CN109142192A - Visualization abnormity well cementation second interface bonding quality and obform body strength test system - Google Patents

Visualization abnormity well cementation second interface bonding quality and obform body strength test system Download PDF

Info

Publication number
CN109142192A
CN109142192A CN201811167812.XA CN201811167812A CN109142192A CN 109142192 A CN109142192 A CN 109142192A CN 201811167812 A CN201811167812 A CN 201811167812A CN 109142192 A CN109142192 A CN 109142192A
Authority
CN
China
Prior art keywords
cavity
behavior
cement paste
hardened cement
interface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811167812.XA
Other languages
Chinese (zh)
Other versions
CN109142192B (en
Inventor
郑明明
刘天乐
蒋国盛
吴晶晶
李谦
李之军
王胜
谭慧静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Univeristy of Technology
Original Assignee
Chengdu Univeristy of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Univeristy of Technology filed Critical Chengdu Univeristy of Technology
Priority to CN201811167812.XA priority Critical patent/CN109142192B/en
Publication of CN109142192A publication Critical patent/CN109142192A/en
Application granted granted Critical
Publication of CN109142192B publication Critical patent/CN109142192B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume, or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/082Investigating permeability by forcing a fluid through a sample
    • G01N15/0826Investigating permeability by forcing a fluid through a sample and measuring fluid flow rate, i.e. permeation rate or pressure change
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume, or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume, or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/0806Details, e.g. sample holders, mounting samples for testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/02Details
    • G01N3/06Special adaptations of indicating or recording means
    • G01N3/068Special adaptations of indicating or recording means with optical indicating or recording means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/24Investigating strength properties of solid materials by application of mechanical stress by applying steady shearing forces
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume, or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N2015/0813Measuring intrusion, e.g. of mercury
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0014Type of force applied
    • G01N2203/0025Shearing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/003Generation of the force
    • G01N2203/0042Pneumatic or hydraulic means
    • G01N2203/0048Hydraulic means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/06Indicating or recording means; Sensing means
    • G01N2203/0641Indicating or recording means; Sensing means using optical, X-ray, ultraviolet, infrared or similar detectors

Abstract

The present invention relates to well cementation second interface bonding quality detection technique fields, in particular to a kind of visualization abnormity well cementation second interface bonding quality and obform body strength test system, simulated formation cavity, cementing concrete/Behavior of Hardened Cement Paste cavity, which are connected, is shaped to experiment chamber, and vertical connected surface is second interface;Experiment top of chamber and bottom are respectively equipped with ring packing retaining ring, and cementing concrete/Behavior of Hardened Cement Paste cavity lower part is equipped with Behavior of Hardened Cement Paste and goes up and down mold;Thermocouple is equipped in simulated formation cavity;It is equipped with more reaction gas injection pipes in simulated formation cavity, visual windows are respectively equipped in simulated formation cavity, cementing concrete/Behavior of Hardened Cement Paste cavity side, sealing cover is equipped at the top of simulated formation cavity, sealing at the top of cementing concrete/Behavior of Hardened Cement Paste cavity is equipped with gas-liquid entrance.The present apparatus can be used for the test of the evaluation of second interface bonding quality in well cementing process containing hydrate formation, the soft soil layer soil body and cement gel junction quality.

Description

Visualization abnormity well cementation second interface bonding quality and obform body strength test system
Technical field
The present invention relates to well cementation second interface bonding quality detection technique field, in particular to a kind of visualization abnormity well cementation two Interface agglutination quality and obform body strength test system.
Background technique
The extraction of oil and gas needs to undergo the process of a series of complex, including drilling well, well cementation, complete well, perforation, note Water, oil recovery etc..Wherein, well cementation, which has, provides protection and support for casing, carries out the important of effective Inter-zonal packing to adjacent earth formations Effect.And the quality of cementing quality directly determines the service life of producing well, and going on smoothly and adopting to subsequent links Yield has a major impact, and is the key project of oil field long term stable production.Therefore the evaluation of cementing quality is then seemed very necessary, Gu The key of well quality is the bonding quality of second interface, mainly includes cementing strength and Inter-zonal packing ability.Currently, two boundaries of evaluation The method of face quality can mainly be summarized as two classes: i.e. the interface cementing strength of live Logging Evaluation Method and laboratory experiment is evaluated Method.Wherein mainly by materials such as cement mortar come simulated formation in laboratory experiment method, then cement after hardening Surface is formed a certain amount of shale thin layer to simulate remaining mud cake after well-flushing by sand, is then infused in the space adjacent with thin layer Enter a certain amount of cement slurry and is formed by curing cement slurry hardenite to simulate cement sheath, and the contact between cement slurry and stratum Face is second interface of cementing the well.Entire physical model is as shown in fig. 6, can be according to requiring to be fabricated to required shape.Second interface is cementing strong Degree is then characterized by being parallel to the shear strength that the shearing behavior measure of second interface obtains, meanwhile, Inter-zonal packing ability is then It is characterized by the permeability of cement slurry and ground interface layer.This method have many advantages, such as it is simple to operation, however still It comes with some shortcomings: for example, (1) simulated formation differs greatly with natural stratum physico-mechanical properties;(2) shear strength and infiltration Rate is tested under the conditions ofs ex situ formation temperature, pressure etc.;(3) second interface form and natural environment have different;To all There is certain influence to the accuracy of test result and the directive function on scene.In addition, being related to made in the experiment such as high pressure low temperature The physical model size of work is larger, also increases the difficulty that experiment is carried out.
In addition, when encountered stratum dynamics intensity of cementing the well is lower, or even when being the sediment stratums such as non-consolidation, second interface Form will be more complicated, and influence of the close degree of physical analogy model and natural environment to test result is bigger.For example, Gas hydrates as clean energy resource.
Gas hydrates are distributed widely in oceanographic sedimentation stratum and land frozen soil stratum, and reserves are extremely abundant, carbon storage Amount is twice or so of conventional energy resource, and with advances in technology with the continuation of investigation and prospecting, theoretical allowable exploitation also gradually increases It is more, successfully exploit for alleviate the increasingly petroleum resources of reduction nervous situation it is significant, be considered as future by various countries The alternative energy source of petroleum, natural gas, great extraction value.Relative to frozen soil stratum, the compacting of sea area hydrate reservoir consolidates journey Spend worse, mechanical strength is lower.To also result in in-situ mechanical property and testing permeability feasibility is very low.In well cementing process For the safety and stability for realizing the borehole wall, the bonding quality of second interface is improved, well cementation hydraulic coupling is generally higher than the pore pressure on stratum, separately Outside since hydrated cementitious heat release leads to nearly borehole wall stratum decomposition of hydrate, so that the permeability on nearly borehole wall stratum and porosity increase Add, has resulted in the nearly borehole wall stratum of a degree of intrusion of cement slurry, therefore the form of second interface is not burnishing surface, and it is similar In the face for being covered with different size taper intrusive bodies (similar to the structure of tree root or mace).In addition, in live well cementing process, it is difficult Intuitively to observe the development in the form of second interface and the development in crack, and by being also beneficial to form and microfissure observation The Influencing Mechanism for the second interface intensity and sealing performance of analyzing and researching.The above existing problem both increases cementing strength and interlayer seals Every the difficulty and accuracy of merit rating.
Summary of the invention
In view of the above technical problems, the present invention provides a kind of visualization abnormity well cementation second interface bonding quality and obform body is strong Spend test macro, it is intended to solve low force strength formation, the abnormity in the presence of second interface bonding quality evaluation method of cementing the well is solid Well second interface morphological Simulation is difficult, and emulator is low and second interface bonding quality is difficult to the problems such as evaluating, and increases visualization function Can, be conducive to the observation of cementing concrete ring Yu the cementing form of second interface, and being replaced by multicomponent, can individually evaluate Reservoir borehole wall interface conditions, influence of the taper intrusive body to second interface bonding quality.In addition it is also used for evaluating secondary squeeze method pair The influence of cementing strength, and can be widely used for the measurement of the boundary strengths such as cement and the soil body, rock mass, it is hindered as pile foundation side rubs Adhesion strengths of cementitious materials such as measurement, building surface masonry body and the cement of power (bearing capacity of friction pile) etc..
The specific technical solution that the present invention solves above-mentioned technical problem is as follows: visualization abnormity well cementation second interface bonding quality And obform body strength test system, it include mainly reaction under high pressure autoclave body and optical viewer, the reaction under high pressure autoclave body includes mould Quasi- stratum cavity, cementing concrete/Behavior of Hardened Cement Paste cavity, hydraulic cylinder cavity, a side wall of the hydraulic cylinder cavity are Behavior of Hardened Cement Paste Go up and down mold base;The hydraulic cylinder cavity is equipped with cylinder chamber high-pressure gas-liquid entrance, hydraulic cylinder oil circuit pipeline, inside peace Equipped with hydraulic cylinder;
The simulated formation cavity, cementing concrete/Behavior of Hardened Cement Paste cavity, which are connected, is shaped to experiment chamber, vertical connected surface For second interface;The second interface bottom is equipped with second interface and is mostly used mouth, and top is equipped with second interface testing permeability gas vent;Institute The experiment cavity wall stated is equipped with rubber pattern pipe, and top and bottom are respectively equipped with ring packing retaining ring, rubber pattern pipe and two groups upper and lower Ring packing retaining ring edge seal contacts to form sealing space;
Cementing concrete/Behavior of Hardened Cement Paste cavity lower part is equipped with Behavior of Hardened Cement Paste and goes up and down mold, and Behavior of Hardened Cement Paste lifting mold is mounted on Behavior of Hardened Cement Paste It goes up and down on mold base, Behavior of Hardened Cement Paste lifting mold is gone up and down by Driven by Hydraulic Cylinder;
In the cementing concrete/Behavior of Hardened Cement Paste cavity, cementing concrete/stayed between Behavior of Hardened Cement Paste cavity inner wall and rubber pattern pipe There is gap, is equipped with thin-wall stainless steel skeleton, thin-wall stainless steel skeletal support rubber pattern pipe in gap;It is equipped in gap multiple Horizontal block, horizontal block are fixed on cementing concrete/Behavior of Hardened Cement Paste cavity inner wall, and multiple horizontal blocks are discontinuously arranged, and Positioned at ring packing retaining ring lower edge;The cementing concrete/Behavior of Hardened Cement Paste cavity wall is equipped with confining pressure entrance, confining pressure entrance and institute The gap connection stated;
Thermocouple is equipped in simulated formation cavity;
More reaction gas injection pipes are equipped in the simulated formation cavity, reaction gas injection pipe lower end is located at simulated formation Outside cavity bottom;Multiple apertures are distributed on the wall of reaction gas injection pipe;
Visual windows are respectively equipped on the simulated formation cavity, cementing concrete/Behavior of Hardened Cement Paste cavity side, outside visual windows Microscopic observation device is installed;Optical viewer can need to select the device of specific different performance parameter according to experiment test.
It is equipped with sealing cover at the top of the simulated formation cavity, is equipped with sealing ring in sealing cover;
Sealing at the top of the cementing concrete/Behavior of Hardened Cement Paste cavity, cementing concrete/Behavior of Hardened Cement Paste cavity top are equipped with laser ranging Instrument is additionally provided with gas-liquid entrance.
The position height of the simulated formation cavity is lower than the cementing concrete/Behavior of Hardened Cement Paste cavity;The annular Sealing shield ring includes height two parts, and two parts are connected by vertical panel, and height two parts are located at cementing concrete/Behavior of Hardened Cement Paste At cavity, simulated formation cavity.
The rubber pattern pipe, when being not necessarily to shearing test, Guan Weiyi entirety of rubber pattern, and work as and need shearing test When, rubber pattern pipe is two parts, is located in simulated formation cavity and cementing concrete/Behavior of Hardened Cement Paste cavity, two parts are on two boundaries It is overlap joint face contact at face, is slidingly sealed in shear history.
Further include transparent vitreous body, multiple intrusive body holes, the one end in intrusive body hole are horizontally disposed in transparent glass body On one side wall of transparent vitreous body, other end is located in transparent glass body, and passes through permeability cell and transparent vitreous body The connection of other side wall, permeability cell is interior to be equipped with intrusive body plunger;Transparent vitreous body is mounted in simulated formation cavity, and and mould Pass through seal with elastometic washer between quasi- stratum cavity inner wall, Behavior of Hardened Cement Paste lifting mold.
Second interface is mostly used mouth as second interface testing permeability gas access or drilling fluid and cementing fluid entrance.
The intracorporal simulated formation cavity of autoclave provides the space of production simulated formation, for simulating actual well drilled mistake Nearly borehole wall stratum in journey can carry out simulation production with materials such as sand, soil as needed, and cementing concrete/Behavior of Hardened Cement Paste cavity is used for With simulating actual well drilled process middle sleeve and the nearly borehole wall annulus of interlayer is circulation of drilling fluid and cementing slurry injection with The space of hardening.Rubber pattern pipe and upper and lower two groups of ring packing retaining rings form sealing space, and rubber pattern pipe is used for simulated formation Cavity and cementing concrete/Behavior of Hardened Cement Paste cavity add confining pressure.Cementing concrete/Behavior of Hardened Cement Paste cavity lower part is that Behavior of Hardened Cement Paste goes up and down mold, is passed through The lifting of hydraulic cylinder can test the cementing strong of the cement plane (second interface) of cementing concrete/Behavior of Hardened Cement Paste cavity and simulated formation cavity Degree.Visualization window is made of high strength glass, is mounted on reaction under high pressure autoclave body by sealing ring sealing with nut, is worked as experiment In do not use rubber pattern pipe when be convenient to observation second interface form, in conjunction with microscope and infrared facility etc., observable cement slurry Under differential pressure into the invasion procedure of simulated formation and cement slurry hardening process microfissure developmental state.Transparent vitreous body For the quickly dismantled mold for simulating nearly borehole wall stratum, by sand, soil in alternative simulated formation cavity in following three kinds of situations The material of equal production: influence of its cement slurry intrusive body for being used to investigate (1) different shape to second interface cementing strength;(2) two Influence of the interface roughness degree to cementing strength and sealing performance;(3) influence of the remaining mud cake of drilling fluid to second interface intensity, On have the cavitys such as prefabricated cylindricality, taper.Vitreous surface degree of roughness mainly passes through the stone of adhering with epoxy resin different-grain diameter Sand is realized.Relative to sand, native simulated formation, transparent vitreous body is more convenient quickly, and focusing on examination not Cement slurry intrusive body and second interface degree of roughness with form.Similar, it equally can use mould when with simulated formations such as sand, soil Having the intrusive body cavity of prefabricated different shape or improving well cementation pressure difference allows cement slurry to invade simulated formation under differential pressure and be formed Intrusive body.
In simulated formation cavity, when with sand, soil production simulated formation, using anhydrous calcium chloride and sodium metasilicate to sand, soil Grain carry out it is cementing, while be added form hydrate needed for water, be subject to certain pressure forming using mold, guarantee ground stratum boundary Not slump when face is high up in the air, and anhydrous calcium chloride and sodium metasilicate bond are smaller, are more nearly natural stratum.
More reaction gas injection pipes are arranged in simulated formation cavity, the side of reaction gas injection pipe is distributed certain aperture, So that gas injection is more convenient, the hydrate formed in hole is more sufficiently and uniform.
Rubber pattern pipe and upper and lower two groups of ring packing retaining ring sealings, rubber pattern pipe upper and lower opening edge are kept off with ring packing always Circle is in contact, and reaches sealing in the effect of confining pressure pressure.Rubber pattern pipe can need to make according to experiment it is a variety of, when need and meanwhile measure When second interface cementing strength and permeability, rubber pattern pipe is divided into two parts, respectively simulated formation chamber rubber pattern semicanal and well cementation Cement chamber rubber pattern semicanal, two parts are sealed at second interface by being slidingly sealed, so that shearing behavior can be realized.Wherein Cementing concrete chamber rubber pattern semicanal top is exceptionally with thin-wall stainless steel skeleton.When only measuring second interface permeability, rubber pattern Pipe is integrally formed, and whether can also needing to select to use according to experiment, but equally exists thin-wall stainless steel skeleton.
Sealing cover is connected with reaction under high pressure autoclave body with nut, is sealed in the form of means of press seals by sealing ring.Work as mould When quasi- ground layer height is lower, sealing cover can be filled with the intracorporal simulated formation of simulated formation chamber by briquetting.Sealing cover material Matter elasticity preferably, to realize seals at dog-ear.
Behavior of Hardened Cement Paste lifting mold passes through seal rubber with reaction under high pressure inner wall of kettle and with Behavior of Hardened Cement Paste lifting mold base Circle realizes sealing, and hydraulic cylinder cavity and inner chamber body are synchronized to pressure to reduce inside and outside differential pressure where hydraulic cylinder in experimentation, So when sealing rubber ring be not subject to pressure difference substantially, be served only for preventing the entrance of sand, soil and cement slurry.
Hydraulic cylinder is connected with pressure gauge, for obtaining pressure reading, calculates shear strength.Second interface is mostly used mouth, second interface Testing permeability gas vent is connected with pressure gauge and flowmeter, for obtaining pressure and flow reading, calculates permeability.It is other Pipeline entrance connects pressure gauge and flowmeter as needed, to realize the monitoring of pressure and flow.
It is equipped with laser ranging instrument at the top of cementing concrete/Behavior of Hardened Cement Paste cavity, to realize that cement slurry liquid level monitors.It is equipped with Gas-liquid entrance is to test the circulation of drilling fluid and the injection of cementing slurry.
Thermocouple is equipped in simulated formation cavity, to realize the monitoring of formation temperature.
When carrying out Fast Evaluation experiment using transparent vitreous body, by transparent vitreous body along second interface, installed in conjunction with cushion block It is close by rubber ring between transparent vitreous body and simulated formation cavity inner wall, Behavior of Hardened Cement Paste lifting mold in simulated formation cavity Envelope.Intrusive body hole form, quantity, size and distribution situation are pre-machined according to experiment exam needs on transparent vitreous body.Glass The degree of roughness of glass body interface can be realized using the quartz sand of adhering with epoxy resin different-grain diameter.
Visual windows can be used for observing the intrusive behavior of cement slurry and microfissure when no rubber pattern pipe uses and develop, in conjunction with sight Survey needs to select optical viewer, can be microscope equipment or infrared facility.
Second interface is mostly used mouth, sets inside Behavior of Hardened Cement Paste lifting mold base as second interface testing permeability suction line It sets, second interface is mostly used mouth pipeline and is arranged along adjacent simulated formation cavity, cementing concrete/Behavior of Hardened Cement Paste cavity, to facilitate shearing The realization of behavior.
The device has been filled up the mechanics scall abnormity such as current natural gas hydrate well cementation second interface and has been formed and cementing matter The blank of the visual testing method of amount.Relative to existing conventional gas and oil stratum cement the well second interface bonding quality test equipment, The present invention considers influence of downhole temperature, pressure, formation mechanical property and hole the infiltration property to second interface formation and form, and in original The bonding quality of special-shaped second interface is tested under the conditions of the temperature, pressure on position stratum by visualization method, evaluation model can integrate Consider the influence to bonding quality such as interface configuration, interface surface roughness, intrusive body size, also can individually consider each factor Influence situation.Physical model in the present invention is more nearly with actual conditions, to keep test result truer, data more may be used It leans on.
The effective effect of bring of the present invention is: by traditional test device that there is three layers or more of annular housing to form It is reduced to only reduce the volume of reaction kettle body there are two main cavity, thus can facilitate and cool down in merging water-bath or air bath, And the shape of reaction kettle body can need to make with size according to experiment.Can test and evaluate the cement intrusive body of different shape with And influence of the bed boundary roughness to the intensity and sealing performance of second interface, in the second interface examined or check and actual well drilled more Adjunction is close.The visible observation of cement slurry intrusion and hardening process under the conditions of achievable original position stratum temperature, pressure etc., more intuitively. The cementing strength and permeability of second interface can be evaluated in primary experiment simultaneously, test scope is wider, and performance is more abundant.
The present apparatus cannot be only used for the evaluation of second interface bonding quality in well cementing process containing hydrate formation, can also Guanji use In the test of the soft soil layer soil body and cement gel junction quality, such as the detection of frozen soil stratum cementing quality, bearing capacity of friction pile test Deng all with good directive function in the construction of drilling engineering and underground infrastructure in China.
Detailed description of the invention
Fig. 1 is sectional elevation structural schematic diagram of the invention;
Fig. 2 is horizontal profile structure schematic diagram of the invention;
Fig. 3 is horizontal profile structure schematic diagram of the invention;
Fig. 4 is transparent vitreous body schematic perspective view of the invention;
Fig. 5 is transparent vitreous body side structure schematic view of the invention;
Fig. 6 prior art well cementation second interface bonding quality evaluation model schematic diagram.
Specific embodiment
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the invention.
Visualization abnormity well cementation second interface bonding quality and obform body strength test system as shown in Figure 1, main includes height Press reaction kettle body 9 and optical viewer 23, as shown in Fig. 2, reaction under high pressure autoclave body 9 can be cylinder, can also with as shown in figure 3, For cuboid.The reaction under high pressure autoclave body 9 includes simulated formation cavity 17, cementing concrete/Behavior of Hardened Cement Paste cavity 20, hydraulic cylinder Cavity, a side wall of the hydraulic cylinder cavity are that Behavior of Hardened Cement Paste goes up and down mold base 13;The hydraulic cylinder cavity is equipped with liquid Cylinder pressure chamber high-pressure gas liquid entrance 10, hydraulic cylinder oil circuit pipeline 12, inside is equipped with hydraulic cylinder 11;
The simulated formation cavity 17, cementing concrete/Behavior of Hardened Cement Paste cavity 20, which are connected, is shaped to experiment chamber, vertical company Logical face is second interface;The second interface bottom is equipped with second interface and is mostly used mouth 14, and top is equipped with second interface testing permeability gas Outlet 21;The experiment cavity wall is equipped with rubber pattern pipe 6, and top and bottom are respectively equipped with ring packing retaining ring 3, rubber pattern pipe 6 and 3 edge seal of upper and lower two groups of ring packing retaining rings contact to form sealing space;
Cementing concrete/20 lower part of Behavior of Hardened Cement Paste cavity is equipped with Behavior of Hardened Cement Paste and goes up and down mold 8, and Behavior of Hardened Cement Paste lifting mold 8 is mounted on water Mudstone is gone up and down on mold base 13, and Behavior of Hardened Cement Paste goes up and down mold 8 and drives lifting by hydraulic cylinder 11;
In the cementing concrete/Behavior of Hardened Cement Paste cavity 20, cementing concrete/20 inner wall of Behavior of Hardened Cement Paste cavity and rubber pattern pipe 6 Between there are gap, be equipped with thin-wall stainless steel skeleton 7 in gap, thin-wall stainless steel skeleton 7 supports rubber pattern pipe 6;In gap Multiple horizontal blocks 4 are installed, horizontal block 4 is fixed on cementing concrete/20 inner wall of Behavior of Hardened Cement Paste cavity, multiple horizontal blocks 4 It is discontinuously arranged, and it is located at 3 lower edge of ring packing retaining ring;The cementing concrete/20 side wall of Behavior of Hardened Cement Paste cavity, which is equipped with, to be enclosed It is pressed into mouth 5, confining pressure entrance 5 is connected to the gap;
Thermocouple 15 is equipped in simulated formation cavity 17;
More reaction gas injection pipes 16 are equipped in the simulated formation cavity 17,16 lower end of reaction gas injection pipe is located at mould Outside quasi- 17 bottom of stratum cavity;Multiple apertures are distributed on the wall of reaction gas injection pipe 16;
The simulated formation cavity 17, cementing concrete/Behavior of Hardened Cement Paste cavity are respectively equipped with visual windows 22 on 20 side, visually Optical viewer 23 is installed outside window 22;
It is equipped with sealing cover 19 at the top of the simulated formation cavity 17, is equipped with sealing ring 18 in sealing cover 19;
It is sealed at the top of the cementing concrete/Behavior of Hardened Cement Paste cavity 20, laser is equipped at the top of cementing concrete/Behavior of Hardened Cement Paste cavity 20 Distance mearuring equipment 2 is additionally provided with gas-liquid entrance 1.
The position height of the simulated formation cavity 17 is lower than the cementing concrete/Behavior of Hardened Cement Paste cavity 20;Described Ring packing retaining ring 3 include height two parts, two parts by vertical panel connection, height two parts be located at cementing concrete/ At Behavior of Hardened Cement Paste cavity 20, simulated formation cavity 17.
The rubber pattern pipe 6, when being not necessarily to shearing test, rubber pattern pipe 6 is an entirety, and works as and need shearing test When, rubber pattern pipe 6 is two parts, is located in simulated formation cavity 17 and cementing concrete/Behavior of Hardened Cement Paste cavity 20, two parts exist It is overlap joint face contact at second interface, is slidingly sealed in shear history.
It as shown in Figure 4 and Figure 5, further include transparent vitreous body 24, size, the quantity in the intrusive body hole on transparent vitreous body It is carried out that setting is pre-machined according to experiment with distribution, arrangement can be irregular.
This embodiment example enumerates a kind of situation: multiple taper intrusive bodies hole 25 is horizontally disposed in transparent vitreous body 24, it is more In same level, about 25 multiple taper intrusive bodies hole sets multiple cylindricality intrusive bodies respectively in a taper intrusive body hole 25 Hole 26, bilevel cylindricality intrusive body hole 26 are located in same level;The big mouth in taper intrusive body hole 25 End and 26 one end of cylindricality intrusive body hole be located on 24 1 side walls of transparent vitreous body, the osculum end in taper intrusive body hole 25 with 26 other end of cylindricality intrusive body hole is located in transparent vitreous body 24, and passes through permeability cell and transparent vitreous body 24 other one Side wall connection, permeability cell is interior to be equipped with intrusive body plunger 27;Transparent vitreous body 24 is mounted in simulated formation cavity 17, and and mould It is sealed between quasi- 17 inner wall of stratum cavity, Behavior of Hardened Cement Paste lifting mold 8 by rubber ring 28.
One of usage mode:
Experiment purpose is mainly to test the cementing strength and permeability of the well cementation second interface containing hydrate formation, is analyzed different solid Influence of the well pressure difference (the cement slurry intrusive body for generating different sizes and form) to second interface quality.
As shown in Figure 1, abnormity well cementation second interface bonding quality and obform body strength test system in the present embodiment, confining pressure Entrance 5, cylinder chamber high-pressure gas-liquid entrance 10, hydraulic cylinder oil circuit pipeline 12, second interface are mostly used mouth 14, reaction gas injection pipe 16, second interface testing permeability gas vent 21 connects pressure gauge respectively, and second interface is mostly used mouth 14, reaction gas injection pipe 16, two boundaries Face testing permeability gas vent 21 is further connected with flow agent simultaneously, and second interface is mostly used mouth 14 and is further connected with slush pump.
Reaction kettle inner wall smears suitable vaseline first at second interface testing permeability gas vent 21.Rubber is installed Mould pipe 6 simultaneously does preload processing to the region for having contact with ring packing retaining ring 3.Utilize natural siliceous sand, anhydrous calcium chloride and silicon In sour sodium mixed filling indentation simulated formation cavity 17, the simulated formation that preparation physical property condition is met the requirements, simulated formation height Not less than 3 lower edge of ring packing retaining ring above, sealing cover 19 is installed after being put into briquetting, entire reaction under high pressure autoclave body 9 is placed in On pedestal, it is placed in cool room.It is injected by reaction gas injection pipe 16 into simulated formation and forms pore water needed for hydrate, Start to cool down, methane gas is injected to 8MPa by reaction gas injection pipe 16 when temperature reaches 2 DEG C, keeps pressure invariable 2 Hour is to be sufficiently formed hydrate.In the process by cylinder chamber high-pressure gas-liquid entrance 10 inject nitrogen with guarantee reaction chamber with Cylinder chamber pressure difference is zero as far as possible.Mouth 14, which is mostly used, by second interface is slowly injected into the static required time of drilling fluid in simulated formation A certain amount of mud cake is formed at second interface, is then discharged out drilling fluid.Mouth 14, which is mostly used, by second interface is slowly injected into low-temperature solid well water Mud determines the real-time liquid level position of cement slurry according to laser range finder 2, guarantees that liquid level position is higher than second interface testing permeability gas Body is exported 21 extreme lower position and is gone lower than 3 lower edge of Sealing shield ring annular in cementing concrete/Behavior of Hardened Cement Paste cavity 20 with reserved shearing For required stroke.Injecting high pressure nitrogen by gas-liquid entrance 1 makes cement slurry pressure be greater than formation pore pressure so that cement slurry It invades in hydrate formation, keeps nitrogen pressure constant.Cement slurry passes through confining pressure entrance 5 to simulated formation and consolidates after sufficiently solidifying Well-cementing cement adds a certain amount of confining pressure in well cement/Behavior of Hardened Cement Paste cavity 20.The injection of mouth 14 is mostly used greater than intracavitary using second interface The nitrogen of pressure collects the gas that seepage flow crosses second interface by second interface testing permeability gas vent 21, records two in the process Interface is mostly used the pressure and flow of mouth 14 and second interface testing permeability gas vent 21, calculates second interface permeability.Start liquid Cylinder pressure 11 is lifted Behavior of Hardened Cement Paste and is sheared, and records the pressure change of hydraulic cylinder, calculates shear strength.By with unimplanted well cementation water Shear strength of the instrument under self weight and friction, which compares, when mud obtains second interface cementing strength.After the completion of test successively Removal confining pressure and cavity internal pressure and Cylinder chamber pressures open reaction under high pressure autoclave body 9, observe two boundaries after removing simulated formation Face and intrusion volume morphing.
When carrying out simulated experiment using transparent vitreous body 24, the production of simulated formation then passes through 24 generation of transparent vitreous body It replaces, remaining space is by briquetting and cushion block completion in simulated formation cavity, and hydrate is not necessarily formed in experimentation.Directly examine Look into the influence of intrusive body or interface roughness degree to second interface bonding quality.Above example is carried out using rubber pattern pipe 6 Experiment, to the more demanding of sealing.
In addition, the permeability when simulated formation is poor, or without testing second interface under the conditions of actual formation in-situ stress When bonding quality, rubber pattern pipe 6 can not be used, is then not necessarily to add confining pressure step in experimentation.It at this time can be at visual windows 22 Microscope equipment is disposed, observes the formation and development of cement slurry intrusion and microfissure in real time.
The two of usage mode:
Experiment purpose is mainly the influence for testing cement intrusive body and interface roughness to second interface bonding quality, and analysis is not With the quantitative effect of size intrusive body and different roughness interface, for instructing the selection of technological parameter in well cementing process.
As shown in Figure 1, abnormity well cementation second interface bonding quality and obform body strength test system in the present embodiment, hydraulic Cylinder oil circuit pipeline 12, second interface are mostly used mouth 14, second interface testing permeability gas vent 21 connects pressure gauge, and second interface is mostly used mouth 14, second interface testing permeability gas vent 21 is further connected with flow agent simultaneously, and second interface is mostly used mouth 14 and is connected to slush pump.
Reaction kettle inner wall smears suitable vaseline first at second interface testing permeability gas vent 21.It then will be saturating Bright vitreum 24 is mounted in simulated formation cavity 17, and remaining space is supplemented by cushion block.It is needed according to research in advance saturating Different sizes, quantity and the taper of distribution intrusive body hole 25 and cylindricality intrusive body hole 26 are made on bright vitreum 24, and Pass through the quartz sand of the certain partial size of adhering with epoxy resin in 24 side of transparent vitreous body.And when examination cement intrusive body is to two boundaries When the influence of face bonding quality, woth no need to be bonded quartz sand.Sealing cover 19 is installed, experiment desired value is reduced the temperature to.Then lead to It crosses the multi-purpose mouth 14 of second interface and is slowly injected into cement slurry so that cement slurry enters taper intrusive body hole 25, cylindricality intrusive body hole 26, cement slurry page height is monitored in real time by laser range finder 2.The abundant aquation of cement slurry is allowed to consolidate after injection.
It is mostly used the nitrogen that the injection of mouth 14 is greater than cavity pressure using second interface, passes through second interface testing permeability gas vent 21 collection seepage flow cross the gas of second interface, record second interface in the process and are mostly used mouth 14 and second interface testing permeability gas vent 21 Pressure and flow, calculate second interface permeability.Starting hydraulic cylinder 11 is lifted Behavior of Hardened Cement Paste and is sheared, and records the pressure of hydraulic cylinder 11 Power variation, calculates second interface cementing strength.It, can be real-time by the microscope equipment disposed at visual windows 22 in entire test process Observe the formation and development process of cement slurry aquation and microfissure.Test after the completion of open reaction kettle, replacement have different sizes, The intrusive body hole of form, interface roughness, according to above step retest.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in the principle of the present invention and Within content, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (5)

1. visualization abnormity well cementation second interface bonding quality and obform body strength test system mainly include reaction under high pressure autoclave body (9) with optical viewer (23), which is characterized in that the reaction under high pressure autoclave body (9) include simulated formation cavity (17), well cementation water Mud/Behavior of Hardened Cement Paste cavity (20), hydraulic cylinder cavity, a side wall of the hydraulic cylinder cavity are that Behavior of Hardened Cement Paste goes up and down mold base (13);The hydraulic cylinder cavity is equipped with cylinder chamber high-pressure gas-liquid entrance (10), hydraulic cylinder oil circuit pipeline (12), inside peace Equipped with hydraulic cylinder (11);
The simulated formation cavity (17), cementing concrete/Behavior of Hardened Cement Paste cavity (20), which are connected, is shaped to experiment chamber, vertical company Logical face is second interface;The second interface bottom is equipped with second interface and is mostly used mouth (14), and top is equipped with second interface testing permeability gas Body exports (21);The experiment top of chamber and bottom are respectively equipped with ring packing retaining ring (3);
Cementing concrete/Behavior of Hardened Cement Paste cavity (20) lower part is equipped with Behavior of Hardened Cement Paste lifting mold (8), and Behavior of Hardened Cement Paste lifting mold (8) is mounted on Behavior of Hardened Cement Paste is gone up and down on mold base (13);Behavior of Hardened Cement Paste goes up and down mold (8) and drives lifting by hydraulic cylinder (11);
Thermocouple (15) are equipped in simulated formation cavity (17);
More reaction gas injection pipes (16) are equipped in the simulated formation cavity (17), reaction gas injection pipe (16) lower end is located at Outside simulated formation cavity (17) bottom;Multiple apertures are distributed on the wall of reaction gas injection pipe (16);
Visual windows (22) are respectively equipped on the simulated formation cavity (17), cementing concrete/Behavior of Hardened Cement Paste cavity (20) side, it can Optical viewer (23) are installed outside viewing window (22);
Sealing cover (19) are equipped at the top of the simulated formation cavity (17), are equipped with sealing ring (18) in sealing cover (19);
Sealing at the top of the cementing concrete/Behavior of Hardened Cement Paste cavity (20), cementing concrete/Behavior of Hardened Cement Paste cavity (20) top are equipped with laser Distance mearuring equipment (2) is additionally provided with gas-liquid entrance (1).
2. visualization abnormity well cementation second interface bonding quality according to claim 1 and obform body strength test system, It is characterized in that, the position height of the simulated formation cavity (17) is lower than the cementing concrete/Behavior of Hardened Cement Paste cavity (20);Institute The ring packing retaining ring (3) stated includes height two parts, and two parts are connected by vertical panel, and height two parts are located at well cementation At cement/Behavior of Hardened Cement Paste cavity (20), simulated formation cavity (17).
3. visualization abnormity well cementation second interface bonding quality according to claim 1 and obform body strength test system, It is characterized in that, the experiment cavity wall is equipped with rubber pattern pipe (6), rubber pattern pipe (6) and upper and lower two groups of ring packing retaining rings (3) edge seal contacts to form sealing space;In the cementing concrete/Behavior of Hardened Cement Paste cavity (20), cementing concrete/Behavior of Hardened Cement Paste There are gaps between cavity (20) inner wall and rubber pattern pipe (6), are equipped with thin-wall stainless steel skeleton (7) in gap, thin-walled is stainless Steel skeleton (7) supports rubber pattern pipe (6);Multiple horizontal blocks (4) are installed, horizontal block (4) is fixed on well cementation water in gap On mud/Behavior of Hardened Cement Paste cavity (20) inner wall, multiple horizontal blocks (4) are discontinuously arranged, and are located under ring packing retaining ring (3) Edge;The cementing concrete/Behavior of Hardened Cement Paste cavity (20) side wall is equipped with confining pressure entrance (5), confining pressure entrance (5) and the gap Connection.
4. visualization abnormity well cementation second interface bonding quality according to claim 3 and obform body strength test system, It is characterized in that, the rubber pattern pipe (6), when being not necessarily to shearing test, rubber pattern pipe (6) is an entirety, and when needs are cut When cutting test, rubber pattern pipe (6) is two parts, is located at simulated formation cavity (17) and cementing concrete/Behavior of Hardened Cement Paste cavity (20) in, two parts are overlap joint face contact at second interface, are slidingly sealed in shear history.
5. being surveyed according to claim 1 to 4 described in any item visualization abnormity well cementation second interface bonding qualities and obform body intensity Test system, which is characterized in that further include transparent vitreous body (24), the multiple intrusive body holes of setting, are invaded in transparent vitreous body (24) Enter body hole one end to be located on (24) side walls of transparent vitreous body, other end is located in transparent vitreous body (24), and leads to It crosses permeability cell to connect with transparent vitreous body (24) other side wall, is equipped with intrusive body plunger (27) in permeability cell;Transparent vitreous body (24) it is mounted in simulated formation cavity (17), and between simulated formation cavity (17) inner wall, Behavior of Hardened Cement Paste lifting mold (8) It is sealed by rubber ring (28).
CN201811167812.XA 2018-10-08 2018-10-08 Visual special-shaped well cementation two-interface cementing quality testing system Active CN109142192B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811167812.XA CN109142192B (en) 2018-10-08 2018-10-08 Visual special-shaped well cementation two-interface cementing quality testing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811167812.XA CN109142192B (en) 2018-10-08 2018-10-08 Visual special-shaped well cementation two-interface cementing quality testing system

Publications (2)

Publication Number Publication Date
CN109142192A true CN109142192A (en) 2019-01-04
CN109142192B CN109142192B (en) 2019-12-27

Family

ID=64810446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811167812.XA Active CN109142192B (en) 2018-10-08 2018-10-08 Visual special-shaped well cementation two-interface cementing quality testing system

Country Status (1)

Country Link
CN (1) CN109142192B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110470596A (en) * 2019-09-12 2019-11-19 西南石油大学 Behavior of Hardened Cement Paste cementing strength in-situ testing device and method under a kind of operating condition of simulation high temperature and pressure underground
CN110823717A (en) * 2019-11-01 2020-02-21 广州大学 Semi-flexible pavement shear strength testing device and testing method
CN112083141A (en) * 2020-09-08 2020-12-15 西南石油大学 Cement paste/drilling fluid hydration heat-affected natural gas hydrate stability testing device
CN113008675A (en) * 2021-03-01 2021-06-22 浙江科技学院 Detection method for bonding failure of undisturbed sand
CN113899889A (en) * 2021-12-10 2022-01-07 成都理工大学 Device and method for monitoring cement paste gel strength of visual retaining wall
CN113899888A (en) * 2021-12-10 2022-01-07 成都理工大学 Device and method for evaluating cement paste condensation quality of slide-resistant pile
CN113901678A (en) * 2021-12-10 2022-01-07 成都理工大学 Evaluation device and evaluation method for condensation quality of cement slurry for engineering grouting
CN114112637A (en) * 2021-12-10 2022-03-01 国网四川省电力公司经济技术研究院 Method and device for detecting concrete strength of miniature pile in peat frozen soil area
CN114136877A (en) * 2021-12-10 2022-03-04 成都理工大学 Device and method for monitoring cementing strength of cement paste for anchor cable
CN117030695A (en) * 2023-10-08 2023-11-10 江苏佳联环境科技有限公司 Breed quality of water extraction detection device
CN113008675B (en) * 2021-03-01 2024-04-26 浙江科技学院 Method for detecting failure of original sand cementation

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202560207U (en) * 2012-05-17 2012-11-28 东北石油大学 Experimental device for determining cementation degree of interface of well cementation cement sheath
US20140202690A1 (en) * 2013-01-18 2014-07-24 Halliburton Energy Services, Inc. Method and apparatus for characterizing fluid channeling through a cement formation interface of a subterranian wellbore
CN104632204A (en) * 2015-01-06 2015-05-20 中国石油天然气集团公司 Hard and brittle shale microfracture manufacturing method and plugging capability testing system
CN104818957A (en) * 2015-03-27 2015-08-05 中国石油化工股份有限公司 Method for improving cement quality of cement-formation interfaces of deep wells
CN105484729A (en) * 2016-01-07 2016-04-13 中国地质大学(武汉) Two-interface cementing strength testing device of cementing sheath containing hydrates and ice stratum
CN106596400A (en) * 2016-12-29 2017-04-26 中国地质大学(北京) Evaluation device and experimental method for cementation quality of second interface for well cementation
CN106761679A (en) * 2017-02-28 2017-05-31 中国地质大学(北京) The evaluating apparatus and method of a kind of the first interface agglutination quality of eccentric test well cementation
US20170205388A1 (en) * 2014-04-04 2017-07-20 Schlumberger Technology Corporation Wellbore cement simulator
CN206707694U (en) * 2017-05-18 2017-12-05 西南石油大学 Hydrate formation primary cement evaluation experimental provision in a kind of deep water cementing
CN107725030A (en) * 2017-11-20 2018-02-23 中国石油大学(华东) The lower well cementation second interface maintenance of stratum water disturbance and bonding quality evaluating apparatus and method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202560207U (en) * 2012-05-17 2012-11-28 东北石油大学 Experimental device for determining cementation degree of interface of well cementation cement sheath
US20140202690A1 (en) * 2013-01-18 2014-07-24 Halliburton Energy Services, Inc. Method and apparatus for characterizing fluid channeling through a cement formation interface of a subterranian wellbore
US20170205388A1 (en) * 2014-04-04 2017-07-20 Schlumberger Technology Corporation Wellbore cement simulator
CN104632204A (en) * 2015-01-06 2015-05-20 中国石油天然气集团公司 Hard and brittle shale microfracture manufacturing method and plugging capability testing system
CN104818957A (en) * 2015-03-27 2015-08-05 中国石油化工股份有限公司 Method for improving cement quality of cement-formation interfaces of deep wells
CN105484729A (en) * 2016-01-07 2016-04-13 中国地质大学(武汉) Two-interface cementing strength testing device of cementing sheath containing hydrates and ice stratum
CN106596400A (en) * 2016-12-29 2017-04-26 中国地质大学(北京) Evaluation device and experimental method for cementation quality of second interface for well cementation
CN106761679A (en) * 2017-02-28 2017-05-31 中国地质大学(北京) The evaluating apparatus and method of a kind of the first interface agglutination quality of eccentric test well cementation
CN206707694U (en) * 2017-05-18 2017-12-05 西南石油大学 Hydrate formation primary cement evaluation experimental provision in a kind of deep water cementing
CN107725030A (en) * 2017-11-20 2018-02-23 中国石油大学(华东) The lower well cementation second interface maintenance of stratum water disturbance and bonding quality evaluating apparatus and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
CHANGLIANG FANG 等: ""A simplified method for predicting the penetration distance of cementing"", 《JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING》 *
刘天乐 等: ""固井水泥浆侵入对近井壁水合物稳定的不利影响"", 《石油学报》 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110470596A (en) * 2019-09-12 2019-11-19 西南石油大学 Behavior of Hardened Cement Paste cementing strength in-situ testing device and method under a kind of operating condition of simulation high temperature and pressure underground
CN110470596B (en) * 2019-09-12 2024-03-19 西南石油大学 In-situ test device and method for simulating cement stone cementing strength under high-temperature high-pressure underground working condition
CN110823717A (en) * 2019-11-01 2020-02-21 广州大学 Semi-flexible pavement shear strength testing device and testing method
CN112083141A (en) * 2020-09-08 2020-12-15 西南石油大学 Cement paste/drilling fluid hydration heat-affected natural gas hydrate stability testing device
CN112083141B (en) * 2020-09-08 2022-04-29 西南石油大学 Cement paste/drilling fluid hydration heat-affected natural gas hydrate stability testing device
CN113008675A (en) * 2021-03-01 2021-06-22 浙江科技学院 Detection method for bonding failure of undisturbed sand
CN113008675B (en) * 2021-03-01 2024-04-26 浙江科技学院 Method for detecting failure of original sand cementation
CN113899889B (en) * 2021-12-10 2022-04-15 成都理工大学 Device and method for monitoring cement paste gel strength of visual retaining wall
CN114814180A (en) * 2021-12-10 2022-07-29 成都理工大学 Anti-slide pile cement slurry condensation control system and method
CN113899888B (en) * 2021-12-10 2022-04-15 成都理工大学 Device and method for evaluating cement paste condensation quality of slide-resistant pile
CN114112637A (en) * 2021-12-10 2022-03-01 国网四川省电力公司经济技术研究院 Method and device for detecting concrete strength of miniature pile in peat frozen soil area
CN113901678A (en) * 2021-12-10 2022-01-07 成都理工大学 Evaluation device and evaluation method for condensation quality of cement slurry for engineering grouting
CN114647938A (en) * 2021-12-10 2022-06-21 成都理工大学 Cement paste construction real-time monitoring method and coagulation strength simulation measuring device thereof
CN114662307A (en) * 2021-12-10 2022-06-24 成都理工大学 Monitoring device for high-simulation analogue measurement of cementing strength of well cementation interface
CN114136877A (en) * 2021-12-10 2022-03-04 成都理工大学 Device and method for monitoring cementing strength of cement paste for anchor cable
CN114994292A (en) * 2021-12-10 2022-09-02 成都理工大学 Monitoring devices of friction pile grout gelatinization intensity
CN113899889A (en) * 2021-12-10 2022-01-07 成都理工大学 Device and method for monitoring cement paste gel strength of visual retaining wall
CN113899888A (en) * 2021-12-10 2022-01-07 成都理工大学 Device and method for evaluating cement paste condensation quality of slide-resistant pile
CN114112637B (en) * 2021-12-10 2023-12-19 国网四川省电力公司阿坝供电公司 Method and device for detecting concrete strength of miniature pile in peat frozen soil area
CN117030695B (en) * 2023-10-08 2023-12-01 江苏佳联环境科技有限公司 Breed quality of water extraction detection device
CN117030695A (en) * 2023-10-08 2023-11-10 江苏佳联环境科技有限公司 Breed quality of water extraction detection device

Also Published As

Publication number Publication date
CN109142192B (en) 2019-12-27

Similar Documents

Publication Publication Date Title
CN109142192A (en) Visualization abnormity well cementation second interface bonding quality and obform body strength test system
Zhuang et al. Laboratory hydraulic fracturing experiments on crystalline rock for geothermal purposes
CN102735547B (en) Coal-rock hydraulic fracturing testing method under true triaxial state
Pan et al. Experimental and numerical study of the water inrush mechanisms of underground tunnels due to the proximity of a water-filled karst cavern
CN102735549B (en) Multifunctional true triaxial flow solid coupling pressure chamber
Xu et al. Excavation-induced microseismicity: microseismic monitoring and numerical simulation
Chang Hydraulic fracturing in particulate materials
CN102735548A (en) Multifunctional true triaxial flow solid coupling test system
Younessi et al. Sand production simulation under true-triaxial stress conditions
CN110924933A (en) Visual experiment method for dynamically simulating shale fracturing fracture network
CN102735600A (en) Method for testing coal sample seepage under true triaxial state
Li et al. Deformation and damage of cement sheath in gas storage wells under cyclic loading
Feng et al. Experimental method for direct shear tests of hard rock under both normal stress and lateral stress
Niu et al. A new method of monitoring the stability of boreholes for methane drainage from coal seams
Wang et al. Experimental study on slurry-induced fracturing during shield tunneling
Vaskou et al. ISRM suggested method for the lugeon test
Li et al. Study on gas leakage along cement sheath interfaces in salt cavern gas storage well
CN109283584A (en) Distribution type fiber-optic sonic test method and device applied to three-dimensional physical simulation
Wang et al. An improvement sealing method for gas pressure measurement by drilling a reducing‐nipple borehole
Yi et al. What do hydraulic fractures look like in different types of reservoirs: Implications from a series of large-scale polyaxial hydraulic fracturing experiments from conventional to unconventional
Li et al. “Ladetes”—A novel device to test deformation behaviors of hydrate-bearing sediments
CN204301779U (en) A kind of indoor deep hole grouting multi-parameter combined measuring instrument
Andersson Rock mass response to coupled mechanical thermal loading: Äspö pillar stability experiment, Sweden
South et al. Permeameter studies of water flow through cement and clay borehole seals in granite, basalt and tuff
CN109681164B (en) Device for simulating casing damage process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant