CN109186565B - 一种用于吊杆长度计算及碰撞检查的方法 - Google Patents
一种用于吊杆长度计算及碰撞检查的方法 Download PDFInfo
- Publication number
- CN109186565B CN109186565B CN201811098200.XA CN201811098200A CN109186565B CN 109186565 B CN109186565 B CN 109186565B CN 201811098200 A CN201811098200 A CN 201811098200A CN 109186565 B CN109186565 B CN 109186565B
- Authority
- CN
- China
- Prior art keywords
- suspender
- length
- calculation
- determining
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Control And Safety Of Cranes (AREA)
- Jib Cranes (AREA)
Abstract
本发明公开了一种用于吊杆长度计算及碰撞检查的方法,在拱肋吊杆长度确定前,确定相关的计算参数以及三维空间坐标转换计算,确定现场测量控制点,进行软件编程,单根吊杆长度计算及碰撞检查,下一吊杆数据测量,吊杆计算长度统计或预埋套筒修正。本发明采用计算机程序编写软件进行坐标体系转换,相比于CAD、BIM技术,操作简便,计算速度快、结果可靠,节约成本,在具体施工过程中,根据现场情况快速得到吊杆的计算长度并判断现场的上、下预埋套筒空间是否能满足吊杆安装,在吊杆下料前预测其安装情况,保证其不与预埋套筒发生碰撞,大大的提高吊杆长度计算效率,且避免出现吊杆张拉后与预埋套筒发生碰撞或摩擦现象。
Description
技术领域
本发明属于提篮拱桥施工技术领域,具体涉及一种用于吊杆长度计算及碰撞检查的方法。
背景技术
吊杆作为提篮拱桥的主要受力构件,目前确定吊杆长度常采用的方法主要是绳测法以及借助CAD绘图工具进行测量,绳测法原理简单但误差较大;CAD绘图工具确定吊杆长度的方法精度高但工作量大、效率低。同时拱肋钢管、系梁随着施工进行,其内部的吊杆预埋套筒位置会发生位移,再累加上安装施工过程中的误差,有可能导致上下预埋套筒在吊杆成型时发生碰撞现象,若待吊杆张拉期间发生该现象,其处理成本极高。
发明内容
为了克服现有技术中提篮拱桥吊杆长度测量工作量大、效率低,在具体施工过程中易出现碰撞等技术缺陷,本发明提供了一种用于吊杆长度计算及碰撞检查的方法,在吊杆施工作业前,预先编写分析全站仪数据的软件,核对吊杆安装位置以及判断吊杆与预埋套筒是否会发生碰撞现象,对其安装情况进行提前预测,保证其不与预埋套筒发生碰撞,大大的提高吊杆长度计算效率,解决了上述技术问题。
本发明通过以下技术方案来实现上述目的,一种用于吊杆长度计算及碰撞检查的方法,包括以下步骤:
步骤一:确定相关的计算参数以及三维空间坐标转换计算,该步骤又包括以下几个部分:
a、根据前期施工数据确定上、下吊杆套筒的预埋长度,以及吊杆直径相关参数;
b、建立求上预埋套筒端部中心的空间坐标计算方法;
c、建立求下预埋套筒顶部中心的空间坐标计算方法;
d、根据a、b、c的结果,建立上预埋套筒底部空间坐标计算方法;
e、根据a、b、c的结果,建立下预埋套筒端部空间坐标计算方法;
f、根据b、e的结果,计算吊杆长度以及空间位置;
g、根据a、c、d、f的结果,建立吊杆与套筒是否会发生碰撞的判断公式;
步骤二:确定现场测量控制点,根据现场条件,确定较易测得上锚箱的三个角点,以及下预埋套管顶部圆周三点;
步骤三:软件编程,根据步骤一中的步骤编写程序源代码,并且生成显示操作界面,读取全站仪导出数据并识别;
步骤四:单根吊杆长度计算及碰撞检查,利用全站仪测量同一吊杆在步骤二中选择的测点,软件计算得到吊杆长度以及碰撞检查情况,并核对设计所给出的上、下预埋套筒端部中心的空间坐标;
步骤五:下一吊杆测量数据;
步骤六:吊杆计算长度统计或预埋套筒修正,统计生成全部吊杆的长度,并生成excel统计表,对有碰撞现象的预埋套筒进行处理后方可确定吊杆计算长度。
总体而言,通过本发明所构思的以上技术方案与现有技术相比,可以达到以下有益效果:本发明所述的现场测点均为可放置棱镜点,避免传统测量方法较难精确的选取上、下预埋套筒中心点坐标进行测量,提高了测量精度,同时采用计算机程序编写软件进行坐标体系转换,相比于传统的CAD、BIM技术,操作简便,计算速度快、结果可靠,节约成本,从空间角度保证吊杆的安装施工,在吊杆下料前预测其安装情况,保证其不与预埋套筒发生碰撞。
附图说明
下面结合附图对本发明的具体实施方式做进一步详细的说明,其中:
图1为吊杆与上、下预埋套筒的空间位置示意图;
图2为本发明中预埋套管空间模型计算示意图;
图3为本发明所述吊杆长度计算及碰撞检查软件界面;
图4为现场导入全站仪测量数据软件计算界面。
具体实施方式
一种用于吊杆长度计算及碰撞检查的方法,该方法包括以下步骤:
步骤一:确定相关的计算参数以及三维空间坐标转换计算,该步骤又包括以下几个部分:
a、根据前期施工数据确定上、下吊杆套筒的预埋长度,以及吊杆直径相关参数;
b、建立求上预埋套筒端部中心的空间坐标计算方法;
c、建立求下预埋套筒顶部中心的空间坐标计算方法;
d、根据a、b、c的结果,建立上预埋套筒底部空间坐标计算方法;
e、根据a、b、c的结果,建立下预埋套筒端部空间坐标计算方法;
f、根据b、e的结果,计算吊杆长度以及空间位置,如图1所示,为吊杆与上、下预埋套筒的空间位置示意图;
g、根据a、c、d、f的结果,建立吊杆与套筒是否会发生碰撞的判断公式;
步骤二:确定现场测量控制点,根据现场条件,确定较易测得上锚箱的三个角点,以及下预埋套管顶部圆周三点,如图2所示,为预埋套管空间模型计算示意图;
步骤三:软件编程,根据步骤一中的步骤编写程序源代码,并且生成显示操作界面,如图3所示,为吊杆长度计算及碰撞检查软件界面,读取全站仪导出数据并识别,如图4所示,为现场导入全站仪测量数据软件计算界面;
步骤四:单根吊杆长度计算及碰撞检查,利用全站仪测量同一吊杆在步骤二中选择的测点,软件计算得到吊杆长度以及碰撞检查情况,并核对设计所给出的上、下预埋套筒端部中心的空间坐标;
步骤五:下一吊杆测量数据;
步骤六:吊杆计算长度统计或预埋套筒修正,统计生成全部吊杆的长度,并生成excel统计表,对有碰撞现象的预埋套筒进行处理后方可确定吊杆计算长度。
本领域的技术人员容易理解,以上所述仅为本发明的较佳实施例而已,并不用于限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (1)
1.一种用于吊杆长度计算及碰撞检查的方法,其特征在于:包括以下步骤:
S1:确定相关的计算参数以及三维空间坐标转换计算;
a、根据前期施工数据确定上、下吊杆套筒的预埋长度,以及吊杆直径相关参数;
b、建立求上预埋套筒端部中心的空间坐标计算方法;
c、建立求下预埋套筒顶部中心的空间坐标计算方法;
d、根据a、b、c的结果,建立上预埋套筒底部空间坐标计算方法;
e、根据a、b、c的结果,建立下预埋套筒端部空间坐标计算方法;
f、根据b、e的结果,计算吊杆长度以及空间位置;
g、根据a、c、d、f的结果,建立吊杆与套筒是否会发生碰撞的判断公式;
S2:确定现场测量控制点,根据现场条件,确定较易测的上锚箱的三个角点,以及下预埋套管顶部圆周三点;
S3:软件编程,根据S1中的步骤编写程序源代码,并且生成显示操作界面,读取全站仪导出数据并识别;
S4:单根吊杆长度计算及碰撞检查,利用全站仪测量同一吊杆在S2中选择的测点,软件计算得到吊杆长度以及碰撞检查情况,并核对设计所给出的上、下预埋套筒端部中心的空间坐标;
S5:下一吊杆测量数据;
S6:吊杆计算长度统计或预埋套筒修正,统计生成全部吊杆的长度,并生成excel统计表,对有碰撞现象的预埋套筒进行处理后即可确定吊杆的长度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811098200.XA CN109186565B (zh) | 2018-09-20 | 2018-09-20 | 一种用于吊杆长度计算及碰撞检查的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811098200.XA CN109186565B (zh) | 2018-09-20 | 2018-09-20 | 一种用于吊杆长度计算及碰撞检查的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109186565A CN109186565A (zh) | 2019-01-11 |
CN109186565B true CN109186565B (zh) | 2020-11-24 |
Family
ID=64908591
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811098200.XA Active CN109186565B (zh) | 2018-09-20 | 2018-09-20 | 一种用于吊杆长度计算及碰撞检查的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109186565B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112854005A (zh) * | 2021-02-25 | 2021-05-28 | 广西路桥工程集团有限公司 | 一种桥梁锚管定位方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007297777A (ja) * | 2006-04-27 | 2007-11-15 | Nippon Steel Engineering Co Ltd | 吊り構造用のケーブル及び測定システム |
KR101145026B1 (ko) * | 2011-10-28 | 2012-05-11 | 현대건설주식회사 | 수치해석 기반의 새그민감도를 이용한 현수교 케이블의 현수선 형상조정방법 |
CN105424078A (zh) * | 2015-12-08 | 2016-03-23 | 中国一冶集团有限公司 | 一种吊杆碰撞测试仪以及基于该吊杆碰撞测试仪辅助bim技术在吊装工艺的模拟方法 |
CN206410640U (zh) * | 2017-01-26 | 2017-08-15 | 山西省交通科学研究院 | 一种测量拱桥吊杆长度的装置 |
CN108505450A (zh) * | 2018-05-09 | 2018-09-07 | 中建三局基础设施建设投资有限公司 | 一种钢管拱桥吊杆安装仿真装置及使用方法 |
-
2018
- 2018-09-20 CN CN201811098200.XA patent/CN109186565B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007297777A (ja) * | 2006-04-27 | 2007-11-15 | Nippon Steel Engineering Co Ltd | 吊り構造用のケーブル及び測定システム |
KR101145026B1 (ko) * | 2011-10-28 | 2012-05-11 | 현대건설주식회사 | 수치해석 기반의 새그민감도를 이용한 현수교 케이블의 현수선 형상조정방법 |
CN105424078A (zh) * | 2015-12-08 | 2016-03-23 | 中国一冶集团有限公司 | 一种吊杆碰撞测试仪以及基于该吊杆碰撞测试仪辅助bim技术在吊装工艺的模拟方法 |
CN206410640U (zh) * | 2017-01-26 | 2017-08-15 | 山西省交通科学研究院 | 一种测量拱桥吊杆长度的装置 |
CN108505450A (zh) * | 2018-05-09 | 2018-09-07 | 中建三局基础设施建设投资有限公司 | 一种钢管拱桥吊杆安装仿真装置及使用方法 |
Non-Patent Citations (2)
Title |
---|
BIM技术在郑万铁路128m钢管混凝土拱桥施工过程中的应用研究;史军胜;《中国优秀硕士学位论文全文数据库》;20180215;全文 * |
西山索道防护棚主缆、吊杆安装施工技术研究;时春喜 等;《桥隧工程》;20151231(第11期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN109186565A (zh) | 2019-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111627099B (zh) | 基于三维扫描技术的钢结构非接触式实测实量方法和系统 | |
WO2023159810A1 (zh) | 一种基于数字孪生的钢管混凝土拱桥施工监控方法及系统 | |
CN111121733A (zh) | 基于bim和三维激光扫描的施工质量检测方法及系统 | |
CN101324428B (zh) | 建筑钢结构异形构件三维坐标测量方法 | |
CN104965947A (zh) | 一种基于bim技术的桥梁三维设计方法 | |
CN113374282B (zh) | 采用假定坐标系控制预埋螺栓的方法 | |
CN109214099B (zh) | 一种拱肋钢管定位及施工方法 | |
CN103114732A (zh) | 铸钢相贯管节点空间定位方法 | |
CN109186565B (zh) | 一种用于吊杆长度计算及碰撞检查的方法 | |
CN110646159A (zh) | 现浇清水混凝土风洞高精度控制测量的施工方法 | |
CN206002038U (zh) | 一种墙柱模板垂直测量仪 | |
CN102564389A (zh) | 顶管工程自动测量系统及其方法 | |
KR101777615B1 (ko) | 벨마우스의 리프팅 러그 부착 위치 산출 방법 | |
CN112459136A (zh) | 深基坑施工安全风险监测方法、装置、设备及介质 | |
CN204649193U (zh) | 一种桥梁钢管混凝土墩柱垂直度检测装置 | |
CN204188127U (zh) | 一种用于连杆分型面上下对称度测量工具 | |
CN206160865U (zh) | 一种起重机部件多维综合检测量具 | |
CN113914632A (zh) | 一种基于bim技术的钢结构拉索施工方法 | |
CN205664761U (zh) | 用于汽车零件的配合间隙检测装置 | |
CN104050336A (zh) | 基于轨迹相交的三维几何元素约束状态判断方法 | |
CN114580048A (zh) | 隧道围岩压力拱计算方法及系统 | |
CN108363862B (zh) | 一种圆钢管施工误差的逆向分析方法 | |
CN102699548B (zh) | 复杂曲线钢结构杆件数控高效组装方法 | |
CN202582533U (zh) | 不占用线路的接触网激光检测仪 | |
CN109357787A (zh) | 一种斜拉桥的主梁混凝土温度监控方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |