CN109175452A - A kind of process equipment of total grade of bracket - Google Patents
A kind of process equipment of total grade of bracket Download PDFInfo
- Publication number
- CN109175452A CN109175452A CN201811231341.4A CN201811231341A CN109175452A CN 109175452 A CN109175452 A CN 109175452A CN 201811231341 A CN201811231341 A CN 201811231341A CN 109175452 A CN109175452 A CN 109175452A
- Authority
- CN
- China
- Prior art keywords
- shelves
- support slot
- processing
- aluminium
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23B—TURNING; BORING
- B23B41/00—Boring or drilling machines or devices specially adapted for particular work; Accessories specially adapted therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23B—TURNING; BORING
- B23B39/00—General-purpose boring or drilling machines or devices; Sets of boring and/or drilling machines
- B23B39/28—Associations of only boring or drilling machines directed to a particular metal-working result
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q3/00—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
- B23Q3/02—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for mounting on a work-table, tool-slide, or analogous part
- B23Q3/06—Work-clamping means
- B23Q3/062—Work-clamping means adapted for holding workpieces having a special form or being made from a special material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q3/00—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
- B23Q3/02—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for mounting on a work-table, tool-slide, or analogous part
- B23Q3/06—Work-clamping means
- B23Q3/08—Work-clamping means other than mechanically-actuated
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q2703/00—Work clamping
- B23Q2703/02—Work clamping means
- B23Q2703/04—Work clamping means using fluid means or a vacuum
Abstract
The present invention relates to the parts machining technical fields of piano, more particularly, to a kind of process equipment of total shelves bracket, it includes pedestal and borehole drill construction, and the first processing stations and the second processing stations are provided on pedestal, can be on the first processing stations and the second processing stations using borehole drill construction.The cooperation that shelves process structure and cross drilling component is carried on the back by aluminium, shelves can be carried on the back to aluminium and carry out drilling processing;By the cooperation that aluminium carries on the back shelves processing structure and longitudinal drilling component drilling processing can be carried out to sound shelves processed;By the cooperation that dynamic back shelves process structure and longitudinal drilling component drilling processing can be carried out to dynamic back shelves, thus through the invention in this process equipment can carry on the back shelves processing structure, sound shelves processed processing structure and dynamic back shelves processing structure to aluminium and carry out drilling processing, it is thus easy to process, also reduce processing cost.
Description
Technical field
The present invention relates to the parts machining technical fields of piano, more particularly, to a kind of process equipment of total shelves bracket.
Background technique
Piano striking machine is one of core component of piano, drives hammered string instrument to fire the master that string vibrates by pressing key
Want component.And total shelves bracket is one of most important mechanism of hammered string instrument, generally includes aluminium back shelves, sound shelves processed and dynamic back shelves.
Aluminium back shelves, sound shelves processed and dynamic back shelves usually require to open up several hole locations, in the prior art, it usually needs utilize drilling
Equipment carries out bore operation to aluminium back shelves, sound shelves processed and dynamic back shelves, originally using artificial drilling, but since piano is for hole location
Precision prescribed it is high, manhole drilling be difficult to ensure borehole accuracy;Later, using special drilling machine to aluminium back shelves, sound shelves processed and
Dynamic back shelves carry out machine drilling, improve certain processing efficiency and machining accuracy.
With reference to attached drawing 8, the hole location that aluminium carries on the back shelves is the perforative aperture of horizontal direction;With reference to attached drawing 9, the hole location of sound shelves processed is perpendicular
Histogram is to perforative aperture;With reference to attached drawing 10, the hole location inclination of dynamic back shelves is opened in the upper surface of dynamic back shelves.
However since the position of aluminium back shelves, sound shelves processed, the shape of dynamic back shelves and its hole location is different, thus need difference
Drilling machine carry out drilling processing respectively, thus the processing cost for causing total shelves bracket is higher, to the extensive life of total grade of bracket
Production brings inconvenience.
Summary of the invention
The object of the present invention is to provide a kind of process equipments of total shelves bracket.
Foregoing invention purpose of the invention has the technical scheme that
A kind of process equipment of total grade of bracket, including pedestal and borehole drill construction are provided with the first processing stations, institute on the pedestal
Stating the first processing stations includes first movement seat, and aluminium back shelves processing structure, sound shelves processed processing structure are provided on first movement seat
Structure is processed with dynamic back shelves, the borehole drill construction includes being set to the support column of pedestal two sides and being installed on outstanding between support column
Arm, being equipped on the cantilever can be equipped with pair in the cantilever level and/or the mobile station of vertical motion, the mobile station
Sound shelves processing structure processed and dynamic back shelves processing structure carry out the longitudinal drilling component of longitudinal drilling;Aluminium carry on the back shelves processing structure setting in
Close to the side of the support column, the cross drilling component that aluminium back shelves are carried out with cross drilling is provided on the support column.
By using above-mentioned technical proposal, the cooperation that shelves process structure and cross drilling component is carried on the back by aluminium, aluminium can be carried on the back
Shelves carry out drilling processing;By the cooperation that aluminium carries on the back shelves processing structure and longitudinal drilling component drilling processing can be carried out to sound shelves processed;
By dynamic back shelves process structure and longitudinal drilling component cooperation can to dynamic back shelves progress drilling processing, thus through the invention in
This process equipment aluminium can be carried on the back shelves processing structure, sound shelves processed processing structure and dynamic back shelves processing structure carry out drilling plus
Work, thus it is easy to process, also reduce processing cost.
Aluminium back shelves processing structure, sound shelves processed processing structure and dynamic back shelves processing structure are all set on first movement seat, and
Longitudinal drilling component is installed in mobile station, thus facilitates aluminium back shelves processing structure, aluminium back shelves processing structure and dynamic back shelves processing
The relative movement of structure and cross drilling component and longitudinal drilling component, improves the processing efficiency of total shelves bracket.
Aluminium back shelves are disposed in proximity to the side of support column, thus when processing aluminium back shelves, sound shelves processed and dynamic back shelves are not influenced
Processing, thus processing creates necessary condition while carry on the back shelves and sound shelves processed and dynamic back shelves for aluminium.
The present invention is further arranged to: aluminium back shelves processing structure includes several mutually matched aluminium back shelves processing units, aluminium
Carrying on the back shelves processing unit includes the first support base, and the first support slot for aluminium back shelves installation, institute are offered on first support base
It states the first support base and the side of the cross drilling component is provided with the first compression cylinder, the top of first compression cylinder
Portion is provided with the first compression bar extended to above first support slot, is provided on first compression bar for compressing aluminium back shelves
The first compression leg.
By using above-mentioned technical proposal, sky is provided by the installation fixation for carrying on the back shelves for aluminium that opens up of the first support slot
Between, the first compression cylinder drives the lifting of the first compression leg by the first compression bar, can either realize and in the vertical direction carry on the back aluminium
Shelves are fixed, and further increase stability of the aluminium back shelves when carrying out bore operation, thus ensure that drilling quality, while
The taking-up and installation of aluminium back shelves can be facilitated, it is easy to use.
The present invention is further arranged to: the side close to the cross drilling component of first support slot is to carry on the back with aluminium
The cambered surface that fits of shelves is pasted with gasket in cambered surface, and the bottom of first compression leg is also pasted with gasket.
By using above-mentioned technical proposal, since aluminium carries on the back the side of shelves as arc, thus the first support slot side arc
Setting increases the contact area of aluminium back shelves and the first support slot, to mention so that aluminium back shelves are bonded to each other with the first support slot
High support strength of first support slot to aluminium back shelves.Due to aluminium back shelves generally aluminum, can occur in boring procedure larger
Vibration, and the cambered surface of aluminium back shelves is prone to compressive deformation or generates scratch, thus by the setting of gasket, prevents the arc of aluminium back shelves
Face is directly in contact with the side wall of the first support slot, and gasket can play buffer function, so that good protection aluminium carries on the back shelves.
The present invention is further arranged to: being offered on first support base and the first support slot structure consistent the
Two support slots, first compression bar are provided with the second compression leg for compressing aluminium back shelves above second support slot.
Aluminium back shelves are enabled to process structure simultaneously by the setting of the second support slot by using above-mentioned technical proposal
Two pieces of aluminium back shelves are installed;When carrying out cross drilling operation, cross drilling component can simultaneously drill to two pieces of aluminium back shelves,
To substantially increase the drilling efficiency of aluminium back shelves.
The present invention is further arranged to: the sound gear processing structure processed includes the second support being installed on first movement seat
, the third support slot and the 4th support slot for sound processed gear installation, second support base are offered on second support base
Side be provided with the second compression cylinder, be provided at the top of second compression cylinder and extend to the third support slot and institute
The second compression bar above the 4th support slot is stated, the third hold-down column for compressing sound shelves processed and are provided on second compression bar
Four hold-down columns.
By using above-mentioned technical proposal, by opening up for third support slot and the 4th support slot, for the installation of sound shelves processed
Fixation provides space, passes through the second compression cylinder and the second compression bar and driving is driven to move down on third hold-down column and the 4th hold-down column
It is dynamic, the stability in sound shelves processed drilling can either be improved, while also facilitating taking for sound shelves processed by being fixed to sound shelves processed
Out with installation.
The present invention is further arranged to: being placed with cushion block in the third support slot and the 4th support slot.
By using above-mentioned technical proposal, since required hole is through-hole on sound shelves processed, thus in punching, need by
Sound shelves processed are punched completely, and the head relative diameter of usually drill bit is smaller, when just punching, is easy to appear a large amount of burrs or hole
The lesser problem of diameter, thus need drill bit it is more partially pass through sound shelves processed.By the setting of cushion block, third support slot is protected
With the 4th support slot, it is therefore prevented that in punching, drill bit breaks the bottom of third support slot and the 4th support slot, meanwhile, it improves
The drilling quality of sound shelves processed.
The present invention is further arranged to: it is provided with baffle between the third support slot and the 4th support slot, described
The side of two support bases is provided with the first positioning component, and the other side is provided with the second positioning component, if the first positioning component includes
The first positioning unit of dry group and the first positioning plate for being driven by the first positioning unit of each group and being matched with the baffle, Mei Gesuo
Stating the first positioning unit includes two mutually matched first positioning cylinders;Second positioning component includes that several groups second are fixed
Bit location and the second positioning plate for being driven by the second positioning unit of each group and being matched with the baffle, each second positioning
Unit includes two mutually matched second positioning cylinders.
By using above-mentioned technical proposal, due to the placement of cushion block, so that the depth of third support slot and the 4th support slot
It shoals, thus passes through the setting of baffle, the first positioning component and the second positioning component, the first positioning of the first positioning unit driving
Plate, the second positioning unit drive the second positioning plate to position sound shelves processed in the horizontal direction, further improve sound shelves processed
Stability when carrying out bore operation, ensure that drilling quality.
The present invention is further arranged to: dynamic back shelves processing structure includes the mutually matched dynamic back shelves processing unit of several groups,
Dynamic back shelves processing unit includes the third support base being installed on first movement seat, offers and inclines at the top of the third support base
The side of the 5th support slot being tiltedly arranged and the 6th support slot, each third support base is provided with third compression cylinder,
The third compression bar extended to above the 5th support slot and the 6th support slot, institute are provided at the top of the third compression cylinder
State the 5th hold-down column and the 6th hold-down column being provided on third compression bar for compressing dynamic back shelves.
By using above-mentioned technical proposal, since the required hole on dynamic back shelves is the hole being obliquely installed, and utilize common
Processing method, corresponding angle usually is rotated to drill bit, to dynamic back shelves progress perforation processing, and due in boring procedure
Certain vibration can be generated, and drill bit is difficult to keep fixed angle, thus drilling quality is poor, while to drill bit fixed structure
Complexity, efficiency are lower.And in the application, using inclined five support slot and the 6th support slot is opened up on third support base, it is
The installation of dynamic back shelves is fixed to provide space, and drill bit need to only be kept straight down, and the angle between drill bit and dynamic back shelves is easy
It is kept fixed, to not only ensure that drilling quality, but also improves drilling efficiency.Third pressure is driven by third compression cylinder
Bar simultaneously drives the 5th hold-down column and the 6th hold-down column to go up and down, and can either dynamic back shelves be carried out with compression positioning, improves dynamic back shelves punching
When stability, meanwhile, the taking-up and installation of convenient dynamic back shelves are easy to use.
The present invention is further arranged to: the longitudinal drilling component includes that mutually matched first units are bored with second
Hole unit, first units include the first drilling machine corresponding with the third support slot and with the 4th support slot pair
The second drilling machine answered;Second units include third drilling machine corresponding with the 5th support slot and with described 6th
Support corresponding 4th drilling machine of slot, first drilling machine, second drilling machine, the third drilling machine and the 4th drilling machine are all provided with point
It is not provided with the lifting cylinder of its lifting of driving.
By using above-mentioned technical proposal, by the setting of the first drilling machine, the second drilling machine, third drilling machine and the 4th drilling machine,
Perforation processing can be carried out to two sound shelves processed and two dynamic back shelves simultaneously, greatly improve processing efficiency;Meanwhile passing through lifting air
The setting of cylinder is able to achieve and each drilling machine is individually gone up and down or reduced to meet different depth on processing sound shelves processed and dynamic back shelves
Hole.
The present invention is further arranged to: being additionally provided on the pedestal and mirror-symmetrical second processing of the first processing stations
Between the spacing and the 5th support slot and the 6th support slot of station, the third support slot and the 4th support slot
Away from identical.
By using above-mentioned technical proposal, by the setting of the second processing stations, when the first processing stations are drilling
When operation, aluminium to be punctured can be carried on the back shelves, sound shelves processed and dynamic back shelves and installed to the second processing stations by operator;First
After the aluminium of processing stations carries on the back shelves, sound shelves processed and dynamic back shelves drilling operation, then shelves, sound shelves processed are carried on the back to the aluminium of the second processing stations
Perforation processing is carried out with dynamic back shelves, while the aluminium back shelves, sound shelves processed of completion of processing on the first processing stations and dynamic back shelves being removed,
And it is changed to aluminium back shelves to be punctured, sound shelves processed and dynamic back shelves.And so on, constantly circulation carries out, thus borehole drill construction can be held
Continuous continuous progress operation, substantially increases the production and processing efficiency of total shelves bracket.
In conclusion advantageous effects of the invention are as follows:
1. carrying on the back the cooperation that shelves process structure and cross drilling component by aluminium, shelves can be carried on the back to aluminium and carry out drilling processing;It is carried on the back by aluminium
The cooperation of shelves processing structure and longitudinal drilling component can carry out drilling processing to sound shelves processed;Structure and longitudinal direction are processed by dynamic back shelves
The cooperation of boring assemblies can to dynamic back shelves carry out drilling processing, thus through the invention in this process equipment aluminium can be carried on the back
Shelves processing structure, sound shelves processed process structure and dynamic back shelves processing structure carries out drilling processing, thus easy to process, also reduce and add
Work cost;
2. aluminium back shelves processing structure, sound shelves processed processing structure and dynamic back shelves processing structure are all set on first movement seat, and are indulged
It is installed in mobile station to boring assemblies, thus facilitates aluminium back shelves processing structure, aluminium back shelves processing structure and dynamic back shelves processing knot
The relative movement of structure and cross drilling component and longitudinal drilling component, improves the processing efficiency of total shelves bracket;
3. aluminium back shelves are disposed in proximity to the side of support column, thus when processing aluminium back shelves, sound shelves processed are not influenced and move back shelves
Processing, thus carry on the back shelves for aluminium and create necessary condition with processing while sound shelves processed and dynamic back shelves.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the process equipment of total shelves bracket.
Fig. 2 is the partial enlargement diagram of part A in Fig. 1.
Fig. 3 is the partial enlargement diagram of part B in Fig. 1.
Fig. 4 is the partial enlargement diagram of C portion in Fig. 1.
Fig. 5 is the partial enlargement diagram of the part D in Fig. 1.
Fig. 6 is the partial enlargement diagram of the part E in Fig. 1.
Fig. 7 is the structural schematic diagram of borehole drill construction.
Fig. 8 is the structural schematic diagram that aluminium carries on the back shelves.
Fig. 9 is the structural schematic diagram of sound shelves processed.
Figure 10 is the structural schematic diagram of dynamic back shelves.
In figure, 1, pedestal;2, borehole drill construction;21, support column;22, cantilever;23, mobile station;24, cylinder is driven;25, it indulges
To boring assemblies;251, the first units;2511, the first drilling machine;2512, the second drilling machine;252, the second units;
2521, third drilling machine;2522, the 4th drilling machine;253, lifting cylinder;26, cross drilling component;261, Horizontal drilling machine;3, first
Processing stations;31, first movement seat;32, aluminium back shelves process structure;321, aluminium back shelves process unit;322, the first support base;
323, the first support slot;324, the second support slot;325, gasket;326, the first compression cylinder;327, the first compression bar;3271,
One compression leg;3272, the second compression leg;33, sound shelves processed process structure;331, the second support base;332, third support slot;333, the 4th
Support slot;334, the second compression cylinder;335, the second compression bar;3351, third hold-down column;3352, the 4th hold-down column;3353, it pads
Block;336, baffle;337, the first positioning component;3371, the first positioning unit;3372, the first positioning cylinder;3373, first is fixed
Position plate;338, the second positioning component;3381, the second positioning unit;3382, the second positioning cylinder;3383, the second positioning plate;34,
Dynamic back shelves process structure;341, back shelves are moved and process unit;342, third support base;343, the 5th support slot;344, the 6th support
Slot;345, third compression cylinder;346, third compression bar;3461, the 5th hold-down column;3462, the 6th hold-down column;35, limit plate;4,
Second processing stations.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
It is a kind of process equipment of total shelves bracket disclosed by the invention, including pedestal 1 and borehole drill construction 2 with reference to attached drawing 1,
The first processing stations 3 and the second processing stations 4 are provided on pedestal 1, the second processing stations 4 and the first processing stations 3 are in mirror image
Symmetrically.First processing stations 3 include that can be provided on the first movement seat 31 that 1 length direction of pedestal moves, pedestal 1 along its length
The driving screw rod that degree direction is arranged and is threadedly coupled with first movement seat 31 passes through and the rotation of screw rod is driven to drive first movement seat
31 are horizontally moved along the length direction of pedestal 1.Since the specific move mode of first movement seat 31 is the prior art, herein
It will not go into details.Aluminium back shelves processing structure is disposed with from the edge close to pedestal 1 to the middle part of pedestal 1 on first movement seat 31
32, sound shelves processing structure 33 processed and dynamic back shelves process structure 34.
Borehole drill construction 2 includes the cantilever 22 for being set to the support column 21 of 1 two sides of pedestal and being installed between support column 21, is hanged
Being equipped on arm 22 can mobile station 23 horizontal along cantilever 22 and/or vertical motion.The two sides of mobile station 23 are provided with driving
Cylinder 24(is referring to attached drawing 7), drive mobile station 23 to be gone up and down by driving cylinder 24, be provided on cantilever 22 it is horizontally disposed and
The driving screw rod being threadedly coupled with mobile station 23, by driving the rotation of screw rod that mobile station 23 is driven to be moved in the horizontal direction
It is dynamic.Since the specific move mode of mobile station 23 is the prior art, it will not go into details herein.It is equipped in mobile station 23 to sound shelves processed
It processes structure 33 and dynamic back shelves processing structure 34 carries out the longitudinal drilling component 25 of longitudinal drilling, be provided on support column 21 to aluminium
Carry on the back the cross drilling component 26 that shelves carry out cross drilling.
With reference to attached drawing 2, it includes that several mutually matched aluminium back shelves process unit 321, each aluminium back that aluminium, which carries on the back shelves processing structure 32,
Shelves processing unit 321 is arranged along the moving direction of first movement seat 31.Each aluminium back shelves processing unit 321 includes being welded in first
The first support base 322 on Mobile base 31, the top of the first support base 322 offer the first support slot for aluminium back shelves installation
323 and second support slot 324, the first support slot 323 be arranged in parallel with the second support slot 324, the first support slot 323 and second
The side of support slot 324 is the arc that the side for carrying on the back shelves with aluminium fits.324 arc of first support slot 323 and the second support slot
Side is also pasted with gasket 325, and the gasket 325 in the present embodiment is made of woollen cloth.
First support base 322 is provided with several first compression cylinders 326, the first pressure far from the side of cross drilling component 26
The top of tight cylinder 326 is provided with the first compression bar 327 for extending to 324 top of the first support slot 323 and the second support slot.First
The first compression leg 3271 and the second compression leg 3272 for compressing aluminium back shelves are provided on compression bar 327.First compression leg 3271 and second
The bottom of compression leg 3272 is also pasted with the gasket 325 of system.
With reference to attached drawing 3 and attached drawing 4, sound shelves processing structure 33 processed includes the second support base being welded on first movement seat 31
331, the third support slot 332 and the 4th support slot 333 for sound shelves processed installation are offered on the second support base 331, second supports
The side of seat 331 is provided with the second compression cylinder 334, and the top of the second compression cylinder 334, which is provided with, extends to third support slot
332 and the top of the 4th support slot 333 the second compression bar 335, the third pressure for compressing sound shelves processed is provided on the second compression bar 335
Tight column 3351 and the 4th hold-down column 3352, wherein third hold-down column 3351 is corresponding with third support slot 332, the 4th hold-down column
3352 is corresponding with the 4th support slot 333.
The wooden cushion block 3353 of strip, third support slot are placed in third support slot 332 and the 4th support slot 333
332 and the 4th are provided with baffle 336 between support slot 333, and the height of baffle 336 is much larger than the thickness of sound shelves and cushion block 3353 processed
The sum of.The side of second support base 331 is provided with the first positioning component 337, and the other side is provided with the second positioning component 338,
In, the first positioning component 337 include the first positioning unit of several groups 3371 and by the first positioning unit of each group 3371 drive and with
The first positioning plate 3373 that baffle 336 matches.Each first positioning unit 3371 includes two mutually matched first positioning
Cylinder 3372, two first positioning cylinders, 3372 Side by side groupings use.Second positioning component 338 includes the second positioning unit of several groups
It 3381 and is driven by the second positioning unit of each group 3381 and the second positioning plate 3383 for being matched with baffle 336.Each second is fixed
Bit location 3381 includes two mutually matched second positioning cylinders 3382, and two second positioning cylinders, 3382 Side by side groupings uses.
And first positioning unit 3371 and the second positioning unit 3381 correspond and be symmetrical arranged about the second support base 331.
With reference to attached drawing 5, moving back shelves processing structure 34 includes that the mutually matched dynamic back shelves of several groups process unit 341, moves back
Shelves processing unit 341 includes the third support base 342 being welded on first movement seat 31, and the top of third support base 342 opens up
There are the 5th support slot 343 and the 6th support slot 344 being obliquely installed, and the bottom of the 5th support slot 343 and the 6th support slot 344
Bottom angled angle it is consistent.The side of each third support base 342 is provided with third compression cylinder 345, third compression cylinder
345 top is provided with the third compression bar 346 for extending to 344 top of the 5th support slot 343 and the 6th support slot, third compression bar
The 5th hold-down column 3461 and the 6th hold-down column 3462 for compressing aluminium back shelves are provided on 346, wherein the 5th hold-down column 3461
Corresponding with the 5th support slot 343, the 6th hold-down column 3462 is corresponding with the 6th support slot 344.
First support slot 323, the second support slot 324, third support slot 332, the 4th support slot 333, the 5th support slot 343
Limit plate 35(is mounted on reference to attached drawing 6 with one end of the 6th support slot 344), in order to aluminium back shelves and sound shelves processed and dynamic back shelves
It is limited when installation.
With reference to attached drawing 7, longitudinal drilling component 25 includes mutually matched first units 251 and the second units
252.First units 251 include corresponding with corresponding first drilling machine 2511 of third support slot 332 and with the 4th support slot 333
The second drilling machine 2512.Second units 252 include third drilling machine 2521 corresponding with the 5th support slot 343 and with the 6th
Support slot 344 thinks corresponding 4th drilling machine 2522.First drilling machine 2511, the second drilling machine 2512, third drilling machine 2521 and the 4th bore
Machine 2522 is arranged straight down, and bit model is consistent, and the liter for driving and respectively going up and down is separately installed in mobile station 23
Sending down abnormally ascending cylinder 253.
Cross drilling component 26 is installed on two support columns 21 along the side of 1 width direction of pedestal, each cross drilling component
26 include a Horizontal drilling machine 261 towards aluminium back shelves processing structure 32, the arc of drill bit and aluminium the back shelves of Horizontal drilling machine 261
One side face.
The implementation principle of the present embodiment are as follows: the cooperation that shelves process structure 32 and cross drilling component 26 is carried on the back by aluminium, it can be right
Aluminium carries on the back shelves and carries out drilling processing;Sound shelves processed can be bored by carrying on the back shelves processing structure 32 and the cooperation of longitudinal drilling component 25 by aluminium
Hole machined;By the cooperation that dynamic back shelves process structure 34 and longitudinal drilling component 25 drilling processing can be carried out to dynamic back shelves, thus
This process equipment in through the invention can carry on the back shelves processing structure 32, sound shelves processed processing structure 33 and dynamic back shelves processing to aluminium
Structure 34 carries out drilling processing, thus easy to process, also reduces processing cost.
Aluminium back shelves processing structure 32, sound shelves processed processing structure 33 and dynamic back shelves processing structure 34 are all set in first movement seat
On 31, and longitudinal drilling component 25 is installed in mobile station 23, thus facilitates aluminium back shelves processing structure 32, aluminium back shelves processing structure
32 and dynamic back shelves processing structure 34 and cross drilling component 26 and longitudinal drilling component 25 relative movement, improve total shelves bracket
Processing efficiency.
It, can be simultaneously by the setting of the first drilling machine 2511, the second drilling machine 2512, third drilling machine 2521 and the 4th drilling machine 2522
Perforation processing is carried out to two sound shelves processed and two dynamic back shelves, greatly improves processing efficiency;Meanwhile passing through lifting cylinder 253
Setting, be able to achieve and each drilling machine individually gone up and down or reduced to meet different depth on processing sound shelves processed and dynamic back shelves
Hole.
When the first processing stations 3 are when carrying out bore operation, operator aluminium to be punctured can be carried on the back shelves, sound shelves processed and
Dynamic back shelves are installed to the second processing stations 4;It is complete in the aluminium back shelves, sound shelves processed and dynamic back shelves drilling operation of the first processing stations 3
Bi Hou, then perforation processing carried out to the aluminium of the second processing stations 4 back shelves, sound shelves processed and dynamic back shelves, while by the first processing stations 3
Aluminium back shelves, sound shelves processed and the dynamic back shelves of upper completion of processing remove, and are changed to aluminium back shelves to be punctured, sound shelves processed and dynamic back shelves.
And so on, constantly circulation carries out, thus the 2 continual carry out operation of energy of borehole drill construction, substantially increases total shelves bracket
Produce and process efficiency.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (10)
1. a kind of process equipment of total shelves bracket, including pedestal (1) and borehole drill construction (2), it is characterised in that: the pedestal (1)
On be provided with the first processing stations (3), first processing stations (3) include first movement seat (31), first movement seat (31)
On be provided with aluminium back shelves processing structure (32), sound shelves processed processing structure (33) and dynamic back shelves and process structure (34), the drilling machine
Structure (2) includes the cantilever (22) for being set to the support column (21) of pedestal (1) two sides and being installed between support column (21), described outstanding
Being equipped on arm (22) can be in the cantilever (22) level and/or the mobile station (23) of vertical motion, the mobile station (23)
The longitudinal drilling component (25) that longitudinal drilling is carried out to sound shelves processed processing structure (33) and dynamic back shelves processing structure (34) is installed;
Aluminium back shelves processing structure (32) is disposed in proximity to the side of the support column (21), be provided on the support column (21) and carry on the back aluminium
Shelves carry out the cross drilling component (26) of cross drilling.
2. a kind of process equipment of total shelves bracket according to claim 1, it is characterised in that: aluminium carries on the back shelves processing structure (32)
Including several mutually matched aluminium back shelves processing unit (321), it includes the first support base (322) that aluminium, which carries on the back shelves processing unit (321),
The first support slot (323) for aluminium back shelves installation, first support base (322) are offered on first support base (322)
Side far from the cross drilling component (26) is provided with the first compression cylinder (326), first compression cylinder (326)
Top is provided with the first compression bar (327) extended to above first support slot (323), sets on first compression bar (327)
It is equipped with the first compression leg (3271) for compressing aluminium back shelves.
3. a kind of process equipment of total shelves bracket according to claim 2, it is characterised in that: first support slot
(323) the side close to the cross drilling component (26) is that the cambered surface that shelves fit is carried on the back with aluminium, is pasted with gasket in cambered surface
(325), the bottom of first compression leg (3271) is also pasted with gasket (325).
4. a kind of process equipment of total shelves bracket according to claim 2, it is characterised in that: first support base
(322) it is offered on and consistent second support slot (324) of the first support slot (323) structure, first compression bar (327)
The second compression leg (3272) for compressing aluminium back shelves is provided with above second support slot (324).
5. a kind of process equipment of total shelves bracket according to claim 1, it is characterised in that: the sound shelves processed process structure
(34) include the second support base (331) being installed on first movement seat (31), offer confession on second support base (331)
The third support slot (332) and the 4th support slot (333) of sound gear installation processed, the side of second support base (331) is provided with
Second compression cylinder (334) is provided at the top of second compression cylinder (334) and extends to the third support slot (332)
And the second compression bar (335) above the 4th support slot (333), it is provided on second compression bar (335) for compressing system
The third hold-down column (3351) and the 4th hold-down column (3352) of sound shelves.
6. a kind of process equipment of total shelves bracket according to claim 5, it is characterised in that: the third support slot
(332) and in the 4th support slot (333) cushion block (3353) are placed with.
7. a kind of process equipment of total shelves bracket according to claim 5, it is characterised in that: the third support slot
(332) it is provided with baffle (336) between the 4th support slot (333), the side of second support base (331) is provided with
One positioning component (337), the other side are provided with the second positioning component (338), and the first positioning component (337) includes several groups first
Positioning unit (3371) and the first positioning for being driven by the first positioning unit of each group (3371) and being matched with the baffle (336)
Plate (3373), each first positioning unit (3371) include two mutually matched first positioning cylinders (3372);It is described
Second positioning component (338) include the second positioning unit of several groups (3381) and by the second positioning unit of each group (3381) driving and
The second positioning plate (3383) matched with the baffle (336), each second positioning unit (3381) include two phases
The second positioning cylinder (3382) mutually cooperated.
8. a kind of process equipment of total shelves bracket according to claim 5, it is characterised in that: dynamic back shelves processing structure (34)
Including mutually matched dynamic back shelves processing unit (341) of several groups, dynamic back shelves processing unit (341) includes being installed on first movement
Third support base (342) on seat (31) offers the 5th support slot being obliquely installed at the top of the third support base (342)
(343) with the 6th support slot (344), the side of each third support base (342) is provided with third compression cylinder
(345), it is provided at the top of the third compression cylinder (345) and extends to the 5th support slot (343) and the 6th support slot
(344) the third compression bar (346) above is provided with the 5th hold-down column for compressing dynamic back shelves on the third compression bar (346)
(3461) and the 6th hold-down column (3462).
9. a kind of process equipment of total shelves bracket according to claim 8, it is characterised in that: the longitudinal drilling component
It (25) include mutually matched first units (251) and the second units (252), first units (251)
Including and third support slot (332) corresponding first drilling machine (2511) and corresponding with the 4th support slot (333)
Two drilling machines (2512);Second units (252) include third drilling machine corresponding with the 5th support slot (343)
(2521) and the 4th drilling machine (2522) corresponding with the 6th support slot (344), first drilling machine (2511), described second
Drilling machine (2512), the third drilling machine (2521) and the 4th drilling machine (2522) are all provided with the liter for being respectively arranged with its lifting of driving
Sending down abnormally ascending cylinder (253).
10. a kind of process equipment of total shelves bracket according to claim 9, it is characterised in that: also set on the pedestal (1)
It is equipped with and mirror-symmetrical second processing stations (4) of the first processing stations (3), the third support slot (332) and the described 4th
The spacing of support slot (333) and the 5th support slot (343) are identical as the spacing of the 6th support slot (344).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811231341.4A CN109175452A (en) | 2018-10-22 | 2018-10-22 | A kind of process equipment of total grade of bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811231341.4A CN109175452A (en) | 2018-10-22 | 2018-10-22 | A kind of process equipment of total grade of bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109175452A true CN109175452A (en) | 2019-01-11 |
Family
ID=64942505
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811231341.4A Pending CN109175452A (en) | 2018-10-22 | 2018-10-22 | A kind of process equipment of total grade of bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109175452A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0565995A1 (en) * | 1992-04-07 | 1993-10-20 | HANS KALTENBACH MASCHINENFABRIK GmbH & Co. KG | Method and device for detecting the position of a I-beam in a I-beam drilling machine |
JPH06155397A (en) * | 1992-11-16 | 1994-06-03 | Hitachi Seiko Ltd | Drill preparation device |
EP0787560A1 (en) * | 1996-02-04 | 1997-08-06 | Urban GmbH & Co. Maschinenbau KG | Device for working bars, profiles and the like |
CN102151870A (en) * | 2011-05-09 | 2011-08-17 | 天津市利洋电工机械材料厂 | Multistation automatic perforating machine for bicycle crank |
CN205201009U (en) * | 2015-12-11 | 2016-05-04 | 台州市安安焊接设备有限公司 | A multifunctional drilling machine for processing soldering turret is kept silent |
CN205668085U (en) * | 2016-06-08 | 2016-11-02 | 浙江舒康五金制品有限公司 | Intelligence Paper plastic die set boring machine |
CN106944641A (en) * | 2017-02-10 | 2017-07-14 | 安徽艾克发数控科技有限公司 | A kind of Digit Control Machine Tool of three faces punching |
CN107042319A (en) * | 2017-04-07 | 2017-08-15 | 南兴装备股份有限公司 | It is double bore bag can double alternately operating planer type numerical control rig |
CN206464871U (en) * | 2017-01-06 | 2017-09-05 | 丰顺泰昌电声元件有限公司 | A kind of installation and positioning structure for digital control drilling machine |
CN206588360U (en) * | 2017-03-15 | 2017-10-27 | 新疆守正轨道交通技术有限公司 | A kind of electric railway H profile steel post digital control drilling machine |
-
2018
- 2018-10-22 CN CN201811231341.4A patent/CN109175452A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0565995A1 (en) * | 1992-04-07 | 1993-10-20 | HANS KALTENBACH MASCHINENFABRIK GmbH & Co. KG | Method and device for detecting the position of a I-beam in a I-beam drilling machine |
JPH06155397A (en) * | 1992-11-16 | 1994-06-03 | Hitachi Seiko Ltd | Drill preparation device |
EP0787560A1 (en) * | 1996-02-04 | 1997-08-06 | Urban GmbH & Co. Maschinenbau KG | Device for working bars, profiles and the like |
CN102151870A (en) * | 2011-05-09 | 2011-08-17 | 天津市利洋电工机械材料厂 | Multistation automatic perforating machine for bicycle crank |
CN205201009U (en) * | 2015-12-11 | 2016-05-04 | 台州市安安焊接设备有限公司 | A multifunctional drilling machine for processing soldering turret is kept silent |
CN205668085U (en) * | 2016-06-08 | 2016-11-02 | 浙江舒康五金制品有限公司 | Intelligence Paper plastic die set boring machine |
CN206464871U (en) * | 2017-01-06 | 2017-09-05 | 丰顺泰昌电声元件有限公司 | A kind of installation and positioning structure for digital control drilling machine |
CN106944641A (en) * | 2017-02-10 | 2017-07-14 | 安徽艾克发数控科技有限公司 | A kind of Digit Control Machine Tool of three faces punching |
CN206588360U (en) * | 2017-03-15 | 2017-10-27 | 新疆守正轨道交通技术有限公司 | A kind of electric railway H profile steel post digital control drilling machine |
CN107042319A (en) * | 2017-04-07 | 2017-08-15 | 南兴装备股份有限公司 | It is double bore bag can double alternately operating planer type numerical control rig |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108189158A (en) | A kind of building board drilling equipment with waste recovery | |
CN107812983A (en) | A kind of simple and quick boring rig of hardware hanging part | |
CN103144204A (en) | Oblique drilling machine for stone dry hanging plate | |
CN111085700A (en) | Perforating device for machining of vertical location | |
CN106735443A (en) | A kind of drilling machine that can move regulation fixing apparatus | |
CN109175452A (en) | A kind of process equipment of total grade of bracket | |
CN209408708U (en) | A kind of vertical and horizontal adjustable woodwork drilling machine of multiple positioning | |
CN205816861U (en) | A kind of three boring machines | |
CN110666219B (en) | Alumina square tube drilling machine | |
CN208696372U (en) | A kind of shaft-like workpiece inner bore machining device | |
CN207480144U (en) | A kind of drill press workpiece clamping tooling | |
CN213226619U (en) | Gang drill machine for plate processing | |
CN203110166U (en) | Inclined drilling rig for stone dry-hang plate | |
CN109623436A (en) | A kind of overturning tooling and drilling machine | |
CN215618653U (en) | Material machine is driven to abatvoix | |
CN213360028U (en) | Pile driver that civil engineering used | |
CN213424550U (en) | Piano mark string sign indicating number system of punching | |
CN210146699U (en) | Machine tool of large bending machine | |
CN219005252U (en) | High stability bench drill | |
CN216608146U (en) | Clamp for reversing valve body and drilling device applying same | |
CN207840226U (en) | Camshaft Pneumatic drilling fixture | |
CN111112673A (en) | Automatic industrial drilling machine | |
CN210877683U (en) | Processing device for bridge support embedded plate | |
CN109733103A (en) | A kind of solid carving machine | |
CN205046725U (en) | Back of body bolt formula stone material curtain pendant and installation node thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190111 |