CN109098056A - A kind of high-intelligentization interchange system and design method - Google Patents

A kind of high-intelligentization interchange system and design method Download PDF

Info

Publication number
CN109098056A
CN109098056A CN201811086204.6A CN201811086204A CN109098056A CN 109098056 A CN109098056 A CN 109098056A CN 201811086204 A CN201811086204 A CN 201811086204A CN 109098056 A CN109098056 A CN 109098056A
Authority
CN
China
Prior art keywords
interchange
traffic
intelligentization
lane
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811086204.6A
Other languages
Chinese (zh)
Inventor
汪淼
施耀华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Road and Bridge Corp
Original Assignee
China Road and Bridge Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Road and Bridge Corp filed Critical China Road and Bridge Corp
Priority to CN201811086204.6A priority Critical patent/CN109098056A/en
Publication of CN109098056A publication Critical patent/CN109098056A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/002Design or lay-out of roads, e.g. street systems, cross-sections ; Design for noise abatement, e.g. sunken road
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/04Road crossings on different levels; Interconnections between roads on different levels

Abstract

The invention discloses a kind of high-intelligentization interchange systems, including from bottom to up successively including ground usual friendship layer, traffic main line layer and bridge cross-level, it is equipped with several branches between traffic main line layer and bridge cross-level and contacts ring road, and left turn lane of branch's connection ring road as traffic main line layer;A kind of high-intelligentization interchange design method, include the following steps: S100, by function status and effect of the analysis interchange in urban road network, category of roads, status landform and land used these restrictive conditions, predicting traffic flow amount selects suitable interchange pattern;S200, both interchange schemes are evaluated respectively by traffic flow analysis, making two kinds of interchange schemes, and using Field Using Fuzzy Comprehensive Assessment;S300, a kind of interchange scheme is selected, rationally determines the installation position of interchange in the program, and total arrangement planning is carried out to it, ensure that the interchange scheme plays bigger effect in road network.

Description

A kind of high-intelligentization interchange system and design method
Technical field
The present invention relates to interchange planning and designing technical field, specially a kind of high-intelligentization interchange system and set Meter method.
Background technique
With rapid urban, the volume of traffic it is growing day by day, on expressway around city road and expressway, expressway and trunk roads Traffic design in, in order to meet the service speed of road application, guarantee that traffic is expeditiously collecting and distributing, generally require using intercommunication The mode of grade separation, interchange are one of the indispensable component part of highway and the important structure of highway, Very important effect is played in whole highway, interchange technology is complicated, and it is various informative, it takes up a large area, cost is high, The superiority and inferiority of design scheme pacifies the industrial grade for directly influencing engineering, investment, benefit, the height of service level and driving Entirely, it so, before carrying out interchange construction, needs to carry out evaluation analysis to interchange scheme, judges the interchange Whether scheme can play a greater role in the road network, meanwhile, subsequent discovery Interchange Scheme Shortcomings are avoided, are carried out more The trouble changed causes bigger construction cost, currently, it is also fairly simple for the analysis of interchange scheme, it is generally only pair The magnitude of traffic flow and geographical conditions carry out simple analysis processing, and the depth of Chang Yinwei analysis not enough causes interchange rear There are some problems in the continuous course of work, such as, spacing between interchange is unreasonable, left turn lane vehicle be easy with The problems such as vehicle of Through Lane collides, there are blind areas;
Furthermore existing common interchange is usually that slow-moving traffic stream and car lane are arranged in same level, Due to the presence of slow-moving traffic stream, often make the speed of the vehicle driving on car lane slower, but also will increase traffic peace The probability that full accident occurs, it cannot be guaranteed that normally travel of the vehicle on the interchange.
Summary of the invention
In order to overcome the shortcomings of prior art, the present invention provides a kind of high-intelligentization interchange system and design side Method can carry out than choosing a variety of interchange schemes of formulation, it is the most suitable to select before determining construction interchange A kind of interchange scheme, and implement according to the program, to play preferably effect, and it can effectively solve that background technique mentions Out the problem of.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of high-intelligentization interchange system, from bottom to up successively include ground usual friendship layer, traffic main line layer and across Bridge cross-level, be additionally provided between the traffic main line layer and bridge cross-level it is several for realizing road intercommunication and dispersion hand over The branch of through-flow function contacts ring road, and left turn lane of the branch connection ring road as traffic main line layer.
Further, the ground usual friendship layer includes intermediate two non-motorized lanes for going slowly round-trip and is arranged in non-machine The pavement of motor-car road side is additionally provided with level-one greenbelt, two non-motorized lanes between the pavement and road tooth Between be also evenly arranged with several fences, there are turning gaps between the two neighboring fence, and are provided with two above fence Grade greenbelt.
Further, the vehicle travelled on the non-motorized lane includes bicycle, tricycle, electric bicycle, deformity The width of people's combustion-motor-driven wheelchairs and animal-drawn vehicle, and at least two lanes on non-motorized lane, every lane is not less than 1.5m, institute Pavement is stated from non-motorized lane using different road surface mechanisms, and the height on pavement is higher than the height of non-motorized lane.
Further, the traffic main line layer include the main traffic runner of grade separation and it is several for realizing with other path connecteds Intercommunication drawing lines, and the main traffic runner of the grade separation include keep straight on main stem and be separately positioned on straight trip main stem two sides several right sides It changes trains or buses, the right-turn lane is connected with corresponding intercommunication drawing lines.
Further, the bridge cross-level includes several intersection lanes, and described intersection lane one end and branch contact circle Road connection, the other end and other path connecteds.
A kind of high-intelligentization interchange design method, includes the following steps:
S100, pass through function status and effect of the analysis interchange in urban road network, category of roads, status Shape and land used these restrictive conditions, predicting traffic flow amount select suitable interchange pattern;
S200, by the further analysis to the magnitude of traffic flow, tentatively make two kinds of interchange schemes, and using fuzzy Comprehensive evaluation respectively evaluates both interchange schemes;
S300, it is selected by the ratio of two kinds of interchange schemes, final choice one of which interchange scheme rationally determines The installation position of interchange in the program, and total arrangement planning is carried out to it.
Further, interchange pattern has tubaeform, diamond shape, orientation Y shape and directional type hinge in the step S100.
Further, the prediction of the magnitude of traffic flow further includes following steps in the step S100:
S101, according to the communications and transportation status of locality and the development characteristic of periphery economic environment, in conjunction with government pair The policy series factor in the region comprehensively considers the state of development for predicting its future transportation;
The position that S102, clear interchange are played the part of in whole traffic, the traffic flow that analysis interchange is on active service Amount.
Further, in the step S200, Field Using Fuzzy Comprehensive Assessment further includes as follows to the evaluation of interchange scheme Step:
S201, it determines evaluation index, establishes evaluation index property set, n evaluation index, evaluation index={ evaluation index 1, evaluation index 2 ..., evaluation index n }, and quantization modulation processing is carried out to each evaluation index;
The weight of S202, Calculation Estimation index, on the basis of determining evaluation index initial weight using rough set method, In conjunction with expert investigation table, the weight of evaluation index, weight=(a of evaluation index are obtained with arithmetic mean method1, a2..., an) most Afterwards, according to normalization principle,
The comprehensive evaluation analysis of S203, interchange scheme are based on step S201 and step S202, using arithmetic mean method Quantitative analysis is carried out to two kinds of interchange schemes respectively.
Further, in the step S300, total arrangement planning include line arrangement, horizontal alignment, vertical alignment and Intersection pattern, wherein line arrangement further includes following steps:
S301, according to traffic flow situation, determine the main traffic flow of grade separation;
S302, pass through Reasonable Arrangement grade separation level, each ring road cross reference, and reasonable set interchange spacing are set.
Compared with prior art, the beneficial effects of the present invention are:
(1) present invention is made up of the intercommunication of three-decker up and down ground usual friendship layer, traffic main line layer and bridge cross-level Grade separation, on the one hand, the layering traveling for realizing mixed traffic flow has slow-moving traffic stream (non-motor vehicle and pedestrian) with motor vehicle Effect separation greatly reduces a possibility that traffic accidents occur while improving vehicle running speed;Another party Face slows down rush hour or other heavy traffic periods by the way that the mixed traffic flow on interchange is distinguished traveling Traffic problems, traffic traveling of effectively having releived reduces traffic blocking problem, ensure that traffic normal reliable is run;
(2) present invention carries out than choosing interchange scheme by using Field Using Fuzzy Comprehensive Assessment, it is determined that the most suitable Interchange scheme, avoid the subsequent change to interchange scheme, and ensure that the interchange scheme of selection in road It can play in net and more preferably act on.
Detailed description of the invention
Fig. 1 is that branch of the invention contacts ring road overlooking structure diagram;
Fig. 2 is ground usual friendship layer overlooking structure diagram of the invention.
Figure label:
The ground 1- usual friendship layer;2- traffic main line layer;3- bridge cross-level;4- branch contacts ring road;5- drainage channel;
101- non-motorized lane;The pavement 102-;103- level-one greenbelt;104- fence;105- turning gap;106- bis- Grade greenbelt;
The main traffic runner of 201- grade separation;202- intercommunication drawing lines;
2011- straight trip main stem;2012- right-turn lane;
301- intersects lane.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the present embodiment, as depicted in figs. 1 and 2, the present invention provides a kind of high-intelligentization interchange system, from Under it is supreme successively include that ground usual friendship layer 1, traffic main line layer 2 and bridge cross-level 3, interchange will not only realize motor vehicle Passage, it is also necessary to the characteristics of considering city mixed flow fully consider the passage of non-motor vehicle and pedestrian, if will Slow-moving traffic is used to be arranged in same level with car lane, it may appear that slow-moving traffic detour distance, non-motor vehicle climbing The problems such as difficult, and a possibility that traffic accident occurs is increased, by being supplied to slow-moving traffic stream and motor-driven in the present invention The lane of vehicle layering traveling, on the one hand, traffic obstacle of having releived significantly, traffic caused by avoiding peak period traffic pressure big are stifled Plug;On the other hand, traffic safety is effectively enhanced, and above-mentioned slow-moving traffic detour distance, non-motor vehicle climbing can be solved The problems such as difficult, the setting of ground usual friendship layer 1 can either provide non power driven vehicle and the passage of pedestrian, and effectively classify Mixed traffic flow, and then improve travel speed of the motor vehicles on traffic main line layer 2 and bridge cross-level 3;Traffic main line Layer 2 mainly provides the main traffic flow of the interchange, and realizes being connected for main traffic flow and other traffic flows;Bridge is intersected The setting of layer 3 provides more road driving sides mainly in rush hour or other heavy traffic periods for motor vehicles Case realizes the function of preferably dredging road to effectively slow down traffic congestion phenomenon.
It is explained further, if ground usual friendship layer 1 is set to subterranean layer, it will lead to draining and other pipeline cloth The problems such as if difficulty increases, and direction of traffic is not easy to identify;If being set to ground floor or more, entire interchange undoubtedly will increase Level, so that project cost greatly increases, so, in the present invention, ground usual friendship layer 1 is arranged in individual ground floor, to the greatest extent may be used Ground loading can be utilized, on the one hand, reduce influence of the intercommunication construction to surrounding enviroment;On the other hand, pass through reasonable traffic Tissue, not only conforms with the trip habit of people, while also various traffic flows can be made orderly to travel.
As preferred embodiment, it is additionally provided between traffic main line layer 2 and bridge cross-level 3 several for realizing road The branch of road intercommunication and diverging traffic stream function contacts ring road 4, and branch connection ring road 4 is as traffic main line layer 2 Left turn lane, on the one hand, the vehicle of traveling can be layered, traffic of releiving, to reduce traffic jam;On the other hand, have Effect avoids left turning vehicle and collides with through vehicles, improves the security reliability of vehicle driving, reduces traffic accident The probability of generation.
Further, ground usual friendship layer 1 includes intermediate two non-motorized lanes 101 for going slowly round-trip and is arranged in non-machine The pavement 102 of 101 side of motor-car road is additionally provided with level-one greenbelt 103, two institutes between the pavement 102 and road tooth It states and is also evenly arranged with several fences 104 between non-motorized lane 101, there are between turning between the two neighboring fence 104 Gap 105, and second level greenbelt 106 is provided with above fence 104, the setting of level-one greenbelt 103 and second level greenbelt 106 rises Good Greening functions have been arrived, to the good urban landscape pattern of formation, perfect landscape ecological and have been created outside pleasant city Portion space plays an important role, while also significant to protection traditional cities landscape, wherein level-one greenbelt 103 is mainly The biggish trees of figure can also keep away day for pedestrian's sunshade on pavement 102;Second level greenbelt 106 is mainly that figure is lesser Flowers and plants avoid blocking the visual field since 106 figure of second level greenbelt is larger, influencing the traveling of the slow-moving vehicles such as non-motor vehicle.
It is explained further, the setting of fence 104, plays and separate two round-trip non-motorized lanes 101 Effect, effectively prevent the slow-moving vehicle on non-motorized lane 101 arbitrarily turn either arbitrarily travel (answer in normally travel direction Should be to keep to the right), although the travel speed of slow-moving vehicle is slower, if, still there is safety traffic thing in arbitrarily traveling Therefore a possibility that, especially when slow-moving vehicle is more, the probability that traffic accident occurs for non-motor vehicle also greatly increases therewith;It is logical The setting turning gap 105 between two neighboring fence 104 is crossed, the passerby for avoiding driving non-motor vehicle arbitrarily turns, moreover, The effect of one " warning " is provided for passerby, when soon close turning gap 105, speed can be reduced, and observes front side to be It is no to there is non-motor vehicle to prepare turning, it gives way to realize.
It remarks additionally, is additionally provided with several drainage channels 5 connecting with sewer on non-motorized lane 101, drain The setting in channel 5 avoids rain and snow weather from leading to excess surface water for realizing drain function, influences road traffic, gives traffic safety It adversely affects.
Further, the vehicle travelled on non-motorized lane 101 includes bicycle, tricycle, electric bicycle, disabled person Combustion-motor-driven wheelchairs and animal-drawn vehicle, larger in view of speed difference between non-motor vehicle, vehicle driving is chaotic, should be in non-motorized lane 101 enterprising runways divide, at least two lanes on non-motorized lane 101, and one is runway, and another is fast, To standardize driving, if having ready conditions, also runway can further be segmented, to make every class travel speed difference larger as much as possible Non-motor vehicle separately travel, effectively prevent the traveling conflict between non-motor vehicle, the width in every lane is not less than 1.5m, Subject to conditions is no less than 1.25m.
As preferred embodiment, pavement 102 uses different road surface mechanisms from non-motorized lane 101, non-maneuver It occurs mainly in conflicting between vehicle and pedestrian on the non-section of plate altogether of people, pedestrian, non-motor vehicle mix row and generate, traditional people Frequently with same road surface mechanism (using pavement bricks making), pedestrian and non motorized vehicle is not easy to differentiate the section of non-plate altogether, and Non-automotive vehicle comfort is poor, in the present invention, pavement 102 and non-motorized lane 101 by using different road surface mechanisms, Asphalt pavement structure is used on non-motorized lane 101, is used azulejo on pavement 102, is visually just distinguished, allow non- Motor vehicle and pedestrian can take their own roads;The height on pavement 102 is higher than the height of non-motorized lane 101, on the one hand, is convenient for people's row Ponding on road 102 flows on non-motorized lane 101 (Water seeks its own level), so that from the drainage channel 5 on non-motorized lane 101 It discharges into sewer, ponding inconvenience pedestrian on pavement 102 is avoided to walk, moreover, because 102 height of pavement is higher, when non- When the non-motor vehicle travelled on car lane 101 passes through, the spray splash is not easy to drench the pedestrian on pavement 102;Another party Face has been better achieved and has separated pavement 102 and non-motorized lane 101.
Traffic main line layer 2 includes the main traffic runner 201 of grade separation and several intercommunication lines for realizing with other path connecteds Road 202, and the main traffic runner 201 of grade separation including straight trip main stem 2011 and is separately positioned on the several of straight trip 2011 two sides of main stem Right-turn lane 2012, right-turn lane 2012 are connected with corresponding intercommunication drawing lines 202, the setting of right-turn lane 2012, for providing The right-hand rotation function of driving vehicle on Through Lane 2011, and being connected between road is realized, guarantee the normal row of vehicle It sails.
Supplementary explanation, Through Lane 2011 is at least two lanes, and two lanes are round-trip lane (one has a try), when So, it according to the vehicle flowrate situation on Through Lane 2011, depending on the number of track-lines measurer body of Through Lane 2011, common are two-way Four-Lane Road (lane each direction You Liangtiao), two-way six-lane (there are three lanes in each direction), unidirectional Four-Lane Road (one direction four Lane) etc., so, the lane quantity that Through Lane 2011 includes condition of the invention without limitation is previous in the present invention It returns and is illustrated for two lanes.
The bridge cross-level 3 includes several intersection lanes 301, and described 301 one end of intersection lane and branch contact ring road 4 Connection, the other end and other path connecteds, realize the function of road intercommunication, it is ensured that vehicle normal row between urban road It sails.
The present invention also provides a kind of high-intelligentization interchange design methods, include the following steps:
S100, pass through function status and effect of the analysis interchange in urban road network, category of roads, status Shape and land used these restrictive conditions, predicting traffic flow amount (magnitude of traffic flow be in interchange design it needs to be determined that pattern and rule The important evidence of mould), suitable interchange pattern is selected, situation biggish for left-turning traffic flow does not select annular generally Grade separation, urban land anxiety should not select leaf grade separation etc.;
S200, by the further analysis to the magnitude of traffic flow, tentatively make two kinds of interchange schemes, and using fuzzy Comprehensive evaluation respectively evaluates both interchange schemes, due to being convenient for quantitative comparison when carrying out scheme evaluation The problem of be usually can use specific digital representation, but be difficult quantization even not quantifiable influence factor for some, with regard to hardly possible Size is influenced to weigh the pros and cons it, it is also difficult to the subjective impact of evaluation is completely eliminated, so, it is comprehensive by using obscuring in the present invention It closes evaluation assessment to evaluate Interchange Scheme, Field Using Fuzzy Comprehensive Assessment is grown up on the basis of fuzzy mathematics, is used The principle of fuzzy relation synthesis, quantifies those obscure boundaries, is not easy quantitative influence factor and index, from multiple indexs to being difficult to The complication system of precision carries out practical approach of the overall merit than choosing;
S300, it is selected by the ratio of two kinds of interchange schemes, final choice one of which interchange scheme is (in order to neck It leads and provides reliable decision-making foundation with decision-making section, so that interchange that is designed, building preferably is played its function, carry out and apply Work G- Design avoids the waste that human and material resources, financial resources are caused because of change scheme, shortens the design cycle, so, it is set in grade separation During meter, overall merit should be carried out to Interchange Scheme than choosing, makes every effort to assist selected grade separation form in communication function, environment Tune, traffic safety, construction management, economical adaptation etc. reach optimum balance, and grade separation is made to play bigger work in road network With), rationally determine the installation position of interchange in the program, and total arrangement planning is carried out to it.
Further, interchange pattern has tubaeform, diamond shape, orientation Y shape and directional type hinge in the step S100.
The prediction of the magnitude of traffic flow further includes following steps in the step S100:
S101, according to the communications and transportation status of locality and the development characteristic of periphery economic environment, in conjunction with government pair The policy series factor in the region comprehensively considers the state of development for predicting its future transportation;
The position that S102, clear interchange are played the part of in whole traffic, the traffic flow that analysis interchange is on active service Amount.
In the step S200, Field Using Fuzzy Comprehensive Assessment further includes following steps to the evaluation of interchange scheme:
S201, it determines evaluation index, establishes evaluation index property set, n evaluation index, evaluation index={ evaluation index 1, evaluation index 2 ..., evaluation index n }, and quantization modulation processing is carried out to each evaluation index, it is assumed that and level-one=1, second level=2, Three-level=3 determine the correspondence quantization level of each evaluation index;
The weight of S202, Calculation Estimation index, on the basis of determining evaluation index initial weight using rough set method, In conjunction with expert investigation table, the weight of evaluation index, weight=(a of evaluation index are obtained with arithmetic mean method1, a2..., an) most Afterwards, according to normalization principle,
The comprehensive evaluation analysis of S203, interchange scheme are based on step S201 and step S202, using arithmetic mean method Quantitative analysis is carried out to two kinds of interchange schemes respectively, the method is as follows:
The correspondence quantization level of each evaluation index is multiplied with the respective weights value of the evaluation index, show that the evaluation refers to Target quantizing factor Mi, Mi=quantization level × weight;
By two kinds of interchange schemesValue, which is found out, to be come.
In the step S300, total arrangement planning includes line arrangement, horizontal alignment, vertical alignment and intersects the shape of the mouth as one speaks Formula, wherein line arrangement is mostly important, and line arrangement further includes following steps:
S301, according to traffic flow situation, determine the main traffic flow of grade separation;
S302, pass through Reasonable Arrangement grade separation level, each ring road cross reference is arranged, and (ring road should avoid shorter as far as possible when laying It is continuously driven out to or drives into from main line apart from interior, should generally follow the principle of " right-in and right-out ", traffic sign is rationally set, so as to just Really judge entrance, avoid because accidentally row interferes vehicular traffic), and reasonable set interchange spacing, the interval pair of interchange Have in its traffic conversion function and significantly affect, it is therefore desirable to reasonable interval is determined, so that the magnitude of traffic flow of adjacent grade separation is protected Hold certain balance, it is however generally that, adjacent interchange minimum interval needs to meet upstream grade separation acceleration lane transition For terminal to downstream grade separation deceleratuib lane transition starting point, interval is not less than 500m, and meets the traffic sign spacing of institute's facility It is required that.
In general, the line arrangement of interchange covers the composition such as circular curve, easement curve and straight line, interchange Vertical curve generally require and be designed according to interchange space, selected according to the elevation feature of road intersection, and really Surely the suitable gradient, the gradient cross conference and traffic accident probability of happening are greatly increased, generally require road grade -2%~ In 3% range, overruns and need obviously to limit speed;Horizontal curve needs to consider the least radius requirement of driving, no Can occur that radius is too small so that vehicle driving centrifugal force is excessive, lateral bucking problem occur.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.

Claims (10)

1. a kind of high-intelligentization interchange system, it is characterised in that: from bottom to up successively include ground usual friendship layer (1), traffic Main line layer (2) and bridge cross-level (3) are additionally provided with several use between the traffic main line layer (2) and bridge cross-level (3) Ring road (4) are contacted in the branch for realizing road intercommunication and diverging traffic stream function, and branch connection ring road (4) is as friendship The left turn lane of logical main line layer (2).
2. a kind of high-intelligentization interchange system according to claim 1, it is characterised in that: the ground usual friendship layer (1) include intermediate two go slowly round-trip non-motorized lane (101) and setting non-motorized lane (101) side pavement (102), it is additionally provided with level-one greenbelt (103) between the pavement (102) and road tooth, two non-motorized lanes (101) it is also evenly arranged between several fences (104), there are turning gaps between the two neighboring fence (104) (105), second level greenbelt (106) and above fence (104) are provided with.
3. a kind of high-intelligentization interchange system according to claim 2, it is characterised in that: the non-motorized lane (101) allowing the vehicle travelled on the vehicle exercised includes bicycle, tricycle, electric bicycle, disabled person's combustion-motor-driven wheelchairs And animal-drawn vehicle, and at least two lanes on non-motorized lane (101), the width in every lane are not less than 1.5m, people's row Road (102) uses different road surface mechanisms from non-motorized lane (101), and the height of pavement (102) is higher than non-motorized lane (101) height.
4. a kind of high-intelligentization interchange system according to claim 1, it is characterised in that: the traffic main line layer It (2) include the main traffic runner (201) of grade separation and several intercommunication drawing lines (202) for realizing with other path connecteds, and described The main traffic runner (201) of grade separation includes straight trip main stem (2011) and several right sides for being separately positioned on straight trip main stem (2011) two sides It changes trains or buses (2012), the right-turn lane (2012) connects with corresponding intercommunication drawing lines (202).
5. a kind of high-intelligentization interchange system according to claim 1, it is characterised in that: the bridge cross-level (3) include several intersection lanes (301), the intersection lane (301) one end contacts ring road (4) with branch and connect, the other end with Other path connecteds.
6. a kind of high-intelligentization interchange design method, characterized by the following steps:
S100, by function status and effect of the analysis interchange in urban road network, category of roads, status landform and These restrictive conditions of land used, predicting traffic flow amount select suitable interchange pattern;
S200, by the further analysis to the magnitude of traffic flow, tentatively make two kinds of interchange schemes, and use fuzzy synthesis Evaluation assessment respectively evaluates both interchange schemes;
S300, it is selected by the ratio of two kinds of interchange schemes, final choice one of which interchange scheme rationally determines the party The installation position of interchange in case, and total arrangement planning is carried out to it.
7. a kind of high-intelligentization interchange design method according to claim 6, it is characterised in that: the step S100 Middle interchange pattern has tubaeform, diamond shape, orientation Y shape and directional type hinge.
8. a kind of high-intelligentization interchange design method according to claim 6, it is characterised in that: the step S100 The prediction of the middle magnitude of traffic flow further includes following steps:
S101, according to the communications and transportation status of locality and the development characteristic of periphery economic environment, in conjunction with government to the area The policy series factor in domain comprehensively considers the state of development for predicting its future transportation;
The position that S102, clear interchange are played the part of in whole traffic, the magnitude of traffic flow that analysis interchange is on active service.
9. a kind of high-intelligentization interchange design method according to claim 6, it is characterised in that: the step S200 In, Field Using Fuzzy Comprehensive Assessment further includes following steps to the evaluation of interchange scheme:
S201, it determines evaluation index, establishes evaluation index property set, n evaluation index, evaluation index={ evaluation index 1, is commented Valence index 2 ..., evaluation index n }, and quantization modulation processing is carried out to each evaluation index;
The weight of S202, Calculation Estimation index, on the basis of determining evaluation index initial weight using rough set method, in conjunction with Expert investigation table obtains the weight of evaluation index, weight=(a of evaluation index with arithmetic mean method1, a2..., an) finally, root According to normalization principle,
The comprehensive evaluation analysis of S203, interchange scheme are based on step S201 and step S202, are distinguished using arithmetic mean method Quantitative analysis is carried out to two kinds of interchange schemes.
10. a kind of high-intelligentization interchange design method according to claim 6, it is characterised in that: the step In S300, total arrangement planning includes line arrangement, horizontal alignment, vertical alignment and intersection pattern, wherein line arrangement is also Include the following steps:
S301, according to traffic flow situation, determine the main traffic flow of grade separation;
S302, pass through Reasonable Arrangement grade separation level, each ring road cross reference, and reasonable set interchange spacing are set.
CN201811086204.6A 2018-09-18 2018-09-18 A kind of high-intelligentization interchange system and design method Pending CN109098056A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811086204.6A CN109098056A (en) 2018-09-18 2018-09-18 A kind of high-intelligentization interchange system and design method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811086204.6A CN109098056A (en) 2018-09-18 2018-09-18 A kind of high-intelligentization interchange system and design method

Publications (1)

Publication Number Publication Date
CN109098056A true CN109098056A (en) 2018-12-28

Family

ID=64866566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811086204.6A Pending CN109098056A (en) 2018-09-18 2018-09-18 A kind of high-intelligentization interchange system and design method

Country Status (1)

Country Link
CN (1) CN109098056A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088737A (en) * 2019-12-31 2020-05-01 中国公路工程咨询集团有限公司 Method and system for single-horn intercommunicating grade separation linear design
CN117494571A (en) * 2023-11-16 2024-02-02 中交第二公路勘察设计研究院有限公司 Microcosmic simulation-based composite high-speed interchange optimization layout method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5921701A (en) * 1997-06-25 1999-07-13 Clayton; Robert F. Traffic interchange
JP2004324206A (en) * 2003-04-24 2004-11-18 Tsukinada Kensetsu Kk Grade separation structure for roads
CN101246513A (en) * 2008-03-20 2008-08-20 天津市市政工程设计研究院 City fast road intercommunicated overpass simulation design system and selection method
CN201334628Y (en) * 2008-12-23 2009-10-28 郭关鸣 Direct-left-and-right-turning interchange
CN102002901A (en) * 2010-12-10 2011-04-06 东南大学 Intersection space design method based on complexity control
CN102444063A (en) * 2011-09-20 2012-05-09 北京工业大学 Method for calculating integral passing capacity of interchange flyover based on traffic operation stability
CN102587235A (en) * 2012-03-12 2012-07-18 李平定 Urban rapid transit network system
WO2013009704A1 (en) * 2011-07-09 2013-01-17 Gingrich Michael A Double crossover merging interchange

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5921701A (en) * 1997-06-25 1999-07-13 Clayton; Robert F. Traffic interchange
JP2004324206A (en) * 2003-04-24 2004-11-18 Tsukinada Kensetsu Kk Grade separation structure for roads
CN101246513A (en) * 2008-03-20 2008-08-20 天津市市政工程设计研究院 City fast road intercommunicated overpass simulation design system and selection method
CN201334628Y (en) * 2008-12-23 2009-10-28 郭关鸣 Direct-left-and-right-turning interchange
CN102002901A (en) * 2010-12-10 2011-04-06 东南大学 Intersection space design method based on complexity control
WO2013009704A1 (en) * 2011-07-09 2013-01-17 Gingrich Michael A Double crossover merging interchange
CN102444063A (en) * 2011-09-20 2012-05-09 北京工业大学 Method for calculating integral passing capacity of interchange flyover based on traffic operation stability
CN102587235A (en) * 2012-03-12 2012-07-18 李平定 Urban rapid transit network system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088737A (en) * 2019-12-31 2020-05-01 中国公路工程咨询集团有限公司 Method and system for single-horn intercommunicating grade separation linear design
CN117494571A (en) * 2023-11-16 2024-02-02 中交第二公路勘察设计研究院有限公司 Microcosmic simulation-based composite high-speed interchange optimization layout method

Similar Documents

Publication Publication Date Title
Planning Design
Bhattacharyya et al. Making Siliguri a walkable city
CN109098056A (en) A kind of high-intelligentization interchange system and design method
CN106381788A (en) Whole-net connection structure of urban road
CN1693585A (en) Fishhook type rotation road full oilrection overpass
Fitzpatrick et al. Managed lane ramp and roadway design issues
Smith Temporary speed hump impact evaluation
Polanski Reimagining the right-of-way: Designing streets as environmental and economic assets for active living and healthy environments
Findley Highway geometric design
Montella Roundabouts
Easa Geometric design
Samuel Innovative roadway design
Demirel Road safety evaluation of urban major arterials case study of 1071 Malazgirt Noulevard in Ankara
CN110616609A (en) Buffering and blockage-relieving access for expressway
CN107724197A (en) Road cross automobile, electric bicycle, the branch running lanes of pedestrian
CN202705839U (en) Crossroads overpass
CN206916558U (en) Bicyclic current viaduct above and below a kind of intersection
Fu The Application of “Humanized” Concept in Urban Road Design
Engineers Traffic calming protocol manual
Allred Traffic engineering for better roads
TALLAHASSEE MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN, CONSTRUCTION AND MAINTENANCE FOR STREETS AND HIGHWAYS
CN203451959U (en) Interchange road structure for shunting fast and slow vehicles
Planning Waldport: Transportation system plan
Haque et al. Roadway condition study
Ewing Traffic Calming in new developments: Avoiding the need for future fixes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181228