CN109127247A - A kind of automobile coating production line die forgingization work chamber body structure - Google Patents

A kind of automobile coating production line die forgingization work chamber body structure Download PDF

Info

Publication number
CN109127247A
CN109127247A CN201811252227.XA CN201811252227A CN109127247A CN 109127247 A CN109127247 A CN 109127247A CN 201811252227 A CN201811252227 A CN 201811252227A CN 109127247 A CN109127247 A CN 109127247A
Authority
CN
China
Prior art keywords
die forging
die
crossbeam
steel plate
forging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811252227.XA
Other languages
Chinese (zh)
Other versions
CN109127247B (en
Inventor
李伟战
沈稳花
陆义顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China (tianjin) System Engineering Co Ltd
Original Assignee
China (tianjin) System Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China (tianjin) System Engineering Co Ltd filed Critical China (tianjin) System Engineering Co Ltd
Priority to CN201811252227.XA priority Critical patent/CN109127247B/en
Publication of CN109127247A publication Critical patent/CN109127247A/en
Application granted granted Critical
Publication of CN109127247B publication Critical patent/CN109127247B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/20Arrangements for spraying in combination with other operations, e.g. drying; Arrangements enabling a combination of spraying operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/40Construction elements specially adapted therefor, e.g. floors, walls or ceilings

Landscapes

  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)

Abstract

The object of the present invention is to provide a kind of automobile coating production line die forgingization work chamber body structures, it include: die forgingization work chamber body, die forging column, die forging crossbeam, glass plate, plate, die forging column mask, the first connection bolt, the first die forging, the second die forging, third die forging, the first nut, U-shaped board, the second connection bolt, pressing plate, the second nut and glass plate sealing strip, it is characterized by: die forgingization work chamber body is mutually made of the first die forging, the second die forging and third die forging, first die forging includes die forging column and die forging crossbeam, and die forging column is provided with two.Die forgingization work chamber body in the present invention has the first die forging, the second die forging and third die forging to be combined with each other, overall structure of the invention uses to be connected with each other between three die forgings, compared with prior art, have the advantages that simple and beautiful, and the later period also facilitates the condition of production according to enterprise practical, can be convenient the upgrading enlarging for carrying out chamber body at any time.

Description

A kind of automobile coating production line die forgingization work chamber body structure
Technical field
The present invention relates to a kind of die forgingization work chamber body structure more particularly to a kind of work of automobile coating production line die forgingization Chamber body structure.
Background technique
Currently, with the development of technology, world energy sources total amount is smaller and smaller, during work piece production, disappear to the energy It consumes huge, is frequently necessary to paint to material during work piece production, make workpiece anti-corrosion, coloring, and needed after painting It is dried.Spray painting is paint to be dispersed into uniform and fine droplet by air pressure by spray gun, and painting imposes on coated article A kind of method on surface.Spray painting processing is carried out to product surface, can be played a protective role to product surface.Paint spray booth is coating One of room, paint booth refer to room equipped with coating equipment, carrying out painting operation, further include powder spraying chamber, leaching outside paint spray booth Paint room, curtain paint booth etc., paint spray booth are to specialize in spraying industry situation coating, structure and equip most complicated paint booth, are coatings The key equipment of workshop indispensability.
Existing die forging formula spray painting cell structure is usually to be connected by the die forging column between two adjacent die forgings at present It connects, generallys use and be connected between two adjacent die forging columns, after the assembly is completed it can be seen that the connection spiral shell of the inside Bolt, very unsightly, and during installation, windowpane usually require it is prefabricated in advance, increase material cost and it is artificial prefabricated at This, and it is existing at present usually mutually viscous with the side plane of die forging crossbeam for the sealing strip of seal glass plate and plate It connecing, does not bond sealing strip therewith on the arcwall face of die forging crossbeam, sealing strip and the contact bond area of die forging crossbeam are smaller, It there are poorly sealed, is easy to fall off and problem that sealing effect is poor, and existing maintenance door is usually to be used in spray painting at present Equal pressure chamber above room, since light maintenance room is that have independent supply air system inside workspace, so also having equal pressure chamber generally It will be installed maintenance door.Maintenance door is reserved by carrying out Inspection and maintenance inside later period equal pressure chamber.
Current existing old-fashioned maintenance door is usually to be punched using siding, the mode being then welded on maintenance door on siding Maintenance door is installed, does so and has weld seam on siding, influences beauty.And due to being that maintenance door is welded on siding , so the later period is inconvenient for the maintenance replacement of maintenance door, the welding between maintenance door and siding is had at the scene It carries out, greatly increases the construction volume at scene.
Therefore a kind of top die forging crossbeam that can solve the above problem and be conveniently suitable for paint spray booth enclosed area is needed to connect Binding structure.
Summary of the invention
In view of the above-mentioned problems, the object of the present invention is to provide a kind of novel automobile coating production line die forgingization work chamber bodies Structure, the die forgingization work chamber body in the present invention has the first die forging, the second die forging and third die forging to be combined with each other, of the invention Overall structure using being connected with each other between three die forgings, compared with prior art, have the advantages that simple and beautiful, and later period Also facilitate the condition of production according to enterprise practical, can be convenient the upgrading enlarging for carrying out chamber body at any time, and the present invention uses this Kind die forging formula structure eliminates the prefabricated of windowpane, reduces material cost and artificial prefabricated cost;It is used in the present invention new The maintenance door of formula, new-type maintenance door, which is used, is directly made into siding for doorframe, is exactly integrally formed maintenance door and siding, can Directly to be carried out in factory, it can only be completed, be greatly reduced existing with bolt link in such a way that siding is installed to scene The workload of field would not have weld seam in apparent place due to being to be integrally formed maintenance door door and siding, make entire The good appearance of maintenance door, good integrity are also convenient for maintenance replacement of the later period for maintenance door.
Used technical solution is the present invention to solve above-mentioned technical problem: a kind of automobile coating production line die forging chemical industry Make chamber body structure, comprising: die forgingization works chamber body, die forging column, die forging crossbeam, glass plate, plate, die forging column mask, the One connection bolt, the first die forging, the second die forging, third die forging, the first nut, U-shaped board, the second connection bolt, pressing plate, the second spiral shell Female and glass plate sealing strip, it is characterised in that: the die forgingization work chamber body is by first die forging, the second die forging and third mould Forging mutually composition, first die forging includes the die forging column and die forging crossbeam, and the die forging column is provided with two, two Die forging column is mutually arranged in parallel vertically, and the die forging crossbeam is arranged between two die forging columns, the die forging crossbeam and mould It is mutually permanently connected between forging column, the die forging crossbeam is provided with four, is horizontally-parallel set between four die forging crossbeams It sets, second die forging, the structure of third die forging are identical with the structure of first die forging, the second die forging setting On the right side of first die forging, the right side of second die forging, first die forging, the second mould is arranged in the third die forging It is connected with each other by the first connection bolt between adjacent die forging column between forging and third die forging, first nut It is screwed on the first connection bolt, fixation is mutually tightened by first nut between two adjacent die forging columns, The front end of two adjacent die forging columns is arranged in the die forging column mask, and die forging column mask and two adjacent die forgings are vertical It is connected with each other between column, the glass plate is mounted between two die forging crossbeams in middle position, and the plate is provided with Two pieces, two pieces of plates are separately mounted to the upper/lower terminal of the glass plate, after the die forging crossbeam is arranged in the U-shaped board End is connected between the U-shaped board and the die forging crossbeam by the second connection bolt, and second nut is screwed in institute It states on the second connection bolt, the U-shaped board is by mutually tightening fixation, the plate between the second nut and the die forging crossbeam The rear end of the U-shaped board is set, is mutually permanently connected between the plate and the U-shaped board, the glass plate is mounted on institute State the lower end of U-shaped board, the glass plate sealing strip is arranged in the side of the die forging crossbeam, the glass plate sealing strip with it is described It is mutually bonded between die forging crossbeam by double-sided adhesive, the glass plate is fixed on die forging crossbeam by the glass plate sealing strip Rear end, the pressing plate are covered on the rear end of the plate Yu the glass plate, pass through between the pressing plate and the die forging crossbeam The second connection bolt is fixed to each other, and the upper end of the die forgingization work chamber body, equal pressure chamber and mould is arranged in the equal pressure chamber Malleabilization work chamber body is mutually permanently connected.
Further, maintenance door is installed in the equal pressure chamber, maintenance door include hinge connector, maintenance door handle, siding, First steel plate, the second steel plate, gasket, the 4th steel plate and the 5th steel plate.
Further, it is integrated connection between the maintenance door and siding, is existed between the siding and equal pressure chamber by setting Two hinge connectors of siding side are hinged.
Further, the maintenance door handle is fixedly connected on the inside and outside two sides of the maintenance door, first steel plate, the Two steel plates, third steel plate, the 4th steel plate and the 5th steel plate are arranged at the inside of the maintenance door, and second steel plate is located at institute The side of the first steel plate is stated, the gasket is arranged between the right extension of the first steel plate and second steel plate, described close It is connected with each other between the side of packing and the second steel plate by countersunk raised head tapping screw, the 5th steel plate is arranged described second The front end of steel plate, the 5th steel plate are mutually permanently connected with second steel plate, and the 4th steel plate is arranged described first The lower end of the right extension of steel plate, the 4th steel plate are mutually permanently connected with first steel plate.
Further, the side of the gasket is provided with third steel plate, third steel plate by countersunk raised head tapping screw with it is close Packing is connected with each other.
Further, rotation lock is provided between the die forging column mask and two adjacent die forging columns, die forging column covers It is connected between plate and two adjacent die forging columns by revolving locking phase.
Further, the die forging crossbeam is c-opening structure.
Further, die forging crossbeam mask, die forging crossbeam mask and the mould are installed in the opening of the die forging crossbeam It is mutually permanently connected between forging crossbeam.
Further, board seal strip, the board seal strip and institute are provided between the plate and the die forging crossbeam It states and is mutually bonded between die forging crossbeam by double-sided adhesive, it is mutual by board seal strip between the plate and the die forging crossbeam Sealing.
Further, the shape of the glass plate sealing strip is U-shaped.
The present invention has the advantages that
1. the mould the present invention provides a kind of novel automobile coating production line die forgingization work chamber body structure, in the present invention Malleabilization work chamber body has the first die forging, the second die forging and third die forging to be combined with each other, and overall structure of the invention uses three Be connected with each other between a die forging, compared with prior art, have the advantages that it is simple and beautiful, and the later period also facilitate according to enterprise reality The condition of production on border can be convenient the upgrading enlarging for carrying out chamber body at any time, and the present invention is cancelled using this die forging formula structure Windowpane it is prefabricated, reduce material cost and artificial prefabricated cost.
2. the die forging column mask in the present invention is arranged in the front end of two adjacent die forging columns, die forging column mask with It is connected with each other between two adjacent die forging columns, the present invention is set between die forging column mask and two adjacent die forging columns It is equipped with rotation lock, is connected between die forging column mask and two adjacent die forging columns by revolving locking phase, the present invention is using rotation lock Make to be connected with each other between die forging column mask and two adjacent die forging columns, the present invention is in die forging crossbeam and two adjacent moulds Outside portion between forging column, which covers, mask, has and is convenient for in-site installation, and flat appearance is beautiful, after mounting convenient for peace The advantages of dress is with disassembly.
3. using new-type gasket structure in the present invention, old-fashioned sealing strip, the board seal strip in the present invention are compared It is mutually bonded with the arc surface of die forging crossbeam by double-sided adhesive with glass plate sealing strip, the glass plate sealing strip in the present invention Shape is U-shaped structure, has the advantages of improving whole air-tightness, improving buffer capacity, impact force is effectively reduced, plays The effect of protection components.
4. using new-type maintenance door in the present invention, new-type maintenance door, which is used, is directly made into siding for doorframe, and being exactly will Maintenance door and siding are integrally formed, and can directly be carried out in factory, only use bolt chain in the way of installing siding to scene Connecing can complete, and greatly reduce the workload at scene, due to being to be integrally formed maintenance door door and siding, just not There can be weld seam in apparent place, make the good appearance of entire maintenance door, good integrity is also convenient for the later period for the dimension of maintenance door Repair replacement.
5. easy for installation between all parts in the present invention, all parts in the present invention can shift to an earlier date in a pre-installation It is directly produced in factory, the scene of being transported to can be mounted directly, and be convenient for in-site installation, improved installation effectiveness, can be effective The duration at reduction project scene, also effectively reduce the cost of construction and installation.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is side structure schematic view of the invention.
Fig. 3 is the overlooking structure diagram of die forging column mask connection structure in the present invention.
Fig. 4 is the side, sectional structural schematic diagram of die forging column in the present invention.
Fig. 5 is the enlarged structure schematic diagram of die forging crossbeam mask connection structure in the present invention.
Fig. 6 is the enlarged structure schematic diagram of maintenance door in the present invention.
Fig. 7 is the cutting plane view of maintenance door overlook direction in the present invention.
Wherein:
1- die forgingization work chamber body;2- die forging column;3- die forging crossbeam;
4- glass plate;5- plate;6- equal pressure chamber;
7- maintenance door;8- die forging column mask connection structure;9- die forging column mask;
The connection bolt of 10- first;11- rotation lock;The first die forging of 12-;
The second die forging of 13-;14- third die forging;The first nut of 15-;
16-U template;The connection bolt of 17- second;18- pressing plate;
19- board seal strip;The second nut of 20-;21- glass plate sealing strip;
22- die forging crossbeam mask;23- die forging crossbeam mask connection structure;24- hinge connector;
25- overhauls door handle;26- siding;The first steel plate of 27-;
The second steel plate of 28-;29- gasket;30- third steel plate;
31- countersunk raised head tapping screw;The 4th steel plate of 32-;The 5th steel plate of 33-
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " center ", The orientation or positional relationship of the instructions such as "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outside" is based on attached drawing institute The orientation or positional relationship shown, is merely for convenience of description of the present invention and simplification of the description, rather than the dress of indication or suggestion meaning It sets or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to limit of the invention System.In addition, term " first ", " second ", " third " are used for description purposes only, it is not understood to indicate or imply relatively important Property, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to detachably connect It connects, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, intermediate matchmaker can also be passed through Jie is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can be with concrete condition Understand the concrete meaning of above-mentioned term in the present invention.
Embodiment 1:
Fig. 1 is the structural diagram of the present invention, and Fig. 2 is side structure schematic view of the invention, and Fig. 3 is die forging in the present invention The overlooking structure diagram of column mask connection structure, Fig. 4 are the side, sectional structural schematic diagram of die forging column in the present invention, figure 5 be the enlarged structure schematic diagram of die forging crossbeam mask connection structure in the present invention, and Fig. 6 is the enlarged structure of maintenance door in the present invention Schematic diagram, Fig. 7 are the cutting plane view of maintenance door overlook direction in the present invention, such as Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 and Fig. 7 Shown in a kind of automobile coating production line die forgingization work chamber body structure, comprising: die forgingization works chamber body 1, die forging column 2, mould It forges crossbeam 3, glass plate 4, plate 5, die forging column mask 9, first and connects bolt 10, the first die forging 12, the second die forging 13, third Die forging 14, the first nut 15, U-shaped board 16, second connect bolt 17, pressing plate 18, the second nut 20 and glass plate sealing strip 21, Be characterized in that: the die forgingization work chamber body 1 is mutually made of first die forging 12, the second die forging 13 with third die forging 14, First die forging 12 includes the die forging column 2 and die forging crossbeam 3, and the die forging column 2 is provided with two, and two die forgings are vertical Column 2 is mutually arranged in parallel vertically, and the die forging crossbeam 3 is arranged between two die forging columns 2, the die forging crossbeam 3 and die forging It is mutually permanently connected between column 2, the die forging crossbeam 3 is provided with four, is horizontally-parallel set between four die forging crossbeams 3 It sets, second die forging 13, the structure of third die forging 14 are identical with the structure of first die forging 12, second mould The right side of first die forging 12 is arranged in forging 13, and the right side of second die forging 13 is arranged in the third die forging 14, described Pass through the first connection spiral shell between first die forging 12, the second die forging 13 and third die forging 14 between adjacent die forging column 2 Bolt 10 is connected with each other, and first nut 15 is screwed on the first connection bolt 10, between two adjacent die forging columns 2 Fixation is mutually tightened by first nut 15, before two adjacent die forging columns 2 are arranged in the die forging column mask 9 End, is connected with each other, the glass plate 4 is mounted on interposition between die forging column mask 9 and two adjacent die forging columns 2 Between the two die forging crossbeams 3 set, the plate 5 is provided with two pieces, two pieces of plates 5 be separately mounted to the glass plate 4 it is upper, The rear end of the die forging crossbeam 3 is arranged in lower both ends, the U-shaped board 16, leads between the U-shaped board 16 and the die forging crossbeam 3 It crosses the second connection bolt 17 to be connected, second nut 20 is screwed on the second connection bolt 17, the U-shaped board 16 by mutually tightening fixation between the second nut 20 and the die forging crossbeam 3, the U-shaped board 16 is arranged in the plate 5 Rear end is mutually permanently connected between the plate 5 and the U-shaped board 16, and the glass plate 4 is mounted under the U-shaped board 16 The side of the die forging crossbeam 3 is arranged in end, the glass plate sealing strip 21, and the glass plate sealing strip 21 and the die forging are horizontal It is mutually bonded between beam 3 by double-sided adhesive, the glass plate 4 is fixed on die forging crossbeam 3 by the glass plate sealing strip 21 Rear end, the pressing plate 18 are covered on the rear end of the plate 5 with the glass plate 4, the pressing plate 18 and the die forging crossbeam 3 it Between be fixed to each other by the second connection bolt 17, the upper end of die forgingization work chamber body 1 is arranged in the equal pressure chamber 6, Equal pressure chamber 6 is mutually permanently connected with die forgingization work chamber body 1.
The optinal plan of the present embodiment is that maintenance door is equipped in equal pressure chamber 6, and maintenance door 7 includes hinge connector 24, inspection Repair door handle 25, siding 26, the first steel plate 27, the second steel plate 28, gasket 29, the 4th steel plate 32 and the 5th steel plate 33.
The optinal plan of the present embodiment is that connection is integrated between maintenance door 7 and siding 26, siding 26 and equal pressure chamber 6 it Between be hinged by two hinge connectors 24 for being arranged in 26 side of siding.
The optinal plan of the present embodiment is that there are two the maintenance settings of door handle 25, and two maintenance door handles 25 are separately connected In the inside and outside two sides of maintenance door 7, the first steel plate 27, the second steel plate 28, third steel plate 30, the 4th steel plate 32 and 22 plate of the 5th steel It is arranged at the inside of maintenance door 7, the second steel plate 28 is located at the side of the first steel plate 27, and gasket 29 is arranged in the first steel plate 27 Right extension and the second steel plate 28 between, between the side of gasket 29 and the second steel plate 28 pass through countersunk raised head tapping screw 31 It being connected with each other, the front end of the second steel plate 28 is arranged in the 5th steel plate 33, and the 5th steel plate 33 is mutually permanently connected with the second steel plate 28, The lower end of the right extension of the first steel plate 27 is arranged in 4th steel plate 32, and the 4th steel plate 32 is mutually permanently connected with the first steel plate 27.
The optinal plan of the present embodiment is that the side of gasket 29 is provided with third steel plate 30, and third steel plate logical 30 is more than half Countersunk self-tapping screw 31 and gasket 29 are connected with each other.
The optinal plan of the present embodiment is that rotation lock is provided between die forging column mask 9 and two adjacent die forging columns 2 11, it is connected with each other between die forging column mask 9 and two adjacent die forging columns 2 by rotation lock 11.
The optinal plan of the present embodiment is that die forging crossbeam 3 is c-opening structure.
The optinal plan of the present embodiment is to be equipped with die forging crossbeam mask 22, die forging crossbeam in the opening of die forging crossbeam 3 It is mutually permanently connected between mask 22 and die forging crossbeam 3.
The optinal plan of the present embodiment is that board seal strip 19, plate seal are provided between plate 5 and die forging crossbeam 3 It is mutually bonded between item 19 and die forging crossbeam 3 by double-sided adhesive, passes through 19 phase of board seal strip between plate 5 and die forging crossbeam 3 Mutually sealing.
The optinal plan of the present embodiment is that the shape of glass plate sealing strip 21 is U-shaped.
The present invention provides a kind of automobile coating production line die forgingization work chamber body structure, die forging operating rooms of the invention Body during installation, firstly, first installing die forging column and die forging crossbeam, pastes double-sided adhesive, sealing strip is led to behind stand column and beam It crosses double-sided adhesive to be bonded in stand column and beam, then plate and glass plate is successively installed, after being installed after plate and glass plate The die forging crossbeam mask for being used to cover bolt after pressing plate completes installation, is mounted on die forging crossbeam, completed whole by end installation pressing plate The installation of a die forging, compared with prior art, the present invention have the advantages that it is simple and beautiful, and the later period also facilitate according to enterprise reality The condition of production on border, can be convenient the upgrading enlarging for carrying out chamber body at any time, and the die forging column mask in the present invention is arranged adjacent Two die forging columns front end, be connected with each other between die forging column mask and two adjacent die forging columns, the present invention is in mould Rotation lock, die forging column mask and two adjacent die forging columns are provided between forging column mask and two adjacent die forging columns Between connected by revolving locking phase, the present invention is made between die forging column mask and two adjacent die forging columns mutually using rotation lock Connection, outside portion of the present invention between die forging crossbeam and two adjacent die forging columns, which covers, mask, has convenient for existing The advantages of field installation, flat appearance is beautiful, is easily installed after mounting with disassembly.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Present invention has been described in detail with reference to the aforementioned embodiments for pipe, the logical technical staff of this field it is understood that its still It is possible to modify the technical solutions described in the foregoing embodiments, or some or all of the technical features is carried out Equivalent replacement;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution various embodiments of the present invention technical side The range of case.

Claims (10)

  1. The chamber body structure 1. a kind of automobile coating production line die forgingization works, comprising: die forgingization work chamber body, die forging column, die forging Crossbeam, glass plate, plate, die forging column mask, the first connection bolt, the first die forging, the second die forging, third die forging, the first spiral shell Mother, U-shaped board, the second connection bolt, pressing plate, the second nut and glass plate sealing strip, it is characterised in that: the die forging operating room Body is mutually made of first die forging, the second die forging and third die forging, and first die forging includes the die forging column and mould Crossbeam is forged, the die forging column is provided with two, and two die forging columns are mutually arranged in parallel vertically, and the die forging crossbeam setting exists It between two die forging columns, is mutually permanently connected between the die forging crossbeam and die forging column, the die forging crossbeam is provided with four Item is horizontally-parallel setting between four die forging crossbeams, second die forging, third die forging structure with first mould The structure of forging is identical, and the right side of first die forging is arranged in second die forging, and the third die forging is arranged described The right side of second die forging passes through institute between adjacent die forging column between first die forging, the second die forging and third die forging The interconnection of the first connection bolt is stated, first nut is screwed on the first connection bolt, and two adjacent die forgings are vertical Fixation is mutually tightened by first nut between column, two adjacent die forging columns are arranged in the die forging column mask Front end is connected with each other between die forging column mask and two adjacent die forging columns, and the glass plate is mounted on interposition Between the two die forging crossbeams set, the plate is provided with two pieces, and two pieces of plates are separately mounted to upper and lower the two of the glass plate The rear end of the die forging crossbeam is arranged in end, the U-shaped board, passes through described second between the U-shaped board and the die forging crossbeam Connection bolt is connected, and second nut is screwed on the second connection bolt, and the U-shaped board passes through the second nut and institute It states and mutually tightens fixation between die forging crossbeam, the rear end of the U-shaped board, the plate and the U-shaped board is arranged in the plate Between be mutually permanently connected, the glass plate is mounted on the lower end of the U-shaped board, and the glass plate sealing strip is arranged in the mould The side for forging crossbeam, is mutually bonded between the glass plate sealing strip and the die forging crossbeam by double-sided adhesive, the glass plate The rear end of die forging crossbeam is fixed on by the glass plate sealing strip, the pressing plate is covered on the plate and the glass plate Rear end is fixed to each other between the pressing plate and the die forging crossbeam by the second connection bolt, and the equal pressure chamber setting exists The upper end of the die forgingization work chamber body, equal pressure chamber are mutually permanently connected with die forgingization work chamber body.
  2. The chamber body structure 2. a kind of automobile coating production line die forgingization according to claim 1 works, it is characterised in that: described Maintenance door is installed in equal pressure chamber, maintenance door include hinge connector, maintenance door handle, siding, the first steel plate, the second steel plate, Gasket, the 4th steel plate and the 5th steel plate.
  3. The chamber body structure 3. a kind of automobile coating production line die forgingization according to claim 2 works, it is characterised in that: described It is integrated connection between maintenance door and siding, is connected between the siding and equal pressure chamber by the way that two hinges of siding side are arranged in Fitting is hinged.
  4. The chamber body structure 4. a kind of automobile coating production line die forgingization according to claim 2 works, it is characterised in that: maintenance There are two door handle settings, and two maintenance door handles are connected to the inside and outside two sides of maintenance door, first steel plate, second Steel plate, third steel plate, the 4th steel plate and the 5th steel plate are arranged at the inside of the maintenance door, and second steel plate is located at described The side of first steel plate, the gasket are arranged between the right extension of the first steel plate and second steel plate, the sealing It is connected with each other between the side of pad and the second steel plate by countersunk raised head tapping screw, the 5th steel plate is arranged in second steel The front end of plate, the 5th steel plate are mutually permanently connected with second steel plate, and the 4th steel plate is arranged in first steel The lower end of the right extension of plate, the 4th steel plate are mutually permanently connected with first steel plate.
  5. The chamber body structure 5. a kind of automobile coating production line die forgingization according to claim 2 works, it is characterised in that: described The side of gasket is provided with third steel plate, and third steel plate is connected with each other by countersunk raised head tapping screw and gasket.
  6. The chamber body structure 6. a kind of automobile coating production line die forgingization according to claim 1 works, it is characterised in that: described Rotation lock is provided between die forging column mask and two adjacent die forging columns, die forging column mask and two adjacent die forgings are vertical It is connected between column by revolving locking phase.
  7. The chamber body structure 7. a kind of automobile coating production line die forgingization according to claim 1 works, it is characterised in that: described Die forging crossbeam is c-opening structure.
  8. The chamber body structure 8. a kind of automobile coating production line die forgingization according to claim 7 works, it is characterised in that: in institute The opening for stating die forging crossbeam is equipped with die forging crossbeam mask, the company of being fixed to each other between die forging crossbeam mask and the die forging crossbeam It connects.
  9. The chamber body structure 9. a kind of automobile coating production line die forgingization according to claim 1 works, it is characterised in that: described Board seal strip is provided between plate and the die forging crossbeam, by double between the board seal strip and the die forging crossbeam Face glue is mutually bonded, and is sealed against each other between the plate and the die forging crossbeam by board seal strip.
  10. The chamber body structure 10. a kind of automobile coating production line die forgingization according to claim 1 works, it is characterised in that: institute It is U-shaped for stating the shape of glass plate sealing strip.
CN201811252227.XA 2018-10-25 2018-10-25 Die forging working chamber structure of automobile coating production line Active CN109127247B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811252227.XA CN109127247B (en) 2018-10-25 2018-10-25 Die forging working chamber structure of automobile coating production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811252227.XA CN109127247B (en) 2018-10-25 2018-10-25 Die forging working chamber structure of automobile coating production line

Publications (2)

Publication Number Publication Date
CN109127247A true CN109127247A (en) 2019-01-04
CN109127247B CN109127247B (en) 2024-04-09

Family

ID=64809737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811252227.XA Active CN109127247B (en) 2018-10-25 2018-10-25 Die forging working chamber structure of automobile coating production line

Country Status (1)

Country Link
CN (1) CN109127247B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0584462A2 (en) * 1992-08-22 1994-03-02 Götz GmbH Metall- und Anlagenbau Painting booth
EP0647476A1 (en) * 1993-10-06 1995-04-12 Dürr GmbH Wall construction for a booth of a painting installation
CN205008166U (en) * 2015-09-30 2016-02-03 无锡运通涂装设备有限公司 Application is wallboard for sealing chamber
CN105750141A (en) * 2016-04-15 2016-07-13 中国汽车工业工程有限公司 Module type wall plate of spraying room and module type spraying room
CN106881231A (en) * 2017-04-28 2017-06-23 中汽(天津)系统工程有限公司 A kind of paint spray booth Prefabricated block structure
CN207254635U (en) * 2017-05-12 2018-04-20 武汉东风涂装设备有限公司 A kind of rotating glass press frame
CN209849159U (en) * 2018-10-25 2019-12-27 中汽(天津)系统工程有限公司 Die forging working chamber body structure of automobile coating production line

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0584462A2 (en) * 1992-08-22 1994-03-02 Götz GmbH Metall- und Anlagenbau Painting booth
EP0647476A1 (en) * 1993-10-06 1995-04-12 Dürr GmbH Wall construction for a booth of a painting installation
CN205008166U (en) * 2015-09-30 2016-02-03 无锡运通涂装设备有限公司 Application is wallboard for sealing chamber
CN105750141A (en) * 2016-04-15 2016-07-13 中国汽车工业工程有限公司 Module type wall plate of spraying room and module type spraying room
CN106881231A (en) * 2017-04-28 2017-06-23 中汽(天津)系统工程有限公司 A kind of paint spray booth Prefabricated block structure
CN207254635U (en) * 2017-05-12 2018-04-20 武汉东风涂装设备有限公司 A kind of rotating glass press frame
CN209849159U (en) * 2018-10-25 2019-12-27 中汽(天津)系统工程有限公司 Die forging working chamber body structure of automobile coating production line

Also Published As

Publication number Publication date
CN109127247B (en) 2024-04-09

Similar Documents

Publication Publication Date Title
CN209849159U (en) Die forging working chamber body structure of automobile coating production line
CN107143250A (en) A kind of door and window fixed connection structure and its production installation method
CN105750141B (en) The modular wallboard and modular spray room of spray room
CN109127247A (en) A kind of automobile coating production line die forgingization work chamber body structure
CN204326438U (en) Hanging buckle structure and there is the wooden facing decorative wall of this hanging buckle structure
CN210526673U (en) Environment-friendly, energy-saving and corrosion-resistant aluminum alloy closed carriage
CN101157362A (en) Production technology of engine aditus door
CN207739460U (en) stainless steel curtain wall system
CN102936933A (en) Exposed frame glass curtain wall with large-span steel structure
CN101293584A (en) Container and assembly technique
CN106080628A (en) Vehicle body of railway vehicle and rail vehicle
CN2912822Y (en) Spray booth for spraying section bar with two-color
CN205663072U (en) Aluminium honeycomb welt stainless steel curtain
CN215167284U (en) Unit type pneumatic skylight opening system adaptable to large span
CN208393057U (en) A kind of detachable composite material car door assembly
CN212613278U (en) Three-dimensional adjusting daylighting roof curtain wall system adapting to three-dimensional space
CN207254635U (en) A kind of rotating glass press frame
CN103993815B (en) A kind of soundproof door and making and installation method thereof
CN209143531U (en) Driver down from tower crane room
CN207357476U (en) A kind of paint spray booth Prefabricated block structure
CN203835208U (en) Soundproof door
CN208580982U (en) The package assembly of aluminizing zine plate case change shell
CN201460629U (en) Corner connector of sub-frame for doors and windows
CN2842825Y (en) Large-sized electric cabinet
CN101585376A (en) Covering used for forming deck of capsule

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant