CN109162179A - Municipal Road Engineering kerbstone transfer tool and kerbstone installation method - Google Patents

Municipal Road Engineering kerbstone transfer tool and kerbstone installation method Download PDF

Info

Publication number
CN109162179A
CN109162179A CN201810991822.9A CN201810991822A CN109162179A CN 109162179 A CN109162179 A CN 109162179A CN 201810991822 A CN201810991822 A CN 201810991822A CN 109162179 A CN109162179 A CN 109162179A
Authority
CN
China
Prior art keywords
kerbstone
cart
rope
horizontal
handgrip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810991822.9A
Other languages
Chinese (zh)
Inventor
赵军
李文
王欣
吴霞
孙浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201810991822.9A priority Critical patent/CN109162179A/en
Publication of CN109162179A publication Critical patent/CN109162179A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Repair (AREA)

Abstract

The present invention relates to Municipal Road Engineering kerbstone transfer tool and kerbstone installation method, including horizontal shore, horizontal shore both ends are respectively arranged with rubber tire;The middle part of horizontal shore is provided with vertical supporting beam along the vertical direction;The top of vertical supporting beam is provided with horizontal beam;The front end of horizontal beam is provided with V-type fixed pulley;Main rope is provided on V-type fixed pulley;The lower end of main rope is connected with lower rope;Lower rope be connected with kerbstone clamp left side clamping plate and right side clamping plate be connected by pin shaft;The vertical section of left side clamping plate and the vertical section of right side clamping plate constitute the jaw for being used to clamp kerbstone being parallel to each other.Municipal Road Engineering kerbstone transfer tool of the present invention, it is easy to use, it is easy to operate, save a large amount of artificial, machinery expenses;The installation deviation for reducing kerbstone improves the installation quality of kerbstone;Construction efficiency is increased substantially, influence of the kerbstone installation to lower step process is reduced.

Description

Municipal Road Engineering kerbstone transfer tool and kerbstone installation method
Technical field
The present invention relates to a kind of construction methods, in particular to a kind of Municipal Road Engineering kerbstone is transported And installation method.
Background technique
Road kurb stone generally uses fork truck to transport at present, manually installed method construction, since kerbstone heavier-weight is (every Block kerbstone weight is between 150-300kg), and kerbstone is transported to after infield, need repeatedly to kerbstone absolute altitude and Axis is adjusted, and fork truck utilization rate is not high, and machine cost is higher, and kerbstone is easily damaged during transportation.
Summary of the invention
In view of the deficiency of the prior art, it is simple to provide a kind of structure by the present invention, easy to operate, can greatly improve The Municipal Road Engineering kerbstone of the working efficiency of construction personnel is transported and installation method.
The technical solution used in the present invention is:
A kind of Municipal Road Engineering kerbstone transfer tool,
Including horizontal shore, horizontal shore both ends are respectively arranged with rubber tire;
The middle part of horizontal shore is provided with vertical supporting beam along the vertical direction;
The top of vertical supporting beam is provided with horizontal beam;
The axis of horizontal beam and the axis perpendicular of horizontal shore;
The front end of horizontal beam is provided with V-type fixed pulley;
Main rope is provided on V-type fixed pulley;
The lower end of main rope is connected with lower rope;
Lower rope is connected with kerbstone clamp;
Kerbstone clamp includes left side clamp and right side clamp;
Left side clamp includes front plate and rear plate;
Front plate is L-shaped;
Rear plate is L-shaped;
Front plate is connected with rear plate by pin shaft;
Front plate includes horizontal segment and vertical section;
Rear plate includes horizontal segment and vertical section;
The vertical section of front plate and the vertical section of rear plate constitute the jaw for being used to clamp kerbstone being parallel to each other;
Lower rope includes front side rope and rear side rope;
The upper end of front side rope and rear side rope is connected with the lower end of main rope;
The front end of the horizontal segment of the lower end and rear plate of front side rope is connected;
The rear end of the horizontal segment of the lower end and front plate of rear side rope is connected.
Reinforcing beam is provided between horizontal beam and vertical beam.
A kind of Municipal Road Engineering kerbstone transhipment installation method, includes the following steps:
A, surveying setting-out: after verification road axis is errorless, pavement boundaries are successively measured out, kerb line setting-out is carried out, makes side Stake is to control direction and elevation;
B, kerbstone is installed: after nail stake hanging wire, cart is transported and installed using kerbstone and successively arranges kerbstone along basic side It is good.Before installing kerbstone, first formwork casting concrete bed course, then mixing starch shop fixtures, and cart is transported and installed using kerbstone Kerbstone is installed by unwrapping wire position;
C, kerbstone transhipment and the transhipment of installation cart use: cart rear end being lifted, front end falls, and makes cart front end handgrip button In kerbstone two sides, then cart rear end is pushed, tilts cart front end, under the action of handgrip, convert pulling force to curb The pressure of stone, kerbstone is sling;
D, kerbstone is transported and installs installing and using for cart: cart is carried out to the kerbstone side successively sequenced along basis, So that cart front end handgrip is buckled in kerbstone two sides, then push cart rear end, tilts cart front end, it, will under the action of handgrip Pulling force is converted into the pressure to kerbstone, and kerbstone is sling.After kerbstone is sling, cart is carried out to installation site, benefit Kerbstone angle is adjusted by unwrapping wire position with head sheave before cart.After adjustment, slowly cart rear end is lifted, under front end It falls, kerbstone is smoothly mounted on designated position;
E, handgrip is gently stirred after being installed, handgrip automatically disengages;
Complete a kerbstone transhipment and installation.
The present invention compared with the prior art the utility model has the advantages that
Municipal Road Engineering kerbstone transfer tool of the present invention makes simple, easy to use, easy to operate;It saves a large amount of Manually, machinery expenses;The installation deviation for reducing kerbstone improves the installation quality of kerbstone;Increase substantially construction effect Rate reduces influence of the kerbstone installation to lower step process.
Municipal Road Engineering kerbstone transfer tool of the present invention, it is only necessary to 2 workers can carry and install kerbstone, The use of equipment is saved, while reducing the damage of kerbstone in handling process.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of political affairs road engineering kerbstone transfer tool;
Fig. 2 is the side structure schematic view of political affairs road engineering kerbstone transfer tool.
Specific embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Attached drawing 1-2 it is found that a kind of Municipal Road Engineering kerbstone transfer tool,
Including horizontal shore 1, horizontal shore both ends are respectively arranged with rubber tire 3;
The middle part of horizontal shore 1 is provided with vertical supporting beam 2 along the vertical direction;
The top of vertical supporting beam 2 is provided with horizontal beam 4;
The axis of horizontal beam 4 and the axis perpendicular of horizontal shore 1;
The front end of horizontal beam 4 is provided with V-type fixed pulley 5;
V-type fixed pulley 5 is connected by supporting beam 6 with horizontal beam 4;
Main rope 7 is provided on V-type fixed pulley 5;
The both ends of main rope 7 are connected with lower rope respectively;
Lower rope is connected with kerbstone clamp;
Kerbstone clamp includes left side clamp and right side clamp;
Left side clamp includes front plate 8 and rear plate 9;
Front plate is L-shaped;
Rear plate is L-shaped;
Front plate 8 is connected with rear plate 9 by pin shaft 10;
Front plate includes horizontal segment and vertical section;
Rear plate includes horizontal segment and vertical section;
The vertical section of front plate and the vertical section of rear plate constitute the jaw for being used to clamp kerbstone being parallel to each other;
Lower rope includes front side rope 14 and rear side rope 15;
The upper end of front side rope and rear side rope is connected with the lower end of main rope 7;
The lower end of front side rope 14 is connected with the front end of the horizontal segment of rear plate 9;
The lower end of rear side rope 15 is connected with the rear end of the horizontal segment of front plate 8.
Reinforcing beam 11 is provided between horizontal beam and vertical beam.
Support frame 12 is provided between horizontal shore and vertical beam.
The rear end of horizontal beam is provided with the handle 13 perpendicular with horizontal beam.
A kind of Municipal Road Engineering kerbstone transhipment installation method, includes the following steps:
A, surveying setting-out: after verification road axis is errorless, pavement boundaries are successively measured out, kerb line setting-out is carried out, makes side Stake is to control direction and elevation;
B, kerbstone is installed: after nail stake hanging wire, cart is transported and installed using kerbstone and successively arranges kerbstone along basic side It is good.Before installing kerbstone, first formwork casting concrete bed course, then mixing starch shop fixtures, and cart is transported and installed using kerbstone Kerbstone is installed by unwrapping wire position;
C, kerbstone transhipment and the transhipment of installation cart use: cart rear end being lifted, front end falls, and makes cart front end handgrip button In kerbstone two sides, then cart rear end is pushed, tilts cart front end, under the action of handgrip, convert pulling force to curb The pressure of stone, kerbstone is sling;
Cart is carried out to destination by construction personnel.Kerbstone is fallen after reaching predetermined position, gently stirs handgrip, handgrip It automatically disengages;
D, kerbstone is transported and installs installing and using for cart: cart is carried out to the kerbstone side successively sequenced along basis, So that cart front end handgrip is buckled in kerbstone two sides, then push cart rear end, tilts cart front end, it, will under the action of handgrip Pulling force is converted into the pressure to kerbstone, and kerbstone is sling.After kerbstone is sling, cart is carried out to installation site, benefit Kerbstone angle is adjusted by unwrapping wire position with head sheave before cart.After adjustment, slowly cart rear end is lifted, under front end It falls, kerbstone is smoothly mounted on designated position;
E, handgrip is gently stirred after being installed, handgrip automatically disengages;
Complete a kerbstone transhipment and installation.
Municipal Road Engineering kerbstone transfer tool of the present invention makes simple, easy to use, easy to operate;It saves big Artificial, the machinery expenses of amount;The installation deviation for reducing kerbstone improves the installation quality of kerbstone;It increases substantially and applies Work efficiency rate reduces influence of the kerbstone installation to lower step process.
Municipal Road Engineering kerbstone transfer tool of the present invention, it is only necessary to 2 workers can carry and install kerbstone, The use of equipment is saved, while reducing the damage of kerbstone in handling process.
The above described is only a preferred embodiment of the present invention, not making in any form to structure of the invention Limitation.Any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention, Belong within the scope of technical solution of the present invention.

Claims (3)

1. a kind of Municipal Road Engineering kerbstone transfer tool, which is characterized in that
Including horizontal shore, horizontal shore both ends are respectively arranged with rubber tire;
The middle part of horizontal shore is provided with vertical supporting beam along the vertical direction;
The top of vertical supporting beam is provided with horizontal beam;
The axis of horizontal beam and the axis perpendicular of horizontal shore;
The front end of horizontal beam is provided with V-type fixed pulley;
Main rope is provided on V-type fixed pulley;
The lower end of main rope is connected with lower rope;
Lower rope is connected with kerbstone clamp;
Kerbstone clamp includes left side clamp and right side clamp;
Left side clamp includes front plate and rear plate;
Front plate is L-shaped;
Rear plate is L-shaped;
Front plate is connected with rear plate by pin shaft;
Front plate includes horizontal segment and vertical section;
Rear plate includes horizontal segment and vertical section;
The vertical section of front plate and the vertical section of rear plate constitute the jaw for being used to clamp kerbstone being parallel to each other;
Lower rope includes front side rope and rear side rope;
The upper end of front side rope and rear side rope is connected with the lower end of main rope;
The front end of the horizontal segment of the lower end and rear plate of front side rope is connected;
The rear end of the horizontal segment of the lower end and front plate of rear side rope is connected.
2. Municipal Road Engineering kerbstone transfer tool according to claim 1, it is characterised in that: horizontal beam and vertical beam it Between be provided with reinforcing beam.
3. a kind of kerbstone using Municipal Road Engineering kerbstone transfer tool described in claim 1-2 any one is installed Method, characterized by the following steps:
A, surveying setting-out: after verification road axis is errorless, pavement boundaries are successively measured out, kerb line setting-out is carried out, makes side Stake is to control direction and elevation;
B, kerbstone is installed: after nail stake hanging wire, cart is transported and installed using kerbstone and successively arranges kerbstone along basic side It is good;
Before installing kerbstone, first formwork casting concrete bed course, then mixing starch shop fixtures, and cart is transported and installed using kerbstone Kerbstone is installed by unwrapping wire position;
C, kerbstone transhipment and the transhipment of installation cart use: cart rear end being lifted, front end falls, and makes cart front end handgrip button In kerbstone two sides, then cart rear end is pushed, tilts cart front end, under the action of handgrip, convert pulling force to curb The pressure of stone, kerbstone is sling;
D, kerbstone is transported and installs installing and using for cart: cart is carried out to the kerbstone side successively sequenced along basis, So that cart front end handgrip is buckled in kerbstone two sides, then push cart rear end, tilts cart front end, it, will under the action of handgrip Pulling force is converted into the pressure to kerbstone, and kerbstone is sling;
After kerbstone is sling, cart is carried out to installation site, adjusts kerbstone by unwrapping wire position using head sheave before cart Angle;
After adjustment, slowly cart rear end is lifted, front end falls, and kerbstone is smoothly mounted on designated position;
E, handgrip is gently stirred after being installed, handgrip automatically disengages;
Complete a kerbstone transhipment and installation.
CN201810991822.9A 2018-08-29 2018-08-29 Municipal Road Engineering kerbstone transfer tool and kerbstone installation method Pending CN109162179A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810991822.9A CN109162179A (en) 2018-08-29 2018-08-29 Municipal Road Engineering kerbstone transfer tool and kerbstone installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810991822.9A CN109162179A (en) 2018-08-29 2018-08-29 Municipal Road Engineering kerbstone transfer tool and kerbstone installation method

Publications (1)

Publication Number Publication Date
CN109162179A true CN109162179A (en) 2019-01-08

Family

ID=64893297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810991822.9A Pending CN109162179A (en) 2018-08-29 2018-08-29 Municipal Road Engineering kerbstone transfer tool and kerbstone installation method

Country Status (1)

Country Link
CN (1) CN109162179A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424224A (en) * 2019-07-19 2019-11-08 杭州江润科技有限公司 The construction method of kerbstone

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203666712U (en) * 2013-12-12 2014-06-25 山西四建集团有限公司 Kerb transporting crane
CN203666704U (en) * 2013-12-11 2014-06-25 中国三冶集团有限公司市政工程公司 Road kerb transport cart
CN204057828U (en) * 2014-09-26 2014-12-31 济南城建集团有限公司 Curb machinery hoist tool
CN204871074U (en) * 2015-05-22 2015-12-16 中国一冶集团有限公司 Dolly device is transported to curb
CN205469124U (en) * 2016-03-14 2016-08-17 中交一公局第一工程有限公司 Curb transport vechicle

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203666704U (en) * 2013-12-11 2014-06-25 中国三冶集团有限公司市政工程公司 Road kerb transport cart
CN203666712U (en) * 2013-12-12 2014-06-25 山西四建集团有限公司 Kerb transporting crane
CN204057828U (en) * 2014-09-26 2014-12-31 济南城建集团有限公司 Curb machinery hoist tool
CN204871074U (en) * 2015-05-22 2015-12-16 中国一冶集团有限公司 Dolly device is transported to curb
CN205469124U (en) * 2016-03-14 2016-08-17 中交一公局第一工程有限公司 Curb transport vechicle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424224A (en) * 2019-07-19 2019-11-08 杭州江润科技有限公司 The construction method of kerbstone
CN110424224B (en) * 2019-07-19 2021-01-15 杭州江润科技有限公司 Construction method of curb

Similar Documents

Publication Publication Date Title
CN105775980A (en) Spreader for transferring supporting plate of engine
CN105569692A (en) Trolley for welding tunnel waterproof board hanging cloth
CN207347122U (en) A kind of automatic Lift-on/Lift-off System of bridge construction
CN208502279U (en) A kind of wallboard transhipment installation carriage
CN109162179A (en) Municipal Road Engineering kerbstone transfer tool and kerbstone installation method
CN203795311U (en) Multi-leg high pier and slip form construction device
CN104401887B (en) A kind of micro lifter
CN109335956B (en) Prefabricated ditch apron hoisting accessory
CN203613464U (en) Slip form construction cargo transportation device
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN211139355U (en) Stone strip transport driving
CN205000249U (en) Cable -stay bridge king -tower cable pipe mounting adjustment support
CN203613461U (en) Slip form construction lifting system
CN211519531U (en) Curb handling tool
CN210366911U (en) Multifunctional transport tool
KR101201215B1 (en) Moving tool for mold of concrete building
CN206735667U (en) A kind of lightweight lifts carrier
CN211113052U (en) Auxiliary mounting fixture for urban road high-station stone
CN214087297U (en) Pipe hoisting tool
CN203741721U (en) Multi-high pier simultaneous sliding slip form system
CN208915190U (en) A conveyer that is used for job site secondary to transport heavy-calibre pipeline
CN211869402U (en) Hoisting device is built by laying bricks or stones in construction of side flat stone
CN217054408U (en) ALC wallboard erection equipment
CN212605188U (en) Curb transfer device for road construction
CN204753393U (en) Attached outside template construction equipment of bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190108