CN109144976A CN201810894269.7A CN201810894269A CN109144976A CN 109144976 A CN109144976 A CN 109144976A CN 201810894269 A CN201810894269 A CN 201810894269A CN 109144976 A CN109144976 A CN 109144976A
Authority
CN
China
Prior art keywords
data
library
database
layer
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810894269.7A
Other languages
Chinese (zh)
Inventor
张坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Tuoli Geographic Information Co Ltd
Original Assignee
Chongqing Tuoli Geographic Information Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Tuoli Geographic Information Co Ltd filed Critical Chongqing Tuoli Geographic Information Co Ltd
Priority to CN201810894269.7A priority Critical patent/CN109144976A/en
Publication of CN109144976A publication Critical patent/CN109144976A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate
    • G06Q50/165Land development

Landscapes

  • Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of database established based on land investigation and its management systems, comprising: (1) data input;(2) analysis on altered project;(3) data inspection;(4) data export;(5) data statistics.The system can complete inquiry, storage and the statistics of inhomogeneity data, realize as-is data by procedure library and be superimposed with data are changed, so that the flow direction and variation to various ground class are analyzed, by report output;Pass through history library, the data of maloperation can be restored, and previous data can be inquired and be paid a return visit, dynamic analysis of the Land Change Survey management system to different times data, with stronger specific aim, flexible and convenient operation of data modification tool, manages and maintains multiple thematic datas, is conducive to information sharing and data maintenance.

Description

A kind of database and its management system based on land investigation foundation
Technical field
The present invention relates to data management system, specifically a kind of database established based on land investigation and its management system System.
Background technique
Adhere to protecting basic farmland, the principle of the non-agricultural farmland loss caused by construction of strict control.It to protect farmland and mention to base oneself upon The high comprehensive grain production ability is target, further strengthens the protection to basic farmland, cultivated land protection is promoted to be protected by tuple amount Transformation is managed and protected comprehensively to quantity, quality and ecology.According to the requirement for ensureing economic development with protecting farming land mutually unified, guarantee warp Ji develops required land used, the scale and layout of reasonable arrangement construction land.
Include a large amount of data and data due in Land Change Survey, thus network technology, computer technology and On the basis of GIS technology, scientific, automation is realized to Land Change Survey, the management of modernization becomes inevitable.Currently, soil The system of management aspect is more, but can be automatically performed the system of statistical report form output and figure layer update, to different times The system that data are overlapped analysis is also fewer.
Summary of the invention
The purpose of the present invention is to provide a kind of database established based on land investigation and its management systems, on solving State the problem of proposing in background technique.
To achieve the above object, the invention provides the following technical scheme:
A kind of database and its management system based on land investigation foundation, comprising:
(1) data input: by various vector formats and graph data input system database;
(2) analysis on altered project: history library and procedure library are used, user is according to procedure library as a result, can be to the accurate of data Property checked, generate various statistical report forms, confirm it is errorless after operated, by merging process library data, to original figure Layer is covered, and obtains new soil layer, and original soil layer is stored in history library;
(3) data inspection: accurately checking topology, attribute and the logic error in data, and batch is supported to correct mistakes;
(4) data export: exporting various reports according to the result of analysis on altered project;
(5) data statistics: being overlapped analysis to different data sources, the data of different times, counts and difference of classifying Data type report.
As a further solution of the present invention: the procedure library is recorded to the result of change overlay analysis, is had Fixed field structure, and with the operation of program, record value can change, and procedure library is a dynamic base, be system into The data source header of the various analyses of row.
As a further solution of the present invention: the procedure library includes the following aspects:
One, by status planar class imported into database, and then the copy of the figure layer is imported and named;
Two, it using Union function, takes out a change figure spot every time and status figure is overlapped analysis;
Three, the result of analysis is put into procedure library, and calculating is re-started to various areas;
Four, it repeats above operation, until generating final figure layer;
Five, procedure library is emptied, the figure layer data ultimately generated is transferred to procedure library, and production quantity nomogram and report;
Six, when updating, the change figure spot in procedure library is merged according to blip code, deletes former status planar class Figure, forms new status figure layer;
Seven, according to change figure spot and status line chart layer, its intersecting lens is found out, line process library is put into, according to space rubber Relationship deletes status line ground class, then line process library is copied to status linearly class figure layer, forms new status figure layer.
As a further solution of the present invention: the history library is that spatial information and temporal information are uniformly stored in one In database, historical data is separated into storage with as-is data, the two keeps synchronizing.
As a further solution of the present invention: historical data with as-is data be it is identical, attribute table structure is also consistent.
As a further solution of the present invention: it is synchronize first to existing that historical data, which separates both storages holding with as-is data, Shape data edition simultaneously records, and then updates result to historical data, it is made to keep synchronizing.
As a further solution of the present invention: the data output is by Standard division range or any administrative area under one's jurisdiction output soil benefit With, basic farmland, disused arable land be classified thematic maps, graph output be JPG, TIFF, GIFF format.
As the present invention further scheme: the data inspection backs up database, restores and field maintenance, The data of maloperation are restored, and previous data are inquired and paid a return visit.
Compared with prior art, the beneficial effects of the present invention are: the system can complete the inquiry of inhomogeneity data, storage And statistics, as-is data is realized by procedure library and is superimposed with data are changed, thus to the flow direction of various ground class with change into Row analysis, by report output;By history library, the data of maloperation can be restored, and previous data can be inquired With return visit, Land Change Survey management system has stronger specific aim, flexibly and easily to the dynamic analysis of different times data Operation of data modification tool, manage and maintain multiple thematic datas, be conducive to information sharing and data maintenance.
Specific embodiment
The technical solution of the patent is explained in further detail With reference to embodiment.
Embodiment 1
A kind of database and its management system based on land investigation foundation, comprising:
(1) data input: by various vector formats and graph data input system database;
(2) analysis on altered project: history library and procedure library are used, user is according to procedure library as a result, can be to the accurate of data Property checked, generate various statistical report forms, confirm it is errorless after operated, by merging process library data, to original figure Layer is covered, and obtains new soil layer, and original soil layer is stored in history library, the procedure library is the knot to change overlay analysis Fruit is recorded, and has fixed field structure, and with the operation of program, record value can change, and procedure library is one Dynamic base, is the data source header that system carries out various analyses, and the history library is by spatial information and the unified storage of temporal information In a database, historical data is separated into storage with as-is data, the two keeps synchronizing, and historical data is with as-is data Identical, attribute table structure is also consistent, and it is synchronize first to status number that historical data, which separates both storages holding with as-is data, According to editing and recording, then result is updated to historical data, it is made to keep synchronizing;
The procedure library includes the following aspects:
One, by status planar class imported into database, and then the copy of the figure layer is imported and named;
Two, it using Union function, takes out a change figure spot every time and status figure is overlapped analysis;
Three, the result of analysis is put into procedure library, and calculating is re-started to various areas;
Four, it repeats above operation, until generating final figure layer;
Five, procedure library is emptied, the figure layer data ultimately generated is transferred to procedure library, and production quantity nomogram and report;
Six, when updating, the change figure spot in procedure library is merged according to blip code, deletes former status planar class Figure, forms new status figure layer;
Seven, according to change figure spot and status line chart layer, its intersecting lens is found out, line process library is put into, according to space rubber Relationship deletes status line ground class, then line process library is copied to status linearly class figure layer, forms new status figure layer;
(3) data inspection: accurately checking topology, attribute and the logic error in data, and batch is supported to correct mistakes, institute State data inspection to back up database, restore and field maintenance, the data of maloperation restored, and to previous data into Row inquiry and return visit.
(4) data export: exporting various reports according to the result of analysis on altered project, the data output is by Standard division range or appoints The administrative area under one's jurisdiction output land use of meaning, basic farmland, disused arable land are classified thematic maps, and graph output is JPG, TIFF, GIFF Format.
(5) data statistics: being overlapped analysis to different data sources, the data of different times, counts and difference of classifying Data type report.
Embodiment 2
A kind of database and its management system based on land investigation foundation, comprising:
(1) data input: by various vector formats and graph data input system database;
(2) it data conversion: supports mutual between the vector data of the extended formattings such as MapGIS and SHP, DXF, E00, VCT Conversion;Support the mutual conversion between the extended formattings image such as MSI image and TIFF, JPG, IMG, BMP;
(3) data inspection: accurately checking topology, attribute and the logic error in data, and batch is supported to correct mistakes, institute State data inspection to back up database, restore and field maintenance, the data of maloperation restored, and to previous data into Row inquiry and return visit.
(4) data export: exporting various reports according to the result of analysis on altered project, the data output is by Standard division range or appoints The administrative area under one's jurisdiction output land use of meaning, basic farmland, disused arable land are classified thematic maps, and graph output is JPG, TIFF, GIFF Format.
(5) data statistics: being overlapped analysis to different data sources, the data of different times, counts and difference of classifying Data type report.
Embodiment 3
A kind of database and its management system based on land investigation foundation, comprising:
(1) data input: by various vector formats and graph data input system database;
(2) analysis on altered project: history library and procedure library are used, user is according to procedure library as a result, can be to the accurate of data Property checked, generate various statistical report forms, confirm it is errorless after operated, by merging process library data, to original figure Layer is covered, and obtains new soil layer, and original soil layer is stored in history library, the procedure library is the knot to change overlay analysis Fruit is recorded, and has fixed field structure, and with the operation of program, record value can change, and procedure library is one Dynamic base, is the data source header that system carries out various analyses, and the history library is by spatial information and the unified storage of temporal information In a database, historical data is separated into storage with as-is data, the two keeps synchronizing, and historical data is with as-is data Identical, attribute table structure is also consistent, and it is synchronize first to status number that historical data, which separates both storages holding with as-is data, According to editing and recording, then result is updated to historical data, it is made to keep synchronizing;
The procedure library includes the following aspects:
One, by status planar class imported into database, and then the copy of the figure layer is imported and named;
Two, it using Union function, takes out a change figure spot every time and status figure is overlapped analysis;
Three, the result of analysis is put into procedure library, and calculating is re-started to various areas;
Four, it repeats above operation, until generating final figure layer;
Five, procedure library is emptied, the figure layer data ultimately generated is transferred to procedure library, and production quantity nomogram and report;
Six, when updating, the change figure spot in procedure library is merged according to blip code, deletes former status planar class Figure, forms new status figure layer;
Seven, according to change figure spot and status line chart layer, its intersecting lens is found out, line process library is put into, according to space rubber Relationship deletes status line ground class, then line process library is copied to status linearly class figure layer, forms new status figure layer;
(3) data export: exporting various reports according to the result of analysis on altered project, the data output is by Standard division range or appoints The administrative area under one's jurisdiction output land use of meaning, basic farmland, disused arable land are classified thematic maps, and graph output is JPG, TIFF, GIFF Format.
(4) data statistics: being overlapped analysis to different data sources, the data of different times, counts and difference of classifying Data type report.
Embodiment 4
A kind of database and its management system based on land investigation foundation, comprising:
(1) data input: by various vector formats and graph data input system database;
(2) it data conversion: supports mutual between the vector data of the extended formattings such as MapGIS and SHP, DXF, E00, VCT Conversion;Support the mutual conversion between the extended formattings image such as MSI image and TIFF, JPG, IMG, BMP;
(3) data export: exporting various reports according to the result of analysis on altered project, the data output is by Standard division range or appoints The administrative area under one's jurisdiction output land use of meaning, basic farmland, disused arable land are classified thematic maps, and graph output is JPG, TIFF, GIFF Format.
(4) data statistics: being overlapped analysis to different data sources, the data of different times, counts and difference of classifying Data type report.
The member of Union categorical variable shares same memory headroom, and space size is maximum by committed memory space What variable determined, and the first address of each member is the same.
The preferred embodiment of the patent is described in detail above, but this patent is not limited to above-mentioned embodiment party Formula within the knowledge of one of ordinary skill in the art can also be under the premise of not departing from this patent objective It makes a variety of changes.

Claims (8)

1. a kind of database established based on land investigation and its management system characterized by comprising
(1) data input: by various vector formats and graph data input system database;
(2) analysis on altered project: using history library and procedure library, user according to procedure library as a result, can accuracy to data into Row checks, generates various statistical report forms, confirm it is errorless after operated, by merging process library data, to original figure layer into Row covering obtains new soil layer, and original soil layer is stored in history library;
(3) data inspection: accurately checking topology, attribute and the logic error in data, and batch is supported to correct mistakes;
(4) data export: exporting various reports according to the result of analysis on altered project;
(5) data statistics: being overlapped analysis to different data sources, the data of different times, counts and different data of classifying Type report.
2. the database according to claim 1 established based on land investigation and its management system, which is characterized in that described Procedure library is recorded to the result of change overlay analysis, has fixed field structure, and with the operation of program, record Value can change, and it is the data source header that system carries out various analyses that procedure library, which is a dynamic base,.
3. the database according to claim 1 established based on land investigation and its management system, which is characterized in that described Procedure library includes the following aspects:
One, by status planar class imported into database, and then the copy of the figure layer is imported and named;
Two, it using Union function, takes out a change figure spot every time and status figure is overlapped analysis;
Three, the result of analysis is put into procedure library, and calculating is re-started to various areas;
Four, it repeats above operation, until generating final figure layer;
Five, procedure library is emptied, the figure layer data ultimately generated is transferred to procedure library, and production quantity nomogram and report;
Six, when updating, the change figure spot in procedure library is merged according to blip code, deletes former status planar class figure, shape The status figure layer of Cheng Xin;
Seven, according to change figure spot and status line chart layer, its intersecting lens is found out, line process library is put into, closed according to space rubber System deletes status line ground class, then line process library is copied to status linearly class figure layer, forms new status figure layer.
4. the database according to claim 1 established based on land investigation and its management system, which is characterized in that described History library is that spatial information and temporal information are uniformly stored in a database, and historical data is separated with as-is data and is deposited Storage, the two keep synchronizing.
5. the database according to claim 4 established based on land investigation and its management system, which is characterized in that history Data with as-is data be it is identical, attribute table structure is also consistent.
6. the database according to claim 4 established based on land investigation and its management system, which is characterized in that history Data and as-is data separate both storages keep synchronize be first to as-is data editor and to record, then result is updated to going through History data make it keep synchronizing.
7. the database according to claim 1 established based on land investigation and its management system, which is characterized in that described Data output is classified thematic maps, figure by Standard division range or any administrative area under one's jurisdiction output land use, basic farmland, disused arable land Part output is JPG, TIFF, GIFF format.
8. the database according to claim 1 established based on land investigation and its management system, which is characterized in that described Data inspection backs up database, restores and field maintenance, and the data of maloperation are restored, and carries out to previous data Inquiry and return visit.
CN201810894269.7A 2018-08-08 2018-08-08 A kind of database and its management system based on land investigation foundation Pending CN109144976A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810894269.7A CN109144976A (en) 2018-08-08 2018-08-08 A kind of database and its management system based on land investigation foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810894269.7A CN109144976A (en) 2018-08-08 2018-08-08 A kind of database and its management system based on land investigation foundation

Publications (1)

Publication Number Publication Date
CN109144976A true CN109144976A (en) 2019-01-04

Family

ID=64791967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810894269.7A Pending CN109144976A (en) 2018-08-08 2018-08-08 A kind of database and its management system based on land investigation foundation

Country Status (1)

Country Link
CN (1) CN109144976A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110209753A (en) * 2019-05-30 2019-09-06 厦门精图信息技术有限公司 A kind of VCT3.0 multi-layer image document conversion method, terminal device and storage medium
CN112148829A (en) * 2020-09-30 2020-12-29 重庆市规划设计研究院 GIS algorithm optimization method applied to elimination of broken pattern spots
CN117078214A (en) * 2023-10-12 2023-11-17 四川华恒升科技发展有限公司 Data management method for high-standard farmland construction project

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103914524A (en) * 2014-03-25 2014-07-09 北京农业信息技术研究中心 Land-using data temporal topology automatic construction method
CN107516282A (en) * 2017-08-01 2017-12-26 青岛市房地产信息与交易资金监管中心 Three look into the Land Change Survey information management system of unification

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103914524A (en) * 2014-03-25 2014-07-09 北京农业信息技术研究中心 Land-using data temporal topology automatic construction method
CN107516282A (en) * 2017-08-01 2017-12-26 青岛市房地产信息与交易资金监管中心 Three look into the Land Change Survey information management system of unification

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宋蕾: "基于ArcGIS Engine的土地变更调查管理系统设计与实现", 《无线互联科技》 *
王斌: "基于ArcGIS Engine的土地变更调查管理系统设计与实现", 《农业工程学报》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110209753A (en) * 2019-05-30 2019-09-06 厦门精图信息技术有限公司 A kind of VCT3.0 multi-layer image document conversion method, terminal device and storage medium
CN112148829A (en) * 2020-09-30 2020-12-29 重庆市规划设计研究院 GIS algorithm optimization method applied to elimination of broken pattern spots
CN117078214A (en) * 2023-10-12 2023-11-17 四川华恒升科技发展有限公司 Data management method for high-standard farmland construction project
CN117078214B (en) * 2023-10-12 2024-03-19 四川华恒升科技发展有限公司 Data management method for high-standard farmland construction project

Similar Documents

Publication Publication Date Title
CN104798070B (en) The technology filed in activity tracking, data classification and database
US7580944B2 (en) Business intelligent architecture system and method
CN109144976A (en) A kind of database and its management system based on land investigation foundation
Wang et al. Fuzzy information representation and processing in conventional GIS software: database design and application
US8645421B2 (en) Attribute based hierarchy management for estimation and forecasting
CN106611246A (en) Integrated management system of land and resources
CN101877144B (en) Three-dimensional modeling method of vast books of virtual library
Psomadaki Using a space filling curve for the management of dynamic point cloud data in a relational DBMS
CN104021210B (en) Geographic data reading and writing method of MongoDB cluster of geographic data stored in GeoJSON-format semi-structured mode
CN112562040B (en) Spark-based high-performance calculation method for mass two-tone and three-tone data result flow
CN101853305A (en) Method for establishing comprehensive agricultural environmental information database
JP2016539449A (en) Database implementation method
CN103177103A (en) Three-dimensional geographical information system management platform
CN104008209B (en) Reading-writing method for MongoDB cluster geographic data stored with GeoJSON format structuring method
CN100578499C (en) Multidimensional data reading and writing method and apparatus in on-line analysing processing system
CN108875087A (en) A method of description things space attribute is simultaneously searched based on the description
CN104636260A (en) Data management method and system for charging services
CN109165120A (en) Snapshot and difference bitmap generation method and product are managed in distributed memory system
Lind Unified data management for distributed experiments: A model for collaborative grassroots scientific networks
Karpinskyi et al. The system model of topographic mapping in the national spatial data infrastructure in Ukraine
Badr et al. Toward large-scale crop production forecasts for global food security
Hewitt et al. Impacts and trade-offs of future land use and land cover change in Scotland: spatial simulation modelling of shared socioeconomic pathways (SSPs) at regional scales
CN115239281A (en) BIM + GIS-based road migration management system, method and storage medium
Navarro Carrión et al. Should eu land use and land cover data be managed with a Nosql document store?
Subotic et al. Data warehouse schema evolution: state of the art

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104