CN101293584A - Container and assembly technique - Google Patents

Container and assembly technique Download PDF

Info

Publication number
CN101293584A
CN101293584A CNA2007101009713A CN200710100971A CN101293584A CN 101293584 A CN101293584 A CN 101293584A CN A2007101009713 A CNA2007101009713 A CN A2007101009713A CN 200710100971 A CN200710100971 A CN 200710100971A CN 101293584 A CN101293584 A CN 101293584A
Authority
CN
China
Prior art keywords
top board
freight container
laterally
welding
assembly technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101009713A
Other languages
Chinese (zh)
Inventor
张新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China International Marine Containers Group Co Ltd
Original Assignee
China International Marine Containers Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China International Marine Containers Group Co Ltd filed Critical China International Marine Containers Group Co Ltd
Priority to CNA2007101009713A priority Critical patent/CN101293584A/en
Publication of CN101293584A publication Critical patent/CN101293584A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention provides a container, comprising a container door, a side wall, a container bottom, a top plate and a top side beam which is arranged on the top of the side wall; the top plate is fixedly bonded onto the upper surface of the top side beam. The containing assembly process comprises total assembly, total assembly welding, cleaning the welding slag, sanding the whole container, paint coating, labelling, floor installation, paving part installation and all working procedures of detection; the total assembly comprises the installation of the side wall, the container bottom and the container door; the top plate installation procedure is carried out after the total assembly, total assembly welding, cleaning welding slag, sanding the whole container, paint coating and floor installation are completed, namely, the detection working procedure is carried out after the top plate is fixedly bonded onto the top side beam and the top plate installation working procedure is completed. The container has the advantages of high welding quality, convenient painting, low cost, high production efficiency and good rigidity, etc.

Description

Freight container and assembly technology thereof
Technical field
The present invention relates to a kind of transportation device, especially relevant with a kind of freight container and assembly technology thereof.
Background technology
All the time, make in the industry at freight container, container structure is basic identical, the top board of freight container normally is welded in top beam of laterally, the freight container assembly technology is also basic identical, as shown in Figure 1, the freight container assembly technology of known technology carries out following operation usually successively: general assembly--spraying of general assembly welding-top board welding-cleaning welding slag-FCL sanding-zinc powder lacquer-inside and outside spray paint-levelling-oven dry-decals-flooring nail-lock floor pin that--auxiliary installation--trickle check--outlet is checked.
In prior art general assembly operation, comprise sidewall, case at the bottom of, the installation of chamber door, top board, top board is the last welding sequence of closed box.Spray paint in FCL sanding, the case, all operations in case such as floor installation, be subjected to space constraint in the case, be difficult to realize automation mechanized operation.
In order to save the energy, improve the sanding degree of uniformity, the outer pneumatic sanding of case is progressively changing the automatic electric sanding into.But because the restriction on case top, the automatic electric sanding is difficult to realize in the freight container assembly technology of prior art.
In addition, since 06 year, along with case east to the increasing day by day of spray paint in the case thickness and degree of uniformity requirement, paint price constantly soaring, improve coating quality and reduce the paint loss extremely important, significant for controlling cost.
Moreover the wood covering installation is that the workman carries wood covering in case in the known technology, finishes by the lifting bed board machine automatic lowering of bottom.But for the different box of bottom cross beam spacing, each thread-changing all will be readjusted the set spacing of elevator, its loss man-hour; The labour intensity that the while workman carries the floor is big especially.
As known from the above, in the freight container assembly technology, have the cost control difficulty at present, work under bad environment, labour intensity reach undesirable elements such as production security difference greatly.Under the situation of the non-style of opening of casing, improve above situation DeGrain by improving technology, be necessary to improve the captive joint mode of top board and the top board mounting process in the freight container assembling for this reason.
Summary of the invention
The object of the present invention is to provide a kind of freight container and assembly technology thereof, can reach and improve working environment, reduce labor intensity, guarantee safety of operation, purpose such as control cost.
Purpose of the present invention realizes in the following manner: freight container of the present invention, comprise chamber door, sidewall, case at the bottom of, the top beam of laterally on top board and sidewall top, described top board is adhesively fixed in the top beam of laterally upper surface.
Freight container of the present invention, described top board are welding formula top board, lock by rivet at the overlapping part of welding weld seam and top beam of laterally.
Freight container of the present invention, the width of the faying surface of described top board and described top beam of laterally are 10mm to 25mm.
Freight container of the present invention, the width of the faying surface of described top board and described top beam of laterally are 19mm.
Freight container assembly technology of the present invention, comprise that install on general assembly, general assembly welding, cleaning welding slag, FCL sanding, paint spraying, decals, floor, each operation is installed and checked to auxiliary, at the bottom of described general assembly comprises sidewall, case, the installation of chamber door, after installing, the floor carries out the top board installation procedure, be about to the top board bonding and be fixed in top beam of laterally, the operation of testing after the top board installation procedure.
Freight container assembly technology of the present invention, described top board installation procedure comprises, roof perimeter is clung with adhesive tape, and top board is carried out the operation of surfaces externally and internally paint spraying.
Freight container assembly technology of the present invention, described top board are welding formula top board, and described operation also comprises, lock by rivet at the overlapping part of welding weld seam and top beam of laterally, and seal with sealing at rivet and welding commissure.
Freight container assembly technology of the present invention, the width of described adhesive tape are 10-25mm, and promptly the width of the faying surface of top board and top beam of laterally is 10-25mm.
Freight container assembly technology of the present invention, described paint spraying operation comprise zinc powder lacquer spraying, inside and outside spray paint, levelling, dry each operation, described floor installation procedure comprises flooring and lock floor pin operation, and described inspection process comprises trickle check and outlet inspection process.
Freight container assembly technology of the present invention, described FCL sanding operation is finished by automatic electric sanding in the case in the case, and described paint spraying operation is finished by automatic static spray mode in the case, and flooring and lock floor pin operation are finished by robot or manipulator.
Beneficial effect of the present invention is:
Compared with prior art, after top board adopted the bonding fixed form and changes the top board mounting process into technique for sticking, the freight container assembly process was in open-top substantially, for be subjected to originally condition restriction can not improved manufacturing and technology all become possibility.
Freight container of the present invention in its assembly technology, has been realized automatic electric sanding in the FCL.If there is not the case top, in case, just can use the automatic electric sanding equally, can improve sanding quality, energy savings, improve workman's operating environment in the case.
Freight container of the present invention, in its assembly technology, because operation under open environment, automatic-spraying is with regard to the outer auto spray painting of similar case in the case, and shower nozzle slides up and down, and relies on the casing reach to finish auto spray painting in the case.Because of having realized in the case static spray automatically, greatly reduce the paint cost, improved coating quality, reduced workman 3-5 people, reduced the potential safety hazard of hand spray in workman's case simultaneously, more improved working environment.
Freight container of the present invention in its assembly technology, owing to not having to carry out the flooring operation under the environment of top board, just can introduce mechanical hand from the top, comes in conveyance wood covering and the direct shop cartonning.It can reduce artificial 4 people, also reduces labor strength.
Description of drawings
Fig. 1 is the freight container assembly technology diagram of circuit of known technology;
Fig. 2 is a freight container assembly technology diagram of circuit of the present invention;
Fig. 3 is adhered to the scheme drawing of top beam of laterally for the top board of freight container of the present invention and assembly technology thereof.
The specific embodiment
The invention will be further described below in conjunction with the accompanying drawings and the specific embodiments.Wherein, Fig. 2 is a freight container assembly technology diagram of circuit of the present invention; Fig. 3 is adhered to the scheme drawing of top beam of laterally for the top board of freight container of the present invention and assembly technology thereof.
As shown in Figures 2 and 3, freight container of the present invention, the top beam of laterally 1 that comprises chamber door, sidewall, top board 2 and sidewall top, top board 2 is adhesively fixed in top beam of laterally 1 upper surface, top beam of laterally 1 can be the square tube girder of square sectional, its thickness can be 3.2mm, 3.0mm or 2.3mm, and the foursquare length of side in cross section is generally 60mm.
Described sidewall surrounds on four sides, and with the common inner space that forms freight container at the bottom of top board, the case, described top beam of laterally can be the integrated top beam of laterally of sidewall, also can be the top beam of laterally that is attached to the sidewall top.
As shown in Figure 3, top board 2 is welding formula top board, the polylith corrugated plating can be welded as a whole top board 2, has weld seam 5 between adjacent two corrugated platings, locks by rivet 3 at the welding weld seam 5 and the overlapping part of top beam of laterally 1.The top beam of laterally of each weld seam and both sides respectively has an overlapping part, rivet of riveting at least on each overlapping part.
Freight container of the present invention, the width of the faying surface 4 of top board 2 and top beam of laterally 1 can be preferably 19mm between 10-25mm.
As shown in Figure 2, freight container assembly technology of the present invention, comprise that install on general assembly, general assembly welding, cleaning welding slag, FCL sanding, paint spraying, decals, floor, each operation is installed and checked to auxiliary, at the bottom of general assembly comprises sidewall, case, the installation of chamber door, do not comprise the installation of top board, after finishing general assembly, general assembly welding, cleaning welding slag, FCL sanding, paint spraying, floor installation, carry out the top board installation procedure, be about to the top board bonding and be fixed in top beam of laterally, the operation of testing after the top board installation procedure.Inspection process comprises trickle check and outlet check.
Freight container assembly technology of the present invention, the top board installation procedure can be refined as:
Step (1): top board 2 peripheries are clung with adhesive tape;
Step (2): top board 2 is carried out the operation of surfaces externally and internally paint spraying;
Step (3): by tool locating, compress top board 2 and top beam of laterally 1, make top board 2 bondings be fixed in top beam of laterally 1.
Freight container assembly technology of the present invention, when top board 2 was welding formula top board, after step (3) was finished, described operation also comprised:
Step (4): lock by rivet 3 at the welding weld seam 5 and the overlapping part of top beam of laterally 1;
Step (5): seal with sealing at rivet 3 and welding weld seam 5 places.
For the top board installation procedure, for step (1), preferred embodiment is, use Acrylic Foam Tape, it simultaneously is bonded in the top board inside face, then to finish paint and outer finish paint in the top board spraying, in step (3), top board is bonded in top beam of laterally after tearing the sticker of another side off.Also can not use Acrylic Foam Tape, and directly adhesion agent is applied in being in contact with one another on the face of top board or top beam of laterally, and realize bonding process.Also can use other adhesive tapes or the adhesion agent that to realize the object of the invention.
In step (4), also can use Huck-bolt will weld the overlapping part locking of weld seam and top beam of laterally.
Freight container assembly technology of the present invention, the width of adhesive tape is 10-25mm described in the step (1), promptly the width of the faying surface 4 of top board and top beam of laterally is 10-25mm, is preferably 19mm.In a preferred embodiment, can be with the periphery of top board, the Acrylic Foam Tape wide with 19mm clings, and carries out subsequent step then.
As shown in Figure 2, in the preferred embodiment of freight container assembly technology of the present invention, carry out general assembly, general assembly welding, cleaning welding slag, FCL sanding, the spray of zinc powder lacquer, levelling, oven dry, decals, flooring, lock floor pin and auxiliary installation procedure before the described top board installation procedure successively, after the top board installation procedure, carry out trickle check and outlet inspection process successively.
The operation of decals is included in the sign that the state-set standard that is sticked on the freight container, enterprise's required standard and case east require; The auxiliary installation procedure comprises freight container auxiliaries such as gasket, locking bar, ventilator are installed.
Decals and auxiliary installation procedure and can carry out before top board is installed also can carry out after top board is installed.
At freight container assembly technology of the present invention, FCL sanding operation can be finished by automatic electric sanding in the case in the case, and zinc powder lacquer spray operation can be finished by automatic static spray mode in the case, and flooring and lock floor pin operation can be finished by robot or manipulator.
Freight container of the present invention and assembly technology thereof, each parts of its casing bear pressure and meet relevant national standard through check.
Freight container of the present invention and assembly technology thereof have reached the purpose of improving working environment, reduction labour intensity, assurance safety of operation and controlling cost.
Above-described only is preferable possible embodiments of the present invention; described embodiment is not in order to limit scope of patent protection of the present invention; therefore the equivalent structure done of every utilization specification sheets of the present invention and accompanying drawing content changes, and in like manner all should be included in protection scope of the present invention.

Claims (10)

1. freight container, comprise chamber door, sidewall, case at the bottom of, the top beam of laterally on top board and sidewall top, it is characterized in that: described top board is adhesively fixed in the top beam of laterally upper surface.
2. freight container as claimed in claim 1 is characterized in that: described top board is a welding formula top board, locks by rivet at the overlapping part of welding weld seam and top beam of laterally.
3. freight container as claimed in claim 1 or 2 is characterized in that: the width of the faying surface of described top board and described top beam of laterally is 10mm to 25mm.
4. freight container as claimed in claim 1 or 2 is characterized in that: the width of the faying surface of described top board and described top beam of laterally is 19mm.
5. freight container assembly technology, comprise that install on general assembly, general assembly welding, cleaning welding slag, FCL sanding, paint spraying, decals, floor, each operation is installed and checked to auxiliary, at the bottom of described general assembly comprises sidewall, case, the installation of chamber door, it is characterized in that: carry out the top board installation procedure after install on the floor, be about to the top board bonding and be fixed in top beam of laterally, the operation of testing after the top board installation procedure.
6. freight container assembly technology as claimed in claim 5 is characterized in that, described top board installation procedure comprises, roof perimeter is clung with adhesive tape, and top board is carried out the operation of surfaces externally and internally paint spraying.
7. freight container as claimed in claim 6 and assembly technology thereof is characterized in that, described top board is a welding formula top board, and described operation also comprises, lock by rivet at the overlapping part of welding weld seam and top beam of laterally, and seal with sealing at rivet and welding commissure.
8. freight container assembly technology as claimed in claim 6 is characterized in that: the width of described adhesive tape is 10-25mm, and promptly the width of the faying surface of top board and top beam of laterally is 10-25mm.
9. freight container assembly technology as claimed in claim 6, it is characterized in that: described paint spraying operation comprise zinc powder lacquer spraying, inside and outside spray paint, levelling, dry each operation, described floor installation procedure comprises flooring and lock floor pin operation, and described inspection process comprises trickle check and outlet inspection process.
10. freight container assembly technology as claimed in claim 9, it is characterized in that: described FCL sanding operation is finished by automatic electric sanding in the case, described paint spraying operation is finished by automatic static spray mode in the case, and flooring and lock floor pin operation are finished by robot or manipulator.
CNA2007101009713A 2007-04-28 2007-04-28 Container and assembly technique Pending CN101293584A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101009713A CN101293584A (en) 2007-04-28 2007-04-28 Container and assembly technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101009713A CN101293584A (en) 2007-04-28 2007-04-28 Container and assembly technique

Publications (1)

Publication Number Publication Date
CN101293584A true CN101293584A (en) 2008-10-29

Family

ID=40064193

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101009713A Pending CN101293584A (en) 2007-04-28 2007-04-28 Container and assembly technique

Country Status (1)

Country Link
CN (1) CN101293584A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101767696B (en) * 2009-01-07 2012-05-30 胜狮货柜技术研发(上海)有限公司 Side wall of container and manufacturing method thereof
CN107856008A (en) * 2017-09-16 2018-03-30 合肥惠科金扬科技有限公司 A kind of processing method of the Buffer Unit of substrate storage equipment
CN108622549A (en) * 2017-03-20 2018-10-09 中集集团集装箱控股有限公司 Fragment assembled container and its method of manufacturing technology
CN111301982A (en) * 2019-11-12 2020-06-19 深圳中集智能科技有限公司 Synchronous beat system and control method for container production factory
CN113909819A (en) * 2021-10-22 2022-01-11 广东中辉绿建移动房屋科技有限公司 Automatic production method and production line for packaging type shipping boxes

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101767696B (en) * 2009-01-07 2012-05-30 胜狮货柜技术研发(上海)有限公司 Side wall of container and manufacturing method thereof
CN108622549A (en) * 2017-03-20 2018-10-09 中集集团集装箱控股有限公司 Fragment assembled container and its method of manufacturing technology
CN108622549B (en) * 2017-03-20 2021-10-22 中集集团集装箱控股有限公司 Piece-by-piece assembled container and manufacturing process thereof
CN107856008A (en) * 2017-09-16 2018-03-30 合肥惠科金扬科技有限公司 A kind of processing method of the Buffer Unit of substrate storage equipment
CN111301982A (en) * 2019-11-12 2020-06-19 深圳中集智能科技有限公司 Synchronous beat system and control method for container production factory
CN113909819A (en) * 2021-10-22 2022-01-11 广东中辉绿建移动房屋科技有限公司 Automatic production method and production line for packaging type shipping boxes
CN113909819B (en) * 2021-10-22 2022-06-03 广东中辉绿建移动房屋科技有限公司 Automatic production method and production line for packaging type shipping boxes

Similar Documents

Publication Publication Date Title
CN101293584A (en) Container and assembly technique
US8973809B2 (en) Bonding of roof panels
CA2825421C (en) A composite insulation panel
CN112031432A (en) Construction method for hoisting large glass of vertically-exposed and horizontally-hidden glass curtain wall by matching electric suction disc with winch
CN101157362A (en) Production technology of engine aditus door
CN214028859U (en) New forms of energy commercial car side wall covering mounting structure
JP6626757B2 (en) Painting booth and painting method
CN209849159U (en) Die forging working chamber body structure of automobile coating production line
CN109606402B (en) Rail vehicle carbon steel vehicle body anticorrosion technology and vehicle body
CN214575821U (en) H-shaped steel beam assembling combined type rapid installation and in-place device
CN110181188B (en) Ultra-long aluminum alloy cabin door butt joint process
CN209866407U (en) Automatic spraying device of aluminium veneer
CN113585560A (en) Construction method of assembled embedded energy-saving curtain wall system
CN110043165A (en) Integrated maintenance door
CN212614321U (en) Glass door frame in painting room or station of coating workshop
CN202595978U (en) Rear-cut type connection structure of connecting dry hanging stone curtain wall with back bolts
CN116435079B (en) Method for fixing tank edge of transformer tank and square steel
CN117344915A (en) Prefabricated steel groove-shaped beam and construction method for appearance consistency of prefabricated steel groove-shaped beam
CN107405785B (en) Method for machining a workpiece
CN219863776U (en) Graphite composite heat-insulating and decorating integrated plate convenient to construct
CN213449242U (en) Sealing strip connected prefabricated house interior trim
CN109127247A (en) A kind of automobile coating production line die forgingization work chamber body structure
CN110076521A (en) One kind being used for streetscape shop vehicle car body periphery plate flatness lifting process method
KR100314534B1 (en) Method for joining flange of door and hood
CN219850244U (en) A shielding tool for application

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20081029