CN109138394A - Construction of prevention work platform for skyscraper - Google Patents

Construction of prevention work platform for skyscraper Download PDF

Info

Publication number
CN109138394A
CN109138394A CN201811219513.6A CN201811219513A CN109138394A CN 109138394 A CN109138394 A CN 109138394A CN 201811219513 A CN201811219513 A CN 201811219513A CN 109138394 A CN109138394 A CN 109138394A
Authority
CN
China
Prior art keywords
fixed
screw rod
skyscraper
construction
work platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811219513.6A
Other languages
Chinese (zh)
Inventor
闫金亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuyang Jinliang Coatings Co Ltd
Original Assignee
Fuyang Jinliang Coatings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuyang Jinliang Coatings Co Ltd filed Critical Fuyang Jinliang Coatings Co Ltd
Priority to CN201811219513.6A priority Critical patent/CN109138394A/en
Publication of CN109138394A publication Critical patent/CN109138394A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses the construction of prevention work platforms for skyscraper, including pedestal, the pedestal upper end is fixed with support column and protective shell, upper end of support column is fixed with top plate, top plate lower end is equipped with pulley one and pulley two, motor two is fixed in protective shell, crust of the device is fixed with mounting plate close to one end face of support column, mounting plate upper end is fixed with motor one and screw rod two, the output shaft and screw rod one of motor one are rotatablely connected, screw rod one is fixedly connected by connecting rod one with sunshading board, second sliding block is installed on screw rod two, second sliding block is fixedly connected by connecting rod two with protective plate, energy-saving effect of the present invention is good, it is easy to operate, stability is good, conveniently moving.

Description

Construction of prevention work platform for skyscraper
Technical field
The present invention relates to construction of prevention work platform technology fields, more particularly, to the construction of prevention work platform of skyscraper.
Background technique
Operation platform refers to that construction site is worker operation and solves vertically and horizontally to transport the external protection facility set up. The generic term of architecture field refers to and is used in exterior wall, interior decoration or the higher place that can not directly construct of layer height on construction site.It is high The intelligent elevated platform making material of layer construction is made by clean steel material, and external protection net is made by clad steel silk screen, is effectively reduced The accident of falling at high altitude rate, thoroughly prevents fire.
The present invention is relative to application No. is patent document disclosed in 20172045.3, and the present invention is to sunshading board and protective plate Control faster intelligence, and in the patent case of application number 20172045.3, sun-shading protective mechanism while carrying out sunshade, Also staff is sealed in platform body, staff can not work, to make construction efficiency reduce, and cannot Sunlight is subjected to absorption power generation, to solve the above-mentioned problems, now releases the construction of prevention work platform of skyscraper.
Summary of the invention
The purpose of the present invention is to solve existing operation platform shaded effects are poor, energy consumption is high, cumbersome problem, and The construction of prevention work platform for skyscraper proposed.
To achieve the goals above, present invention employs following technical solutions:
It is fixed with top plate for skyscraper upper end, top plate lower end is equipped with pulley one and pulley two, consolidates in protective shell Surely there is motor two, crust of the device is fixed with mounting plate close to one end face of support column, and mounting plate upper end is fixed with motor one and silk Bar two, the output shaft and screw rod one of motor one are rotatablely connected, and screw rod one is fixedly connected by connecting rod one with sunshading board, on screw rod two Second sliding block is installed, the second sliding block is fixedly connected by connecting rod two with protective plate.
Preferably, described device shell lower end is fixed with bottom plate, and the bottom plate is slidably connected by sliding rail and support column.
Preferably, the screw rod one and screw rod two are symmetricly set on crust of the device rear and front end, the screw rod one and Sprocket wheel is mounted on screw rod two, two sprocket wheels are connected by chain.
Preferably, the protective plate is fixedly connected with motion bar one end, in the motion bar other end and hollow gag lever post Wall is slidably connected, and hollow gag lever post is fixed on crust of the device front end face.
Preferably, the top plate upper end is fixed with hydraulic cylinder, and hydraulic cylinder upper end passes through elevating lever and solar energy photovoltaic panel Lower end is hinged, and the solar energy photovoltaic panel and top plate are hinged, and the chassis interior is fixed with inverter, distribution box and counterweight Block, the solar energy photovoltaic panel and inverter are electrically connected, and the inverter and distribution box are electrically connected, the distribution box and electricity Machine one, motor two and hydraulic cylinder are electrically connected.
Preferably, the pedestal lower end is symmetrically fixed with several self-locking shape universal wheels.
Preferably, described device case nose offers square aperture, and connecting rod one passes through square aperture and fixes with sunshading board Connection.
Preferably, the sunshading board rear end is slidably connected with crust of the device inner wall.
Preferably, the output shaft of the motor two and unreeling shaft are rotatablely connected, and unreeling shaft is fixedly connected with rope one end, are restricted The rope other end passes sequentially through pulley two and pulley one is fixedly connected with crust of the device upper end.
The beneficial effects of the present invention are: the design is realized by being added to solar energy photovoltaic panel, inverter and distribution box Solar energy is changed into electric energy, has reached energy-efficient effect, and by hydraulic cylinder, is realized to solar energy photovoltaic panel light angle It is adjusted, to improve the working efficiency of solar energy photovoltaic panel.
By being added to motor one, screw rod one, screw rod two, the first sliding block and the second sliding block, which is convenient for sunshade Plate and protective plate are quickly adjusted, swift and convenient to operate.
By being added to self-locking shape universal wheel, which moves the present invention convenient for staff, by being added to Clump weight, should who convenient for improve pedestal stability.
In conclusion energy-saving effect of the present invention is good, easy to operate, stability is good, conveniently moving.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the construction of prevention work platform proposed by the present invention for skyscraper;
Fig. 2 is the structural schematic diagram of crust of the device in the construction of prevention work platform proposed by the present invention for skyscraper;
Fig. 3 is the rearview of crust of the device in the construction of prevention work platform proposed by the present invention for skyscraper;
Fig. 4 is the cross-sectional view of pedestal in the construction of prevention work platform proposed by the present invention for skyscraper;
Fig. 5 is the cross-sectional view of protective shell in the construction of prevention work platform proposed by the present invention for skyscraper.
In figure: 1 elevating lever, 2 hydraulic cylinders, 3 pulleys one, 4 connecting rods one, 5 sunshading boards, 6 screw rods one, 7 motors one, 8 first are sliding Block, 9 bottom plates, 10 pedestals, 11 motors two, 12 protective shells, 13 pulleys two, 14 top plates, 15 solar energy photovoltaic panels, 16 support columns, 17 Square aperture, 18 protective plates, 19 motion bars, 20 hollow gag lever posts, 21 mounting plates, 22 unreeling shafts, 23 crusts of the device, 24 screw rods Two, 25 second sliding blocks, 26 connecting rods two, 27 inverters, 28 clump weights, 29 distribution boxs.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-5, for the construction of prevention work platform of skyscraper, including pedestal 10,10 upper end of pedestal is fixed with support Column 16 and protective shell 12,16 upper end of support column are fixed with top plate 14, and 14 lower end of top plate is equipped with pulley 1 and pulley two 13, motor 2 11 is fixed in protective shell 12, and crust of the device 23 is fixed with mounting plate 21, mounting plate close to 16 1 end face of support column 21 upper ends are fixed with motor 1 and screw rod 2 24, and the output shaft and screw rod 1 of motor 1 are rotatablely connected, and screw rod 1 passes through Connecting rod 1 is fixedly connected with sunshading board 5, is equipped with the second sliding block 25 on screw rod 2 24, the second sliding block 25 by connecting rod 2 26 with Protective plate 18 is fixedly connected.
In the present embodiment, 23 lower end of crust of the device is fixed with bottom plate 9, and bottom plate 9 is slidably connected by sliding rail with support column 16, Screw rod 1 and screw rod 2 24 are symmetricly set on 23 rear and front end of crust of the device, are mounted on screw rod 1 and screw rod 2 24 Sprocket wheel, two sprocket wheels are connected by chain, and protective plate 18 is fixedly connected with 19 one end of motion bar, 19 other end of motion bar and sky 20 inner wall of heart gag lever post is slidably connected, and hollow gag lever post 20 is fixed on 23 front end face of crust of the device, and 14 upper end of top plate is fixed with Hydraulic cylinder 2, and 2 upper end of hydraulic cylinder is hinged by elevating lever 1 and 15 lower end of solar energy photovoltaic panel, solar energy photovoltaic panel 15 and top plate 14 is hinged, and inverter 27, distribution box 29 and clump weight 28, solar energy photovoltaic panel 15 and inverter 27 are fixed with inside pedestal 10 It is electrically connected, inverter 27 and distribution box 29 are electrically connected, and distribution box 29 and motor 1, motor 2 11 and hydraulic cylinder 2 are electrically Connection, 10 lower end of pedestal are symmetrically fixed with several self-locking shape universal wheels, and 23 front end of crust of the device offers square aperture 17, even Bar 1 passes through square aperture 17 and is fixedly connected with sunshading board 5, and 5 rear end of sunshading board is slidably connected with 23 inner wall of crust of the device, motor 2 11 output shaft and unreeling shaft 22 is rotatablely connected, and unreeling shaft 22 is fixedly connected with rope one end, and the rope other end passes sequentially through Pulley 2 13 and pulley 1 are fixedly connected with 23 upper end of crust of the device.
Working principle: staff enters in crust of the device 23 first, then starts motor 1, one 7 work belt of motor Dynamic screw rod 1 rotates, and the rotation of screw rod 1 drives the first sliding block 8 mobile to separate 16 direction of support column, and the first sliding block 8 is mobile logical It crosses connecting rod 1 and drives the movement of sunshading board 5, thus by inside 5 moving-out device shell 23 of sunshading board, so that the effect of sunshade is played, And the rotation of screw rod 1 is rotated by sprocket wheel and chain-driving screw rod 2 24, the rotation of screw rod 2 24 drive the second sliding block 25 to It is mobile close to 16 direction of support column, to drive protective plate 18 mobile to 23 direction of crust of the device by connecting rod 2 26, thus will Protective plate 18 covers on crust of the device 23, and so as to protect the safety of staff, then staff starts motor 2 11, The work of motor 2 11 drives crust of the device 23 to move up by rope, and 23 height of crust of the device is adjusted to realize, Consequently facilitating staff constructs to skyscraper, staff starts hydraulic cylinder 2, liquid according to sunlight direction of illumination The work of cylinder pressure 2 drives elevating lever 1 to move up and down, and elevating lever 1, which moves up and down, drives 15 one end of solar energy photovoltaic panel to move up and down, from And solar energy photovoltaic panel 15 is enable to receive more sunlights, solar energy photovoltaic panel 15 receives solar energy, and too by receiving Sun can be converted into electric energy, and electric energy is transmitted to inverter 27, and the direct current received is changed into alternating current by the work of inverter 27, And by alternating current be transmitted to distribution box 29 carry out electric energy storage, distribution box 29 by the electric energy of storage be transmitted to motor 1, motor 2 11 with And hydraulic cylinder 2, realization charge to it, by being added to solar energy photovoltaic panel 15, inverter 27 and distribution box 29, this is set Meter, which is realized, is changed into electric energy for solar energy, has reached energy-efficient effect, and by hydraulic cylinder 2, realizes to solar energy photovoltaic panel 15 light angles are adjusted, so that the working efficiency of solar energy photovoltaic panel 15 is improved, by being added to motor 1, screw rod one 6, screw rod 2 24, the first sliding block 8 and the second sliding block 25, the design are convenient for carrying out a key tune to sunshading board 5 and protective plate 18 Section, swift and convenient to operate, by being added to self-locking shape universal wheel, which moves the present invention convenient for staff, leads to Cross and be added to clump weight 28, should who convenient for the stability for improving pedestal 10, energy-saving effect of the present invention is good, easy to operate, surely It is qualitative good, conveniently moving.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (9)

1. being used for the construction of prevention work platform of skyscraper, including pedestal (10), which is characterized in that pedestal (10) upper end is fixed There are support column (16) and protective shell (12), support column (16) upper end is fixed with top plate (14), and top plate (14) lower end is equipped with cunning One (3) and pulley two (13) are taken turns, motor two (11) is fixed in protective shell (12), crust of the device (23) is close to support column (16) One end face is fixed with mounting plate (21), and mounting plate (21) upper end is fixed with motor one (7) and screw rod two (24), motor one (7) Output shaft and screw rod one (6) be rotatablely connected, screw rod one (6) is fixedly connected by connecting rod one (4) with sunshading board (5), screw rod two (24) it is equipped on the second sliding block (25), the second sliding block (25) is fixedly connected by connecting rod two (26) with protective plate (18).
2. the construction of prevention work platform according to claim 1 for skyscraper, which is characterized in that described device shell (23) lower end is fixed with bottom plate (9), and the bottom plate (9) is slidably connected by sliding rail with support column (16).
3. the construction of prevention work platform according to claim 1 for skyscraper, which is characterized in that the screw rod one (6) And screw rod two (24) is symmetricly set on crust of the device (23) rear and front end, on the screw rod one (6) and screw rod two (24) Sprocket wheel is installed, two sprocket wheels are connected by chain.
4. the construction of prevention work platform according to claim 1 for skyscraper, which is characterized in that the protective plate (18) It being fixedly connected with motion bar (19) one end, motion bar (19) other end is slidably connected with hollow gag lever post (20) inner wall, and Hollow gag lever post (20) is fixed on crust of the device (23) front end face.
5. the construction of prevention work platform according to claim 1 for skyscraper, which is characterized in that on the top plate (14) End is fixed with hydraulic cylinder (2), and hydraulic cylinder (2) upper end is hinged by elevating lever (1) and solar energy photovoltaic panel (15) lower end, described Solar energy photovoltaic panel (15) and top plate (14) hingedly, be fixed with inside the pedestal (10) inverter (27), distribution box (29) with And clump weight (28), the solar energy photovoltaic panel (15) and inverter (27) are electrically connected, the inverter (27) and distribution box (29) it is electrically connected, the distribution box (29) and motor one (7), motor two (11) and hydraulic cylinder (2) are electrically connected.
6. the construction of prevention work platform according to claim 1 for skyscraper, which is characterized in that under the pedestal (10) End is symmetrically fixed with several self-locking shape universal wheels.
7. the construction of prevention work platform according to claim 1 for skyscraper, which is characterized in that described device shell (23) front end offers square aperture (17), and connecting rod one (4) passes through square aperture (17) and is fixedly connected with sunshading board (5).
8. the construction of prevention work platform according to claim 1 for skyscraper, which is characterized in that the sunshading board (5) Rear end is slidably connected with crust of the device (23) inner wall.
9. the construction of prevention work platform according to claim 1 for skyscraper, which is characterized in that the motor two (11) Output shaft and unreeling shaft (22) be rotatablely connected, unreeling shaft (22) is fixedly connected with rope one end, and the rope other end passes sequentially through Pulley two (13) and pulley one (3) are fixedly connected with crust of the device (23) upper end.
CN201811219513.6A 2018-10-19 2018-10-19 Construction of prevention work platform for skyscraper Withdrawn CN109138394A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811219513.6A CN109138394A (en) 2018-10-19 2018-10-19 Construction of prevention work platform for skyscraper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811219513.6A CN109138394A (en) 2018-10-19 2018-10-19 Construction of prevention work platform for skyscraper

Publications (1)

Publication Number Publication Date
CN109138394A true CN109138394A (en) 2019-01-04

Family

ID=64808843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811219513.6A Withdrawn CN109138394A (en) 2018-10-19 2018-10-19 Construction of prevention work platform for skyscraper

Country Status (1)

Country Link
CN (1) CN109138394A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110995974A (en) * 2019-12-12 2020-04-10 苏州哲思达智能设备科技有限公司 Interim supervisory equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2493283A (en) * 2011-07-28 2013-01-30 Monkey Tower Ltd Overhead access platform
CN203805768U (en) * 2014-04-10 2014-09-03 浙江国盛钢结构有限公司 Vehicle with construction protective shed
CN203905424U (en) * 2013-11-19 2014-10-29 公安消防部队昆明指挥学校 Movable hazardous chemical substance leakage rescue operation platform
CN105421739A (en) * 2015-12-25 2016-03-23 中国一冶集团有限公司 Electric lifting construction vehicle for factory for prefabrication
CN205444957U (en) * 2016-03-23 2016-08-10 张小霞 A novel protection canopy for building
CN206707250U (en) * 2017-04-20 2017-12-05 南通市达欣工程股份有限公司 A kind of construction of prevention work platform for skyscraper
CN207314800U (en) * 2017-08-15 2018-05-04 杨镜湖 A kind of external wall construction Telescopic hanging basket
CN108518638A (en) * 2018-03-26 2018-09-11 陈安 A kind of solar illumination apparatus

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2493283A (en) * 2011-07-28 2013-01-30 Monkey Tower Ltd Overhead access platform
CN203905424U (en) * 2013-11-19 2014-10-29 公安消防部队昆明指挥学校 Movable hazardous chemical substance leakage rescue operation platform
CN203805768U (en) * 2014-04-10 2014-09-03 浙江国盛钢结构有限公司 Vehicle with construction protective shed
CN105421739A (en) * 2015-12-25 2016-03-23 中国一冶集团有限公司 Electric lifting construction vehicle for factory for prefabrication
CN205444957U (en) * 2016-03-23 2016-08-10 张小霞 A novel protection canopy for building
CN206707250U (en) * 2017-04-20 2017-12-05 南通市达欣工程股份有限公司 A kind of construction of prevention work platform for skyscraper
CN207314800U (en) * 2017-08-15 2018-05-04 杨镜湖 A kind of external wall construction Telescopic hanging basket
CN108518638A (en) * 2018-03-26 2018-09-11 陈安 A kind of solar illumination apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110995974A (en) * 2019-12-12 2020-04-10 苏州哲思达智能设备科技有限公司 Interim supervisory equipment

Similar Documents

Publication Publication Date Title
CN110374315A (en) A kind of construction security platform
CN105391391B (en) A kind of device of solar generating with safeguard function
CN206472234U (en) A kind of intelligent elevator supervising device
CN208923641U (en) A kind of box type transformation cabinet convenient for lifting
CN206041878U (en) Mobile solar power panel
CN206664861U (en) A kind of window peculiar to vessel using solar power generation
CN109138394A (en) Construction of prevention work platform for skyscraper
CN108252415A (en) A kind of construction site mobile energy conservation environmental protection sound insulation canopy
CN111535221A (en) Automatic lifting height limiting device for bridge head
CN218371650U (en) Building electrical construction lift
CN209482684U (en) A kind of slewing frame device of wind-powered electricity generation concrete tower mounting platform
CN216381738U (en) Suspended ceiling extension type multifunctional wind power generator cabin cover
CN212248943U (en) Support tool for construction of green building energy-saving roof
CN215734151U (en) Photovoltaic power generation board mount
CN215858940U (en) Novel detachable combined type steel structure aerial work moving operation platform
CN209218007U (en) A kind of mounting structure of power station power supply power supply
CN210578362U (en) Photovoltaic power generation device
CN211115015U (en) Block terminal processing area safety protection canopy
CN210559228U (en) Telescopic cylinder type aerial work platform
CN210790999U (en) On-line walking device structure of inspection robot
CN219653503U (en) Multifunctional trolley suitable for overhead operation of bridge
CN215671258U (en) Safety protection equipment for constructional engineering
CN221792687U (en) Prefabricated component storage rack
CN218714882U (en) Municipal house building construction safety elevating gear
CN213359608U (en) Energy-concerving and environment-protective electric power tower protector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190104

WW01 Invention patent application withdrawn after publication