CN109183542A - Run highway soft soil roadbed bumping at bridge-head lower clapboard processing method - Google Patents

Run highway soft soil roadbed bumping at bridge-head lower clapboard processing method Download PDF

Info

Publication number
CN109183542A
CN109183542A CN201810832683.5A CN201810832683A CN109183542A CN 109183542 A CN109183542 A CN 109183542A CN 201810832683 A CN201810832683 A CN 201810832683A CN 109183542 A CN109183542 A CN 109183542A
Authority
CN
China
Prior art keywords
roadbed
half range
bridge
long
carried out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810832683.5A
Other languages
Chinese (zh)
Inventor
吴志军
朱汉华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Tantuo Engineering Technology Service Co., Ltd.
Original Assignee
Wuhan University WHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University WHU filed Critical Wuhan University WHU
Priority to CN201810832683.5A priority Critical patent/CN109183542A/en
Publication of CN109183542A publication Critical patent/CN109183542A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention is operation highway soft soil roadbed bumping at bridge-head lower clapboard processing method, includes the following steps: the safety measure and mark of carrying out the current half range road excavation of half range roadbed;1.5~2.0m of half range roadbed depth, 20~30m long are excavated, supporting runway excavates roadbed side;Two rows are set by end of the bridge endLongitudinal pitch 100cm horizontal spacing 150cm long 10m drilled pile, sets two rows from end of the bridge endLongitudinal pitch 100cm horizontal spacing 150cm long 5m drilled pile;Half range roadbed bottom is excavated in leveling, is laid with 20cm thickness 20~30m long armoured concrete slab;Slag roadbed step backfill of delaying clearly first is carried out according to code requirement on armoured concrete slab, then carries out road surface, and open half range roadbed traffic;Other half range roadbed, open whole roadbed traffic are carried out according to the first step~the 5th step circulation.Foregoing invention use operation highway soft soil roadbed bumping at bridge-head lower clapboard processing method have it is easy for construction, it is economic and environment-friendly, fundamentally solve operation highway soft soil roadbed bumping at bridge-head.

Description

Run highway soft soil roadbed bumping at bridge-head lower clapboard processing method
Technical field
The invention belongs to construction of the highway method field, has and be related to runing the processing of highway soft soil roadbed bumping at bridge-head lower clapboard Method.
Background technique
Bumping at bridge-head is made due to the relative settlement or expansion joint destruction at highway end of the bridge and expansion joint (bridge approach) Road surface longitudinal slope occur step cause vehicle by when generate jump the phenomenon that.There is different degrees of sink at back filling behind abutment in road surface Drop fracture (sedimentation value is generally 10~30cm, and some is even more than 60cm), make vehicle by when generate and jump and impact, thus Additional impact load is caused to bridges and culverts and road surface, so that driver and passenger is felt discomfort of jolting, or even vehicle is caused significantly to subtract Speed, it is serious to can lead to traffic accident (especially vehicle mechanical accident).Run highway soft soil roadbed end of the bridge in China's Coastal Areas It is more to jump vehicle phenomenon, operation traffic counting is larger at this stage, cannot suspend traffic, then existing roadbed is excavated in first half range part Subgrade settlement is controlled with lower clapboard again, to achieve the purpose that solve operation highway soft soil roadbed bumping at bridge-head.
Summary of the invention
The present invention is easy to ignore roadbed using lower clapboard for existing operation highway soft soil roadbed bumping at bridge-head solution Soft soil roadbed sinking and soft soil foundation relative stability relationship are controlled, lacks the deficiency of macro qualitative analysis control method, operation is provided Highway soft soil roadbed bumping at bridge-head lower clapboard processing method.
The technical solution adopted by the present invention to solve the technical problems is: operation highway soft soil roadbed bumping at bridge-head lower clapboard Processing method includes the following steps:
(1) technology and substance prepare before highway subgrade pavement is excavated:
Operation highway subgrade pavement knot is carried out in strict accordance with highway subgrade pavement design construction standard and traffic safety regulation Technologies and the substance preparations such as structure safety prepare entire construction teams and subgrade and pavement substance in good state;
(2) safety measure and mark of the current half range road excavation of half range roadbed are carried out:
Security identifier is carried out in the current side of half range roadbed, and sends special messenger on duty, maintenance driving and construction safety;
(3) 1.5~2.0m of half range roadbed depth, 20~30m long are excavated, supporting runway excavates roadbed side, according to driving Road excavates roadbed lateral stability, carries out gunite concrete or embedded steel board supporting, it is ensured that driving and construction safety;
(4) two rows are set by end of the bridge endLongitudinal pitch 100cm horizontal spacing 150cm long 10m drilled pile, from bridge Head end sets two rowsLongitudinal pitch 100cm horizontal spacing 150cm long 5m drilled pile;
(5) half range roadbed bottom is excavated in leveling, is laid with 20cm thickness 20~30m long armoured concrete slab, is played control roadbed The effect of deformation of bottom and average pressure;
(6) slag roadbed step backfill of delaying clearly first is carried out according to code requirement on armoured concrete slab, then carries out road surface, and Open half range roadbed traffic;
(7) other half range roadbed, open whole roadbed traffic are carried out according to the first step~the 5th step circulation.
Beneficial effects of the present invention are mainly manifested in: the operation highway soft soil roadbed bumping at bridge-head lower clapboard that the present invention uses Processing method have it is easy for construction, it is economic and environment-friendly, fundamentally solve operation highway soft soil roadbed bumping at bridge-head.
Detailed description of the invention
Fig. 1 is operation highway soft soil roadbed bumping at bridge-head lower clapboard processing schematic of the invention.
Specific embodiment
Below with reference to the embodiments and with reference to the accompanying drawing the technical solutions of the present invention will be further described.
Embodiment 1: the technical solution adopted by the present invention to solve the technical problems is: operation highway soft soil roadbed end of the bridge is jumped Vehicle lower clapboard processing method, includes the following steps:
(1) safety measure and mark of the current half range road excavation of half range roadbed are carried out;
(2) 1.5~2.0m of half range roadbed depth, 20~30m long are excavated, supporting runway excavates roadbed side;
(3) two rows are set by end of the bridge endLongitudinal pitch 100cm horizontal spacing 150cm long 10m drilled pile, from bridge Head end sets two rowsLongitudinal pitch 100cm horizontal spacing 150cm long 5m drilled pile, is shown in Fig. 1;
(4) half range roadbed bottom is excavated in leveling, is laid with 20cm thickness 20~30m long armoured concrete slab, is played control roadbed The effect of deformation of bottom and average pressure, is shown in Fig. 1;
(5) slag roadbed step backfill of delaying clearly first is carried out according to code requirement on armoured concrete slab, then carries out road surface, and Open half range roadbed traffic, is shown in Fig. 1;
(6) other half range roadbed is carried out according to the first step~the 5th step circulation, Fig. 1 is shown in open whole roadbed traffic.
The operation highway soft soil roadbed bumping at bridge-head lower clapboard processing method that foregoing invention uses has easy for construction, economy Environmental protection fundamentally solves operation highway soft soil roadbed bumping at bridge-head.

Claims (1)

1. runing highway soft soil roadbed bumping at bridge-head lower clapboard processing method, include the following steps:
(1) technology and substance prepare before highway subgrade pavement is excavated:
Operation highway subgrade pavement structure peace is carried out in strict accordance with highway subgrade pavement design construction standard and traffic safety regulation Congruent technology and substance preparation prepare entire construction teams and subgrade and pavement substance in good state;
(2) safety measure and mark of the current half range road excavation of half range roadbed are carried out:
Security identifier is carried out in the current side of half range roadbed, and sends special messenger on duty, maintenance driving and construction safety;
(3) 1.5~2.0m of half range roadbed depth, 20~30m long are excavated, supporting runway excavates roadbed side, opens according to runway Roadbed lateral stability is dug, gunite concrete or embedded steel board supporting are carried out, it is ensured that driving and construction safety;
(4) two rows are set by end of the bridge endLongitudinal pitch 100cm horizontal spacing 150cm long 10m drilled pile, beats from end of the bridge end If two rows ofLongitudinal pitch 100cm horizontal spacing 150cm long 5m drilled pile;
(5) half range roadbed bottom is excavated in leveling, is laid with 20cm thickness 20~30m long armoured concrete slab, plays control roadbed bottom The effect of deformation and average pressure;
(6) slag roadbed step backfill of delaying clearly first is carried out according to code requirement on armoured concrete slab, then carries out road surface, and is open Half range roadbed traffic;
(7) other half range roadbed, open whole roadbed traffic are carried out according to the first step~the 5th step circulation.
CN201810832683.5A 2018-07-26 2018-07-26 Run highway soft soil roadbed bumping at bridge-head lower clapboard processing method Pending CN109183542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810832683.5A CN109183542A (en) 2018-07-26 2018-07-26 Run highway soft soil roadbed bumping at bridge-head lower clapboard processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810832683.5A CN109183542A (en) 2018-07-26 2018-07-26 Run highway soft soil roadbed bumping at bridge-head lower clapboard processing method

Publications (1)

Publication Number Publication Date
CN109183542A true CN109183542A (en) 2019-01-11

Family

ID=64937562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810832683.5A Pending CN109183542A (en) 2018-07-26 2018-07-26 Run highway soft soil roadbed bumping at bridge-head lower clapboard processing method

Country Status (1)

Country Link
CN (1) CN109183542A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2391035B (en) * 2002-07-18 2005-05-04 Roxbury Ltd Ground improvement
CN101368383A (en) * 2008-09-11 2009-02-18 中国科学院武汉岩土力学研究所 Method for treating soft soil roadbed by artificial composite crust layer
CN201962558U (en) * 2011-03-21 2011-09-07 中铁二院工程集团有限责任公司 High-steepness side slope subgrade structure for mountainous area
CN104278608A (en) * 2013-07-05 2015-01-14 杭州华水市政工程有限公司 Novel highway embankment widened structure and construction method
CN105887603A (en) * 2016-05-11 2016-08-24 宁波市交通规划设计研究院有限公司 Method for controlling differential settlement of bridgehead roadbed

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2391035B (en) * 2002-07-18 2005-05-04 Roxbury Ltd Ground improvement
CN101368383A (en) * 2008-09-11 2009-02-18 中国科学院武汉岩土力学研究所 Method for treating soft soil roadbed by artificial composite crust layer
CN201962558U (en) * 2011-03-21 2011-09-07 中铁二院工程集团有限责任公司 High-steepness side slope subgrade structure for mountainous area
CN104278608A (en) * 2013-07-05 2015-01-14 杭州华水市政工程有限公司 Novel highway embankment widened structure and construction method
CN105887603A (en) * 2016-05-11 2016-08-24 宁波市交通规划设计研究院有限公司 Method for controlling differential settlement of bridgehead roadbed

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
严邵军等: "《基础工程学》", 31 May 2018 *
付厚利等: "《地下工程施工技术》", 31 January 2016 *

Similar Documents

Publication Publication Date Title
CN103866694B (en) Deep water silty sand ground geology large span multi-line hardened system and jacking culvert construction method
CN101831873B (en) Temporary bridge covered excavation method for constructing box culvert below traffic ground line of operating track
CN108204240A (en) Newly built tunnels closely on across existing tunnel anti-floating reinforcement system and its reinforcement means
CN104018405A (en) Pile-anchor-frame composite double-layer roadbed structure
CN101598028A (en) Lining structure for super large section water-rich loess tunnel of high-speed railroad
CN110158367A (en) A kind of structure and deformation control method for helping the existing high-speed railway subgrade of width
KR20190006665A (en) Slope face adjusting constructor of embanking roadbed for railway track, and construction method for the same
CN203834511U (en) Bolting-grouting retaining wall with specially-shaped section
CN104533426A (en) Method for constructing ultra-shallow buried tunnel under-passing highway by large-span covering excavating method
CN105926391A (en) Method for widening shoulder of existing railway subgrade
CN105625446B (en) A kind of construction method of tunnel undercrossing tunnel
CN205576637U (en) Processing closes on roadbed structure of existing line soft soil foundation
CN107841908A (en) For eliminating the road structure of the high embankment lateral variation sedimentation in high-speed railway abrupt slope
CN207525567U (en) A kind of pile plate composite structure suitable for Steep Slope Embankment
CN104674645A (en) Integral plate type small bridge and culvert combination applicable to soft soil foundations
CN109183542A (en) Run highway soft soil roadbed bumping at bridge-head lower clapboard processing method
CN104652299B (en) Construction method is shifted out in the whole hole of a kind of existing bridges and culverts of electric railway
CN207958885U (en) A kind of anti-settling highway subgrade
CN103866788B (en) A kind of method of pillar abutment scarp slope barricadeization transformation
CN108049438B (en) The anchor force measuring method of Resistant heave pile foundation in a kind of ballastless track roadbed substrate swelled ground
CN106758886A (en) A kind of method of the existing bridges and culverts structure of new dismounting
CN203393527U (en) Component for preventing beam from stabbing into railway ballast in existing railway reinforcing process
CN106555379A (en) Pass through both wired elevated formation level Combined temporary bridge construction methods
CN207131412U (en) Under wear the crossings on different level tunnel construction of building
CN203782492U (en) Lateral pile plate structure applicable to rocky steep embankment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190118

Address after: Room 1312, 165 Youshengguan Road, Shangcheng District, Hangzhou City, Zhejiang Province

Applicant after: Hangzhou Tantuo Engineering Technology Service Co., Ltd.

Address before: 430061 Luojia Mountain, Wuchang District, Wuhan City, Hubei Province

Applicant before: Wuhan University

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111