- CN109165837A CN109165837A CN201810927616.1A CN201810927616A CN109165837A CN 109165837 A CN109165837 A CN 109165837A CN 201810927616 A CN201810927616 A CN 201810927616A CN 109165837 A CN109165837 A CN 109165837A
- Authority
- CN
- China
- Prior art keywords
- power supply
- supply path
- equipment
- guarantor
- risk
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
Operation risk analysis method is classified based on main guarantor's power supply area with one the invention discloses a kind of, based on the main the whole network supply path search for realizing the electric user of guarantor with Integrated Model, it ties contracted areas and protects the otherness of electric user's power configuration principle and the related foundation of risk deciding grade and level, it constructs power supply and lacks risk rating experts database, the redundant configuration of electric user's different voltages grade power supply point is protected in analysis, assessment protects electricity user's power supply and lacks risk, realizes main with integral system guarantor's power supply area classification operation risk analysis.Meanwhile, it is capable to extract supply path cluster tool by Topology service dynamic based on real-time grid state, the supply path and its power supply risk of electric user are protected using tree topology mode automatic Display.The method of the present invention can assist in management and running personnel and control the electric customer power supply situation of guarantor in real time, prompt for risk, sound assurance power supply reliability.
Description
Technical field
The invention belongs to dispatching automation of electric power systems field more particularly to a kind of guarantor's power supply areas based on master with one
It is classified operation risk analysis method.
Background technique
Traditional responsible consumer running state monitoring only realizes the monitoring that user matches net side power supply, due to lacking major network path
Information can not monitor major network power supply power supply state, cannot provide responsible consumer transmission & distribution integrally highly reliable operation risk
Analysis and early warning.Based on transmission and distribution network integral system framework, it can be achieved that fortune to responsible consumer (protect electric user) transmission & distribution complete trails
Row risk assessment early warning protects electric customer power supply path to 500kV by search, and electric area operation state is protected in monitoring, according to prior
The evaluation criteria (different regions difference protects electric level assessment index system and evaluation criteria is different) made carries out real-time
Analysis ensures the highly reliable operation of responsible consumer to the timely early warning of the electric user of the equipment of occurrence risk, path and corresponding guarantor.
Summary of the invention
Goal of the invention: in view of the above problems, the present invention proposes a kind of guarantor's power supply area classification operation based on main with one
Risk analysis method.
Technical solution: to achieve the purpose of the present invention, the technical scheme adopted by the invention is that: one kind is based on main with one
Guarantor's power supply area be classified operation risk analysis method, obtain main distribution Integrated Model and real time operation mode, pass through network
Topological analysis searches the supply path of target device, and supply path, which is searched, flows to information according to equipment connecting relation and trend,
All primary equipments on supply path are counted, the standby electricity source point of different voltages grade bus is searched, obtains on supply path
The power configuration information of different voltages grade assesses the risk class of the guarantor electricity user in conjunction with power supply risk experts database.Based on confession
Equipment connecting relation on power path generates supply path display diagram by the way of automatic tree layout.
Further, comprising steps of
(1) the main data information for matching Integrated Model and the method for operation is obtained, the connection relationship of equipment room is established;
(2) electric user is protected from target, obtains the device node for protecting electric user, by the connection relationship of device node,
Using topology search technology, the opposite direction along trend flow direction up traces step by step, the equipment passed through during record search, until
Until target voltage grade equipment;
(3) after the completion of searching for, all buses on supply path is counted, the backup power source feelings of every bus are successively analyzed
Condition, and record backup power source number;
(4) power supply risk rule library is combined, judges whether the backup power source number of each voltage class meets condition, and give
Corresponding risk class out;
(5) supply path connection is generated by automatic tree topology technology based on the equipment connecting relation on supply path
Relational graph is simultaneously shown.
Further, the step (2) includes:
(2.1) from electric user equipment node is protected, based on the connection relationship of electric network model equipment, retrospect upwards step by step;
(2.2) equipment in search process is recorded, and forms connection relationship;
(2.3) judge whether to search target voltage grade, if having searched highest voltage level, complete this time and search
Otherwise rope continues the equipment search of next voltage class.
Further, the retrospect target of supply path can be with the equipment for finding a certain voltage class by being manually specified
Path tracing termination condition.
The utility model has the advantages that the present invention is based on main guarantor's power supply areas with one to be classified operation risk analysis method, matched based on master
Integrated Model realizes the whole network supply path search for protecting electric user, and knot contracted areas protects the difference of electric user's power configuration principle
Property and risk deciding grade and level related foundation, building power supply lacks risk rating experts database, and electric user's different voltages grade electricity is protected in analysis
The redundant configuration of source point, assessment protect electricity user's power supply and lack risk, realize main with integral system guarantor's power supply area classification operation
Risk analysis.Meanwhile, it is capable to supply path cluster tool be extracted by Topology service dynamic based on real-time grid state, using tree
Shape layout type automatic Display protects the supply path and its power supply risk of electric user.The method of the present invention can assist in management and running people
Member controls in real time protects electric customer power supply situation, prompt for risk, sound assurance power supply reliability.
Detailed description of the invention
Fig. 1 is the method for the present invention the general frame.
Specific embodiment
Further description of the technical solution of the present invention with reference to the accompanying drawings and examples.
It is of the present invention that operation risk analysis method is classified based on main guarantor's power supply area with one, master is obtained first to be matched
Net Integrated Model and real time operation mode, the supply path of target device is searched by Network topology, and supply path is looked into
It looks for and flows to information according to equipment connecting relation and trend, count all primary equipments on supply path, search different voltages
The standby electricity source point of grade bus obtains the power configuration information of different voltages grade on the supply path, in conjunction with power supply risk
Experts database assesses the risk class of the guarantor electricity user.
Supply path refers to route, the main transformer, switch, disconnecting link from designated user, passed through along the retrospect of trend opposite direction
And the primary equipments such as bus.The retrospect target of supply path can find setting for a certain voltage class by being manually specified
Standby is path tracing termination condition.
Meanwhile based on the equipment connecting relation on supply path, supply path is generated by the way of automatic tree layout
Display diagram.Main guarantor's power supply area classification operation risk analysis method with one supports anticipation mode simultaneously, and implementation is same as above.
Specific step is as follows:
Step 1, the data information for obtaining the main electric network model with one and the method for operation, the connection for establishing equipment room are closed
System, including device name, connecting node, switch state, disconnecting link state, route are active, main transformer winding is active etc.;
Step 2, electric user is protected from target, obtains the device node of the guarantor electricity user, passes through the connection of device node
Relationship simultaneously combines switch, disconnecting link state, and using topology search technology, the opposite direction along trend flow direction is up traced step by step, recorded
The equipment passed through in search procedure, until target voltage grade equipment;
Step 2.1, it is chased after upwards step by step from the electric user equipment node of guarantor based on the connection relationship of electric network model equipment
It traces back, trace back process follows the reversed principle of trend, i.e., carries out next step search when trend is reversed, otherwise exit search;
Step 2.2, the equipment such as main transformer, route, bus, switch, the disconnecting link in search process are recorded, and forms connection and closes
System;
Step 2.3, judge whether to search target voltage grade, if having searched highest voltage level, completing should
Otherwise secondary search continues the equipment search of next voltage class;
Step 3, after the completion of search, all buses on the supply path is counted, the standby electricity of every bus is successively analyzed
Whether source situation can search attachable stand-by heat switch, and record backup power source number;
Step 4, in conjunction with power supply risk rule library, judge whether the backup power source number of each voltage class meets condition,
And provide corresponding risk class;
Step 5, the equipment such as route, main transformer, switch, disconnecting link on supply path are obtained, by automatic tree topology technology,
It generates supply path annexation figure and shows.
It is of the present invention that operation risk analysis method is classified based on main guarantor's power supply area with one, it can be matched based on master
The whole network supply path of electric user is protected in Integrated Model analysis, and power supply is established in the power supply redundancy configuration of analysis different voltages grade
Risk experts database, assessment protect electric user's power supply and lack risk.
Claims (5)
1. a kind of be classified operation risk analysis method based on main guarantor's power supply area with one, which is characterized in that obtain main distribution
Integrated Model and real time operation mode, the supply path of target device is searched by Network topology, and supply path is searched
Information is flowed to according to equipment connecting relation and trend, counts all primary equipments on supply path, searches different voltages etc.
The standby electricity source point of grade bus, obtains the power configuration information of different voltages grade on supply path, in conjunction with power supply risk expert
The risk class of the guarantor electricity user is assessed in library.
2. according to claim 1 be classified operation risk analysis method, feature based on main guarantor's power supply area with one
It is, further includes, based on the equipment connecting relation on supply path, supply path exhibition is generated by the way of automatic tree layout
Diagram.
3. according to claim 2 be classified operation risk analysis method, feature based on main guarantor's power supply area with one
It is, comprising steps of
(1) the main data information for matching Integrated Model and the method for operation is obtained, the connection relationship of equipment room is established;
(2) electric user is protected from target, obtains the device node for protecting electric user, by the connection relationship of device node, used
Topology search technology, the opposite direction along trend flow direction up trace step by step, the equipment passed through during record search, until target
Until voltage class equipment;
(3) after the completion of searching for, all buses on supply path is counted, the backup power source situation of every bus is successively analyzed, and
Record backup power source number;
(4) power supply risk rule library is combined, judges whether the backup power source number of each voltage class meets condition, and provide phase
The risk class answered;
(5) supply path connection relationship is generated by automatic tree topology technology based on the equipment connecting relation on supply path
Scheme and shows.
4. according to claim 3 be classified operation risk analysis method, feature based on main guarantor's power supply area with one
It is, the step (2) includes:
(2.1) from electric user equipment node is protected, based on the connection relationship of electric network model equipment, retrospect upwards step by step;
(2.2) equipment in search process is recorded, and forms connection relationship;
(2.3) judge whether to search target voltage grade, if having searched highest voltage level, complete the secondary search,
Otherwise continue the equipment search of next voltage class.
5. according to claim 1 be classified operation risk analysis method, feature based on main guarantor's power supply area with one
It is, the retrospect target of supply path can be terminated using the equipment for finding a certain voltage class as path tracing by being manually specified
Condition.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810927616.1A CN109165837B (en) | 2018-08-15 | 2018-08-15 | Power protection and supply area grading operation risk analysis method based on main distribution integration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810927616.1A CN109165837B (en) | 2018-08-15 | 2018-08-15 | Power protection and supply area grading operation risk analysis method based on main distribution integration |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109165837A true CN109165837A (en) | 2019-01-08 |
CN109165837B CN109165837B (en) | 2021-11-30 |
Family
ID=64895780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810927616.1A Active CN109165837B (en) | 2018-08-15 | 2018-08-15 | Power protection and supply area grading operation risk analysis method based on main distribution integration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109165837B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111898925A (en) * | 2020-08-13 | 2020-11-06 | 国网湖南省电力有限公司 | Area protection power supply risk analysis method based on event tree |
CN115347570A (en) * | 2022-10-17 | 2022-11-15 | 国网浙江省电力有限公司宁波供电公司 | Main-distribution cooperation-based regional power failure range analysis method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102931726A (en) * | 2012-10-22 | 2013-02-13 | 深圳供电局有限公司 | Main network and distribution network integrated security power supply system |
CN103955789A (en) * | 2014-04-18 | 2014-07-30 | 国电南瑞科技股份有限公司 | Power supply path analyzing method based on integrated model for allocation |
CN105305444A (en) * | 2015-11-30 | 2016-02-03 | 国网浙江省电力公司绍兴供电公司 | Distribution network intelligent alarm and processing method based on integrated allocation |
CN107944661A (en) * | 2017-10-26 | 2018-04-20 | 国电南瑞科技股份有限公司 | A kind of main distribution integration regulator control system |
-
2018
- 2018-08-15 CN CN201810927616.1A patent/CN109165837B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102931726A (en) * | 2012-10-22 | 2013-02-13 | 深圳供电局有限公司 | Main network and distribution network integrated security power supply system |
CN103955789A (en) * | 2014-04-18 | 2014-07-30 | 国电南瑞科技股份有限公司 | Power supply path analyzing method based on integrated model for allocation |
CN105305444A (en) * | 2015-11-30 | 2016-02-03 | 国网浙江省电力公司绍兴供电公司 | Distribution network intelligent alarm and processing method based on integrated allocation |
CN107944661A (en) * | 2017-10-26 | 2018-04-20 | 国电南瑞科技股份有限公司 | A kind of main distribution integration regulator control system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111898925A (en) * | 2020-08-13 | 2020-11-06 | 国网湖南省电力有限公司 | Area protection power supply risk analysis method based on event tree |
CN111898925B (en) * | 2020-08-13 | 2022-08-05 | 国网湖南省电力有限公司 | Area protection power supply risk analysis method based on event tree |
CN115347570A (en) * | 2022-10-17 | 2022-11-15 | 国网浙江省电力有限公司宁波供电公司 | Main-distribution cooperation-based regional power failure range analysis method |
CN115347570B (en) * | 2022-10-17 | 2023-01-24 | 国网浙江省电力有限公司宁波供电公司 | Main-distribution cooperation-based regional power failure range analysis method |
Also Published As
Publication number | Publication date |
---|---|
CN109165837B (en) | 2021-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105894172B (en) | Combined power failure research and judgment method based on marketing and distribution fusion | |
CN106021596B (en) | A kind of analysis method of electric network fault rush of current topological diagram | |
CN106124935A (en) | Middle and low voltage network Fault Locating Method | |
CN106990328A (en) | The analysis of distribution repairing abnormal data, fault location system and method | |
CN103093276B (en) | Urban power grid risk assessment method | |
CN104318374A (en) | Method for assessing reliability of medium voltage distribution network for calculating upstream power restoration operation time | |
CN104914356A (en) | Distribution network fault positioning method based on network structure matrix | |
CN107167704A (en) | Fault Diagnosis of Distribution Network system and method based on CIM | |
CN109447284B (en) | Distribution network fault information sending method and system for power supply service command platform | |
CN103926891B (en) | Mobile Telecommunication Equipment Room environment in mobile stations equipment monitoring system and method | |
CN102608497B (en) | Power failure diagnosis method and device | |
CN106097159A (en) | Related information topology analyzing method and system in a kind of power distribution network | |
CN109165837A (en) | Operation risk analysis method is classified based on main guarantor's power supply area with one | |
Gautam et al. | Development and integration of momentary event models in active distribution system reliability assessment | |
CN104795897B (en) | The configurable relay protecting method of intelligent substation and system | |
CN104123478A (en) | Fast topology analysis method based on general information model | |
CN107067126B (en) | Thermal stability key power transmission channel identification method based on power flow transfer ratio | |
CN110412421B (en) | Method and system for intelligently analyzing and positioning faults | |
CN109142988A (en) | A kind of distribution network fault location method and system based on electric energy quality monitoring data | |
CN113627766A (en) | Risk identification method for topology identification power failure maintenance plan | |
CN105335824B (en) | Distribution network failure repairing command methods and system based on data center | |
CN107832857A (en) | A kind of low-voltage network system of smart city | |
CN103324795A (en) | Direct current system reliability evaluation method taking station service power influence into account | |
CN109449930B (en) | Power distribution network reliability assessment and repair time parameter modeling method, equipment and medium | |
CN105184657A (en) | Power supply risk assessment method and system for power system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |