CN109098179A - A kind of throwing structural system and working method - Google Patents

A kind of throwing structural system and working method Download PDF

Info

Publication number
CN109098179A
CN109098179A CN201810929144.3A CN201810929144A CN109098179A CN 109098179 A CN109098179 A CN 109098179A CN 201810929144 A CN201810929144 A CN 201810929144A CN 109098179 A CN109098179 A CN 109098179A
Authority
CN
China
Prior art keywords
sandbag
throwing
control
leading truck
control cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810929144.3A
Other languages
Chinese (zh)
Other versions
CN109098179B (en
Inventor
孙旭亮
随守信
李久春
周林
付光进
王成
付栋
刘强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Harbour Co Ltd
Original Assignee
PowerChina Harbour Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Harbour Co Ltd filed Critical PowerChina Harbour Co Ltd
Priority to CN201810929144.3A priority Critical patent/CN109098179B/en
Publication of CN109098179A publication Critical patent/CN109098179A/en
Application granted granted Critical
Publication of CN109098179B publication Critical patent/CN109098179B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/10Placing gravel or light material under water inasmuch as not provided for elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of throwing structural system and working method, the throwing structural system mainly includes throwing ship, GPS, windlass, buoyancy tank, sandbag control leading truck, the fixed device of control cage, topside control cage storing unit, control cage lifting system and operation control box;The buoyancy tank is located at the side of the throwing ship, and the buoyancy tank middle position is provided with moon pool, three groups are placed in moon pool described in sandbag control leading truck;The sandbag control leading truck is fitted together by multiple independent sandbag control cage;The control cage lifting system is made of four promotion columns, and for controlling the movement of sandbag control leading truck, the topside control cage storing unit is made of four storage racks, for storing sandbag guiding control cage.In short, throwing structural system of the present invention can effectively improve the accuracy of sandbag throwing, construction quality is improved, is accelerated construction progress.

Description

A kind of throwing structural system and working method
Technical field
The present invention relates to dredging waterway technical field, it is specifically related to a kind of throwing structural system and working method.
Background technique
Bangladesh Pa Dema bridge river training works, construction area depth of water 15m~30m, construction time flow rate of water flow 0.5~ 1.5m/s, design bank slope gradient 1:6, slope excavating tolerance be ± 250mm, using large-scale cutter suction dredger dredging at Slope;Soil property is based on silt and Extra-fine sand.Bank slope protection structure is mainly that 3 layers of 125kg soil engineering bag loaded filter+90cm chunk stone are anti- Shield, foundation trench safeguard structure are 5 layers of 800kg soil engineering bag protection.Soil engineering bag dissipates throwing form using continuous, wherein 125kg soil engineering bag 17000000,800kg soil engineering bag 4,000,000.Soil engineering bag throwing quality requirement minimum thickness meets three layers of geotechnique's 125kg soil engineering bag Or 5 layers of 800kg soil engineering bag, 5 layers of 800kg soil engineering bag allow with a thickness of 2.0m~2.5m, 3 layers of 125kg soil engineering bag allow with a thickness of 0.5m~0.75m, for maximum gauge no more than designing the 150% of thickness, throwing required precision is high.
Bangladesh Pa Dema dredging waterway project from soil engineering bag throwing construction go into operation since, always using utilize plate It refutes and leans on GPS positioning using four windlass as location base for operation platform, riprapping is that deck pinpoints step-by-step movement throwing method, because Construction area water flow, water level enters the factors such as water posture is different compared with depth and soil engineering bag influences, and underwater drift and dispersion are very big, lead Cause the soil engineering bag flatness tolerance after throwing larger, irregular, the slope surface formed after throwing is bigger, and labor intensity Greatly, safety is poor, and construction efficiency is low, and the riprapping and throwing result is caused to cannot get owner and management approval, existing letter always It is described as follows:
The throwing precision of soil engineering bag is low, and the region after throwing has that thickness is too high or too low.Soil engineering bag throwing with Flat top barge is operation platform, and in barge side, by the measured fixed position of survey and throwing number of plies requirement dozens of, throwing enters together Then water carries out stepping and next round throwing using four positioning of anchor winches;But due to when soil engineering bag enters water by construction area water The turbulent flow of stream and the sack impact water surface influences, in addition construction area water level is deep, drifts about after will lead to soil engineering bag water inlet, It is difficult to fall on scheduled riverbed throwing place, and drifts about there is biggish randomness, it is final after soil engineering bag water inlet to leave a nothing Method control, the soil engineering bag thickness degree for eventually leading to throwing region are unsatisfactory for code requirement (too high or too low).Supervision requirement: throwing Precision disapproves the construction of subsequent processing or working face in the case where not up to demand of technical standard;Throwing is more than certain thick Degree is removed, and be unsatisfactory for thickness must mend throwing;Super thick remove work difficulty it is larger, and again carry out mend throw when, mend throw Soil engineering bag equally will receive above-mentioned influence, cause soil engineering bag to be difficult to fall at low spot, be not achieved mend throw effect.Cause work It constantly repeats, inefficiency.
Summary of the invention
Technical problem solved by the present invention is improving construction quality to improve the construction technology of soil engineering bag throwing, accelerate Construction speed, the present invention provides a kind of throwing structural system and working methods.
The technical scheme is that a kind of throwing structural system, mainly includes throwing ship, GPS, windlass, buoyancy tank, sandbag Control the fixed device of leading truck, control cage, topside control cage storing unit, control cage lifting system and operation control box;
The GPS altogether there are two, be located at the both ends of the buoyancy tank, the windlass altogether there are four, be located at described The quadrangle of throwing ship, throwing ship are moved to specified throwing position by the GPS and windlass;
The buoyancy tank is located at the side of the throwing ship, and the buoyancy tank middle position is provided with moon pool, and the moon pool is in strip Shape, place three groups in moon pool described in sandbag control leading truck;The buoyancy tank can in the deck usable floor area for not reducing throwing ship, It ensures the increased modular manufacturing installation for throwing bag control device again simultaneously, reduces former ship to greatest extent in retrofit process It stops work the repacking time;
The sandbag control leading truck is fitted together by multiple independent sandbag control cage, and sandbag controls leading truck in work Making each station in surface side can open to form throwing mouth, and sandbag control cage according to the depth of water situation of construction operation area for gradually mentioning Sandbag control cage is risen or removed to realize the adjustment of the sandbag control leading truck depth of water;The sandbag control leading truck is provided with specially The independent lifting beam of door, installation and disassembly of the lifting beam for sandbag control leading truck;The sandbag control guiding Frame can enable the sandbag left more accurately drop on bed mud face, prevent sandbag free-falling in the process due to water The drift phenomenon that resistance and water flow generate;
The control cage lifting system is made of four promotion columns, and four promotion columns include being located among moon pool Two promotion columns and two promotion columns positioned at moon pool two sides, be respectively provided with two on two promotion columns of the centre Leading truck hoisting gear, a leading truck hoisting gear is respectively provided on the promotion column of the two sides, and control cage lifting system is used In the lifting of control sandbag control leading truck;
The fixed device of the control cage is fixed on inside and outside sandbag control leading truck on railway platform, and the fixed device of control cage is logical It crosses chain to connect with the lifting lug on sandbag control leading truck, the fixed device of control cage is for fixing sandbag control leading truck and satisfaction Two sides leading truck hoisting gear, which breaks off relations, when sandbag control cage dismounts changes the needs of suspension centre, plays the role of insurance and fixation;
The topside control cage storing unit is made of four storage racks, and four storage racks are equidistantly fixed on buoyancy tank Distal side, four storage racks form three storage mouths, and topside control cage storing unit is used for through storage mouth placement sandbag Control leading truck;
The operation control box is fixed on buoyancy tank side, carries out sandbag control leading truck for operating control cage lifting system Lifting.
Further, the fixed device every two of the control cage is respectively provided at every group of sandbag for one group and controls the remote of leading truck End and proximal end two sides.
Further, the buoyancy tank is connect with throwing ship by the strong structure of main deck, bow stern transom plate and topside.It can be with Guarantee the fixation between buoyancy tank and throwing ship, while improving the position precision of throwing.
Further, the sandbag control leading truck is assembled in by the sandbag control cage that 6 independent height are mono- section of 4m Together, it is bolted between sandbag control cage.It can make the easy for installation of lifting.
Further, the sandbag control cage is mainly made of steel pipe, round steel and angle steel, and sandbag controls table in leading truck Face need to design round and smooth, no protrusion.Prevent sandbag control leading truck when jettisoninging soil engineering bag, frame wall, which draws rotten soil engineering bag, makes soil engineering bag It is ineffective.
Further, the promotion column is installed on buoyancy tank in such a way that bolt and electric welding are reinforced, and is promoted on column Face is equipped with leading block, suspension hook and ladder etc.;The top for promoting column is provided with maintenance platform, convenient for the follow-up maintenance of equipment Maintenance and the fixation and promotion of sandbag control leading truck, promote column inner top and are provided with vertical lifting bracket, vertically play ascending branch Frame, which is used to hang on sandbag control leading truck by wirerope, promotes column, prevents sandbag control leading truck during raising Shaking, influence control sandbag control leading truck movement.
Further, the control cage lifting system controls the suspension centre at leading truck both ends by sandbag and is promoted above column Leading truck hoisting gear and leading block come cooperate complete, the leading truck hoisting gear at both ends be designed to double speed or three speed, energy Realize the linkage of two vehicles and a vehicle single action, three groups of sandbag control leading trucks can focus on control cabinet at one and control.Due to entire sandbag Weight is larger after controlling leading truck connection, belongs to flat boxes and baskets body structure, and overall stiffness is on the weak side, to realize that sandbag controls leading truck Lifting in moon pool can satisfy the requirement of two-end-point promotion with this solution.
Further, the sandbag control leading truck bottom outside is equipped with baffle.By the design of baffle, geotechnique can be made Exit is fallen under bag, gives the power of soil engineering bag one inwardly, keeps soil engineering bag filling even closer, improves the efficiency and matter of throwing Amount.
The present invention also provides a kind of working methods of throwing structural system, comprising the following steps:
S1: selecting the height of sandbag control leading truck according to the depth of water in practice of construction region, is assisted using windlass as work, Install or remove sandbag control cage additional;
S2: guiding sandbag to control leading truck movement by operation control box (8), according to the depth of water and passes through control cage promotion system Promotion and reduction sandbag appropriate of uniting controls leading truck, and throwing ship manipulator should adjust in time sandbag control according to throwing depth and lead To the depth of frame, avoids the outlet of sandbag control leading truck too far from riverbed, do not have effect, also avoid outlet too close from riverbed Danger is bottomed out, to guarantee going on smoothly for construction;
S3: it after work starts, is controlled by four anchors on throwing ship and double GPS computer monitors, manipulator understands throwing in real time The coordinate position of ship is filled out, to grasp the positioning accuracy of each throwing point;
S4: each soil engineering bag is pushed into sandbag guiding control cage after completing filling, seam packet according to directives for construction, because To there is sandbag to control the constraint of leading truck, soil engineering bag by water velocity, the depth of water and will not enter water posture and influenced, prevent in water The generation of irregular drift phenomenon is oriented to control cage by sandbag and directly drop to designated place, each throwing of strict control The soil engineering bag throwing number of point carries out soil engineering bag throwing according to preset throwing superficial density, after the completion of each batch throwing Joint signature confirmation should be carried out at once, substantially increase throwing precision;
S5: it after completing a wheel throwing, is measured by GPS, determines the throwing number and batch of next round, and pass through four anchors Machine carries out the movement of ship, completes a new wheel throwing, repeats the throwing process;Ship pays attention to sandbag control in moving process The underwater position of leading truck processed, avoids bottoming out.
The beneficial effects of the present invention are:
(1) present invention is designed using buoyancy tank, can be in the deck usable floor area for not reducing throwing ship, while being ensured and being increased again Throwing bag control device modular manufacturing installation, the shut-down for reducing former ship to greatest extent in retrofit process reequips the time, Improve construction efficiency.
(2) present invention controls leading truck using sandbag, and the sandbag left can be enable more accurately to drop to bed mud On face, drift phenomenon of the sandbag free-falling in the process due to water resistance and water flow generation is prevented;Throwing construction efficiency is improved, Reduce security risk.
(3) sandbag of the invention control leading truck is combined assembly by multiple sandbag control cage, can be according to reality The throwing depth of water carries out dismounting adjustment, is suitable for a variety of depth of water environment, and the scope of application is wider.
Detailed description of the invention
Fig. 1 is throwing structural system main view of the present invention.
Fig. 2 is throwing structural system top view of the present invention.
Fig. 3 is the Section A-A figure of Fig. 2 of the present invention, specially promotion pillar construction schematic diagram.
Fig. 4 is the section B-B figure of Fig. 2 of the present invention, and the specially fixed device of control cage and sandbag control guiding rack position closes System, a are positional relationship one, and b is positional relationship two, and c is positional relationship three.
Fig. 5 is the C-C sectional view of Fig. 2 of the present invention, specially the positional relationship and sliding of sandbag control leading truck and railway platform Schematic diagram.
Wherein, 1- throwing ship, 11- windlass, 2- buoyancy tank, 21-GPS, 3- moon pool, 4- sandbag control leading truck, 41- sandbag control Frame processed, 42- baffle, 43- lifting lug, 5- promote column, 51- leading truck hoisting gear, 52- ladder, 53- suspension hook, 54- guiding and slide Wheel, the vertical lifting bracket of 55-, 6- storage rack, 7- control cage fixed device, 8- operation control box, 9- lifting beam.
Specific embodiment
As shown in Figure 1, a kind of throwing structural system, mainly includes throwing ship 1, GPS 21, windlass 11, buoyancy tank 2, sandbag control Leading truck 4, the fixed device 7 of control cage, topside control cage storing unit, control cage lifting system and operation control box 8 processed;GPS 21 altogether there are two, be located at the both ends of buoyancy tank 2, windlass 11 altogether there are four, be located at the quadrangle of throwing ship 1, throwing ship 1 is logical It crosses GPS 21 and windlass 11 is moved to specified throwing position;
As shown in Fig. 2, buoyancy tank 2 is located at the side of throwing ship 1, buoyancy tank 2 and throwing ship 1 by main deck, bow stern transom plate with And the strong structure connection of topside.It can guarantee the fixation between buoyancy tank 2 and throwing ship 1, while improve the position precision of throwing. 2 middle position of buoyancy tank is provided with moon pool 3, and moon pool 3 is elongated, and three groups of sandbag control leading trucks 4 are placed in moon pool 3;Buoyancy tank 2 can be with In the deck usable floor area for not reducing throwing ship 1, while the increased modular manufacturing installation for throwing bag control device is ensured again, The time is reequiped in the shut-down for reducing former ship to greatest extent in retrofit process;
It is assembled in as shown in Figure 1, sandbag controls leading truck 4 by the sandbag control cage 41 that 6 independent height are mono- section of 4m Together, it is bolted between sandbag control cage 41.It can make the easy for installation of lifting.Sandbag control cage 41 is mainly by steel Pipe, round steel and angle steel are made, and sandbag control 4 inner surface of leading truck need to design round and smooth, no protrusion.Prevent sandbag from controlling leading truck 4 when jettisoninging soil engineering bag, and frame wall, which draws rotten soil engineering bag, keeps soil engineering bag ineffective.Sandbag controls 4 bottom outside of leading truck and is equipped with gear Plate 42.It by the design of baffle 42, can make to fall on exit under soil engineering bag, give the power of soil engineering bag one inwardly, make geotechnique Bag filling is even closer, improves the efficiency and quality of throwing.Sandbag controls leading truck 4 and can open in the work each station in surface side It is formed and throws mouth, sandbag control cage 41 is used to gradually promote or remove sandbag control cage 41 according to the depth of water situation of construction operation area To realize the adjustment of sandbag control 4 depth of water of leading truck;Sandbag control leading truck 4 is provided with special independent lifting beam 9, rises Installation and disassembly of the weight crossbeam 9 for sandbag control leading truck 4;Sandbag control leading truck 4 can enable the sandbag left compare It accurately drops on bed mud face, prevents drift phenomenon of the sandbag free-falling in the process due to water resistance and water flow generation;
As shown in Figure 1-3, control cage lifting system is made of four promotion columns 5, promotes column 5 and pass through bolt and electric welding The mode of reinforcing is installed on buoyancy tank 2, is promoted column 5 and is equipped with leading block 54, suspension hook 53 and ladder 52 etc. above;It is promoted vertical The top of column 5 is provided with maintenance platform, and the fixation and promotion of leading truck 4 are controlled convenient for the follow-up maintenance maintenance of equipment and sandbag, It promotes 5 inner top of column and is provided with vertical lifting bracket 55, vertical lifting bracket 55 is used to lead sandbag control by wirerope It hangs on and is promoted on column 5 to frame 4, prevent the shaking of sandbag control leading truck 4 during raising, influence control sandbag control and lead Movement to frame 4.Four promotion columns 5 include two promotion columns 5 positioned at 3 centre of moon pool and two positioned at moon pool two sides Column 5 is promoted, is respectively provided with two leading truck hoisting geares 51 on two intermediate promotion columns 5, it is each on the promotion column 5 of two sides Equipped with a leading truck hoisting gear 51, control cage lifting system is used to control the lifting of sandbag control leading truck 4;Control cage mentions The system of liter pass through sandbag control the suspension centre at leading truck both ends and promoted leading truck hoisting gear and the leading block above column come Cooperation is completed, and the leading truck hoisting gear at both ends is designed to double speed or three speed, is able to achieve the linkage of two vehicles and a vehicle single action, and three groups husky Bag control leading truck can focus on control cabinet at one and control.Weight is larger after being connected due to entire sandbag control leading truck 4, belongs to Flat boxes and baskets body structure, overall stiffness is on the weak side, to realize lifting of the sandbag control leading truck 4 in moon pool 3, with this solution may be used To meet the requirement of two-end-point promotion.
It is fixed on two inside and outside every group of sandbag control leading truck 4 as shown in Fig. 2, fixed 7 every two of device of control cage is one group On side railway platform 3, the fixed device 7 of control cage controls the lifting lug 43 on leading truck 4 with sandbag by chain and connect, the fixed dress of control cage 7 are set to change for fixing sandbag control leading truck 4 and meeting two sides leading truck hoisting gear 51 when sandbag control cage 41 dismounts to break off relations The needs of suspension centre, play the role of insurance and fixation;
As shown in Fig. 2, topside control cage storing unit is made of four storage racks 6, four storage racks 6 are equidistantly fixed on The distal side of buoyancy tank 2, four storage racks 6 form three storage mouths, and topside control cage storing unit is used to put by storing mouth Set sandbag control leading truck 4;
As shown in Fig. 2, operation control box 8 is fixed on 2 side of buoyancy tank, sandbag control is carried out for operating control cage lifting system The lifting of leading truck 4 processed.
As shown in figure 4, figure a, b and c are followed successively by the fixed device 7 of three kinds of control cage and the position of sandbag control leading truck 4 is closed System.
As shown in figure 5, the positional relationship and sliding schematic diagram of sandbag control leading truck 4 and railway platform 3.
The present invention also provides a kind of working methods of throwing structural system, comprising the following steps:
S1: selecting the height of sandbag control leading truck 4 according to the depth of water in practice of construction region, auxiliary using windlass 11 as work It helps, installs or remove sandbag control cage 41 additional;
S2: guiding sandbag to control the movement of leading truck 4 by operation control box 8, according to the depth of water and passes through control cage promotion system Promotion and reduction sandbag appropriate of uniting controls leading truck 4, and 1 manipulator of throwing ship should adjust in time sandbag control according to throwing depth The depth of leading truck 4 avoids the outlet of sandbag control leading truck 4 too far from riverbed, does not have effect, also avoid outlet from riverbed Closely danger is bottomed out very much, to guarantee going on smoothly for construction;
S3: it after work starts, is controlled by four anchors on throwing ship 1 and double GPS computer monitors, manipulator understands throwing in real time The coordinate position for filling out ship 1 grasps the positioning accuracy of each throwing point;
S4: each soil engineering bag is pushed into sandbag guiding control cage 4 after completing filling, seam packet according to directives for construction, because To there is sandbag to control the constraint of leading truck, soil engineering bag by water velocity, the depth of water and will not enter water posture and influenced, prevent in water The generation of irregular drift phenomenon is oriented to control cage 4 by sandbag and directly drop to designated place, each throwing of strict control The soil engineering bag throwing number of point carries out soil engineering bag throwing according to preset throwing superficial density, after the completion of each batch throwing Joint signature confirmation should be carried out at once, substantially increase throwing precision;
S5: it after completing a wheel throwing, is measured by GPS 21, determines the throwing number and batch of next round, and pass through four A windlass 11 carries out the movement of ship, completes a new wheel throwing, repeats the throwing process;Ship pays attention in moving process Sandbag controls the underwater position of leading truck 4, avoids bottoming out.
To further illustrate advantage of the present invention, We conducted be transformed to sandbag throwing ship: by three 125kg And two 800kg throwing plates refute side overall length direction installation buoyancy tank 2,2 middle position of buoyancy tank increases sandbag control leading truck 4, Control cage lifting system, the fixed facilities such as device 7 and topside control cage storing unit of control cage leave process to meet sandbag In posture and position control.
Primary structure system:
1) buoyancy tank
The size of buoyancy tank 2 is calculated according to the size of flat top barge, to meet intensity and requirement.Size is inadequate Accordingly increasing overhanging platform, (B16 increases the overhanging platform of windlass 11, guarantees effective row rope distance of positioning windlass 11, generally It is 5-6 times of 11 drum length of windlass).Deck and hull use attached gusset and electric welding connection, and underwater is disregarded, waterline It is connected using structure with structure at the above 200mm, stem is connected with increasing T-shaped outside ship stern.Spiral shell is used respectively at deck and hull Bolt and electric welding connection guarantee the longitudinal strength needs of entire buoyancy tank 2, and after the completion of the buoyancy tank 2 entirely newly added splices, centre be will form The moon pool 3 of one longitudinal direction, sandbag control leading truck 4 are put into river water from moon pool 3.It is 24 that sandbag, which controls 4 total height of leading truck, Rice, is fitted together by 6 independent 4 meters high sandbag control cage 41, is gradually promoted according to the depth of water situation of construction operation area Or sandbag control cage 41 is removed to phytal zone movement.
By the haul of buoyancy tank 2 to the barge position for needing to be transformed, (barge will be parked in relatively flat at this time with barge side of a ship side positioning Hydrostatic domain, barge are also required to by adjusting load finally concordant with 2 main deck of buoyancy tank to be installed additional), pass through main deck, bow stern transom plate And the strong structure connection of topside, combine brand-new buoyancy tank 2 firmly with former ship.
2) sandbag controls leading truck
Sandbag control leading truck 4 is designed to that height is mono- section of 4m, and the requirement for meeting the throwing bag depth of water (can in ' s operation in shallow water Meet job requirements by promoting or removing sandbag control cage 41), entire sandbag control leading truck 4 work surface side each Station can be opened to form throwing mouth, and the every ship design of 800kg soil engineering bag has three groups of sandbag control leading trucks 4, and horizontal direction is equipped with 7 Throw mouth, full ship can simultaneously 21 sandbags of throwing.The every ship design of 125kg soil engineering bag has three groups of sandbag control leading trucks 4, horizontal direction Equipped with 13 throwing mouths, full ship can 39 sandbags of throwing simultaneously.
41 4 meters of height of every section sandbag control cage, divides upper layer and lower layer, and two meters every layer, every layer has a throwing mouth, and every group totally 6 Sandbag control cage 41 is saved, can be dismantled at any time, is able to satisfy from the water surface to -24 meters of throwing and is oriented to, greatest limit overworks 6 section sandbags When control cage 41, the intensity of every group of sandbag control leading truck 4 laterally can anti-1m/s water impact, (laterally refer to perpendicular to throwing Fill out working face) it longitudinally can anti-2m/s water impact (vertical face, which refers to, is parallel to throwing working face).It cannot construct during the rainy season of the side mawa, Since flow rate of water flow reaches 4m/s during Pa Dema main stem rainy season, the side Jajira can construct throughout the year, and maximum flow rate is equal No more than 2m/s.
3) column is promoted
After the completion of buoyancy tank 2 is built, for convenience of the installation of subsequent sandbag control cage 41, every 4 sets of setting of throwing ship 1 is dedicated to be mentioned Column 5 is risen, promotes stem height at 11 meters or so, the scheme reinforced by bolt and electric welding is installed on buoyancy tank 2.It is dedicated It promotes column 5 and hoisting gear 51, leading block 54, ladder 52, suspension hook 53 etc. is installed above, maintenance platform is arranged in top, convenient The follow-up maintenance of equipment is maintained and the fixation and promotion of sandbag control leading truck 4.
The vertical lifting bracket 55 that setting sandbag at the top of column 5 controls leading truck 4 is promoted, by specialized wire rope by sandbag Control leading truck 4, which is hung on, to be promoted on column 5, according to the depth of water situation of actual production, passes through hoisting gear 51, leading block Sandbag control leading truck 4 is promoted or is declined by 54 equal cooperations.
4) control cage lifting system
The both ends of this programme each group of sandbag control leading truck 4 are designed with suspension centre, dedicated are mentioned by promoted above column 5 Winch 51 and leading block 54 are risen to complete the lifting of sandbag control leading truck 4, the hoisting gear 51 at both ends is designed to double speed, energy Realize the linkage of two vehicles and a vehicle single action, three groups of sandbag control leading trucks 4 can focus on control cabinet at one and control.
5) the fixed device of control cage
Sandbag controls leading truck 4 when adjustment position finishes in running order, for the sake of assurance, control is equipped on buoyancy tank The fixed device 7 of frame processed, controls the lifting lug 43 on leading truck 4 with sandbag by chain and connect, play insurance and fixed function.Simultaneously Also the needs that suspension centre is changed in hoisting gear 51 unhook in two sides when sandbag control cage 41 dismounts are able to satisfy.
It is used by actual test, this throwing structural system falls on river along leading truck after can entering water with effective guarantee sandbag Bottom position is accurate, will not occur drift situation because of water currents, and the number of plies is uniform after throwing, can largely improve throwing precision, Guarantee construction quality, reduction do over again and mends throw etc. construction volumes, throwing effect it is good.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify to technical solution documented by previous embodiment or equivalent replacement of some of the technical features;And These are modified or replaceed, the spirit and model of technical solution of the embodiment of the present invention that it does not separate the essence of the corresponding technical solution It encloses.

Claims (8)

1. a kind of throwing structural system, which is characterized in that mainly include throwing ship (1), GPS (21), windlass (11), buoyancy tank (2), Sandbag controls leading truck (4), control cage fixed device (7), topside control cage storing unit, control cage lifting system and operation control Case (8) processed;
The GPS (21) altogether there are two, be located at the both ends of the buoyancy tank (2), the windlass (11) altogether there are four, position respectively In the quadrangle of the throwing ship (1), throwing ship (1) is moved to specified throwing position by the GPS (21) and windlass (11);
The buoyancy tank (2) is located at the side of the throwing ship (1), and buoyancy tank (2) middle position is provided with moon pool (3), the moon Pond (3) is elongated, the control of sandbag described in three groups of placement leading truck (4) in moon pool (3);
Sandbag control leading truck (4) is fitted together by multiple independent sandbag control cage (41), and sandbag controls leading truck (4) it can open to form throwing mouth in the work each station in surface side, sandbag control cage (41) is used for the water according to construction operation area Deep feeling condition gradually promotes or removes sandbag control cage (41) to realize the adjustment of sandbag control leading truck (4) depth of water;The sand Bag control leading truck (4) is provided with special independent lifting beam (9), and the lifting beam (9) controls leading truck for sandbag (4) installation and disassembly;
The control cage lifting system is made of four promotion columns (5), and four promotion columns (5) include being located at moon pool (3) two intermediate promotion columns (5) and two promotion columns (5) positioned at moon pool two sides, two of the centre are promoted vertical It is respectively provided with two leading truck hoisting geares (51) on column (5), is respectively provided with a leading truck on the promotion column (5) of the two sides and mentions It rises winch (51), control cage lifting system is used to control the lifting of sandbag control leading truck (4);
The control cage fixed device (7) is fixed on inside and outside sandbag control leading truck (4) on railway platform (3), and control cage is fixed Device (7) is connect by chain with the lifting lug (43) in sandbag control leading truck (4), and control cage fixed device (7) is for fixing Two sides leading truck hoisting gear (51), which breaks off relations, when sandbag controls leading truck (4) and meets sandbag control cage (41) dismounting changes suspension centre It needs;
The topside control cage storing unit is made of four storage racks (6), and four storage racks (6) are equidistantly fixed on floating The distal side of case (2), four storage racks (6) form three storage mouths, and topside control cage storing unit is used for through storage mouth Place sandbag control leading truck (4);
The operation control box (8) is fixed on buoyancy tank (2) side, carries out sandbag control guiding for operating control cage lifting system The lifting of frame (4).
2. a kind of throwing structural system according to claim 1, which is characterized in that the control cage fixed device (7) is every Two are respectively provided at the distal end and proximal end two sides that every group of sandbag controls leading truck for one group.
3. a kind of throwing structural system according to claim 1, which is characterized in that the buoyancy tank (2) and throwing ship (1) are logical Cross the strong structure connection of main deck, bow stern transom plate and topside.
4. a kind of throwing structural system according to claim 1, which is characterized in that sandbag control leading truck (4) is by 6 A independent height is that the sandbag control cage (41) of mono- section of 4m fits together, and is connected between sandbag control cage (41) by bolt It connects.
5. a kind of throwing structural system according to claim 4, which is characterized in that the sandbag control cage (41) mainly by Steel pipe, round steel and angle steel are made, and sandbag control leading truck (4) inner surface need to design round and smooth, no protrusion.
6. a kind of throwing structural system according to claim 1, which is characterized in that the promotion column (5) passes through bolt And electric welding reinforce mode be installed on buoyancy tank (2), promoted column (5) above be equipped with leading block (54), suspension hook (53) and Ladder (52);The top for promoting column (5) is provided with maintenance platform, promotes column (5) inner top and is provided with vertical lifting bracket (55), vertical lifting bracket (55), which is used to hang on sandbag control leading truck (4) by wirerope, promotes column (5).
7. a kind of throwing structural system according to claim 1, which is characterized in that the sandbag controls leading truck (4) bottom Baffle (42) are equipped on the outside of portion.
8. a kind of working method of throwing structural system, which comprises the following steps:
S1: selecting the height of sandbag control leading truck (4) according to the depth of water in practice of construction region, auxiliary as work using windlass (11) It helps, installs or remove sandbag control cage (41) additional;
S2: guiding sandbag control leading truck (4) mobile by operation control box (8), promotes system according to the depth of water and by control cage Promotion and reduction sandbag appropriate of uniting controls leading truck (4), and throwing ship (1) manipulator should adjust in time sandbag according to throwing depth The depth for controlling leading truck (4) avoids the outlet of sandbag control leading truck (4) too far from riverbed, does not have effect, also avoid out Mouth closely bottoms out very much danger from riverbed, to guarantee going on smoothly for construction;
S3: it after work starts, is controlled by four anchors on throwing ship (1) and double GPS computer monitors, manipulator understands throwing in real time The coordinate position of ship (1) grasps the positioning accuracy of each throwing point;
S4: each soil engineering bag is pushed into sandbag guiding control cage (4) according to directives for construction, passes through after completing filling, seam packet Sandbag guiding control cage (4) directly drop to designated place, the soil engineering bag throwing number of each throwing point of strict control, according to Preset throwing superficial density carries out soil engineering bag throwing, should carry out joint signature confirmation after the completion of each batch throwing at once;
S5: it after completing a wheel throwing, is measured by GPS (21), determines the throwing number and batch of next round, and pass through four anchors Machine (11) carries out the movement of ship, completes a new wheel throwing, repeats the throwing process;Ship pays attention to sand in moving process The underwater position of bag control leading truck (4), avoids bottoming out.
CN201810929144.3A 2018-08-15 2018-08-15 Throwing filling structure system and working method Active CN109098179B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810929144.3A CN109098179B (en) 2018-08-15 2018-08-15 Throwing filling structure system and working method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810929144.3A CN109098179B (en) 2018-08-15 2018-08-15 Throwing filling structure system and working method

Publications (2)

Publication Number Publication Date
CN109098179A true CN109098179A (en) 2018-12-28
CN109098179B CN109098179B (en) 2020-06-09

Family

ID=64849904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810929144.3A Active CN109098179B (en) 2018-08-15 2018-08-15 Throwing filling structure system and working method

Country Status (1)

Country Link
CN (1) CN109098179B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8240265B1 (en) * 2007-11-14 2012-08-14 Jon Khachaturian Method and apparatus for salvaging underwater objects
CN202899140U (en) * 2012-09-13 2013-04-24 江苏淮阴船用机械有限公司 Riprap operation device of lifting hopper
CN103924597A (en) * 2013-01-10 2014-07-16 中交第一航务工程局有限公司 Platform type riprap leveling barge and construction method thereof
JP2014136546A (en) * 2013-01-18 2014-07-28 Toyo Constr Co Ltd Door opening control method of barge, and throw-in control system implementing the same
CN105015717A (en) * 2015-07-24 2015-11-04 上海勘测设计研究院有限公司 Box-type deepwater positioning throwing boat and usage method thereof
CN106320344A (en) * 2016-09-22 2017-01-11 中交航局第二工程有限公司 Construction control method for dimension stone deepwater precise throwing and filling
CN207389483U (en) * 2017-11-02 2018-05-22 中国电建集团港航建设有限公司 A kind of deep water high-precision throws bag operation flat-bottomed boat
CN108252306A (en) * 2018-03-20 2018-07-06 中国水利水电第五工程局有限公司 A kind of underwater filler throwing system and construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8240265B1 (en) * 2007-11-14 2012-08-14 Jon Khachaturian Method and apparatus for salvaging underwater objects
CN202899140U (en) * 2012-09-13 2013-04-24 江苏淮阴船用机械有限公司 Riprap operation device of lifting hopper
CN103924597A (en) * 2013-01-10 2014-07-16 中交第一航务工程局有限公司 Platform type riprap leveling barge and construction method thereof
JP2014136546A (en) * 2013-01-18 2014-07-28 Toyo Constr Co Ltd Door opening control method of barge, and throw-in control system implementing the same
CN105015717A (en) * 2015-07-24 2015-11-04 上海勘测设计研究院有限公司 Box-type deepwater positioning throwing boat and usage method thereof
CN106320344A (en) * 2016-09-22 2017-01-11 中交航局第二工程有限公司 Construction control method for dimension stone deepwater precise throwing and filling
CN207389483U (en) * 2017-11-02 2018-05-22 中国电建集团港航建设有限公司 A kind of deep water high-precision throws bag operation flat-bottomed boat
CN108252306A (en) * 2018-03-20 2018-07-06 中国水利水电第五工程局有限公司 A kind of underwater filler throwing system and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵国权等: "深水域抛填袋装砂筑堤工艺探索", 《中国水运》 *

Also Published As

Publication number Publication date
CN109098179B (en) 2020-06-09

Similar Documents

Publication Publication Date Title
CN101429752B (en) Pier column prefabrication splicing building technology
CN106381870B (en) A kind of deep concrete mixture ship pile frame system and pile making method
CN202273179U (en) High-altitude steel cable suspended working platform for construction and maintenance on outer side of bridge box girder
CN107938699A (en) A kind of construction method on booster stations basis
CN102322062B (en) Transportation and installation process of base barrel body of barrel type breakwater
CN103835300A (en) Inner-support-free double-wall locking mouth steel bushing box cofferdam construction method and cofferdam
CN107100193B (en) A kind of construction technology for blower cushion cap
CN107254869A (en) A kind of ship booster supporting compartment enters water and floating and transportation method
CN106012960A (en) Assembly type long piled wharf upper structure system and construction method thereof
CN1528636A (en) Bridge under water fourdation floating-drilling platform construction method
CN1099834A (en) Sum navigation lock
CN109707002B (en) Device and method for accurately positioning, sinking and installing large water intake head
KR20240039045A (en) Method of constructing a platform for cast-in-place pile construction of high-pile pier
CN103600817A (en) Self-elevating offshore wind turbine installation vessel
CN102817342A (en) Construction technology of in-situ assembly under pile foundation construction platform of double-wall steel cofferdam
CN109944287A (en) Dredging operation system below harbour
CN206646567U (en) Self-propulsion type is multi-functional to take out sapin platform
CN109098179A (en) A kind of throwing structural system and working method
CN106812171A (en) The portable three floating bodies silt extraction system of medium and small reservoirs
CN217325078U (en) Bearing platform cofferdam system suitable for bridge pier restoration of existing bridge
CN206279527U (en) A kind of deep concrete mixture ship pile frame system
CN108999428A (en) A kind of method for dismounting of submerged tunnel steel closure door
CN212535661U (en) Shaft cantilever concrete unloader
CN113356065A (en) Construction method for main trestle in deep water area
CN1760079A (en) Transverse haif island type shipbuilding practices

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant