Prior art keywords
plate
carriageway
tunnel
traffic
synthesis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811349767.XA
Other languages
Chinese (zh)
Inventor
张金良
王惠芹
王美斋
董甲甲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201811349767.XA priority Critical patent/CN109184732A/en
Publication of CN109184732A publication Critical patent/CN109184732A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes
    • E01F15/04Continuous barriers extending along roads or between traffic lanes essentially made of longitudinal beams or rigid strips supported above ground at spaced points
    • E01F15/0461Supports, e.g. posts
    • E01F15/0469Covers, e.g. of ground surface around the foot
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention discloses a kind of synthesis tunnel structure for taking into account draining and traffic, including tunnel ontology, pipe-plate lining is set on the inner wall of tunnel ontology, the inside of tunnel ontology also sets up carriageway plate, carriageway plate is connected with pipe-plate lining, longitudinal supporting plate can be arranged for vehicle pass-through, the bottom of carriageway plate on carriageway plate, longitudinal supporting plate is connected with carriageway plate, and the channel that longitudinal supporting plate, carriageway plate and pipe-plate lining surround forms water passage.Longitudinal supporting plate can be arranged in carriageway plate bottom for vehicle driving in carriageway plate, reduce carriageway plate and get on the car the influencing each other of vibration, improve travel safety, meanwhile, water passage is separated, the maintenance of water passage is facilitated.

Description

A kind of synthesis tunnel structure for taking into account draining and traffic
Technical field
The present invention relates to underground traffic tunnels technical fields, more particularly to a kind of synthesis tunnel for taking into account draining and traffic Structure.
Background technique
With the development of modern city, the scale in city is gradually expanded, the drainability of existing subsurface stormwater system Seem increasingly insufficient, it is urban public that sewerage system, which is processing and the job facilities system for excluding municipal sewage and rainwater, The important component of facility.In recent years, rainy season often will appear the natural calamity of urban waterlogging, make to the people's lives and property At great harm.
It is exactly urban transportation increasingly congestion along with another widened phenomenon of city size, automobile utilization rate increase is to lead The main reason for causing urban transportation blocking.Due to the convenience of automobile, wagon flow in urban district is caused increasingly to increase, whenever peak hour, Working, tourism, shopping wagon flow pours in downtown from all quarter;In addition, road capacity deficiency is also to cause traffic congestion Factor, as the quantity of automobile is continuously increased, and not catch up with vehicle flowrate increased several times for the speed of expressway extension, so that in city The time cost of the crowded road of the heart, city people life is being gradually increased, to solve traffic problems, underground traffic tunnels It is vigorously developed, underground traffic tunnels had exactly not only guaranteed speed but also prevented take up being preferably selected for city space, but built underground While traffic tunnel solves traffic problems, to ensure that subdrainage increases a heavy difficulty again.
Therefore, Urban Underground draining how is taken into account while developing underground traffic tunnels, becomes those skilled in the art Member's urgent problem to be solved.
Summary of the invention
The object of the present invention is to provide a kind of synthesis tunnel structures for taking into account draining and traffic, to solve the above-mentioned prior art There are the problem of, enable subterranean tunnel while alleviating urban traffic pressure, accomplish that subdrainage is unobstructed, prevent in city The generation of flood.
To achieve the above object, the present invention provides following schemes: the present invention, which provides, a kind of takes into account the comprehensive of draining and traffic Tunnel structure, including tunnel ontology are closed, pipe-plate lining is set on the inner wall of the tunnel ontology, the inside of the tunnel ontology is also Carriageway plate is set, and the carriageway plate is connected with the pipe-plate lining, can be described for vehicle pass-through on the carriageway plate Longitudinal supporting plate is arranged in the bottom of carriageway plate, and the longitudinal supporting plate is connected with the carriageway plate, the longitudinal supporting plate, The channel that the carriageway plate and the pipe-plate lining surround forms water passage.
Preferably, described to take into account draining and the synthesis tunnel structure of traffic further include bottom connecting plate, the bottom connection Plate is connected with the carriageway plate, and the longitudinal supporting plate connects the carriageway plate and the bottom support plate.
Preferably, plane where the longitudinal supporting plate and plane where the carriageway plate are perpendicular.
Preferably, the quantity of the longitudinal supporting plate is two, and two longitudinal supporting plates are symmetrical arranged.
Preferably, the carriageway plate, the bottom connecting plate and the longitudinal supporting plate are reinforced concrete structure.
Preferably, the tunnel body interior also sets up ventilation equipment, and the ventilation equipment is set to the tunnel ontology Top, the ventilation equipment is connected with outside air.
Preferably, the cross section of the tunnel ontology is circle, and the width of the carriageway plate tunnel ontology is horizontal The diameter in section is small.
Preferably, the carriageway plate is respectively provided with boss close to the two sides of the pipe-plate lining.
The present invention achieves following technical effect compared with the existing technology: the synthesis tunnel for taking into account draining and traffic of the invention Pipe-plate lining is arranged on the inner wall of tunnel ontology in road structure, including tunnel ontology, and the inside of tunnel ontology also sets up runway Plate, carriageway plate are connected with pipe-plate lining, longitudinal bracing can be arranged for vehicle pass-through, the bottom of carriageway plate on carriageway plate Plate, longitudinal supporting plate are connected with carriageway plate, and it is logical that the channel that longitudinal supporting plate, carriageway plate and pipe-plate lining surround formed water Road.Longitudinal supporting plate can be arranged in carriageway plate bottom for vehicle driving in carriageway plate, reduce carriageway plate and get on the car vibration Dynamic influences each other, and improves travel safety, meanwhile, water passage is separated, the maintenance of water passage is facilitated.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings Obtain other attached drawings.
Fig. 1 is the schematic cross-section of the synthesis tunnel structure for taking into account draining and traffic of the invention;
Wherein, 1 is tunnel ontology, and 2 be pipe-plate lining, and 3 be carriageway plate, and 4 be longitudinal supporting plate, and 5 be bottom connecting plate, 6 be ventilation equipment.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The object of the present invention is to provide a kind of synthesis tunnel structures for taking into account draining and traffic, to solve the above-mentioned prior art There are the problem of, enable subterranean tunnel while alleviating urban traffic pressure, accomplish that subdrainage is unobstructed, prevent in city The generation of flood.
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
Referring to FIG. 1, Fig. 1 is the schematic cross-section of the synthesis tunnel structure for taking into account draining and traffic of the invention.
The present invention provides a kind of synthesis tunnel structure for taking into account draining and traffic, including tunnel ontology 1, tunnel ontology 1 Pipe-plate lining 2 is set on inner wall, the inside of tunnel ontology 1 also sets up carriageway plate 3, and carriageway plate 3 is connected with pipe-plate lining 2, Longitudinal supporting plate 4, longitudinal supporting plate 4 and runway can be set for vehicle pass-through, the bottom of carriageway plate 3 on carriageway plate 3 Plate 3 is connected, and the channel that longitudinal supporting plate 4, carriageway plate 3 and pipe-plate lining 2 surround forms water passage.
Carriageway plate 3 can be arranged longitudinal supporting plate 4 in 3 bottom of carriageway plate, reduce carriageway plate for vehicle driving 3 get on the car the influencing each other of vibration, and improve travel safety, meanwhile, water passage is separated, the inspection of water passage is facilitated It repairs.
The synthesis tunnel structure for taking into account draining and traffic further includes bottom connecting plate 5, bottom connecting plate 5 and carriageway plate 3 It is connected, longitudinal supporting plate 4 connects carriageway plate 3 and bottom support plate, and bottom connecting plate 5 is arranged, it is strong to enhance overall structure Degree.
Wherein, 4 place plane of longitudinal supporting plate and 3 place plane of carriageway plate are perpendicular, longitudinal supporting plate 4 and runway Plate 3 is perpendicular, can provide a supporting role to vehicle of the traveling on carriageway plate 3.
Specifically, the quantity of longitudinal supporting plate 4 is two, and two longitudinal supporting plates 4 are symmetrical arranged, and water passage is divided into Three across and the spans arrangement such as far as possible.In other specific implementations of the invention, can also according to the water amount of water passage or its He carries the longitudinal supporting plate 4 of factor arrangement different number, and the interval being arranged between longitudinal supporting plate 4.
In order to avoid being impacted when having pressure water to traffic safety, carriageway plate 3, bottom connecting plate 5 and longitudinal bracing Plate 4 is reinforced concrete structure.
In addition, also setting up ventilation equipment 6 inside tunnel ontology 1, ventilation equipment 6 is set to the top of tunnel ontology 1, ventilation Facility 6 is connected with outside air.
More specifically, the cross section of tunnel ontology 1 is circle, the width of carriageway plate 3 is straight compared with 1 cross section of tunnel ontology Diameter is small, reserves proportional space for driving vehicle.
Further, carriageway plate 3 is respectively provided with boss close to the two sides of pipe-plate lining 2, at boss for bottom connecting plate 5 with 3 junction of carriageway plate, setting boss can be avoided stress concentration, while boss can enable vehicle and tunnel ontology 1 keep pacifying Full distance.
The synthesis tunnel structure for taking into account draining and traffic of the invention, carriageway plate 3 can be for vehicle drivings, in runway Longitudinal supporting plate 4 is arranged in 3 bottom of plate, reduces carriageway plate 3 and gets on the car the influencing each other of vibration, improves travel safety, Meanwhile separating water passage, facilitate the maintenance of water passage.
Specific examples are applied in the present invention, and principle and implementation of the present invention are described, above embodiments Illustrate to be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, according to According to thought of the invention, there will be changes in the specific implementation manner and application range.In conclusion the content of the present specification It should not be construed as limiting the invention.

Claims (8)

1. a kind of synthesis tunnel structure for taking into account draining and traffic, it is characterised in that: including tunnel ontology, the tunnel ontology Pipe-plate lining is set on inner wall, and the inside of the tunnel ontology also sets up carriageway plate, and the carriageway plate and the section of jurisdiction serve as a contrast It builds and is connected, longitudinal supporting plate, the longitudinal direction can be set for vehicle pass-through, the bottom of the carriageway plate on the carriageway plate Support plate is connected with the carriageway plate, the channel that the longitudinal supporting plate, the carriageway plate and the pipe-plate lining surround Form water passage.
2. the synthesis tunnel structure according to claim 1 for taking into account draining and traffic, it is characterised in that: further include that bottom connects Fishplate bar, the bottom connecting plate are connected with the carriageway plate, and the longitudinal supporting plate connects the carriageway plate and described Bottom support plate.
3. the synthesis tunnel structure according to claim 2 for taking into account draining and traffic, it is characterised in that: the longitudinal bracing Plane where plate and plane where the carriageway plate are perpendicular.
4. the synthesis tunnel structure according to claim 3 for taking into account draining and traffic, it is characterised in that: the longitudinal bracing The quantity of plate is two, and two longitudinal supporting plates are symmetrical arranged.
5. the synthesis tunnel structure according to claim 4 for taking into account draining and traffic, it is characterised in that: the runway Plate, the bottom connecting plate and the longitudinal supporting plate are reinforced concrete structure.
6. the synthesis tunnel structure according to claim 1 for taking into account draining and traffic, it is characterised in that: the tunnel ontology Inside also sets up ventilation equipment, and the ventilation equipment is set to the top of the tunnel ontology, and the ventilation equipment and outside are empty Gas phase connection.
7. the synthesis tunnel structure according to claim 1 for taking into account draining and traffic, it is characterised in that: the tunnel ontology Cross section be circle, the width of the carriageway plate is small compared with the diameter of the tunnel body cross-section.
8. the synthesis tunnel structure according to claim 1 for taking into account draining and traffic, it is characterised in that: the carriageway plate Two sides close to the pipe-plate lining are respectively provided with boss.
CN201811349767.XA 2018-11-14 2018-11-14 A kind of synthesis tunnel structure for taking into account draining and traffic Pending CN109184732A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811349767.XA CN109184732A (en) 2018-11-14 2018-11-14 A kind of synthesis tunnel structure for taking into account draining and traffic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811349767.XA CN109184732A (en) 2018-11-14 2018-11-14 A kind of synthesis tunnel structure for taking into account draining and traffic

Publications (1)

Publication Number Publication Date
CN109184732A true CN109184732A (en) 2019-01-11

Family

ID=64939800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811349767.XA Pending CN109184732A (en) 2018-11-14 2018-11-14 A kind of synthesis tunnel structure for taking into account draining and traffic

Country Status (1)

Country Link
CN (1) CN109184732A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130969A (en) * 2019-05-16 2019-08-16 黄河勘测规划设计研究院有限公司 Method of ventilation for Super-long tunnel construction

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU49901U1 (en) * 2005-06-03 2005-12-10 Закрытое Акционерное Общество "Проектно-Строительное Объединение "Система-Галс" TWO LEVEL TUNNEL
CN102155240A (en) * 2011-04-29 2011-08-17 中铁第四勘察设计院集团有限公司 Shield tunnel lining structure by adopting non-closed secondary lining
KR20140099711A (en) * 2013-02-04 2014-08-13 한국건설기술연구원 Vehicle and flood complex tunnel
CN104234078A (en) * 2013-06-18 2014-12-24 华北水利水电大学 Multifunctional tunnel type city rainfall flood comprehensive utilization system
CN207211200U (en) * 2017-08-02 2018-04-10 东北农业大学 A kind of municipal water lower cervical spine tunnel structure
CN108505411A (en) * 2018-04-04 2018-09-07 长安大学 A kind of tunnel cement concrete road surface structure and laying method
CN209469440U (en) * 2018-11-14 2019-10-08 黄河勘测规划设计研究院有限公司 A kind of synthesis tunnel structure for taking into account draining and traffic

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU49901U1 (en) * 2005-06-03 2005-12-10 Закрытое Акционерное Общество "Проектно-Строительное Объединение "Система-Галс" TWO LEVEL TUNNEL
CN102155240A (en) * 2011-04-29 2011-08-17 中铁第四勘察设计院集团有限公司 Shield tunnel lining structure by adopting non-closed secondary lining
KR20140099711A (en) * 2013-02-04 2014-08-13 한국건설기술연구원 Vehicle and flood complex tunnel
CN104234078A (en) * 2013-06-18 2014-12-24 华北水利水电大学 Multifunctional tunnel type city rainfall flood comprehensive utilization system
CN207211200U (en) * 2017-08-02 2018-04-10 东北农业大学 A kind of municipal water lower cervical spine tunnel structure
CN108505411A (en) * 2018-04-04 2018-09-07 长安大学 A kind of tunnel cement concrete road surface structure and laying method
CN209469440U (en) * 2018-11-14 2019-10-08 黄河勘测规划设计研究院有限公司 A kind of synthesis tunnel structure for taking into account draining and traffic

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130969A (en) * 2019-05-16 2019-08-16 黄河勘测规划设计研究院有限公司 Method of ventilation for Super-long tunnel construction

Similar Documents

Publication Publication Date Title
US20130011190A1 (en) Double Crossover Merging Interchange
KR20070094362A (en) Construction method of roadway and transportation method
KR20150105949A (en) Municipal crossroads structure
CN204608534U (en) A kind of layout structure of interchange
CN209469440U (en) A kind of synthesis tunnel structure for taking into account draining and traffic
CN202688809U (en) T-junction flyover with pedestrian and vehicle lanes
CN109184732A (en) A kind of synthesis tunnel structure for taking into account draining and traffic
CN105350416A (en) Method for solving urban road traffic jam
CN203782508U (en) Precast type road intersection structure system
CN204982577U (en) All -round multilevel traffic facility of city crossroad
CN104093905A (en) Crossroads structure to facilitate re-modelling of established crossroads
CN104831595A (en) Intercommunication type grade-separated junction layout structure
CN101575834A (en) Left-turning torodial flyover
CN212357845U (en) Invisible flyover
CN1851129B (en) Pedestrian direct-crossing type T-crossing full-interconnection flyover
CN202323601U (en) Urban road well-type overpass
CN102605694A (en) T-junction flyover with pedestrian and vehicle lanes
CN203411922U (en) Asphalt deceleration strip
CN202671991U (en) Small universal unblocked overpass
CN101974883B (en) Bridge dragging slideway device
CN104093906B (en) T junction structure
CN210395000U (en) Rotary overpass
CN201826231U (en) Sectional flyover for public traffic vehicles
CN204059123U (en) A kind of Multifunctional overpass
CN202323602U (en) Urban road interchange bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 450008 Jinshui Road 109, Zhengzhou City, Henan Province

Applicant after: Yellow River Survey Planning and Design Research Institute Co., Ltd.

Address before: 450000 Jinshui Road 109, Zhengzhou City, Henan Province

Applicant before: Yellow River Engineering Consulting Co., Ltd.