CN104534722A - Air conditioning refrigeration equipment - Google Patents
Air conditioning refrigeration equipment Download PDFInfo
- Publication number
- CN104534722A CN104534722A CN201410779491.4A CN201410779491A CN104534722A CN 104534722 A CN104534722 A CN 104534722A CN 201410779491 A CN201410779491 A CN 201410779491A CN 104534722 A CN104534722 A CN 104534722A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- cross valve
- heat exchanger
- node
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B13/00—Compression machines, plants or systems, with reversible cycle
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B41/00—Fluid-circulation arrangements
- F25B41/20—Disposition of valves, e.g. of on-off valves or flow control valves
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B41/00—Fluid-circulation arrangements
- F25B41/20—Disposition of valves, e.g. of on-off valves or flow control valves
- F25B41/26—Disposition of valves, e.g. of on-off valves or flow control valves of fluid flow reversing valves
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B41/00—Fluid-circulation arrangements
- F25B41/30—Expansion means; Dispositions thereof
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B41/00—Fluid-circulation arrangements
- F25B41/30—Expansion means; Dispositions thereof
- F25B41/31—Expansion valves
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2313/00—Compression machines, plants or systems with reversible cycle not otherwise provided for
- F25B2313/027—Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
- F25B2313/02742—Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using two four-way valves
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Fluid Mechanics (AREA)
- Compression-Type Refrigeration Machines With Reversible Cycles (AREA)
- Air Conditioning Control Device (AREA)
Abstract
The invention discloses air conditioning refrigeration equipment. The air conditioning refrigeration equipment comprises a first compression mechanism, a second compression mechanism, a first four-way valve, a second four-way valve, a first heat exchanger, a second heat exchanger, a third heat exchanger, a first throttling mechanism, a third throttling mechanism and a first flow direction control valve, wherein a low-pressure node of the first four-way valve is connected with a low-pressure node of the second four-way valve through a No.65 pipeline; a high-pressure node of the first four-way valve is connected with the No.65 pipeline between the low-pressure node of the first four-way valve and the low-pressure node of the second four-way valve by a No.60 pipeline, an outlet end of the second compression mechanism, an inlet end of the second compression mechanism and a No.68 pipeline in sequence; a high-pressure node of the second four-way valve is connected with an outlet end of the first compression mechanism by a No.62 pipeline. The air conditioning refrigeration equipment has a simple structure, can work reliably and has low cost; the air conditioning refrigeration equipment can absorb heat from the environment to defrost in an operation process and refrigerating fluid can be prevented from being remained in the four-way valves and the heat exchangers.
Description
Technical field
The present invention relates to a kind of operation of air conditioning systems, belong to refrigeration technology field.
Background technology
Present invention applicant disclosed on 06 20th, 2012, application number be 201110355046.1 patent of invention propose a kind of operation of air conditioning systems scheme, its system composition respectively as Fig. 8.
Known further from the description of this patent of invention description (that is: the description of patent of invention 201110355046.1) " 0025 ~ 0027 " section: scheme shown in Fig. 8 is when realizing separate refrigeration function, 3rd heat exchanger 8 does not work, First Heat Exchanger 3 is evaporimeters, for being user's cooling, second heat exchanger 6 is condensers, for by First Heat Exchanger 3 for user's whole condensation heat produced of freezing enter in environment (outdoor air or cooling water or soil etc.).During work, first throttle mechanism 4 standard-sized sheet, second throttle body 5 normally works, and the 3rd throttle mechanism 7 cuts out.
The workflow of scheme shown in Fig. 8 under this function is: after cold-producing medium is discharged from compressing mechanism 1 port of export, successively through the 60 pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 often opens node 74, 64 pipeline 64, second heat exchanger 6, first throttle mechanism 4, 57 pipeline 57, 58 pipeline 58, second throttle body 5, First Heat Exchanger 3, 67 pipeline 67, second cross valve 80 often opens node 84, second cross valve 80 low pressure node 83, 65 pipeline 65, 63 pipeline 63, get back to compressing mechanism 1 arrival end, enter compressing mechanism 1 to be compressed, complete and once circulate.
From the workflow of scheme shown in above Fig. 8 under separate refrigeration function, when scheme shown in Fig. 8 works under separate refrigeration function, the connected mode of the first cross valve 70 4 connected nodes is: the first cross valve 70 high voltage nodes 71 is often opened node 74 with the first cross valve 70 and is connected, and the first cross valve 70 common points 72 is connected with the first cross valve 70 low pressure node 73.
The connected mode of the second cross valve 80 4 connected nodes is: the second cross valve 80 is often opened node 84 and is connected with the second cross valve 80 low pressure node 83, and the second cross valve 80 high voltage nodes 81 is connected with the second cross valve 80 common points 82.
Because during work, second cross valve 80 high voltage nodes 81 is connected with the second cross valve 80 common points 82, and the 3rd throttle mechanism 7 is in closed condition, therefore as shown in Figure 8, in the course of work of scheme shown in Fig. 8 under separate refrigeration function, from the second cross valve 80 high voltage nodes 81 successively through the second cross valve 80 common points 82, 66 pipeline 66, second check valve 22, 51 pipeline 51, 3rd heat exchanger 8 is in this article of refrigerant circulation passage of the 3rd throttle mechanism 7, cold-producing medium does not flow, therefore when the scheme shown in Fig. 8 works under separate refrigeration function, the high-temperature high-pressure refrigerant gas that compressing mechanism 1 is discharged can be stagnated in the high-pressure side of the second cross valve 80 inside.
Also known further from the description of patent of invention description (that is: the description of patent of invention 201110355046.1) " 0040 ~ 0042 " section of scheme shown in Fig. 8:
Scheme shown in Fig. 8 is when realizing independent heating function, 3rd heat exchanger 8 does not work, and the second heat exchanger 6 is evaporimeters, for from draw heat in environment (outdoor air or cooling water or soil etc.), First Heat Exchanger 3 is condensers, for being user's heating; During work, first throttle mechanism 4 normally works, second throttle body 5 standard-sized sheet, and the 3rd throttle mechanism 7 cuts out.
The workflow of scheme shown in Fig. 8 under this function is as follows: after cold-producing medium is discharged from compressing mechanism 1 port of export, successively through the 60 pipeline 60, 59 pipeline 59, second cross valve 80 high voltage nodes 81, second cross valve 80 often opens node 84, 67 pipeline 67, First Heat Exchanger 3, second throttle body 5, 58 pipeline 58, 57 pipeline 57, first throttle mechanism 4, second heat exchanger 6, 64 pipeline 64, first cross valve 70 often opens node 74, first cross valve 70 low pressure node 73, 65 pipeline 65, 63 pipeline 63, get back to compressing mechanism 1 arrival end, enter compressing mechanism 1 to be compressed, complete and once circulate.
From the workflow of scheme under independent heating function shown in above Fig. 8, when scheme shown in Fig. 8 works under this function, the connected mode of the first cross valve 70 4 connected nodes is: the first cross valve 70 is often opened node 74 and is connected with the first cross valve 70 low pressure node 73, and the first cross valve 70 high voltage nodes 71 is connected with the first cross valve 70 common points 72.
The connected mode of the second cross valve 80 4 connected nodes is: the second cross valve 80 high voltage nodes 81 is often opened node 84 with the second cross valve 80 and is connected, and the second cross valve 80 common points 82 is connected with the second cross valve 80 low pressure node 83.
Because during work, first cross valve 70 high voltage nodes 71 is connected with the first cross valve 70 common points 72, and the 3rd throttle mechanism 7 is in closed condition, therefore as shown in Figure 8, in the course of work of scheme shown in Fig. 8 under independent heating function, from the first cross valve 70 high voltage nodes 71 successively through the first cross valve 70 common points 72, 61 pipeline 61, first check valve 21, 51 pipeline 51, 3rd heat exchanger 8 is in this article of refrigerant circulation passage of the 3rd throttle mechanism 7, cold-producing medium does not flow, therefore when the scheme shown in Fig. 8 works under independent heating function, the high-temperature high-pressure refrigerant gas that compressing mechanism 1 is discharged also can be stagnated in the high-pressure side of the first cross valve 70 inside.
Comprehensive above known to the analysis of scheme shown in Fig. 8: the scheme shown in Fig. 8 in the course of the work, when the 3rd heat exchanger 8 does not work, First Heat Exchanger 3 is evaporimeters, when second heat exchanger 6 is condensers (when working under separate refrigeration function), in the high-pressure side of the second cross valve 80 inside, there will be the phenomenon that cold-producing medium is stagnated.
Similar, in the course of work, when the 3rd heat exchanger 8 does not work, First Heat Exchanger 3 is condensers, when second heat exchanger 6 is evaporimeters (when working under independent heating function), in the high-pressure side of the first cross valve 70 inside, also there will be the phenomenon that cold-producing medium is stagnated.
As can be seen here, when scheme shown in Fig. 8 works long hours under separate refrigeration function and independent heating function, indirect heat exchange between the inner high temperature and high pressure gas due to stagnation of its cross valve and the low temperature low pressure gas of flowing, and the heat radiation of cross valve high-pressure side surface of shell environment towards periphery, therefore refrigerant liquid can be produced in the high-pressure side of cross valve inside, in the high-pressure side that these cold-producing mediums can accumulate in cross valve inside and the 3rd heat exchanger 8, the minimizing of circulating mass of refrigerant can be caused on the one hand, when serious, the normal work of operation of air conditioning systems can be affected, and this adverse effect will be eliminated, the refrigerant charge increasing operation of air conditioning systems certainly will be needed again, when the refrigerant liquid produced when these on the other hand accumulates in the high-pressure side of cross valve inside, in the process of cross valve commutation, likely there is liquid hammer, cause the damage of cross valve, therefore scheme shown in Fig. 8 owing to working under separate refrigeration function and independent heating function time, the cold-producing medium stagnation problem occurred in its second cross valve 80 and the first cross valve 70 internal high pressure side respectively, therefore whole system job insecurity, easily breaks down.
Summary of the invention
The object of this invention is to provide a kind of cold-producing medium of avoiding in the course of the work to be detained in the high-pressure side and heat exchanger of cross valve, and in the winter time in the course of work, can realize absorbing heat defrost from environment, and the simple operation of air conditioning systems of structure.
In order to overcome above-mentioned technology Problems existing, the technical scheme of technical solution problem of the present invention is:
1, a kind of operation of air conditioning systems, comprise the first compressing mechanism (1), the first cross valve (70), the second cross valve (80), First Heat Exchanger (3), the second heat exchanger (4), the 3rd heat exchanger (8), first throttle mechanism (5), the 3rd throttle mechanism (7), the first flow direction control valve (41), it is characterized in that: this operation of air conditioning systems also comprises the second compressing mechanism (2); the low pressure node (73) of described first cross valve (70) is connected by the low pressure node (83) of the 65 pipeline (65) with described second cross valve (80), the high voltage nodes (71) of described first cross valve (70) is successively by the 60 pipeline (60), second compressing mechanism (2) port of export, second compressing mechanism (2) arrival end, the 65 pipeline (65) between the low pressure node (73) of the 68 pipeline (68) and described first cross valve (70) and the low pressure node (83) of the second cross valve (80) is connected, the high voltage nodes (81) of described second cross valve (80) is successively by the 62 pipeline (62), first compressing mechanism (1) port of export, first compressing mechanism (1) arrival end, 63 pipeline (63) is also connected with the 65 pipeline (65) between the low pressure node (73) of described first cross valve (70) and the low pressure node (83) of the second cross valve (80), second commutation node (84) of described second cross valve (80) is successively by the 67 pipeline (67), 3rd heat exchanger (8), 3rd throttle mechanism (7), 58 pipeline (58), first throttle mechanism (5), First Heat Exchanger (3), 64 pipeline (64) and second of described first cross valve (70) node (74) that commutates is connected, first commutation node (82) of described second cross valve (80) is connected by the 51 pipeline (51) and first of described first cross valve (70) node (72) that commutates, one end of described second heat exchanger (4) is successively by the first flow direction control valve (41), 52 pipeline (52) is connected with the 58 pipeline (58) between described first throttle mechanism (5) and the 3rd throttle mechanism (7), the other end of described second heat exchanger (4) is connected by commutate the first the 51 pipeline (51) commutated between node (82) of node (72) and the second cross valve (80) of the 61 pipeline (61) and first of described first cross valve (70).
2, a kind of operation of air conditioning systems, comprise the first compressing mechanism (1), the first cross valve (70), the second cross valve (80), First Heat Exchanger (3), the second heat exchanger (4), the 3rd heat exchanger (8), first throttle mechanism (5), the 3rd throttle mechanism (7), the 4th check valve (24) and the 5th check valve (25), it is characterized in that: this operation of air conditioning systems also comprises the second compressing mechanism (2); the low pressure node (73) of described first cross valve (70) is connected by the low pressure node (83) of the 65 pipeline (65) with described second cross valve (80), the high voltage nodes (71) of described first cross valve (70) is successively by the 60 pipeline (60), second compressing mechanism (2) port of export, second compressing mechanism (2) arrival end, the 65 pipeline (65) between the low pressure node (73) of the 68 pipeline (68) and described first cross valve (70) and the low pressure node (83) of the second cross valve (80) is connected, the high voltage nodes (81) of described second cross valve (80) is successively by the 62 pipeline (62), first compressing mechanism (1) port of export, first compressing mechanism (1) arrival end, 63 pipeline (63) is also connected with the 65 pipeline (65) between the low pressure node (73) of described first cross valve (70) and the low pressure node (83) of the second cross valve (80), second commutation node (84) of described second cross valve (80) is successively by the 67 pipeline (67), 3rd heat exchanger (8), 3rd throttle mechanism (7), 58 pipeline (58), first throttle mechanism (5), First Heat Exchanger (3), 64 pipeline (64) and second of described first cross valve (70) node (74) that commutates is connected, first commutation node (82) of described second cross valve (80) is successively by the 51 pipeline (51), 4th check valve (24) arrival end, 4th check valve (24) port of export, 5th check valve (25) port of export, 5th check valve (25) arrival end and first of described first cross valve (70) node (72) that commutates is connected, one end of described second heat exchanger (4) is connected with the 58 pipeline (58) between described first throttle mechanism (5) and the 3rd throttle mechanism (7) by the 52 pipeline (52), the other end of described second heat exchanger (4) is connected with the pipeline between described 4th check valve (24) port of export and the 5th check valve (25) port of export by the 61 pipeline (61).
Compared with prior art, its beneficial effect is in the present invention:
1. the delay of cold-producing medium in cross valve and heat exchanger operationally, can be avoided;
2., in the course of work in winter, can realize absorbing heat defrost from environment;
3. structure is simple;
4. the present invention is applicable to industry and civilian operation of air conditioning systems, is specially adapted to the occasion using air as low-temperature heat source.
Accompanying drawing explanation
Fig. 1 is the embodiment of the present invention 1 structural representation;
Fig. 2 is the embodiment of the present invention 1 change programme structural representation;
Fig. 3 is the embodiment of the present invention 2 structural representation;
Fig. 4 is the embodiment of the present invention 3 structural representation;
Fig. 5 is the embodiment of the present invention 4 structural representation;
Fig. 6 is the embodiment of the present invention 5 structural representation;
Fig. 7 is the embodiment of the present invention 5 change programme structural representation;
Fig. 8 is prior art structural representation.
Detailed description of the invention
Below in conjunction with accompanying drawing, content of the present invention is described in further detail.
Embodiment 1
As shown in Figure 1, the present embodiment is a kind of operation of air conditioning systems that can realize refrigeration and heating function, for there being the occasion of refrigeration, heating demands the whole year.Whole equipment comprises following part: the first compressing mechanism 1, second compressing mechanism 2, first cross valve 70, second cross valve 80, first throttle mechanism 5, the 3rd throttle mechanism 7, First Heat Exchanger 3, second heat exchanger 4, the 3rd heat exchanger 8, first flow direction control valve 41.First throttle mechanism 5, the 3rd throttle mechanism 7 are all electric expansion valve; In the course of work, the first flow direction control valve 41 substitute by second throttle body 6, and second throttle body 6 is also electric expansion valve.
This operation of air conditioning systems, in whole year operation process, can realize several functions.During work, First Heat Exchanger 3, the 3rd heat exchanger 8 are all heat source side heat exchangers, and summer and spring and autumn, as condenser, distribute the condensation heat produced in process of refrigerastion to environment, winter, as evaporimeter, absorbs heat from environment; Second heat exchanger 4 is user side heat exchangers, and summer and spring and autumn, as evaporimeter, are user's cooling, and winter, as condenser, is user's heating.
Workflow under each function is as described below respectively.
(1) separate refrigeration function
Scheme one: the first compressing mechanism 1 does not work, and the second compressing mechanism 2 normally works; First Heat Exchanger 3, second heat exchanger 4 works, and the 3rd heat exchanger 8 does not work.
Under this scheme, the condensation heat produced of freezing all enters environment (outdoor air or cooling water or soil etc.) by First Heat Exchanger 3, and the second heat exchanger 4 is user's refrigeration.
During work, first throttle mechanism 5 standard-sized sheet, second throttle body 6 normally works, and the 3rd throttle mechanism 7 cuts out.First cross valve 70 high voltage nodes 71 and the first cross valve 70 second node 74 that commutates communicates, and the first cross valve 70 first node 72 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: after cold-producing medium is discharged from second compressing mechanism 2 port of export, successively through the 60 pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 second commutation node 74, 64 pipeline 64, First Heat Exchanger 3, first throttle mechanism 5, 58 pipeline 58, 52 pipeline 52, second throttle body 6, second heat exchanger 4, 61 pipeline 61, 51 pipeline 51, first cross valve 70 first commutation node 72, first cross valve 70 low pressure node 73, 65 pipeline 65, 68 pipeline 68, get back to the second compressing mechanism 2 arrival end, enter the second compressing mechanism 2 to be compressed, complete and once circulate.
Scheme two: the first compressing mechanism 1 normally works, and the second compressing mechanism 2 does not work; First Heat Exchanger 3 does not work, and the second heat exchanger 4, the 3rd heat exchanger 8 normally work.
Under this scheme, the condensation heat produced of freezing all enters environment (outdoor air or cooling water or soil etc.) by the 3rd heat exchanger 8, and the second heat exchanger 4 is for being user's refrigeration.
During work, first throttle mechanism 5 closes, and second throttle body 6 normally works, the 3rd throttle mechanism 7 standard-sized sheet.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 second node 84 that commutates communicates, and the second cross valve 80 first node 82 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: after cold-producing medium is discharged from first compressing mechanism 1 port of export, successively through the 62 pipeline 62, second cross valve 80 high voltage nodes 81, second cross valve 80 second commutation node 84, 67 pipeline 67, 3rd heat exchanger 8, 3rd throttle mechanism 7, 58 pipeline 58, 52 pipeline 52, second throttle body 6, second heat exchanger 4, 61 pipeline 61, 51 pipeline 51, second cross valve 80 first commutation node 82, second cross valve 80 low pressure node 83, 65 pipeline 65, , 63 pipeline 63, get back to the first compressing mechanism 1 arrival end, enter the first compressing mechanism 1 to be compressed, complete and once circulate.
Scheme three: the first compressing mechanism 1, second compressing mechanism 2 all normally works; First Heat Exchanger 3, second heat exchanger 4, the 3rd heat exchanger 8 also all normally work.
Under this scheme, the condensation heat produced of freezing enters environment (outdoor air or cooling water or soil etc.) by First Heat Exchanger 3 and the 3rd heat exchanger 8, and the second heat exchanger 4 is for being user's refrigeration.
During work, first throttle mechanism 5, the 3rd throttle mechanism 7 standard-sized sheet, second throttle body 6 normally works.First cross valve 70 high voltage nodes 71 and the first cross valve 70 second node 74 that commutates communicates, and the first cross valve 70 first node 72 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 second node 84 that commutates communicates, and the second cross valve 80 first node 82 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: the cold-producing medium entering the 65 pipeline 65 is divided into two-way; The first via is after the 68 pipeline 68, enter the second compressing mechanism 2 to be compressed, after discharging from second compressing mechanism 2 port of export, successively through the 60 pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 second commutation node the 74, the 64 pipeline 64, First Heat Exchanger 3, first throttle mechanism 5, enter the 58 pipeline 58; Second tunnel is after the 63 pipeline 63, enter the first compressing mechanism 1 to be compressed, after discharging from first compressing mechanism 1 port of export, successively through the 62 pipeline 62, second cross valve 80 high voltage nodes 81, second cross valve 80 second commutation node the 84, the 67 pipeline 67, the 3rd heat exchanger 8, the 3rd throttle mechanism 7, also enter the 58 pipeline 58; Two-way cold-producing medium, after the 58 pipeline 58 mixes, successively through the 52 pipeline 52, second throttle body 6, second heat exchanger the 4, the 61 pipeline 61, enters the 51 pipeline 51 and is divided into again two-way; The first via through the second cross valve 80 first commutation node 82, second cross valve 80 low pressure node 83, gets back to again the 65 pipeline 65 successively; The 65 pipeline 65 through the first cross valve 70 first commutation node 72, first cross valve 70 low pressure node 73, is also got back to successively in second tunnel; Two-way, after the 65 pipeline 65 mixes, is divided into two-way again, enters two compressor structures respectively and compressed, complete and once circulate.
(2) winter independent heat-production functions
Scheme one: the first compressing mechanism 1 normally works, and the second compressing mechanism 2 does not work; First Heat Exchanger 3 does not work, and the second heat exchanger 4, the 3rd heat exchanger 8 normally work.
Under this scheme, the 3rd heat exchanger 8 draw heat from environment, the heat drawn, for being user's heating in the second heat exchanger 4, First Heat Exchanger 3 does not work.
During work, first throttle mechanism 5 closes, second throttle body 6 standard-sized sheet, and the 3rd throttle mechanism 7 normally works.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: after cold-producing medium is discharged from first compressing mechanism 1 port of export, successively through the 62 pipeline 62, second cross valve 80 high voltage nodes 81, second cross valve 80 first commutation node 82, 51 pipeline 51, 61 pipeline 61, second heat exchanger 4, second throttle body 6, 52 pipeline 52, 58 pipeline 58, 3rd throttle mechanism 7, 3rd heat exchanger 8, 67 pipeline 67, second cross valve 80 second commutation node 84, second cross valve 80 low pressure node 83, 65 pipeline 65, 63 pipeline 63, get back to the first compressing mechanism 1 arrival end, enter the first compressing mechanism 1 to be compressed, complete and once circulate.
Scheme two: the first compressing mechanism 1 does not work, and the second compressing mechanism 2 normally works; 3rd heat exchanger 8 does not work, and First Heat Exchanger 3, second heat exchanger 4 normally works.
Under this scheme, First Heat Exchanger 3 draw heat from environment, the heat drawn, for being user's heating in the second heat exchanger 4, the 3rd heat exchanger 8 does not work.
During work, first throttle mechanism 5 normally works, second throttle body 6 standard-sized sheet, and the 3rd throttle mechanism 7 cuts out.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: after cold-producing medium is discharged from second compressing mechanism 2 port of export, successively through the 60 pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 first commutation node 72, 51 pipeline 51, 61 pipeline 61, second heat exchanger 4, second throttle body 6, 52 pipeline 52, 58 pipeline 58, first throttle mechanism 5, First Heat Exchanger 3, 64 pipeline 64, first cross valve 70 second commutation node 74, first cross valve 70 low pressure node 73, 65 pipeline 65, 68 pipeline 68, get back to the second compressing mechanism 2 arrival end, enter the second compressing mechanism 2 to be compressed, complete and once circulate.
Scheme three: the first compressing mechanism 1, second compressing mechanism 2 all normally works; First Heat Exchanger 3, second heat exchanger 4, the 3rd heat exchanger 8 also all normally work.
Under this scheme, First Heat Exchanger 3, the 3rd heat exchanger 8 draw heat from environment, the heat drawn, for being user's heating in the second heat exchanger 4.
During work, first throttle mechanism 5, the 3rd throttle mechanism 7 normally work, second throttle body 6 standard-sized sheet.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: the cold-producing medium entering the 65 pipeline 65 is divided into two-way; The first via is after the 68 pipeline 68, enter the second compressing mechanism 2 to be compressed, after discharging from second compressing mechanism 2 port of export, successively through the 60 pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 first commutation node 72, enter the 51 pipeline 51; Second tunnel is after the 63 pipeline 63, enter the first compressing mechanism 1 to be compressed, after discharging from first compressing mechanism 1 port of export, successively through the 62 pipeline 62, second cross valve 80 high voltage nodes 81, second cross valve 80 first commutation node 82, also enter the 51 pipeline 51; Two-way, after the 51 pipeline 51 mixes, successively through the 61 pipeline 61, second heat exchanger 4, second throttle body the 6, the 52 pipeline 52, enters the 58 pipeline 58 and is divided into two-way; The first via through the 3rd throttle mechanism 7, the 3rd heat exchanger the 8, the 67 pipeline 67, second cross valve 80 second commutation node 84, second cross valve 80 low pressure node 83, enters the 65 pipeline 65 successively; Second tunnel through first throttle mechanism 5, First Heat Exchanger the 3, the 64 pipeline 64, first cross valve 70 second commutation node 74, first cross valve 70 low pressure node 73, also enters the 65 pipeline 65 successively; Two-way, after the 65 pipeline 65 mixes, is divided into two-way again; The first via, through the 63 pipeline 63, gets back to again the first compressing mechanism 1 arrival end; Second tunnel, through the 68 pipeline 68, is got back to again the second compressing mechanism 2 arrival end, is so far completed and once circulate.
(3) winter frost removing function
1) defrosting of First Heat Exchanger 3
In this kind of defrosting situation, the first compressing mechanism 1 does not work, and the second compressing mechanism 2 normally works; First Heat Exchanger 3, the 3rd heat exchanger 8 normally work, and the second heat exchanger 4 does not work.
In this kind of defrosting situation, the 3rd heat exchanger 8 draw heat from environment, the heat drawn, for the defrost of First Heat Exchanger 3; Second heat exchanger 4 does not work.
During work, first throttle mechanism 5 standard-sized sheet, the 3rd throttle mechanism 7 normally works, and second throttle body 6 is closed.First cross valve 70 high voltage nodes 71 and the first cross valve 70 second node 74 that commutates communicates, and the first cross valve 70 first node 72 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.Second heat exchanger 4 does not work, but under being in the pressure of inspiration(Pi) of the second compressing mechanism 2 in defrost process, therefore cold-producing medium can not be stagnated wherein in defrost process.In addition, under the arrival end of the first compressing mechanism 1 and the port of export are also all in the pressure of inspiration(Pi) of the second compressing mechanism 2.
Its workflow is: after cold-producing medium is discharged from second compressing mechanism 2 port of export, successively through the 60 pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 second commutation node 74, 64 pipeline 64, First Heat Exchanger 3, first throttle mechanism 5, 58 pipeline 58, 3rd throttle mechanism 7, 3rd heat exchanger 8, 67 pipeline 67, second cross valve 80 second commutation node 84, second cross valve 80 low pressure node 83, 65 pipeline 65, 68 pipeline 68, get back to the second compressing mechanism 2 arrival end, enter the second compressing mechanism 2 to be compressed, complete a defrost cycle.
2) defrosting of the 3rd heat exchanger 8
In this kind of defrosting situation, the first compressing mechanism 1 normally works, and the second compressing mechanism 2 does not work; First Heat Exchanger 3, the 3rd heat exchanger 8 normally work, and the second heat exchanger 4 does not work.
In this kind of defrosting situation, First Heat Exchanger 3 draw heat from environment, the heat drawn, for the defrost of the 3rd heat exchanger 8; Second heat exchanger 4 does not work.
During work, first throttle mechanism 5 normally works, and the 3rd throttle mechanism 7 standard-sized sheet, second throttle body 6 is closed.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 second node 84 that commutates communicates, and the second cross valve 80 first node 82 that commutates communicates with the second cross valve 80 low pressure node 83.Second heat exchanger 4 does not work, but under being in the pressure of inspiration(Pi) of the first compressing mechanism 1 in defrost process, therefore cold-producing medium can not be stagnated wherein in defrost process.In addition, under the arrival end of the second compressing mechanism 2 and the port of export are also all in the pressure of inspiration(Pi) of the first compressing mechanism 1.
Its workflow is: after cold-producing medium is discharged from first compressing mechanism 1 port of export, successively through the 62 pipeline 62, second cross valve 80 high voltage nodes 81, second cross valve 80 second commutation node 84, 67 pipeline 67, 3rd heat exchanger 8, 3rd throttle mechanism 7, 58 pipeline 58, first throttle mechanism 5, First Heat Exchanger 3, 64 pipeline 64, first cross valve 70 second commutation node 74, first cross valve 70 low pressure node 73, 65 pipeline 65, 63 pipeline 63, get back to the first compressing mechanism 1 arrival end, enter the first compressing mechanism 1 to be compressed, complete a defrost cycle.
Shown in Fig. 1, operation of air conditioning systems is in practical work process, in order to avoid back flow of refrigerant enters compressing mechanism, at the exhaust outlet of the first compressing mechanism 1, second compressing mechanism 2, a check valve can be set respectively, as shown in Figure 2, now, first check valve 21, second check valve 22 connected mode is in systems in which: the first check valve 21 arrival end is connected with first compressing mechanism 1 port of export, and first check valve 21 port of export is connected with the second cross valve 80 high voltage nodes 81 by the 62 pipeline 62.Second check valve 22 arrival end is connected with second compressing mechanism 2 port of export, and second check valve 22 port of export is connected with the first cross valve 70 high voltage nodes 71 by the 60 pipeline 60.
Scheme shown in Fig. 2 also can realize all functions of scheme shown in Fig. 1.The connected mode of the first check valve 21, second check valve 22 in system shown in Figure 2 is also applicable to scheme described in all embodiments of the present invention.
Embodiment 2
As shown in Figure 3, the present embodiment is also a kind of operation of air conditioning systems that can realize refrigeration and heating function, for there being the occasion of refrigeration, heating demands the whole year.The difference of scheme shown in scheme with Fig. 1 shown in Fig. 3 is: compared with scheme shown in Fig. 1, and scheme shown in Fig. 3 adds second flow direction control valve 42 in systems in which, as shown in Figure 3; Second flow direction control valve 42 mounting means is in systems in which: the second flow direction control valve 42 is arranged on the 65 pipeline 65, and second flow direction control valve 42 one end is connected with the 63 pipeline 63, second flow direction control valve 42 other end is connected with the 68 pipeline 68.
In the course of work, when the second flow direction control valve 42 is opened, scheme shown in Fig. 3 also can realize all functions of scheme shown in embodiment 1 Fig. 1, and when realizing identical function, workflow is also identical.
In the course of work, when the second flow direction control valve 42 is closed, scheme shown in Fig. 3 is in the winter time separately under heat-production functions, can realize utilizing the evaporating temperature that two different, the simultaneously object of draw heat from two temperature different low-temperature heat source, now, first compressing mechanism 1, second compressing mechanism 2 all normally works, and all adopt variable conpacitance compressor structure, such as: frequency-changeable compressor, due in the course of work, first compressing mechanism 1, second compressing mechanism 2 is absorbed heat from two low-temperature heat sources with different evaporating temperatures respectively by the method changing operating frequency, therefore, with only use a lower evaporating temperature simultaneously from compared with the different low-temperature heat source draw heat of two temperature, shown in Fig. 3, scheme is more energy-conservation.
When working under scheme shown in Fig. 3 in the winter time independent heat-production functions, second flow direction control valve 42 is closed, and the first compressing mechanism 1, second compressing mechanism 2 is when all working, scheme shown in its workflow with embodiment 1 Fig. 1 in the winter time separately under heat-production functions the workflow of scheme three identical; Unique is not both: during due to work, the second flow direction control valve 42 is closed, and therefore, the 65 pipeline 65 has been divided into independently two parts.
The mounting means of the second flow direction control valve 42 in system shown in Figure 3 is also applicable to scheme described in all embodiments of the present invention.
Embodiment 3
As shown in Figure 4, the present embodiment is a kind of operation of air conditioning systems with two heat source side heat exchangers, for there being the occasion of heat demand the whole year, such as: productive life hot water.Whole equipment comprises following part: the first compressing mechanism 1, second compressing mechanism 2, first cross valve 70, second cross valve 80, first throttle mechanism 5, the 3rd throttle mechanism 7, First Heat Exchanger 3, second heat exchanger 4, the 3rd heat exchanger 8, first flow direction control valve 41.First throttle mechanism 5, the 3rd throttle mechanism 7 are all electric expansion valve; In the course of work, the first flow direction control valve 41 substitute by the 3rd check valve 23, and the 3rd check valve 23 arrival end is connected with the second heat exchanger 4, and the 3rd check valve 23 port of export is connected with the 52 pipeline 52,
This operation of air conditioning systems, in whole year operation process, can be implemented as user's heat supply.During work, First Heat Exchanger 3, the 3rd heat exchanger 8 are all heat source side heat exchangers, as evaporimeter, from environment, absorb heat; Second heat exchanger 4 is user side heat exchangers, as condenser, is user's heat supply, such as: productive life hot water.
Workflow under each function is as described below respectively.
(1) heat-production functions
Scheme one: the first compressing mechanism 1 normally works, and the second compressing mechanism 2 does not work; First Heat Exchanger 3 does not work, and the second heat exchanger 4, the 3rd heat exchanger 8 normally work.
Under this scheme, the 3rd heat exchanger 8 draw heat from environment, the heat drawn, for being user's heat supply in the second heat exchanger 4, First Heat Exchanger 3 does not work.
During work, first throttle mechanism 5 closes, and the 3rd throttle mechanism 7 normally works.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: after cold-producing medium is discharged from first compressing mechanism 1 port of export, successively through the 62 pipeline 62, second cross valve 80 high voltage nodes 81, second cross valve 80 first commutation node 82, 51 pipeline 51, 61 pipeline 61, second heat exchanger 4, 3rd check valve 23, 52 pipeline 52, 58 pipeline 58, 3rd throttle mechanism 7, 3rd heat exchanger 8, 67 pipeline 67, second cross valve 80 second commutation node 84, second cross valve 80 low pressure node 83, 65 pipeline 65, 63 pipeline 63, get back to the first compressing mechanism 1 arrival end, enter the first compressing mechanism 1 to be compressed, complete and once circulate.
Scheme two: the first compressing mechanism 1 does not work, and the second compressing mechanism 2 normally works; 3rd heat exchanger 8 does not work, and First Heat Exchanger 3, second heat exchanger 4 normally works.
Under this scheme, First Heat Exchanger 3 draw heat from environment, the heat drawn, for being user's heat supply in the second heat exchanger 4, the 3rd heat exchanger 8 does not work.
During work, first throttle mechanism 5 normally works, and the 3rd throttle mechanism 7 cuts out.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: after cold-producing medium is discharged from second compressing mechanism 2 port of export, successively through the 60 pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 first commutation node 72, 51 pipeline 51, 61 pipeline 61, second heat exchanger 4, 3rd check valve 23, 52 pipeline 52, 58 pipeline 58, first throttle mechanism 5, First Heat Exchanger 3, 64 pipeline 64, first cross valve 70 second commutation node 74, first cross valve 70 low pressure node 73, 65 pipeline 65, 68 pipeline 68, get back to the second compressing mechanism 2 arrival end, enter the second compressing mechanism 2 to be compressed, complete and once circulate.
Scheme three: the first compressing mechanism 1, second compressing mechanism 2 all normally works; First Heat Exchanger 3, second heat exchanger 4, the 3rd heat exchanger 8 also all normally work.
Under this scheme, First Heat Exchanger 3, the 3rd heat exchanger 8 draw heat from environment, the heat drawn, for being user's heat supply in the second heat exchanger 4.
During work, first throttle mechanism 5, the 3rd throttle mechanism 7 normally work.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: the cold-producing medium entering the 65 pipeline 65 is divided into two-way; The first via is after the 68 pipeline 68, enter the second compressing mechanism 2 to be compressed, after discharging from second compressing mechanism 2 port of export, successively through the 60 pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 first commutation node 72, enter the 51 pipeline 51; Second tunnel is after the 63 pipeline 63, enter the first compressing mechanism 1 to be compressed, after discharging from first compressing mechanism 1 port of export, successively through the 62 pipeline 62, second cross valve 80 high voltage nodes 81, second cross valve 80 first commutation node 82, also enter the 51 pipeline 51; Two-way, after the 51 pipeline 51 mixes, successively through the 61 pipeline 61, second heat exchanger 4, the 3rd check valve the 23, the 52 pipeline 52, enters the 58 pipeline 58 and is divided into two-way; The first via through the 3rd throttle mechanism 7, the 3rd heat exchanger the 8, the 67 pipeline 67, second cross valve 80 second commutation node 84, second cross valve 80 low pressure node 83, enters the 65 pipeline 65 successively; Second tunnel through first throttle mechanism 5, First Heat Exchanger the 3, the 64 pipeline 64, first cross valve 70 second commutation node 74, first cross valve 70 low pressure node 73, also enters the 65 pipeline 65 successively; Two-way, after the 65 pipeline 65 mixes, is divided into two-way again; The first via, through the 63 pipeline 63, gets back to again the first compressing mechanism 1 arrival end; Second tunnel, through the 68 pipeline 68, is got back to again the second compressing mechanism 2 arrival end, is so far completed and once circulate.
(2) winter frost removing function
1) defrosting of First Heat Exchanger 3
In this kind of defrosting situation, the first compressing mechanism 1 does not work, and the second compressing mechanism 2 normally works; First Heat Exchanger 3, the 3rd heat exchanger 8 normally work, and the second heat exchanger 4 does not work.
In this kind of defrosting situation, the 3rd heat exchanger 8 draw heat from environment, the heat drawn, for the defrost of First Heat Exchanger 3; Second heat exchanger 4 does not work.
During work, first throttle mechanism 5 standard-sized sheet, the 3rd throttle mechanism 7 normally works.First cross valve 70 high voltage nodes 71 and the first cross valve 70 second node 74 that commutates communicates, and the first cross valve 70 first node 72 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.Second heat exchanger 4 does not work, but under being in the pressure of inspiration(Pi) of the second compressing mechanism 2 in defrost process, therefore cold-producing medium can not be stagnated wherein in defrost process; In addition, under the arrival end of the first compressing mechanism 1 and the port of export are also all in the pressure of inspiration(Pi) of the second compressing mechanism 2.
Its workflow is: after cold-producing medium is discharged from second compressing mechanism 2 port of export, successively through the 60 pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 second commutation node 74, 64 pipeline 64, First Heat Exchanger 3, first throttle mechanism 5, 58 pipeline 58, 3rd throttle mechanism 7, 3rd heat exchanger 8, 67 pipeline 67, second cross valve 80 second commutation node 84, second cross valve 80 low pressure node 83, 65 pipeline 65, 68 pipeline 68, get back to the second compressing mechanism 2 arrival end, enter the second compressing mechanism 2 to be compressed, complete a defrost cycle.
2) defrosting of the 3rd heat exchanger 8
In this kind of defrosting situation, the first compressing mechanism 1 normally works, and the second compressing mechanism 2 does not work; First Heat Exchanger 3, the 3rd heat exchanger 8 normally work, and the second heat exchanger 4 does not work.
In this kind of defrosting situation, First Heat Exchanger 3 draw heat from environment, the heat drawn, for the defrost of the 3rd heat exchanger 8; Second heat exchanger 4 does not work.
During work, first throttle mechanism 5 normally works, the 3rd throttle mechanism 7 standard-sized sheet.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 second node 84 that commutates communicates, and the second cross valve 80 first node 82 that commutates communicates with the second cross valve 80 low pressure node 83.Second heat exchanger 4 does not work, but under being in the pressure of inspiration(Pi) of the first compressing mechanism 1 in defrost process, therefore cold-producing medium can not be stagnated wherein in defrost process; In addition, under the arrival end of the second compressing mechanism 2 and the port of export are also all in the pressure of inspiration(Pi) of the first compressing mechanism 1.
Its workflow is: after cold-producing medium is discharged from first compressing mechanism 1 port of export, successively through the 62 pipeline 62, second cross valve 80 high voltage nodes 81, second cross valve 80 second commutation node 84, 67 pipeline 67, 3rd heat exchanger 8, 3rd throttle mechanism 7, 58 pipeline 58, first throttle mechanism 5, First Heat Exchanger 3, 64 pipeline 64, first cross valve 70 second commutation node 74, first cross valve 70 low pressure node 73, 65 pipeline 65, 63 pipeline 63, get back to the first compressing mechanism 1 arrival end, enter the first compressing mechanism 1 to be compressed, complete a defrost cycle.
Embodiment 4
As shown in Figure 5, the present embodiment is also a kind of operation of air conditioning systems with two heat source side heat exchangers, for there being the occasion of heat demand the whole year, such as: productive life hot water.Compared with scheme shown in embodiment 3 Fig. 4, scheme shown in Fig. 5 adds a liquid reservoir 50, second flow direction control valve 42, the 4th throttle mechanism 9 in systems in which.
Liquid reservoir 50 connected mode is in systems in which: on the 58 pipeline 58, be provided with a liquid reservoir 50, and first throttle mechanism 5 one end is connected with First Heat Exchanger 3, and first throttle mechanism 5 other end is connected with liquid reservoir 50 by the 58 pipeline 58; 3rd throttle mechanism 7 one end is connected with the 3rd heat exchanger 8, and the 3rd throttle mechanism 7 other end is also connected with liquid reservoir 50 by the 58 pipeline 58; First flow direction control valve 41 one end is connected with the second heat exchanger 4, and first flow direction control valve 41 other end is connected with liquid reservoir the 50 or the 58 pipeline 58 by the 52 pipeline 52.The method of attachment in systems in which of the above-described liquid reservoir 50 of the present embodiment, is also applicable to scheme described in all embodiments of the present invention.
The method of attachment of 4th throttle mechanism 9 in system (that is: air conditioner refrigerating of the present invention is standby) has following five kinds of modes:
1) the 4th throttle mechanism 9 one end is connected with liquid reservoir 50, and the 4th throttle mechanism 9 other end is connected (as shown in Figure 5) with the second vapor injection mouth of the first compressing mechanism 1.2) the 4th throttle mechanism 9 one end is connected with liquid reservoir 50, and the 4th throttle mechanism 9 other end is connected with the second vapor injection mouth of the second compressing mechanism 2.3) the 4th throttle mechanism 9 one end is connected with liquid reservoir 50, and the 4th throttle mechanism 9 other end is connected with the 65 pipeline 65.4) the 4th throttle mechanism 9 one end is connected with liquid reservoir 50, and the 4th throttle mechanism 9 other end is connected with the 63 pipeline 63.5) the 4th throttle mechanism 9 one end is connected with liquid reservoir 50, and the 4th throttle mechanism 9 other end is connected with the 68 pipeline 68.
Above-described 4th throttle mechanism 9 method of attachment in systems in which of the present embodiment, is also applicable to scheme described in all embodiments of the present invention.
As shown in Figure 5, second flow direction control valve 42 connected mode is in systems in which: the second flow direction control valve 42 is arranged on the 65 pipeline 65, and second flow direction control valve 42 one end is connected with the 63 pipeline 63, second flow direction control valve 42 other end is connected with the 68 pipeline 68.
In the course of work, when the second flow direction control valve 42 open, the 4th throttle mechanism 9 close time, scheme shown in Fig. 5 also can realize all functions of scheme shown in embodiment 3 Fig. 4, and when realizing identical function, workflow is also identical.
In the course of work, when the second flow direction control valve 42 is closed, scheme shown in Fig. 5, under heat-production functions, can realize utilizing two different evaporating temperatures, the simultaneously object of draw heat from two temperature different low-temperature heat source, reach energy-conservation object.Now, the first compressing mechanism 1, second compressing mechanism 2 all normally works, and all adopts variable conpacitance compressor structure, such as: frequency-changeable compressor; In the course of work, the first compressing mechanism 1, second compressing mechanism 2 is absorbed heat from two low-temperature heat sources with different evaporating temperatures respectively by the method changing operating frequency.
As shown in Figure 5, during work, the second flow direction control valve 42 is closed; First compressing mechanism 1, second compressing mechanism 2 all normally works; First throttle mechanism 5, the 3rd throttle mechanism 7, the 4th throttle mechanism 9 also all normally work.3rd heat exchanger 8 absorbs heat from the lower low-temperature heat source of temperature; First Heat Exchanger 3 absorbs heat from the higher low-temperature heat source of temperature; From the heat that two low-temperature heat sources are drawn, all pass through the second heat exchanger 4 for being user's heat supply; First flow direction control valve 41 equally substitute by the 3rd check valve 23.Whole workflow is as follows: from the second heat exchanger 4 cold-producing medium out, successively through the 3rd check valve 23 arrival end, the 3rd check valve 23 port of export, the 52 pipeline 52, is divided into three tunnels after entering liquid reservoir 50; First via cold-producing medium, after the 4th throttle mechanism 9 is become intermediate pressure by throttling, enters the second vapor injection mouth of the first compressing mechanism 1 through the 66 pipeline 66; Second road cold-producing medium is after the 58 pipeline 58, enter the 3rd throttle mechanism 7 and become low pressure by throttling, then, successively through the 3rd heat exchanger the 8, the 67 pipeline 67, second cross valve 80 second commutation node 84, second cross valve 80 low pressure node the 83, the 65 pipeline the 65, the 63 pipeline 63, enter the first compressing mechanism 1 and be compressed into intermediate pressure, again with the first via refrigerant mixed entering the first compressing mechanism 1 from middle gas supplementing opening, then continue to be compressed into high-pressure refrigerant; After high-pressure refrigerant is discharged from first compressing mechanism 1 port of export, successively through the 62 pipeline 62, second cross valve 80 high voltage nodes 81, second cross valve 80 first commutation node the 82, the 51 pipeline 51, enter the 61 pipeline 61; 3rd road cold-producing medium is equally after the 58 pipeline 58, enter during first throttle mechanism 5 is become by throttling and press, then, again successively through First Heat Exchanger the 3, the 64 pipeline 64, first cross valve 70 second commutation node 74, first cross valve 70 low pressure node the 73, the 65 pipeline the 65, the 68 pipeline 68, enter the second compressing mechanism 2 and be compressed into into high-pressure refrigerant; After high-pressure refrigerant is discharged from second compressing mechanism 2 port of export, successively through the 60 pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 first commutation node the 72, the 51 pipeline 51, also enter the 61 pipeline 61; Two-way cold-producing medium after the 61 pipeline 61 mixes, then enters the second heat exchanger 4, so far completes and once circulates.
Embodiment 5
As shown in Figure 6, the present embodiment is also a kind of operation of air conditioning systems with two heat source side heat exchangers, for there being the occasion of heat demand the whole year, such as: productive life hot water.Compared with scheme shown in embodiment 3 Fig. 4, scheme shown in Fig. 6 adds the 4th check valve 24, the 5th check valve 25 in systems in which.As shown in Figure 6, now, 4th check valve 24, the 5th check valve 25 connected mode are in systems in which: the 4th check valve 24 arrival end is connected by the 51 pipeline 51 and the second cross valve 80 first node 82 that commutates, 4th check valve 24 port of export is connected with the 5th check valve 25 port of export with the 61 pipeline 61 simultaneously, and the 5th check valve 25 arrival end and the first cross valve 70 first node 72 that commutates is connected.
4th check valve 24, the connected mode of the 5th check valve 25 in system shown in Figure 6 are also applicable to scheme shown in embodiments of the invention 4 Fig. 5.
This operation of air conditioning systems, in whole year operation process, can be implemented as user's heat supply equally.During work, First Heat Exchanger 3, the 3rd heat exchanger 8 are all heat source side heat exchangers, as evaporimeter, from environment, absorb heat; Second heat exchanger 4 is user side heat exchangers, as condenser, is user's heat supply, such as: productive life hot water.
Workflow under each function is as described below respectively.
(1) heat-production functions
Scheme one: the first compressing mechanism 1 normally works, and the second compressing mechanism 2 does not work; First Heat Exchanger 3 does not work, and the second heat exchanger 4, the 3rd heat exchanger 8 normally work.
Under this scheme, the 3rd heat exchanger 8 draw heat from environment, the heat drawn, for being user's heat supply in the second heat exchanger 4, First Heat Exchanger 3 does not work.
During work, first throttle mechanism 5 closes, and the 3rd throttle mechanism 7 normally works.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: after cold-producing medium is discharged from first compressing mechanism 1 port of export, successively through the 62 pipeline 62, second cross valve 80 high voltage nodes 81, second cross valve 80 first commutation node 82, 51 pipeline 51, 4th check valve 24 arrival end, 4th check valve 24 port of export, 61 pipeline 61, second heat exchanger 4, 3rd check valve 23, 52 pipeline 52, 58 pipeline 58, 3rd throttle mechanism 7, 3rd heat exchanger 8, 67 pipeline 67, second cross valve 80 second commutation node 84, second cross valve 80 low pressure node 83, 65 pipeline 65, 63 pipeline 63, get back to the first compressing mechanism 1 arrival end, enter the first compressing mechanism 1 to be compressed, complete and once circulate.
Scheme two: the first compressing mechanism 1 does not work, and the second compressing mechanism 2 normally works; 3rd heat exchanger 8 does not work, and First Heat Exchanger 3, second heat exchanger 4 normally works.
Under this scheme, First Heat Exchanger 3 draw heat from environment, the heat drawn, for being user's heat supply in the second heat exchanger 4, the 3rd heat exchanger 8 does not work.
During work, first throttle mechanism 5 normally works, and the 3rd throttle mechanism 7 cuts out.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: after cold-producing medium is discharged from second compressing mechanism 2 port of export, successively through the 60 pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 first commutation node 72, 5th check valve 25 arrival end, 5th check valve 25 port of export, 61 pipeline 61, second heat exchanger 4, 3rd check valve 23, 52 pipeline 52, 58 pipeline 58, first throttle mechanism 5, First Heat Exchanger 3, 64 pipeline 64, first cross valve 70 second commutation node 74, first cross valve 70 low pressure node 73, 65 pipeline 65, 68 pipeline 68, get back to the second compressing mechanism 2 arrival end, enter the second compressing mechanism 2 to be compressed, complete and once circulate.
Scheme three: the first compressing mechanism 1, second compressing mechanism 2 all normally works; First Heat Exchanger 3, second heat exchanger 4, the 3rd heat exchanger 8 also all normally work.
Under this scheme, First Heat Exchanger 3, the 3rd heat exchanger 8 draw heat from environment, the heat drawn, for being user's heat supply in the second heat exchanger 4.
During work, first throttle mechanism 5, the 3rd throttle mechanism 7 normally work.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: the cold-producing medium entering the 65 pipeline 65 is divided into two-way; The first via is after the 68 pipeline 68, enter the second compressing mechanism 2 to be compressed, after discharging from second compressing mechanism 2 port of export, successively through the 60 commutation of pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 first node 72, the 5th check valve 25 arrival end, the 5th check valve 25 port of export, enter the 61 pipeline 61; Second tunnel is after the 63 pipeline 63, enter the first compressing mechanism 1 to be compressed, after discharging from first compressing mechanism 1 port of export, successively through the 62 pipeline 62, second cross valve 80 high voltage nodes 81, second cross valve 80 first commutation node the 82, the 51 pipeline 51, the 4th check valve 24 arrival end, the 4th check valve 24 port of export, also enter the 61 pipeline 61; Two-way, after the 61 pipeline 61 mixes, successively through the second heat exchanger 4, the 3rd check valve the 23, the 52 pipeline 52, enters the 58 pipeline 58 and is divided into two-way; The first via through the 3rd throttle mechanism 7, the 3rd heat exchanger the 8, the 67 pipeline 67, second cross valve 80 second commutation node 84, second cross valve 80 low pressure node 83, enters the 65 pipeline 65 successively; Second tunnel through first throttle mechanism 5, First Heat Exchanger the 3, the 64 pipeline 64, first cross valve 70 second commutation node 74, first cross valve 70 low pressure node 73, also enters the 65 pipeline 65 successively; Two-way, after the 65 pipeline 65 mixes, is divided into two-way again; The first via, through the 63 pipeline 63, gets back to again the first compressing mechanism 1 arrival end; Second tunnel, through the 68 pipeline 68, is got back to again the second compressing mechanism 2 arrival end, is so far completed and once circulate.
(2) winter frost removing function
1) defrosting of First Heat Exchanger 3
In this kind of defrosting situation, the first compressing mechanism 1 does not work, and the second compressing mechanism 2 normally works; First Heat Exchanger 3, the 3rd heat exchanger 8 normally work, and the second heat exchanger 4 does not work.
In this kind of defrosting situation, the 3rd heat exchanger 8 draw heat from environment, the heat drawn, for the defrost of First Heat Exchanger 3; Second heat exchanger 4 does not work.
During work, first throttle mechanism 5 standard-sized sheet, the 3rd throttle mechanism 7 normally works.First cross valve 70 high voltage nodes 71 and the first cross valve 70 second node 74 that commutates communicates, and the first cross valve 70 first node 72 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 first node 82 that commutates communicates, and the second cross valve 80 second node 84 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: after cold-producing medium is discharged from second compressing mechanism 2 port of export, successively through the 60 pipeline 60, first cross valve 70 high voltage nodes 71, first cross valve 70 second commutation node 74, 64 pipeline 64, First Heat Exchanger 3, first throttle mechanism 5, 58 pipeline 58, 3rd throttle mechanism 7, 3rd heat exchanger 8, 67 pipeline 67, second cross valve 80 second commutation node 84, second cross valve 80 low pressure node 83, 65 pipeline 65, 68 pipeline 68, get back to the second compressing mechanism 2 arrival end, enter the second compressing mechanism 2 to be compressed, complete a defrost cycle.
In this course of work, be: during work that, due to the non-return effect of the 4th check valve 24, the 5th check valve 25, in defrost process, the second heat exchanger 4 still maintains a higher pressure with the difference of scheme shown in embodiment 3 Fig. 4.
2) defrosting of the 3rd heat exchanger 8
In this kind of defrosting situation, the first compressing mechanism 1 normally works, and the second compressing mechanism 2 does not work; First Heat Exchanger 3, the 3rd heat exchanger 8 normally work, and the second heat exchanger 4 does not work.
In this kind of defrosting situation, First Heat Exchanger 3 draw heat from environment, the heat drawn, for the defrost of the 3rd heat exchanger 8; Second heat exchanger 4 does not work.
During work, first throttle mechanism 5 normally works, the 3rd throttle mechanism 7 standard-sized sheet.First cross valve 70 high voltage nodes 71 and the first cross valve 70 first node 72 that commutates communicates, and the first cross valve 70 second node 74 that commutates communicates with the first cross valve 70 low pressure node 73.Second cross valve 80 high voltage nodes 81 and the second cross valve 80 second node 84 that commutates communicates, and the second cross valve 80 first node 82 that commutates communicates with the second cross valve 80 low pressure node 83.
Its workflow is: after cold-producing medium is discharged from first compressing mechanism 1 port of export, successively through the 62 pipeline 62, second cross valve 80 high voltage nodes 81, second cross valve 80 second commutation node 84, 67 pipeline 67, 3rd heat exchanger 8, 3rd throttle mechanism 7, 58 pipeline 58, first throttle mechanism 5, First Heat Exchanger 3, 64 pipeline 64, first cross valve 70 second commutation node 74, first cross valve 70 low pressure node 73, 65 pipeline 65, 63 pipeline 63, get back to the first compressing mechanism 1 arrival end, enter the first compressing mechanism 1 to be compressed, complete a defrost cycle.
In this course of work, be: during work that, due to the non-return effect of the 4th check valve 24, the 5th check valve 25, in defrost process, the second heat exchanger 4 also maintains a higher pressure with the difference of scheme shown in embodiment 3 Fig. 4.
Scheme shown in Fig. 7 is the improvement project of scheme shown in Fig. 6, and compared with scheme shown in Fig. 6, in scheme shown in Fig. 7, not arranging the 3rd check valve 23, second heat exchanger 4 is directly be connected with the 58 pipeline 58 by the 52 pipeline 52.Scheme shown in Fig. 7 also can realize all functions of scheme shown in Fig. 6, and workflow when realizing identical is identical.
In the scheme of the above-mentioned all embodiments of the present invention, any one check valve in described first check valve 21, second check valve 22, the 3rd check valve 23, the 4th check valve 24, the 5th check valve 25 can both adopt magnetic valve, any one in have the throttle mechanism of turn-off function (such as: electric expansion valve) or flow control device substitutes.Second flow direction control valve 42 can adopt magnetic valve, or other has the flow control device of turn-off function.
In the scheme of the above-mentioned all embodiments of the present invention, the while of any one or two in first compressing mechanism 1, second compressing mechanism 2, can adopt in following compressor any one: screw compressor, helical-lobe compressor, rolling rotor compressor, sliding-vane compressor, rotary blade type compressor, centrifugal compressor, digital scroll compressor; The while of any one or two in first compressing mechanism 1, second compressing mechanism 2, also can be variable conpacitance compressor (such as: frequency-changeable compressor, digital scroll compressor), or constant speed compressor.
In the scheme of the above-mentioned all embodiments of the present invention, the compressor bank that the first compressing mechanism 1, second compressing mechanism 2 can also be made up of at least two variable conpacitance compressors, or the compressor bank be made up of at least two constant speed compressors; In addition, the first compressing mechanism 1, second compressing mechanism 2 also can be the compressor bank of at least one variable conpacitance compressor and at least one constant speed compressor composition.
In the scheme of the above-mentioned all embodiments of the present invention, any one in First Heat Exchanger 3, second heat exchanger 4 or the 3rd heat exchanger 8, except can being refrigerant-air heat exchanger, also can be the heat exchanger of cold-producing medium-water-to-water heat exchanger or other kind; During as cold-producing medium-water-to-water heat exchanger, can adopt in volumetric heat exchanger, plate type heat exchanger, shell and tube exchanger or double pipe heat exchanger any one.When any one in First Heat Exchanger 3, second heat exchanger 4 or the 3rd heat exchanger 8 is as refrigerant-air heat exchanger, usual employing finned heat exchanger, the fin of described finned heat exchanger is generally aluminum or aluminum alloy material, and the occasion special at some also uses copper material.
In the scheme of the above-mentioned all embodiments of the present invention, in first throttle mechanism 5, second throttle body 6, the 3rd throttle mechanism 7, the 4th throttle mechanism 9 one or more, even all throttle mechanisms can both adopt the throttle mechanism (such as: electric expansion valve) with turn-off function substitute.
In the scheme of the above-mentioned all embodiments of the present invention, described all pipelines are all copper pipes.
Claims (10)
1. an operation of air conditioning systems, comprise the first compressing mechanism (1), the first cross valve (70), the second cross valve (80), First Heat Exchanger (3), the second heat exchanger (4), the 3rd heat exchanger (8), first throttle mechanism (5), the 3rd throttle mechanism (7), the first flow direction control valve (41), it is characterized in that: this operation of air conditioning systems also comprises the second compressing mechanism (2); the low pressure node (73) of described first cross valve (70) is connected by the low pressure node (83) of the 65 pipeline (65) with described second cross valve (80), the high voltage nodes (71) of described first cross valve (70) is successively by the 60 pipeline (60), second compressing mechanism (2) port of export, second compressing mechanism (2) arrival end, the 65 pipeline (65) between the low pressure node (73) of the 68 pipeline (68) and described first cross valve (70) and the low pressure node (83) of the second cross valve (80) is connected, the high voltage nodes (81) of described second cross valve (80) is successively by the 62 pipeline (62), first compressing mechanism (1) port of export, first compressing mechanism (1) arrival end, 63 pipeline (63) is also connected with the 65 pipeline (65) between the low pressure node (73) of described first cross valve (70) and the low pressure node (83) of the second cross valve (80), second commutation node (84) of described second cross valve (80) is successively by the 67 pipeline (67), 3rd heat exchanger (8), 3rd throttle mechanism (7), 58 pipeline (58), first throttle mechanism (5), First Heat Exchanger (3), 64 pipeline (64) and second of described first cross valve (70) node (74) that commutates is connected, first commutation node (82) of described second cross valve (80) is connected by the 51 pipeline (51) and first of described first cross valve (70) node (72) that commutates, one end of described second heat exchanger (4) is successively by the first flow direction control valve (41), 52 pipeline (52) is connected with the 58 pipeline (58) between described first throttle mechanism (5) and the 3rd throttle mechanism (7), the other end of described second heat exchanger (4) is connected by commutate the first the 51 pipeline (51) commutated between node (82) of node (72) and the second cross valve (80) of the 61 pipeline (61) and first of described first cross valve (70).
2. operation of air conditioning systems according to claim 1, it is characterized in that described first flow direction control valve (41) substitute by second throttle body (6).
3. operation of air conditioning systems according to claim 1, it is characterized in that described first flow direction control valve (41) substitute by the 3rd check valve (23), and the 3rd check valve (23) port of export is connected with the 52 pipeline (52), the 3rd check valve (23) arrival end is connected with the second heat exchanger (4).
4. operation of air conditioning systems according to claim 1, it is characterized in that being provided with the 4th check valve (24) and the 5th check valve (25) on described 51 pipeline (51), described 4th check valve (24) arrival end is connected by the 51 pipeline (51) and first of the second cross valve (80) node (82) that commutates, described 4th check valve (24) port of export is connected with the 61 pipeline (61) with described 5th check valve (25) port of export simultaneously, described 5th check valve (25) port of export and first of the second cross valve (80) node (82) that commutates is connected.
5. an operation of air conditioning systems, comprise the first compressing mechanism (1), the first cross valve (70), the second cross valve (80), First Heat Exchanger (3), the second heat exchanger (4), the 3rd heat exchanger (8), first throttle mechanism (5), the 3rd throttle mechanism (7), the 4th check valve (24) and the 5th check valve (25), it is characterized in that: this operation of air conditioning systems also comprises the second compressing mechanism (2); the low pressure node (73) of described first cross valve (70) is connected by the low pressure node (83) of the 65 pipeline (65) with described second cross valve (80), the high voltage nodes (71) of described first cross valve (70) is successively by the 60 pipeline (60), second compressing mechanism (2) port of export, second compressing mechanism (2) arrival end, the 65 pipeline (65) between the low pressure node (73) of the 68 pipeline (68) and described first cross valve (70) and the low pressure node (83) of the second cross valve (80) is connected, the high voltage nodes (81) of described second cross valve (80) is successively by the 62 pipeline (62), first compressing mechanism (1) port of export, first compressing mechanism (1) arrival end, 63 pipeline (63) is also connected with the 65 pipeline (65) between the low pressure node (73) of described first cross valve (70) and the low pressure node (83) of the second cross valve (80), second commutation node (84) of described second cross valve (80) is successively by the 67 pipeline (67), 3rd heat exchanger (8), 3rd throttle mechanism (7), 58 pipeline (58), first throttle mechanism (5), First Heat Exchanger (3), 64 pipeline (64) and second of described first cross valve (70) node (74) that commutates is connected, first commutation node (82) of described second cross valve (80) is successively by the 51 pipeline (51), 4th check valve (24) arrival end, 4th check valve (24) port of export, 5th check valve (25) port of export, 5th check valve (25) arrival end and first of described first cross valve (70) node (72) that commutates is connected, one end of described second heat exchanger (4) is connected with the 58 pipeline (58) between described first throttle mechanism (5) and the 3rd throttle mechanism (7) by the 52 pipeline (52), the other end of described second heat exchanger (4) is connected with the pipeline between described 4th check valve (24) port of export and the 5th check valve (25) port of export by the 61 pipeline (61).
6. according to the operation of air conditioning systems in claim 1 and 5 described in arbitrary claim, it is characterized in that one first check valve (21) arrival end is connected with the first compressing mechanism (1) port of export, described first check valve (21) port of export is connected with the 62 pipeline (62), one second check valve (22) arrival end is connected with the second compressing mechanism (2) port of export, and described second check valve (22) port of export is connected with the 60 pipeline (60).
7. according to the operation of air conditioning systems in claim 1 and 5 described in arbitrary claim, it is characterized in that one second flow direction control valve (42) is arranged on the 65 pipeline, and the second flow direction control valve (42) one end is connected with the 63 pipeline, the second flow direction control valve (42) other end is connected with the 68 pipeline.
8., according to the operation of air conditioning systems in claim 1 and 5 described in arbitrary claim, any one that it is characterized in that in described first throttle mechanism (5), the 3rd throttle mechanism (7) is electric expansion valve.
9. operation of air conditioning systems according to claim 2, is characterized in that described second throttle body (6) is electric expansion valve.
10. operation of air conditioning systems according to claim 7, is characterized in that described the second flow direction control valve (42) is magnetic valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410779491.4A CN104534722B (en) | 2014-12-08 | 2014-12-08 | Operation of air conditioning systems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410779491.4A CN104534722B (en) | 2014-12-08 | 2014-12-08 | Operation of air conditioning systems |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104534722A true CN104534722A (en) | 2015-04-22 |
CN104534722B CN104534722B (en) | 2017-10-20 |
Family
ID=52850296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410779491.4A Active CN104534722B (en) | 2014-12-08 | 2014-12-08 | Operation of air conditioning systems |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104534722B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104879944A (en) * | 2015-05-26 | 2015-09-02 | 珠海格力电器股份有限公司 | Heat pump air conditioner and control method thereof |
CN105091436A (en) * | 2015-08-26 | 2015-11-25 | 珠海格力电器股份有限公司 | Air conditioning unit and heating and defrosting method thereof |
CN105444453A (en) * | 2015-12-18 | 2016-03-30 | 珠海格力电器股份有限公司 | Double-temperature refrigerating and heating system |
CN106524588A (en) * | 2016-10-22 | 2017-03-22 | 刘雄 | Heat pump air conditioning equipment |
CN115200194A (en) * | 2022-08-12 | 2022-10-18 | 宁波奥克斯电气股份有限公司 | Control method and device for outdoor unit of multi-split air conditioner, air conditioner and medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070051635A (en) * | 2005-11-15 | 2007-05-18 | 삼성전자주식회사 | Compressor distributing apparatus and refrigerator |
CN102128511A (en) * | 2011-04-04 | 2011-07-20 | 刘雄 | Double heat source heat pump air-conditioning equipment |
CN102506520A (en) * | 2011-10-31 | 2012-06-20 | 刘雄 | Refrigeration equipment of air conditioner |
CN203464560U (en) * | 2012-09-24 | 2014-03-05 | 刘雄 | Air conditioning refrigeration equipment |
CN204285906U (en) * | 2014-12-08 | 2015-04-22 | 刘雄 | Operation of air conditioning systems |
-
2014
- 2014-12-08 CN CN201410779491.4A patent/CN104534722B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070051635A (en) * | 2005-11-15 | 2007-05-18 | 삼성전자주식회사 | Compressor distributing apparatus and refrigerator |
CN102128511A (en) * | 2011-04-04 | 2011-07-20 | 刘雄 | Double heat source heat pump air-conditioning equipment |
CN102506520A (en) * | 2011-10-31 | 2012-06-20 | 刘雄 | Refrigeration equipment of air conditioner |
CN203464560U (en) * | 2012-09-24 | 2014-03-05 | 刘雄 | Air conditioning refrigeration equipment |
CN204285906U (en) * | 2014-12-08 | 2015-04-22 | 刘雄 | Operation of air conditioning systems |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104879944A (en) * | 2015-05-26 | 2015-09-02 | 珠海格力电器股份有限公司 | Heat pump air conditioner and control method thereof |
CN105091436A (en) * | 2015-08-26 | 2015-11-25 | 珠海格力电器股份有限公司 | Air conditioning unit and heating and defrosting method thereof |
CN105444453A (en) * | 2015-12-18 | 2016-03-30 | 珠海格力电器股份有限公司 | Double-temperature refrigerating and heating system |
CN106524588A (en) * | 2016-10-22 | 2017-03-22 | 刘雄 | Heat pump air conditioning equipment |
CN106524588B (en) * | 2016-10-22 | 2021-04-02 | 刘雄 | Heat pump air conditioning equipment |
CN115200194A (en) * | 2022-08-12 | 2022-10-18 | 宁波奥克斯电气股份有限公司 | Control method and device for outdoor unit of multi-split air conditioner, air conditioner and medium |
CN115200194B (en) * | 2022-08-12 | 2023-08-04 | 宁波奥克斯电气股份有限公司 | Control method and device of outdoor unit of multi-split air conditioner, air conditioner and medium |
Also Published As
Publication number | Publication date |
---|---|
CN104534722B (en) | 2017-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201407759Y (en) | Heat pipe energy recovery type fresh air handling unit | |
CN102506520B (en) | Refrigeration equipment of air conditioner | |
CN103471296B (en) | Operation of air conditioning systems | |
CN102645060A (en) | Multi-split air conditioning system | |
CN104534722A (en) | Air conditioning refrigeration equipment | |
CN101398234A (en) | Low-temperature air-cooling heat pump unit | |
CN102418971B (en) | Dual heat source heat pump air conditioning equipment | |
CN204285906U (en) | Operation of air conditioning systems | |
CN112066583B (en) | Air conditioning unit with double heat sources and control method thereof | |
CN203286825U (en) | Defrosting device of air source heat pump | |
CN204438597U (en) | Heat-pump apparatus | |
CN102338503A (en) | Air-conditioning refrigeration equipment | |
CN202581918U (en) | Air conditioning refrigeration equipment | |
CN104848591A (en) | Modular heat pump | |
CN103245150B (en) | Air source heat pump defrosting device | |
CN204612244U (en) | Modular heat pump | |
CN102116541B (en) | Refrigerating device | |
CN104457047A (en) | Refrigeration equipment for air conditioner | |
CN204438618U (en) | Operation of air conditioning systems | |
CN104501461A (en) | Heat pump device | |
CN209877423U (en) | Three-way flow direction conversion device for refrigerant | |
CN106524588B (en) | Heat pump air conditioning equipment | |
CN202581926U (en) | Refrigeration equipment of air conditioner | |
CN204006791U (en) | Operation of air conditioning systems | |
CN102853580B (en) | Operation of air conditioning systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |