CN109102137A - Safety management integrated risk early warning system - Google Patents

Safety management integrated risk early warning system Download PDF

Info

Publication number
CN109102137A
CN109102137A CN201710545660.1A CN201710545660A CN109102137A CN 109102137 A CN109102137 A CN 109102137A CN 201710545660 A CN201710545660 A CN 201710545660A CN 109102137 A CN109102137 A CN 109102137A
Authority
CN
China
Prior art keywords
risk
data
library
management
indicator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710545660.1A
Other languages
Chinese (zh)
Inventor
朱伟华
张吉
江伟
张翔宇
赵康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jiayuan Polytron Technologies Inc
Original Assignee
Sichuan Jiayuan Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jiayuan Polytron Technologies Inc filed Critical Sichuan Jiayuan Polytron Technologies Inc
Priority to CN201710545660.1A priority Critical patent/CN109102137A/en
Publication of CN109102137A publication Critical patent/CN109102137A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provide safety management integrated risk early warning system, system library be judgement system verifiability data associated therewith can collectivity carry out classification typing, the basis of formation algorithm is combined according to the design of the natural language attribute of system and program language;Risk indicator library includes setting risk indicator by the action of safety management system and range, divides risk classifications and weight and defines risk point to determine the presence of risk factors and assess the property and hazard analysis and HACCP of risk, the measure controlled risk;The comparison data or verifying logic of system library and risk indicator library as acquisition data, when data volume, data area, the data exception of acquisition data have reached the standard of risk indicator setting or have matched the factor of risk point formation, system will form risk data report by risk analysis, security risk is intuitively exposed by data displaying, the generation for guarding against security risk in advance, achievees the purpose that risk management and control.

Description

Safety management integrated risk early warning system
Technical field
The invention belongs to safety management technology fields, and in particular to safety management integrated risk early warning system.
Background technique
Currently, the safety management of the industries such as military enterprise, army, government, finance is according to the basic fortune of market economy Professional etiquette rule is reformed, and each management business of internal institution gradually integrates with international advanced management mode, and safety management is passing Also management lean, digitlization, informationization, scientific requirement and development trend are faced in the fundamentals of management of system.But it is existing There is the safety management of technology to be but unable to satisfy the above demand, therefore is badly in need of researching and developing a kind of novel safety management integrated risk early warning System solves the above problems.
Summary of the invention
The object of the invention is that providing safety management integrated risk early warning system to solve the above-mentioned problems.
The present invention through the following technical solutions to achieve the above objectives:
Safety management integrated risk early warning system,
The system library of measure foundation including verification condition and risk case as Risk-warning, system library are judgement system The verifiability of degree data associated therewith can collectivity carry out classification typing, according to the natural language attribute and program word of system The design of speech combines the basis of formation algorithm, and algorithm is the mathematical algorithm of intelligent parsing system;
Including risk indicator library, risk indicator library includes setting risk by the action of safety management system and range Index divides risk classifications and weight and defines risk point to determine the presence of risk factors and assess the property of risk And hazard analysis and HACCP, the measure controlled risk;
The comparison data or verifying logic of system library and risk indicator library as acquisition data, when the data of acquisition data Amount, data area, data exception have reached the standard of risk indicator setting or have had matched the factor of risk point formation, and system will lead to It crosses risk analysis and forms risk data report, security risk is intuitively exposed by data displaying, or mention by Risk-warning Show that defendance administrative staff take necessary measure, guards against the generation of security risk in advance, achieve the purpose that risk management and control.
The beneficial effects of the present invention are:
Safety management integrated risk early warning system of the present invention, by analyze and research safety crime prevention system evaluation theory and Method, building security management and protection management Input of Data platform, layering classify and safeguard authorities, key portion to unit Door and the daily defendance management data of other unit, prevention data carry out typing and control;Maintenance data management and analytical technology, are looked into It looks for management and averts risks a little, realize the regular Function of Evaluation of management and prevention, the dynamic realizing defendance management and averting risks Monitoring finds risk hidden danger in time;Management and prevention realization of model management platform are established, it is according to dynamic data analysis as a result, automatic raw At the instruction of the contents such as defendance management and prevention construction, O&M, management, effectively standardize and instruct important goal and base single Carry out daily defendance management, hidden danger regulation and protection management work in position.
Change the subjective consciousness and experience management mode of previous defendance management, safety precaution management and risk management.It solves The not defendance management and prevention data management of commensurate, different zones, different prevention ranks;Defendance and safety precaution risk identification With control;Defendance and safety precaution are periodically evaluated;Supervision, the prompting, guidance of defendance and safety precaution work;Security prevention and construction And the problems such as medium-term and long-term plans, dramatically promote company's defendance managerial ability and safety precaution efficiency.
Specific embodiment
The invention will be further described below:
Safety management integrated risk early warning system,
The system library of measure foundation including verification condition and risk case as Risk-warning, system library are judgement system The verifiability of degree data associated therewith can collectivity carry out classification typing, according to the natural language attribute and program word of system The design of speech combines the basis of formation algorithm, and algorithm is the mathematical algorithm of intelligent parsing system;
Including risk indicator library, risk indicator library includes setting risk by the action of safety management system and range Index divides risk classifications and weight and defines risk point to determine the presence of risk factors and assess the property of risk And hazard analysis and HACCP, the measure controlled risk;
The comparison data or verifying logic of system library and risk indicator library as acquisition data, when the data of acquisition data Amount, data area, data exception have reached the standard of risk indicator setting or have had matched the factor of risk point formation, and system will lead to It crosses risk analysis and forms risk data report, security risk is intuitively exposed by data displaying, or mention by Risk-warning Show that defendance administrative staff take necessary measure, guards against the generation of security risk in advance, achieve the purpose that risk management and control.
The present invention be directed to the work customizations of unit safe security department, mainly solve:
Security system Initiative Defense;
Security system risk management and control;
Security everyday tasks;
Security department's personal management and training.
The content and emphasis of safety precaution according to the present invention are as follows:
Concerning security matters safety precaution;
Assets security prevention;
Personnel activity's abnormity early warning and treatment measures;
Attached most importance to providing the data-optimized safety precaution management work of safety precaution management;
Using real-time judge and prediction security risk as core.
Inventive feature:
This product provides data management and acquisition management module for the comprehensive acquisition of management of safe operation data, can System library is established in classification in acquisition data and executable system, concludes outlet air according to single system in system library or a plurality of system Danger put and gradually built up risk library, pass through analyze data and match " safety management system " and security risk assessment index as Data analyze foundation, by the various types of security data assessed value for three dimensions such as setting people's air defense, technical precaution, object be anti-, assess with corresponding The risk status that value is embodied, system matches risk status according to dynamic data and display data is endangered with corresponding risk assessment Description, embodiment in the product is risk management function, reaches risk management and control purpose.System can design all kinds of according to risk library The data model of risk point verifies optimization data model by successive ignition, enables a system to accurate early warning reduction wrong report and fails to report The probability of risk, embodiment in the product are Risk-warning functions, solve the problems, such as Initiative Defense.By the peace of certain time Full prevention data accumulation and measure tracking provide data supporting to improve safe precaution system construction, optimization that can be gradual Specification safety precaution management work, the behavior for reducing harm safety occur, and prevent safety precaution loophole early, improve exploiting entity Security level.
Invention Functional Design:
1, data management digitizes
The integrity of the scale of enterprises and institutions and safety precaution management system causes the document information of its output with regard to opposite Amount is big, and law/regulation file generally works out publication of binding into book form by government, can all have relevant policies or regulation to put into effect every year, Er Qieshi The case where often having revision or abolishing.If necessarily leading to its inefficiency without reasonably managing.The data management of this product Module will carry out digitized processing for the document information of laws and regulations and rules and regulations needed for military enterprise's security department, By laws and regulations input system database, facilitate manager's classified and stored, tracking revision, screening inquiry, reading study.
The safety precaution management system of exploiting entity is also the matched basic foundation of this product risk, we will lead at this stage Cross artificially judge the verifiability of system data associated therewith can collectivity carry out classification typing.The system class being classified with this Type is by the accumulation element as this product, we are defined as system library Rules Repository, and system library will be used as wind The verification condition of dangerous early warning and the measure foundation of risk case, it needs the process of a long-term accumulation, and its formation The experience that will be accumulated in the artificial deterministic process carried out for a long time according to us, further according to the natural language attribute and program word of system The design of speech combines the basis of formation algorithm, is gradually optimized for the mathematical algorithm of intelligent parsing system.
2, acquisition management
The safety precaution that security department carries out is the work of the duration of a maintenance safe condition, so security risk number According to daily or periodic update is also required to, the collecting work management of data and the management of the data obtained by acquisition become The important component of support risk data source, acquisition management is divided into artificial acquisition management and automatic collection manages two Point.
Artificial acquisition management mainly for manpower prevention routine work situation and periodical personnel's situation and physics prevent The acquisition of the data such as the scene construction of model facility and daily maintenance.The data manually acquired support customized acquisition module, user Template can be sorted out after completing self-defining data acquisition module and assign them to specified data collecting work personnel, so both It ensure that acquisition the comprehensive of data also improves the flexibility of collecting work, this relevance of the system on collecting work The effect of specification collecting work will be generated.
Automatic collection management is primarily directed to the operation data and management data of safety precaution technical equipment.Automatically Acquiring item can also carry out by different level according to the particularity or the safety precaution class requirement in exploiting entity's period of exploiting entity Acquisition, do so be guarantee system sustainable operation, optimization system resource avoids system from being constantly in the acquisition of highly dense The paralysis that may cause in state, this also contributes to us and gradually excavates risk data relationship by optimization system and finally establish Data standard.
3, risk management
Risk indicator, which is set, by the action of safety precaution and range divides risk classifications and weight and definition risk The property and hazard analysis and HACCP of the presence and assessment risk putting to determine risk factors, the measure etc. controlled risk.By system library Comparison data or verifying logic with index storehouse as acquisition data.When data volume, data area, the data exception of acquisition data The standard of risk indicator setting is reached or has had matched the factor of risk point formation, system will form risk number by risk analysis According to report, security risk is intuitively exposed by data displaying, or prompting defendance administrative staff to take by Risk-warning must The measure wanted guards against the generation of security risk in advance, achievees the purpose that risk management and control.
Risk management is divided into: risk analysis, risk setting and three modules of Risk-warning.
(1) risk analysis is divided into people's air defense risk analysis, the anti-risk analysis of object, technical precaution risk analysis and integrated risk analysis Four aspects, are mainly illustrated the cyclically-varying of safety precaution data by way of Visual Chart, intuitively got The trend of risk data variation, and then defendance administrative staff is instructed to take corresponding prevention of risk measure.
It (two) include setup measures, region setting, risk setting and association four function points of setting in risk setting.
Setup measures have the index item setting of people's air defense index, the anti-index of object, technical precaution index and overall target four dimensions, Substantially the various aspects of safety precaution work are contained.The content of setup measures mainly has determining index name, risk assessment Value and weight etc..Index item safeguards administrative staff can also basis other than the index that some security industries of system default are generally acknowledged The setting value of index item is independently added or modified to the actual conditions of itself unit, to guarantee the integrity of risk indicator.
Region setting divides safety precaution working region by the plan view of exploiting entity convenient for defendance administrative staff, and straight That sees checks that each region security takes precautions against data and the action trail of specific people etc. by plan view.
Risk setting be by risk generate critical value determine, the source of critical value can be system regulations, articles of law, The single numerical value such as technological document and historical experience or comprehensive weight ratio.
Risk association establishes incidence relation between system library, index storehouse and risk library, specifies the comparison of acquisition data The Rule of judgment of the verifying logic and Risk-warning of data and data, is modeled using data.Establishing risk model can be with Creation is fanned out from point to area with the molding mode in face, once setting up risk model, safety precaution data can be obtained by sufficient benefit With the controllability of risk is just greatly improved.
(3) Risk-warning is acquisition data, computer program utilize data model verify data simultaneously in real time or periodically The result of matching risk factors feeds back to defendance administrative staff and describes risk according to the foundation of safety precaution management measure and refer to A series of processes led.Safeguard administrative staff that can also pass through early warning setting adjusting risk class because of emergency event or occasion To change the verifying logic of internal system, calling emergency event or occasion counterplan, provisional adjustment safety precaution Management work.It may be said that the core function that Risk-warning is exactly this product is a series of final embodiment of other efficacies.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appending claims and equivalents circle It is fixed.

Claims (1)

1. safety management integrated risk early warning system, it is characterised in that:
The system library of measure foundation including verification condition and risk case as Risk-warning, system library are judgement system Verifiability data associated therewith can collectivity carry out classification typing, according to the natural language attribute of system and program language Design combines the basis of formation algorithm, and algorithm is the mathematical algorithm of intelligent parsing system;
Including risk indicator library, risk indicator library includes setting risk by the action of safety management system and range to refer to Mark, divide risk classifications and weight and define risk point come determine the presence of risk factors and assess risk property and Hazard analysis and HACCP, the measure controlled risk;
The comparison data or verifying logic of system library and risk indicator library as acquisition data, data volume, number when acquisition data The standard of risk indicator setting is reached according to range, data exception or has had matched the factor of risk point formation, system will pass through wind Danger analysis forms risk data report, intuitively exposes security risk by data displaying, or prompt to protect by Risk-warning It defends administrative staff and takes necessary measure, guard against the generation of security risk in advance, achieve the purpose that risk management and control.
CN201710545660.1A 2017-07-06 2017-07-06 Safety management integrated risk early warning system Pending CN109102137A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710545660.1A CN109102137A (en) 2017-07-06 2017-07-06 Safety management integrated risk early warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710545660.1A CN109102137A (en) 2017-07-06 2017-07-06 Safety management integrated risk early warning system

Publications (1)

Publication Number Publication Date
CN109102137A true CN109102137A (en) 2018-12-28

Family

ID=64796342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710545660.1A Pending CN109102137A (en) 2017-07-06 2017-07-06 Safety management integrated risk early warning system

Country Status (1)

Country Link
CN (1) CN109102137A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111538478A (en) * 2020-04-20 2020-08-14 佳缘科技股份有限公司 Method for improving randomness of output sequence
CN114240386A (en) * 2021-12-22 2022-03-25 重庆至信实业集团有限公司 Risk point management system and method based on quality control

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1588405A (en) * 2004-08-31 2005-03-02 杭州恒生电子股份有限公司 Data processing device and method for risk control system
CN102663538A (en) * 2012-03-16 2012-09-12 深圳供电局有限公司 Power grid risk management system and application method thereof
CN103401699A (en) * 2013-07-18 2013-11-20 深圳先进技术研究院 Cloud data center security monitoring early warning system and method
US20140019194A1 (en) * 2012-07-12 2014-01-16 Bank Of America Predictive Key Risk Indicator Identification Process Using Quantitative Methods
US20140236665A1 (en) * 2013-02-18 2014-08-21 Tamika M. Baker Automated Risk Management System and Method
CN104318408A (en) * 2014-11-25 2015-01-28 上海建科工程咨询有限公司 Multi-target and multi-dimension risk management system for large building engineering construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1588405A (en) * 2004-08-31 2005-03-02 杭州恒生电子股份有限公司 Data processing device and method for risk control system
CN102663538A (en) * 2012-03-16 2012-09-12 深圳供电局有限公司 Power grid risk management system and application method thereof
US20140019194A1 (en) * 2012-07-12 2014-01-16 Bank Of America Predictive Key Risk Indicator Identification Process Using Quantitative Methods
US20140236665A1 (en) * 2013-02-18 2014-08-21 Tamika M. Baker Automated Risk Management System and Method
CN103401699A (en) * 2013-07-18 2013-11-20 深圳先进技术研究院 Cloud data center security monitoring early warning system and method
CN104318408A (en) * 2014-11-25 2015-01-28 上海建科工程咨询有限公司 Multi-target and multi-dimension risk management system for large building engineering construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
崔良中;郭福亮;杨光明;: "军队保密工作风险评估模型研究", 网络空间安全 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111538478A (en) * 2020-04-20 2020-08-14 佳缘科技股份有限公司 Method for improving randomness of output sequence
CN114240386A (en) * 2021-12-22 2022-03-25 重庆至信实业集团有限公司 Risk point management system and method based on quality control

Similar Documents

Publication Publication Date Title
Bondarenko et al. National resilience as a determinant of national security of Ukraine
Usman et al. An investigation on the rate of crime in Sokoto state using principal component analysis
CN104199854B (en) Petrochemical equipment risk register method
CN111310803B (en) Environment data processing method and device
Bürgenmeier Environmental policy: Beyond the economic dimension
CN109102137A (en) Safety management integrated risk early warning system
CN115169779A (en) Enterprise safety risk early warning prediction system and method
Menshikh et al. Simulating the Evaluation of Survivability of Ergatic Systems Based on the Use of Weighted Hypergraphs
Zhang et al. System dynamics analysis for petrochemical enterprise fire safety system
Karpa et al. Problems of stabilization of the system of public administration under the conditions of decentralizational changes and martial law in Ukraine
CN116805087A (en) Engineering safety supervision method and system based on artificial intelligence
Haynes Workplace violence: Why every state must adopt a comprehensive workplace violence prevention law
Holsinger Exploring the relationship between time in pretrial detention and four outcomes
Prokofieva-Yanchylenko Methods for Assessing Threats to Criminological Security
Pera et al. A Conceptual Framework to Defining Leading Indicators to Measure Safety Management System Performance
Jafari et al. Approach to implementing health and environmental safety system in construction projects using fuzzy logic
Sevryugina et al. Resource verification of construction objects having increased importance level
CN117217625B (en) Enterprise safety supervision method and device based on data analysis
Moskvichev et al. Management of technogenic safety based on a risk-oriented approach
Herrscher et al. Implementation of Risk Management in Hospitals
Hinchuk The factors of quality of statistical information which is formed by the state statistics of Ukraine about administrative offenses
Wang et al. The Researches on Security Risk Management Process
Myshko et al. Model of a risk-based approach in the organization of control (supervision) in the field of education
Xu et al. Risk early warning indicators for air traffic controllers' unsafe acts
CN1442809A (en) Method of determining whether hazardous source is or not conformed with serious hazardous source management range and laws and regulations requirement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination