CN109140866A - It is a kind of to use the vacuum precooling device for exerting gloomy pump - Google Patents

It is a kind of to use the vacuum precooling device for exerting gloomy pump Download PDF

Info

Publication number
CN109140866A
CN109140866A CN201810790617.6A CN201810790617A CN109140866A CN 109140866 A CN109140866 A CN 109140866A CN 201810790617 A CN201810790617 A CN 201810790617A CN 109140866 A CN109140866 A CN 109140866A
Authority
CN
China
Prior art keywords
outlet
gloomy pump
connect
import
cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810790617.6A
Other languages
Chinese (zh)
Other versions
CN109140866B (en
Inventor
卢苇
邢鹏浩
许知洲
何鸣阳
王祥
王博韬
谢超许
王南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi University
Original Assignee
Guangxi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi University filed Critical Guangxi University
Priority to CN201810790617.6A priority Critical patent/CN109140866B/en
Publication of CN109140866A publication Critical patent/CN109140866A/en
Application granted granted Critical
Publication of CN109140866B publication Critical patent/CN109140866B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D11/00Self-contained movable devices, e.g. domestic refrigerators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D19/00Arrangement or mounting of refrigeration units with respect to devices or objects to be refrigerated, e.g. infrared detectors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D2201/00Insulation
    • F25D2201/10Insulation with respect to heat

Abstract

The vacuum precooling device for exerting gloomy pump is used the invention discloses a kind of, comprising: vacuum pre-cooling case;The cooling cylinder being connect with vacuum pre-cooling case;First connect with cooling cylinder exerts gloomy pump installation;Second connect with the evaporator in cooling cylinder exerts gloomy pump installation;The cooling heat exchanger that gloomy pump installation is connect is exerted with second;The first triple valve being connect with cooling cylinder;Gloomy pump installation and second, which is exerted, with first exerts the second triple valve that gloomy pump installation connect, water at low temperature in cooling cylinder is conveyed to first by the first triple valve respectively exerts gloomy pump installation and second and exerts gloomy pump installation, and a part of water at low temperature is discharged into outside environment by the second triple valve, another part water at low temperature is transmitted back in cooling cylinder.Of the invention first is exerted gloomy pump installation and second and exerts gloomy pump installation and can directly be driven using low grade heat energy, environmental protection and energy saving, and the simple movement-less part of structure, reduces the cost of initial outlay and operation and maintenance.

Description

It is a kind of to use the vacuum precooling device for exerting gloomy pump
Technical field
The present invention relates to vacuum pre-cooling technology fields, in particular to a kind of to use the vacuum precooling device for exerting gloomy pump.
Background technique
With the continuous improvement of living standards, requirement of the people to food quality is also higher and higher, and the one of food quality A important indicator is exactly freshness, and the vacuum pre-cooling technology occurred in recent years is exactly a kind of method that can effectively keep food freshness. Vacuum pre-cooling has fresh keeping time long, cooling time is exceedingly fast, to the original sense organ of food and product compared with other storage modes Quality guarantee is held, and bacterium and microorganism can be inhibited or kill, and has " thin layer drying effect ", it is excellent can to extend Food Shelf-life etc. Point.
But there are following two main problems for vacuum precooling machine used at present:
Structure is complicated for 1 vacuum precooling machine, assembles also relatively difficult, the higher cost of initial outlay and operation and maintenance.
2 vacuum precooling machines nearly all use steam compression type refrigerating mode, and when operation needs to consume a large amount of high-grade electricity Energy or mechanical energy, and refrigerant used is environmentally hazardous HCFCs or HFCs substance, does not adapt to current energy-saving and emission-reduction Growth requirement.
In view of these problems existing for current vacuum precooling machine, design usable low grade heat energy driving, it is cheap, There is realistic meaning using environmental protection refrigerant and the relatively simple vacuum pre-cooling equipment of structure, it is gloomy thus to propose that a kind of use is exerted The vacuum precooling device of pump.The vacuum pump and compressor of this vacuum precooling device are all substituted with exerting gloomy pump, therefore can be directly by low Product heat-driven, and structure has greater advantage simply without moving component in terms of initial cost and operation and maintenance.
The information disclosed in the background technology section is intended only to increase the understanding to general background of the invention, without answering When being considered as recognizing or imply that the information constitutes the prior art already known to those of ordinary skill in the art in any form.
Summary of the invention
The purpose of the present invention is to provide a kind of using the vacuum precooling device for exerting gloomy pump, to overcome existing vacuum pre- Structure is complicated for cold, refrigerant endangers environment, initial outlay and operation expense are high, and needs when vacuum precooling machine operation The shortcomings that consuming a large amount of high-grade electric energies.
To achieve the above object, the vacuum precooling device for exerting gloomy pump is used the present invention provides a kind of, comprising: vacuum pre-cooling Case;Cooling cylinder, gas feed are connect with the outlet of the vacuum pre-cooling case;First exerts gloomy pump installation, gas introduction tube Import is connect with the gas vent of the cooling cylinder, this first exert gloomy pump installation gas eduction tube first outlet and exhaust outlet Connection, the second outlet of first gas eduction tube for exerting gloomy pump installation connect with the import of the vacuum pre-cooling case, and this One second outlet for exerting the gas eduction tube of gloomy pump installation is provided with a vacuum valve;Second exerts gloomy pump installation, gas introduction tube Import connect with the outlet of the gilled tube of the evaporator in the cooling cylinder;Cooling heat exchanger, the import of cooling duct with Described second exerts the outlet connection of the gas eduction tube of gloomy pump installation, the outlet of the cooling duct of the cooling heat exchanger and the steaming The import connection of the gilled tube of device is sent out, and the import of the gilled tube of the evaporator is provided with a throttle mechanism;First triple valve, Its import is connect with the low temperature water out of the cooling cylinder, and the first outlet of first triple valve and described first exerts gloomy pump installation Water at low temperature water inlet pipe import connection, and the water at low temperature that the second outlet of first triple valve exerts gloomy pump installation with described second The import of water inlet pipe connects;And second triple valve, the water at low temperature outlet pipe that import exerts gloomy pump installation with described first respectively The outlet of the outlet water at low temperature outlet pipe of exerting gloomy pump installation with described second connect, the first outlet of second triple valve and row Mouth of a river connection, the second outlet of second triple valve are connect with the low temperature water inlet of the cooling cylinder, and second triple valve Second outlet is provided with a regulating valve.
It preferably, further include first filter in above-mentioned technical proposal, the import of the first filter and the condensation The gas vent of case connects, and the import for exporting the gas introduction tube for exerting gloomy pump installation with described first of the first filter Connection.
It preferably, further include the second filter in above-mentioned technical proposal, the import and the evaporation of second filter The outlet of the gilled tube of device connects, and the outlet of second filter gas introduction tube of exerting gloomy pump installation with described second Import connection.
It preferably, further include third filter in above-mentioned technical proposal, the import of the third filter passes through diversion pipe It is connect with the low temperature water out of the cooling cylinder, and the outlet of the third filter and the import of first triple valve connect It connects.
It preferably, further include storage room in above-mentioned technical proposal, the entrance of the storage room and the cooling heat exchanger The outlet of cooling duct connects, and the outlet of the storage room is connect with the import of the gilled tube of the evaporator.
Preferably, in above-mentioned technical proposal, the throttle mechanism is throttle valve.
Preferably, in above-mentioned technical proposal, the refrigerant in the gilled tube of the evaporator is water, ammonia or ethyl alcohol.
Preferably, in above-mentioned technical proposal, the vacuum pre-cooling case and the cooling cylinder are provided with insulating layer.
Compared with prior art, the invention has the following beneficial effects:
1. of the invention first, which exerts gloomy pump installation, can replace conventional vacuum pump, to be vacuumized to vacuum pre-cooling case, the Two, which exert gloomy pump installation, can replace conventional compressor, to drive the movement of evaporator inner refrigerant, keep low temperature in cooling cylinder State, first, which exerts gloomy pump installation and second, is exerted gloomy pump installation and can directly be driven using low grade heat energy, environmental protection and energy saving, and is tied The simple movement-less part of structure reduces the cost of initial outlay and operation and maintenance;It is evaporated from the food in vacuum pre-cooling case Vapor enters cooling cylinder, and the vapor liquefaction that is condensed forms water at low temperature in cooling cylinder, the water at low temperature recoverable, into one Step reduces energy consumption.
2. vacuum precooling device of the invention is avoided using working medium such as water, ammonia or the ethyl alcohol of environmental sound using harm HCFCs the or HFCs class refrigerant of environment.
Detailed description of the invention
Fig. 1 is the structural schematic diagram according to the present invention using the vacuum precooling device for exerting gloomy pump.
Fig. 2 is the structural schematic diagram according to the present invention for individually exerting gloomy pump.
Fig. 3 is according to the present invention first to exert gloomy pump installation or second exert the structural schematic diagram of gloomy pump installation.
Main appended drawing reference explanation:
1- vacuum pre-cooling case;2- connecting tube;3- cooling cylinder;4- first filter;5- first exerts gloomy pump installation;6- exhaust Mouthful;7- vacuum valve;The second filter of 8-;9- second exerts gloomy pump installation;10- cooling heat exchanger;11- storage room;12- throttling machine Structure;13- evaporator;14- third filter;The first triple valve of 15-;16- water at low temperature water inlet pipe;17- water at low temperature outlet pipe;18- Second triple valve;19- regulating valve;20- diversion pipe;21- heat-carrying agent inlet tube;22- heat-carrying agent outlet;23- heat insulation layer; 24- base station body;The cold chamber heat exchanger of 25-;26- temperature-detecting device;The cold chamber of 27-;The porous interlayer of 28-;The hot chamber heat exchanger of 29-;30- Hot chamber;31- heat-carrying agent channel;32- interface channel;33- exerts gloomy pump;34- low temperature aquaporin;35- keeps the temperature sleeve;36- gas Ingress pipe;37- gas eduction tube;38- exerts gloomy pump group.
Specific embodiment
With reference to the accompanying drawing, specific embodiments of the present invention will be described in detail, it is to be understood that guarantor of the invention Shield range is not limited by the specific implementation.
Unless otherwise explicitly stated, otherwise in entire disclosure and claims, term " includes " or its change Changing such as "comprising" or " including " etc. will be understood to comprise stated element or component, and not exclude other members Part or other component parts.
Fig. 1 to Fig. 3 shows that the vacuum precooling device of gloomy pump is exerted in a kind of use according to the preferred embodiment of the present invention Structural schematic diagram, the use exert gloomy pump vacuum precooling device include vacuum pre-cooling case 1, cooling cylinder 3, first exert gloomy pump installation 5, Second exerts gloomy pump installation 9, cooling heat exchanger 10, the first triple valve 15 and the second triple valve 18.With reference to Fig. 1, vacuum pre-cooling case 1 For placing and handling food, the gas feed of cooling cylinder 3 is connect by connecting tube 2 with the outlet of vacuum pre-cooling case 1, and first exerts Gloomy pump installation 5 is connect by gas introduction tube 36 with the gas vent of cooling cylinder 3, and vacuum pre-cooling case 1 exerts gloomy pump installation 5 by first It constantly extracts air out, its internal pressure is made to insist on continuous reduction, since the boiling point of water declines with the reduction of atmospheric pressure, lead to food Interior moisture constantly, rapidly evaporates, and keeps food cooled because moisture evaporates the heat for absorbing food, vacuum pre-cooling case 1 The vapor that interior air and food is evaporated can be flowed into cooling cylinder 3 by connecting tube 2, and vapor is in cooling cylinder 3 It is condensed into low temperature liquid water and separates, remaining air is exerted gloomy pump installation 5 by first and taken away.
Referring to figs. 2 and 3, first exert gloomy pump installation 5 include at least one set exert gloomy pump group 38, exerting gloomy pump group 38 for every group includes Base station body 24 and at least one exert it is gloomy pump 33, base station body 24 is provided with a main import and a primary outlet.Each exert gloomy pump 33 Including cold chamber 27, hot chamber 30, porous interlayer 28 and interface channel 32, divided between cold chamber 27 and hot chamber 30 by porous interlayer 28 Every the aperture in the hole on porous interlayer 28 is not more than the molecule mean free path of air.Wherein, porous interlayer 28 is porous thin Film can be Bio-sil film, and the edge of porous membrane is sealingly disposed in base station body 24 by sealing ring.Due to porous The aperture in the hole on interlayer 28 be not more than air molecule mean free path, when hot chamber 30 temperature be higher than cold chamber 27 temperature with When meeting the condition that thermal transpiration effect occurs, the molecule of the air entered in cold chamber 27 will pass through porous interlayer 28 and be flowed into heat In chamber 30, and because air molecule is assembled due to pressure rise in hot chamber 30, which achieves air to flow to high pressure from low-pressure state State, i.e., hot chamber 30 vacuumize cold chamber 27.When the quantity for exerting gloomy pump 33 that every group is exerted gloomy pump group 38 is one, cold chamber 27 Import is connect by interface channel 32 with the main import of base station body 24, and the outlet of hot chamber 30 passes through interface channel 32 and base station body 24 Primary outlet connection;When the quantity for exerting gloomy pump 33 that every group is exerted gloomy pump group 38 is two or more, all exerts gloomy pump 33 exert the import of the cold chamber 27 of gloomy pump 33 with the outlet of the previous hot chamber 30 for exerting gloomy pump 33 by interface channel 32 and the latter The mode of connection is sequentially disposed in series in base station body 24, the import of first cold chamber 27 for exerting gloomy pump 33 and base station body 24 Main import connection, the last one outlet for exerting the hot chamber 30 of gloomy pump 33 is connect with the primary outlet of base station body 24, when air sequentially passes through Cross it is all it is concatenated exert it is gloomy pump 33 after, air pressure will be increased constantly.It is exerted in gloomy pump group 38 when every group and exerts gloomy pump When 33 quantity is not very much, the gloomy pump 33 of exerting in group can be made linearly to be together in series front to back certainly, and be exerted when every group When the quantity for exerting gloomy pump 33 in gloomy pump group 38 is more, it can make to exert gloomy pump 33 to be in several row's parallelly distribute ons in base station body 24, Two rows of exerting adjacent at this time is separated between gloomy compressor with adiabatic insulation.It exerts gloomy pump group 38 for every group and is provided with a heat-carrying agent Channel 31, and 31 surface of heat-carrying agent channel package heat preservation sleeve 35, to reduce the thermal loss in channel;Every group is exerted gloomy pump group 38 It is provided with a low temperature aquaporin 34, and 34 surface of low temperature aquaporin package heat preservation sleeve 35, to reduce the loss of refrigeration capacity in channel.For Every group of reduction cold chamber 27 for exerting gloomy pump group 38 and hot chamber 30 and extraneous heat exchange, the base station body 24 of gloomy pump group 38 is exerted at every group Outer surface be provided with heat insulation layer 23, to reduce the loss of cooling capacity in cold chamber 27 and reduce the loss of heat in hot chamber 30.Often Group exert gloomy pump group 38 respectively exert it is gloomy pump 33 hot chamber 30 in be provided with a temperature-detecting device 26, to detect the temperature in hot chamber 30 Degree, every group exert gloomy pump group 38 exert it is gloomy pump 33 cold chamber 27 in be provided with a temperature-detecting device 26, to detect in cold chamber 27 Temperature, it can thus be appreciated that every group exert gloomy pump group 38 exert it is gloomy pump 33 hot chamber 30 and cold chamber 27 between the temperature difference.Every group exert it is gloomy It is each provided with a hot chamber heat exchanger 29 in the hot chamber 30 for respectively exerting gloomy pump 33 of pump group 38, all hot chamber heat exchangers 29 are with previous The import of the hot-fluid pipeline of the outlet and hot chamber heat exchanger 29 of the latter of the hot-fluid pipeline of a hot chamber heat exchanger 29 is situated between by heat-carrying The mode that matter channel 31 is attached is sequentially connected in series, and the import and first of the hot-fluid pipeline of first hot chamber heat exchanger 29 The outlet in a heat-carrying agent channel 31 connects, the outlet and the last one heat-carrying of the hot-fluid pipeline of the last one hot chamber heat exchanger 29 The import of medium channel 31 connects, so that hot fluid is by heat-carrying agent channel 31 followed by the hot-fluid of each hot chamber heat exchanger 29 Pipeline;Every group exert gloomy pump group 38 exert it is gloomy pump 33 cold chamber 27 in be each provided with a cold chamber heat exchanger 25, all cold chambers Heat exchanger 25 is with the cold flow pipeline of the outlet of the cold flow pipeline of previous cold chamber heat exchanger 25 and the cold chamber heat exchanger 25 of the latter Import is sequentially connected in series in such a way that low temperature aquaporin 34 is attached, and the cold flow pipeline of first cold chamber heat exchanger 25 Import connect with the outlet of first low temperature aquaporin 34, the outlet of the cold flow pipeline of the last one cold chamber heat exchanger 25 with most The import of the latter low temperature aquaporin 34 connects, so that water at low temperature is by low temperature aquaporin 34 followed by each cold chamber heat exchanger 25 Cold flow pipeline.Exert that 33 concatenated quantity of gloomy pump are more, and the suction capactity for exerting gloomy pump group 38 is stronger, very in gloomy pump group 38 because exerting The vacuum degree that empty pre-cooling box 1 can reach is higher, so the first every group for exerting gloomy pump installation 5 is exerted in gloomy pump group 38 and exert gloomy pump 33 quantity is determined according to the vacuum degree that vacuum pre-cooling case 1 requires.
With reference to Fig. 1 and Fig. 3, when the quantity for exerting gloomy pump group 38 that first exerts gloomy pump installation 5 is two or more, this It exerts gloomy pump group 38 to connect with gas introduction tube 36 in parallel, i.e. each group main import and the gas of exerting the base station body 24 of gloomy pump group 38 The outlet of ingress pipe 36 connects;And these exert connecting with gas eduction tube 37 for gloomy 38 parallel connection of pump group, i.e., each group exerts gloomy pump group 38 The primary outlet of base station body 24 connect with the import of gas eduction tube 37.First exerts the quantity for exerting gloomy pump group 38 of gloomy pump installation 5 It can be determined according to the capacity of system requirements.First exerts the import of the gas introduction tube 36 of gloomy pump installation 5 and cooling cylinder 3 Gas vent connection, the first first outlet for exerting the gas eduction tube 37 of gloomy pump installation 5 are connect with exhaust outlet 6, and first exerts gloomy pump The second outlet of the gas eduction tube 37 of device 5 is connect with the import of vacuum pre-cooling case 1, and the first gas for exerting gloomy pump installation 5 The second outlet of delivery line 37 is provided with a vacuum valve 7, to adjust the vacuum degree of vacuum pre-cooling case 1.Sky in vacuum pre-cooling case 1 The vapor that gas and food are evaporated enters cooling cylinder 3 by connecting tube 2, after cooling cylinder 3 separates vapor therein, is left Air be inhaled into each group that first exerts gloomy pump installation 5 via gas introduction tube 36 and exert gloomy pump group 38, exert gloomy pump group 38 from each group Air out is divided into two tributaries after converging inflow gas eduction tube 37: first tributary is connect with exhaust outlet 6, and air is arranged Into external environment, to achieve the purpose that pumped down, the pressure of vacuum pre-cooling case 1 is reduced, improves the true of vacuum pre-cooling case 1 Reciprocal of duty cycle;Article 2 tributary flows into vacuum pre-cooling case 1, increases the pressure of vacuum pre-cooling case 1, is adjusted jointly by being evacuated with air inlet The size of the pressure of vacuum pre-cooling case 1, so that vacuum pre-cooling case 1 can reach and maintain required vacuum degree, to meet processing The requirement of food in vacuum pre-cooling case 1.Preferably, vacuum pre-cooling case 1 and cooling cylinder 3 are provided with insulating layer, because of cooling cylinder 3 Temperature it is lower and the range of setting need to be maintained at, and the temperature of vacuum pre-cooling case 1 is also required to be maintained at the range of setting, so The connecting tube 2 of vacuum pre-cooling case 1, cooling cylinder 3 and connection vacuum pre-cooling case 1 and cooling cylinder 3 has required heat insulation effect, therefore Insulating layer is provided in the outer surface of the outer surface of vacuum pre-cooling case 1, the outer surface of cooling cylinder 3 and connecting tube 2.
With reference to Fig. 1 and Fig. 3, enter evaporator in the air and vapor and cooling cylinder 3 of cooling cylinder 3 from vacuum pre-cooling case 1 Refrigerant in 13 gilled tube carries out heat exchange, the heat gasification of refrigerant suction air and vapor, the temperature drop of air Low and Water vapor condensation forms water at low temperature.The refrigerant of the gilled tube of evaporator 13 is conveyed to second by gas introduction tube 36 and exerts Gloomy pump installation 9, second, which exerts gloomy pump installation 9, exerts gloomy pump group 38 including at least one set, and the second every group for exerting gloomy pump installation 9 exerts gloomy pump The structure of group 38 is consistent with every group of structure for exerting gloomy pump group 38 that first exerts gloomy pump installation 5, wherein second exerts gloomy pump installation 9 Every group of aperture for exerting the hole on the porous interlayer 28 for exerting gloomy pump 33 of gloomy pump group 38 is average no more than the molecule of gaseous refrigerant certainly By journey.When the quantity for exerting gloomy pump group 38 that second exerts gloomy pump installation 9 is two or more, it is in parallel that these exert gloomy pump group 38 Ground is connect with gas introduction tube 36, i.e., each group exerts the main import of the base station body 24 of gloomy pump group 38 and the outlet of gas introduction tube 36 connects It connects;And these exert connecting with gas eduction tube 37 for gloomy 38 parallel connection of pump group, i.e., the master that each group exerts the base station body 24 of gloomy pump group 38 goes out Mouth is connect with the import of gas eduction tube 37.Second exerts the import of the gas introduction tube 36 of gloomy pump installation 9 and the steaming in cooling cylinder 3 Send out the outlet connection of the gilled tube of device 13;So that refrigerant in evaporator 13 by gas introduction tube 36 be conveyed to second exert it is gloomy The each group of pump installation 9 exerts gloomy pump group 38.Because exerting gloomy pump 33 can be improved compression ratio by plural serial stage, so that refrigerant obtains Higher pressure, so second exerts gloomy pump installation 9 and can substitute traditional compressor, therefore each group exert it is concatenated in gloomy pump group 38 The quantity for exerting gloomy pump 33 can determine according to the compression ratio needed for system, and second exerts and in parallel in gloomy pump installation 9 exert gloomy pump The quantity of group 38 can be determined according to the refrigerating capacity of system.Gloomy pump is exerted in the import of the cooling duct of cooling heat exchanger 10 and second The outlet of the gas eduction tube 37 of device 9 connects, the outlet of the cooling duct of cooling heat exchanger 10 and the gilled tube of evaporator 13 Import connection, and the import of the gilled tube of evaporator 13 is provided with a throttle mechanism 12.Preferably, throttle mechanism 12 is throttling Valve, so that refrigerant cools down and is depressured.The each group for exerting gloomy pump installation 9 from second is exerted the gaseous refrigerant that gloomy pump group 38 comes out and is converged Inflow gas delivery line 37 and the cooling duct that cooling heat exchanger 10 is transported to by gas eduction tube 37, cooling heat exchanger 10 Low temperature path is connect with external cold source, and the cooling medium from external cold source is made to flow through the low temperature path of cooling heat exchanger 10, with Heat exchange is carried out with the gaseous refrigerant in the cooling duct of cooling heat exchanger 10, refrigerant is absorbed from air and vapor Heat discharge into external environment, gaseous refrigerant because heat release cause temperature reduce due to become liquid refrigerant, then again general Liquid refrigerant is transmitted back in the gilled tube of evaporator 13, is so recycled.Preferably, the refrigerant in evaporator 13 is water, ammonia Or the working medium of the environmental sounds such as ethyl alcohol, liquid refrigerant in the gilled tube of evaporator 13 with the air and water in cooling cylinder 3 Steam carries out heat exchange, and liquid refrigerant heat absorption evaporation becomes gaseous refrigerant, and gaseous refrigerant exerts gloomy pump installation 9 by second High temperature and high pressure gaseous refrigerant is formed after pressurization heating, high temperature and high pressure gaseous refrigerant is absorbed sky by cooling heat exchanger 10 The heat of gas and vapor forms high temperature and pressure liquid refrigerant after being released to external environment, and high temperature and pressure liquid refrigerant passes through Throttle valve throttle decrease temperature and pressure, become low-temp low-pressure liquid refrigerant and be fed to the gilled tube of evaporator 13, with condensation Air in case 3 and vapor carry out heat exchange, keep the low-temperature condition of cooling cylinder 3 and make vapor therein condense to be formed it is low Warm water so recycles.
With reference to Fig. 3, the first every group for exerting gloomy pump installation 5 exert the import in first heat-carrying agent channel 31 of gloomy pump group 38 with Heat-carrying agent inlet tube 21 connects, and the first every group for exerting gloomy pump installation 5 exerts the last one heat-carrying agent channel 31 of gloomy pump group 38 Outlet connect with heat-carrying agent outlet 22;First water at low temperature that first every group for exerting gloomy pump installation 5 exerts gloomy pump group 38 is logical The import in road 34 is connect with the outlet of water at low temperature water inlet pipe 16, and the first every group for exerting gloomy pump installation 5 exerts last of gloomy pump group 38 The outlet of a low temperature aquaporin 34 is connect with the import of water at low temperature outlet pipe 17.Second every group for exerting gloomy pump installation 9 exerts gloomy pump group The import in 38 first heat-carrying agent channel 31 is connect with heat-carrying agent inlet tube 21, and the second every group for exerting gloomy pump installation 9 is exerted The outlet in the last one heat-carrying agent channel 31 of gloomy pump group 38 is connect with heat-carrying agent outlet 22;Second exerts gloomy pump installation 9 The import of every group of first low temperature aquaporin 34 for exerting gloomy pump group 38 connect with the outlet of water at low temperature water inlet pipe 16, second exert it is gloomy Every group of pump installation 9 exerts the outlet of the last one low temperature aquaporin 34 of gloomy pump group 38 and the import of water at low temperature outlet pipe 17 connects It connects.
With reference to Fig. 1, the vapor that air and food in vacuum pre-cooling case 1 are evaporated flow into cooling cylinder 3 and with condensation Refrigerant in case 3 in the gilled tube of evaporator 13 carries out heat exchange, to reduce the temperature in cooling cylinder 3 and steam water therein Air cooling is solidifying to form water at low temperature.The import of first triple valve 15 is connect with the low temperature water out of cooling cylinder 3, because in cooling cylinder 3 Water at low temperature is predominantly located at the bottom of cooling cylinder 3, therefore the low temperature water out of cooling cylinder 3 is set to the bottom of cooling cylinder 3, and the one or three The import for the water at low temperature water inlet pipe 16 that the first outlet of port valve 15 exerts gloomy pump installation 5 with first is connect, and the first triple valve 15 The import for the water at low temperature water inlet pipe 16 that second outlet exerts gloomy pump installation 9 with second is connect.After water at low temperature flows into the first triple valve 15 Be divided into two tributaries: first tributary flows through the low temperature aquaporin 34 that the first every group for exerting gloomy pump installation 5 exerts gloomy pump group 38, conveying Water at low temperature, with each cold chamber 27 of cooling, keeps the low-temperature condition of cold chamber 27 to each cold chamber heat exchanger 25;Article 2 tributary flows through Second every group for exerting gloomy pump installation 9 exerts the low temperature aquaporin 34 of gloomy pump group 38, transporting low temperature water to each cold chamber heat exchanger 25 with Cooling each cold chamber 27, keeps the low-temperature condition of cold chamber 27.Cooling each cold chamber 27, to maintain between cold chamber 27 and hot chamber 30 It is suitable for the temperature difference, improves driving force, generate more significant thermal transpiration effect.The import of second triple valve 18 exerts gloomy pump with first respectively The outlet for the water at low temperature outlet pipe 17 that gloomy pump installation 9 is exerted with second in the outlet of the water at low temperature outlet pipe 17 of device 5 connects, and the two or three The first outlet of port valve 18 is connect with discharge outlet, and the second outlet of the second triple valve 18 is connect with the low temperature water inlet of cooling cylinder 3, And second the second outlet of triple valve 18 be provided with a regulating valve 19, to adjust the flow for the water at low temperature for flowing into cooling cylinder 3.From One exert gloomy pump installation 5 and second exert gloomy pump installation 9 come out water at low temperature converge flow into the second triple valve 18 after be divided into two tributaries: First tributary is connect with discharge outlet, and part water at low temperature is directly discharged in external environment;Cooling cylinder is flowed back in Article 2 tributary 3, part water at low temperature is recycled, into next circulation.
It continues to refer to figure 1, it is further preferred that the vacuum precooling device further includes first filter 4, first filter 4 Import connect with the gas vent of cooling cylinder 3, and first filter 4 outlet with first exert gloomy pump installation 5 gas import The import of pipe 36 connects.First filter 4 for filtering air in impurity, prevent its blocking from first exerting each of gloomy pump installation 5 The porous interlayer 28 of gloomy pump 33 is exerted, gloomy pump installation 5 is exerted in guarantee first to be operated normally.
It continues to refer to figure 1, it is further preferred that the vacuum precooling device further includes the second filter 8, the second filter 8 Import connect with the outlet of the gilled tube of evaporator 13, and the gas that gloomy pump installation 9 is exerted with second in the outlet of the second filter 8 The import of ingress pipe 36 connects.Second filter 8 is used to filter the impurity in refrigerant, prevents its blocking second from exerting gloomy pump installation The 9 porous interlayer 28 for respectively exerting gloomy pump 33, gloomy pump installation 9 is exerted in guarantee second to be operated normally.
It continues to refer to figure 1, it is further preferred that the vacuum precooling device further includes third filter 14, third filter 14 import is connect by diversion pipe 20 with the low temperature water out of cooling cylinder 3, and the outlet of third filter 14 and the first threeway The import of valve 15 connects.The low temperature water out of the bottom of cooling cylinder 3 is connect with the import of diversion pipe 20, the outlet of diversion pipe 20 with The import of third filter 14 connects, and diversion pipe 20 is for the water at low temperature in water conservancy diversion and Collection utilization cooling cylinder 3.Third filter 14, for filtering the impurity in water at low temperature, prevent its blocking two from exerting the low temperature aquaporin 34 of gloomy pump installation and leading to water at low temperature The cold flow pipeline for each cold chamber heat exchanger 25 that road 34 connects, to keep the low-temperature condition of cold chamber 27, to guarantee that first exerts gloomy pump Device 5 and second is exerted gloomy pump installation 9 and can be operated normally.
It continues to refer to figure 1, it is further preferred that the vacuum precooling device further includes storage room 11, the entrance of storage room 11 It is connect with the outlet of the cooling duct of cooling heat exchanger 10, and the import of the gilled tube of the outlet of storage room 11 and evaporator 13 connects It connects.The high temperature and pressure liquid refrigerant come out from cooling heat exchanger 10 flows into storage room 11 and accumulates in it, avoids refrigerant Flowed fluctuation has an adverse effect to the performance of the present apparatus.
The heat-carrying agent that of the invention first exerts the heat-carrying agent inlet tube 21 of gloomy pump installation 5 and second exerts gloomy pump installation 9 Inlet tube 21 is connect with external heat source.The hot fluid of external heat source flows separately through the first every group for exerting gloomy pump installation 5 and exerts gloomy pump The heat-carrying agent channel 31 of group 38 and second exert gloomy pump installation 9 every group exert the heat-carrying agent channel 31 of gloomy pump group 38, conveying heat Fluid, to heat to each hot chamber 30, keeps the condition of high temperature in hot chamber 30, after carrying out heat exchange to each hot chamber heat exchanger 29 Hot fluid again from corresponding heat-carrying agent outlet 22 flow out.Wherein, heating hot chamber 30 is to make hot chamber 30 and cold chamber 27 Between more effectively generate and maintain the suitable temperature difference, it is ensured that generate more significant thermal transpiration effect.The hot fluid of external heat source Can be by industry generate more than the low grade heat energies such as (useless) heat, solar energy or the geothermal energy gas or liquid that heat, be not required to Consume excessive high-grade energy, energy conservation and environmental protection.The structure of vacuum precooling device of the invention is simple, and whole device does not need Consume excessive high-grade energy, it is reliable for operation, the refrigerating efficiency of whole device with to vacuumize efficiency higher, and its refrigerating capacity with And it vacuumizes performance and can be adjusted according to actual needs.
The aforementioned description to specific exemplary embodiment of the invention is in order to illustrate and illustration purpose.These descriptions It is not wishing to limit the invention to disclosed precise forms, and it will be apparent that according to the above instruction, can much be changed And variation.The purpose of selecting and describing the exemplary embodiment is that explaining specific principle of the invention and its actually answering With so that those skilled in the art can be realized and utilize a variety of different exemplary implementation schemes of the invention and Various chooses and changes.The scope of the present invention is intended to be limited by claims and its equivalents.

Claims (8)

1. a kind of use the vacuum precooling device for exerting gloomy pump characterized by comprising
Vacuum pre-cooling case (1);
Cooling cylinder (3), gas feed are connect with the outlet of the vacuum pre-cooling case (1);
First exerts gloomy pump installation (5), and the import of gas introduction tube (36) is connect with the gas vent of the cooling cylinder (3), should First first outlet for exerting the gas eduction tube (37) of gloomy pump installation (5) is connect with exhaust outlet (6), this first exerts gloomy pump installation (5) second outlet of gas eduction tube (37) is connect with the import of the vacuum pre-cooling case (1), and this first exerts gloomy pump installation (5) second outlet of gas eduction tube (37) is provided with a vacuum valve (7);
Second exerts gloomy pump installation (9), the import of gas introduction tube (36) and the rib of the evaporator (13) in the cooling cylinder (3) The outlet of piece pipe connects;
Cooling heat exchanger (10), the gas eduction tube (37) that the import of cooling duct exerts gloomy pump installation (9) with described second Outlet connection, the outlet of the cooling duct of the cooling heat exchanger (10) are connect with the import of the gilled tube of the evaporator (13), And the import of the gilled tube of the evaporator (13) is provided with a throttle mechanism (12);
First triple valve (15), import are connect with the low temperature water out of the cooling cylinder (3), and the of first triple valve (15) The import for the water at low temperature water inlet pipe (16) that gloomy pump installation (5) is exerted with described first in one outlet is connect, and first triple valve (15) The import of the second outlet water at low temperature water inlet pipe (16) of exerting gloomy pump installation (9) with described second connect;And
The outlet of the water at low temperature outlet pipe (17) of gloomy pump installation (5) is exerted in second triple valve (18), import with described first respectively The outlet for the water at low temperature outlet pipe (17) for exerting gloomy pump installation (9) with described second connects, and the first of second triple valve (18) goes out Mouth is connect with discharge outlet, and the second outlet of second triple valve (18) is connect with the low temperature water inlet of the cooling cylinder (3), and should The second outlet of second triple valve (18) is provided with a regulating valve (19).
2. according to claim 1 use the vacuum precooling device for exerting gloomy pump, which is characterized in that further include first filter (4), the import of the first filter (4) is connect with the gas vent of the cooling cylinder (3), and the first filter (4) The import of the outlet gas introduction tube (36) of exerting gloomy pump installation (5) with described first connect.
3. according to claim 1 use the vacuum precooling device for exerting gloomy pump, which is characterized in that further include the second filter (8), the import of second filter (8) is connect with the outlet of the gilled tube of the evaporator (13), and second filtering The import for the gas introduction tube (36) that gloomy pump installation (9) are exerted with described second in the outlet of device (8) is connect.
4. according to claim 1 use the vacuum precooling device for exerting gloomy pump, which is characterized in that further include third filter (14), the import of the third filter (14) is connect by diversion pipe (20) with the low temperature water out of the cooling cylinder (3), and The outlet of the third filter (14) is connect with the import of first triple valve (15).
5. according to claim 1 use the vacuum precooling device for exerting gloomy pump, which is characterized in that further include storage room (11), the entrance of the storage room (11) is connect with the outlet of the cooling duct of the cooling heat exchanger (10), and the storage The outlet of room (11) is connect with the import of the gilled tube of the evaporator (13).
6. according to claim 1 use the vacuum precooling device for exerting gloomy pump, which is characterized in that the throttle mechanism (12) For throttle valve.
7. according to claim 1 use the vacuum precooling device for exerting gloomy pump, which is characterized in that the evaporator (13) Refrigerant in gilled tube is water, ammonia or ethyl alcohol.
8. according to claim 1 use the vacuum precooling device for exerting gloomy pump, which is characterized in that the vacuum pre-cooling case (1) and the cooling cylinder (3) is provided with insulating layer.
CN201810790617.6A 2018-07-18 2018-07-18 Vacuum precooling device using Knudsen pump Active CN109140866B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810790617.6A CN109140866B (en) 2018-07-18 2018-07-18 Vacuum precooling device using Knudsen pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810790617.6A CN109140866B (en) 2018-07-18 2018-07-18 Vacuum precooling device using Knudsen pump

Publications (2)

Publication Number Publication Date
CN109140866A true CN109140866A (en) 2019-01-04
CN109140866B CN109140866B (en) 2020-11-03

Family

ID=64801091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810790617.6A Active CN109140866B (en) 2018-07-18 2018-07-18 Vacuum precooling device using Knudsen pump

Country Status (1)

Country Link
CN (1) CN109140866B (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1080389A (en) * 1992-06-10 1994-01-05 波克股份有限公司 The method and apparatus of cooling
RU2084776C1 (en) * 1994-05-10 1997-07-20 Борис Тимофеевич Маринюк Cold production method
CN1159303A (en) * 1996-12-18 1997-09-17 何军 Vacuum pre-refrigerating multi-kind air preservation device and method thereof
CN2554931Y (en) * 2002-07-24 2003-06-11 顾严亮 Outfit for vacuum precooling and degrading residual agricultural medicine on fruits and vegetables
US20040011955A1 (en) * 2002-07-02 2004-01-22 Yoshiki Hirano Ion attachment mass spectrometry apparatus, ionization apparatus, and ionization method
CN1778180A (en) * 2004-11-22 2006-05-31 袁红玲 Antidotismus insect killer with antistaling and sterilizing functions for fruits and vegetables
TW200621618A (en) * 2004-12-30 2006-07-01 Prec Instr Dev Ct Nat Science Council Composite plate device for thermal transpiration micropump
CN1973644A (en) * 2006-12-07 2007-06-06 上海海事大学 Energy-saving clean safe vacuum pre-cooling system
CN201417041Y (en) * 2009-05-18 2010-03-03 杭州山立净化设备有限公司 Energy saving compressed air pre-cooler
CN104048447A (en) * 2014-06-18 2014-09-17 广西大学 Refrigerating system with Knudsen compressor as core
CN104567089A (en) * 2014-12-23 2015-04-29 广西大学 Compression-ejection compound refrigerating system using Knudsen compressor
CN104567448A (en) * 2014-12-23 2015-04-29 广西大学 Multi-stage ejection vacuum system using Knudsen pump
CN104833147A (en) * 2015-04-27 2015-08-12 黑龙江省农业科学院畜牧研究所 Vacuum precooling and fresh-keeping equipment capable of preventing ice blockage of cold trap
CN106871484A (en) * 2017-01-22 2017-06-20 广西大学 A kind of gas refrigeration system based on thermal transpiration effect

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1080389A (en) * 1992-06-10 1994-01-05 波克股份有限公司 The method and apparatus of cooling
RU2084776C1 (en) * 1994-05-10 1997-07-20 Борис Тимофеевич Маринюк Cold production method
CN1159303A (en) * 1996-12-18 1997-09-17 何军 Vacuum pre-refrigerating multi-kind air preservation device and method thereof
US20040011955A1 (en) * 2002-07-02 2004-01-22 Yoshiki Hirano Ion attachment mass spectrometry apparatus, ionization apparatus, and ionization method
CN2554931Y (en) * 2002-07-24 2003-06-11 顾严亮 Outfit for vacuum precooling and degrading residual agricultural medicine on fruits and vegetables
CN1778180A (en) * 2004-11-22 2006-05-31 袁红玲 Antidotismus insect killer with antistaling and sterilizing functions for fruits and vegetables
TW200621618A (en) * 2004-12-30 2006-07-01 Prec Instr Dev Ct Nat Science Council Composite plate device for thermal transpiration micropump
CN1973644A (en) * 2006-12-07 2007-06-06 上海海事大学 Energy-saving clean safe vacuum pre-cooling system
CN201417041Y (en) * 2009-05-18 2010-03-03 杭州山立净化设备有限公司 Energy saving compressed air pre-cooler
CN104048447A (en) * 2014-06-18 2014-09-17 广西大学 Refrigerating system with Knudsen compressor as core
CN104567089A (en) * 2014-12-23 2015-04-29 广西大学 Compression-ejection compound refrigerating system using Knudsen compressor
CN104567448A (en) * 2014-12-23 2015-04-29 广西大学 Multi-stage ejection vacuum system using Knudsen pump
CN104833147A (en) * 2015-04-27 2015-08-12 黑龙江省农业科学院畜牧研究所 Vacuum precooling and fresh-keeping equipment capable of preventing ice blockage of cold trap
CN106871484A (en) * 2017-01-22 2017-06-20 广西大学 A kind of gas refrigeration system based on thermal transpiration effect

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐昆,卢苇,王博韬,王祥: "气体在热流逸效应作用下的压力与流量特性", 《高效化学工程学报》 *
王博韬,芦苇,徐昆,王祥: "热流逸效应的抽真空特性分析", 《真空科学与技术学报》 *

Also Published As

Publication number Publication date
CN109140866B (en) 2020-11-03

Similar Documents

Publication Publication Date Title
CN101851945B (en) Device for preparing liquid water by air
CN103075831B (en) Novel air-cooled evaporation type composite refrigeration house refrigerating system
CN107521698A (en) A kind of environmental control system heat refrigeration apparatus
CN101482321B (en) Ultra-low temperature heat pump water heater
CN105004100A (en) Single-refrigerant loop and multiple-suction pressure steam compression refrigeration/heat pump system
CN102927730A (en) Direct-contact ice slurry making device of gas
CN105962005A (en) Energy-saving control method of twin-stage compression type heat pump vacuum freeze drying combined device
CN206755636U (en) A kind of water circulation refrigeration system
CN106839204B (en) A kind of air-conditioning refrigeration system based on thermal transpiration effect
CN104534722A (en) Air conditioning refrigeration equipment
CN109140866A (en) It is a kind of to use the vacuum precooling device for exerting gloomy pump
CN212205124U (en) Efficient circulating refrigerator
CN109237856B (en) Pressure reduction refrigeration system using Knudsen pump
CN103868266B (en) Novel energy-conserving refrigeration plant
CN205048788U (en) Air source heat pump unit is used in high -efficient crude oil heating
CN106679226A (en) Bi-evaporator ejecting refrigeration system established by two levels of ejectors
CN201129799Y (en) Low temperature high-efficiency heat-production air conditioner
CN210242475U (en) Vacuum pumping system capable of improving pumping capacity of vacuum pump
CN209267917U (en) A kind of heat recovery module data center
CN207355402U (en) Comprehensively utilize the food cooling device of energy
CN110398011A (en) A kind of refrigeration system
CN105526745A (en) Refrigerating system utilizing flash air to supercool high-pressure liquid refrigerant and realizing single-phase liquid-state uniform distribution of refrigerant
CN206504474U (en) A kind of Teat pump boiler
CN205690725U (en) Energy-saving year round cooling unit
CN104315747B (en) A kind of utilize low-temperature waste heat for refrigeration equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant