole forming filling pile structure for post-grouting matched rotary drilling rig and construction method | |
CN106988302B (en) | A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method | |
CN107524138A (en) | A kind of ultra-deep foundation pit construction method of underground continuous wall | |
CN106436788A (en) | Foundation reinforcement and inclination correction method for friction piles of high-rise building | |
CN208766812U (en) | Stop well construction between a kind of underground deep space of long-range wired control construction | |
CN109555116A (en) | A kind of high density karst intense development area fully-sleeved filled pile construction method | |
CN103266600A (en) | Occlusion pile of full reinforcement pile and construction method thereof | |
CN110258658A (en) | The leakage anticipation of diaphram wall and the construction method of processing | |
CN208721064U (en) | Real-time monitoring system across existing subway tunnel on a kind of city tunnel | |
CN108442370A (en) | The broken pile connector processing method of prestressed concrete pipe pile | |
CN109191792A (en) | Stop well construction between a kind of underground deep space of long-range wired control construction | |
CN105180787A (en) | High-pressure grouting lifting deformation monitor and installation method thereof | |
CN114033388A (en) | Vertical shaft construction method for underground tunnel top pipe of water-rich silt layer | |
CN107190769A (en) | Stop well construction between a kind of underground deep space of soft soil foundation | |
CN108205055A (en) | Ground Deformation for Shallow Tunnel pilot system under a kind of operation highway | |
CN102505685A (en) | Tubular pile defect processing method | |
CN107780407A (en) | Secondary precipitation union dynamic consolidation soft base processing method | |
CN107675700A (en) | The construction method of diaphram wall | |
CN109138006A (en) | A kind of underground parking well construction with vibrating string type sensor and unidirectional RF chip | |
CN209538248U (en) | A kind of underground parking well construction with vibrating string type sensor and unidirectional RF chip | |
CN210658410U (en) | Inverted wall hanging surrounding well structure | |
CN202170513U (en) | No undergoing force slab prestressed high strength concrete pipe pile base | |
CN206974504U (en) | Deep footing groove enclosing structure real time on-line monitoring system | |
CN206971243U (en) | Draw hole caisson structure in a kind of wall for not influenceing surrounding enviroment | |
CN206607584U (en) | A kind of PHC piles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: Chen Xi Document name: Notice of First Examination Opinion |
|
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: WENZHOU CITY RESOURCES DEVELOPMENT ENGINEERING Co.,Ltd. Person in charge of patents Document name: Deemed withdrawal notice |