CN109087189A - Public expense approaches to IM, device, server and computer storage medium - Google Patents

Public expense approaches to IM, device, server and computer storage medium Download PDF

Info

Publication number
CN109087189A
CN109087189A CN201810958733.4A CN201810958733A CN109087189A CN 109087189 A CN109087189 A CN 109087189A CN 201810958733 A CN201810958733 A CN 201810958733A CN 109087189 A CN109087189 A CN 109087189A
Authority
CN
China
Prior art keywords
public
expenditure
terminal
amount
expense
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810958733.4A
Other languages
Chinese (zh)
Inventor
张聪
朱华东
李云裳
阳傲傲
刘宇
王松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Polytechnic University
Original Assignee
Wuhan Polytechnic University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Polytechnic University filed Critical Wuhan Polytechnic University
Priority to CN201810958733.4A priority Critical patent/CN109087189A/en
Publication of CN109087189A publication Critical patent/CN109087189A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/12Accounting
    • G06Q40/125Finance or payroll

Abstract

The present invention provides a kind of public expense approaches to IM, device, server and computer storage medium, server of the invention obtains the public expense expenditure request of present terminal transmission first, generates pre- expenditure amount information based on public expense expenditure request;Then pre- expenditure amount information is respectively sent to other terminals, carries out ballot operation to prompt each terminal to be based on the pre- expenditure amount information, and voting results are fed back;Every member in current organization can be allowed all to know movable cost detail and object in this way;Finally receive the voting results of each terminal feedback, when voting results meet default effective term, the expenditure target amount of money corresponding with pre- expenditure amount information is paid from public coin pond with completing public expense, and then realizes common cost more transparence and rationalization when in use.

Description

Public expense approaches to IM, device, server and computer storage medium
Technical field
The present invention relates to communication and computer field more particularly to a kind of public expense approaches to IM, device, server and Computer storage medium.
Background technique
In the collective organizations such as class, corporations, association, it is often necessary to collect certain expense and unified work to each member For the common cost entirely organized, these common costs are used for the purposes such as the movable spending of tissue, equipment purchasing.In these tissues Public expense management process in can usually encounter some problems.It has different views as how much the amount of money collected the charges every time can generate, often The detail of secondary activity spending or the detail of equipment purchasing are relatively difficult to achieve to the coming into the open of every member, transparence while entire Common cost remaining sum in tissue is also required to that every member is allowed to know.It can effectively be solved currently without a public expense management system Certainly in collective organization the problem of common cost.
Summary of the invention
The main purpose of the present invention is to provide a kind of public expense approaches to IM, device, server and computers to deposit Storage media, it is intended to solve the problems, such as how to allow common cost when in use more transparence, come into the open.
To achieve the above object, the present invention provides a kind of public expense approaches to IM, the method includes following steps It is rapid:
Server obtains the public expense that present terminal is sent and pays request, generates pre- expenditure gold based on public expense expenditure request Volume information;
The pre- expenditure amount information is respectively sent to other terminals, to prompt each terminal to be based on the pre- amount paid Information carries out ballot operation, and voting results are fed back;
The voting results for receiving each terminal feedback, when the voting results meet default effective term, from public coin pond The middle expenditure target amount of money corresponding with the pre- expenditure amount information is paid with completing public expense.
Preferably, the voting results for receiving each terminal feedback, when the voting results meet default effective term, It is described after paying step from the target amount of money corresponding with the pre- expenditure amount information of expenditure in public coin pond to complete public expense Method further include:
It generates public expense and pays detail, public expense expenditure detail is respectively sent to each terminal, so that each terminal is to institute Public expense expenditure detail is stated to be shown.
Preferably, described when the voting results meet default effective term, from public coin pond expenditure with it is described pre- The corresponding target amount of money of amount paid information is specifically included with completing public expense expenditure step:
When the voting results meet default effective term, the current balance in public coin pond is detected;
In the current balance target amount of money corresponding not less than the pre- expenditure amount information, execution is from described public Expenditure completes the step of public expense expenditure with the target amount of money in coin pond.
Preferably, the voting results for receiving each terminal feedback, when the voting results meet default effective term, After the current balance progress detecting step in public coin pond, further includes:
When current balance in the public coin pond is less than the pre- expenditure amount information corresponding target amount of money, according to The target amount of money and the current balance are that each terminal generates subsequent collection amount information respectively;
Each subsequent collection amount information is respectively sent to each terminal so that each terminal to the public coin pond send with it is described The corresponding subsequent collection amount of money of subsequent collection amount information.
Preferably, described that the pre- expenditure amount information is respectively sent to other terminals, to prompt each terminal to be based on institute It states pre- expenditure amount information and carries out ballot operation, and will be after voting results progress feedback step, further includes:
When the voting results are unsatisfactory for default effective term, payment cancellation notice is sent to the present terminal.
Preferably, the public expense that the server obtains that present terminal is sent pays request, based on public expense expenditure request Before generating pre- expenditure amount information step, the method also includes:
Server receives the corresponding amount information to be deposited of each terminal that payment platform is sent, the amount information to be deposited It is generated by the payment platform according to the payment request that the terminal is initiated;
Public expense detail interface to be deposited is generated based on each amount information to be deposited;
Public expense detail interface to be deposited is pushed into each terminal respectively, to prompt each terminal to be deposited to the public expense Detail interface is confirmed, and feedback acknowledgment result;
The confirmation of each terminal feedback is received as a result, when the confirmation result meets preset condition, by each terminal wait deposit Enter the corresponding amount of money of amount information and is stored in public coin pond.
Preferably, the method also includes:
The amount of money detail inquiry instruction for receiving present terminal input, according to the amount of money detail inquiry instruction to described public Amount of money detail in coin pond is searched;
The amount of money detail found is fed back into the present terminal, so that the present terminal is to the amount of money detail It is shown.
In addition, to achieve the above object, the present invention also proposes a kind of public expense apparatus for management of information, described device includes:
Respond module is generated for obtaining the public expense expenditure request of present terminal transmission based on public expense expenditure request Pre- expenditure amount information;
Vote module, for the pre- expenditure amount information to be respectively sent to other terminals, to prompt each terminal to be based on The pre- expenditure amount information carries out ballot operation, and voting results are fed back;
Payment module meets default effective term in the voting results for receiving the voting results of each terminal feedback When, the expenditure target amount of money corresponding with the pre- expenditure amount information is paid from public coin pond with completing public expense.
In addition, to achieve the above object, the present invention also proposes that a kind of server, the server include: memory, processing Device and it is stored in the public expense information management program that can be run on the memory and on the processor, the server and more A terminal, payment platform, public coin pond carry out communication connection, and the public expense information management program is arranged for carrying out as described above The step of public expense approaches to IM.
In addition, to achieve the above object, the present invention also proposes a kind of computer storage medium, the computer storage medium On be stored with public expense information management program, the public expense information management program configuration is realized as described above when being executed by processor The step of public expense approaches to IM.
Server of the invention obtains the public expense expenditure request of present terminal transmission first, is generated based on public expense expenditure request Pre- expenditure amount information;Then pre- expenditure amount information is respectively sent to other terminals, it is described pre- to prompt each terminal to be based on Amount paid information carries out ballot operation, and voting results are fed back;It can allow every member in current organization in this way All know movable cost detail and object;The voting results for finally receiving each terminal feedback meet default life in voting results When effect condition, the expenditure target amount of money corresponding with pre- expenditure amount information is from public coin pond to complete public expense expenditure, Jin Ershi Common cost more transparence and rationalization when in use are showed.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the server for the hardware running environment that the embodiment of the present invention is related to;
Fig. 2 is the structural schematic diagram of the public expense information management for the hardware running environment that the embodiment of the present invention is related to;
Fig. 3 is the flow diagram of public expense approaches to IM first embodiment of the invention;
Fig. 4 is the flow diagram of public expense approaches to IM second embodiment of the invention;
Fig. 5 is the flow diagram of public expense approaches to IM 3rd embodiment of the invention;
Fig. 6 is the structural block diagram of public expense apparatus for management of information of the invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
Referring to Fig.1, Fig. 1 is the server architecture schematic diagram for the hardware running environment that the embodiment of the present invention is related to.
As shown in Figure 1, this may include: processor 1001, such as CPU, communication bus 1002, network interface 1003 are deposited Reservoir 1004.Wherein, communication bus 1002 is for realizing the connection communication between these components.Network interface 1003 optionally may be used To include standard wireline interface and wireless interface (such as WI-FI interface).Memory 1004 can be high speed RAM memory, can also To be stable memory (non-volatile memory), such as magnetic disk storage.
It, can be with it will be understood by those skilled in the art that server architecture shown in Fig. 1 is not constituted to the restriction Including perhaps combining certain components or different component layouts than illustrating more or fewer components.
As shown in Figure 1, may include operating system, network communication module, Subscriber Interface Module SIM in the memory 1004 And public expense information management program.
With reference to Fig. 2, the server of the present embodiment belongs to public expense information management system as shown in Figure 2, the public expense information Management system purpose is solve the problems such as public expense managerial confusion in collective organization, publicity and the transparency are inadequate.This is System has used terminal, four coating systems framework of server, public coin pond and payment platform.It is flat that the payment platform can be Alipay Platform is also possible to wechat payment platform, but is not limited to both payment platforms;Terminal, that is, the client, the main users of terminal It is rank and file and fund manager in collective organization, the terminal can be computer, mobile phone, plate etc.;The server is real Now to the control of the collection processing and user right of client data, server and multiple terminals, payment platform, public coin pond into Row communication connection realizes the function of transferring accounts of system.Public coin pond is used to store the common cost in entire collective organization, public coin Pond can be based on payment platform, it is connected by interface with payment platform, so that the function of transferring accounts of system is more convenient, look into See that common cost detail is more convenient.The advantages of public expense information management system is centralized control, and distributed management will be entire Fund in tissue is managed collectively and is stored in public coin pond, and every rank and file, which has permission, to be transferred to and check, but only There is fund manager that can produce, is able to achieve informationization, the transparent management of common cost.
In server shown in Fig. 1, network interface 1003 is mainly used for multiple with above-mentioned public expense information management system Terminal, public coin pond carry out data communication;The present invention calls the public expense information stored in memory 1004 by processor 1001 Management program, and the step of executing public expense approaches to IM provided in an embodiment of the present invention.
Referring to Fig. 3, it is based on hardware above running environment, proposes a kind of public expense approaches to IM embodiment of the present invention;
In the present embodiment, the public expense approaches to IM the following steps are included:
Step S10: server obtains the public expense that present terminal is sent and pays request, is generated based on public expense expenditure request Pre- expenditure amount information;
It should be noted that the server is equivalent to the information centralized control end of above-mentioned public expense information management system, it is real Now to the control of the collection processing and user right of client (i.e. terminal) data.
It will be appreciated that for the present embodiment for carrying out a group activity, needs to pay corresponding activity cost It is illustrated, i.e., when the corresponding event organizer of present terminal needs to pay expense to movable platform, server can be responded currently The public expense that terminal is initiated pays request, generates pre- expenditure amount information corresponding with public expense expenditure request, wherein pre- expenditure gold Volume information may include for informations parameter such as the movable disbursement, payment objects.
Step S20: being respectively sent to other terminals for the pre- expenditure amount information, described pre- to prompt each terminal to be based on Amount paid information carries out ballot operation, and voting results are fed back;
It will be appreciated that each movable expense amount of money cannot all be disclosed to group in time usually in a group activity Intracorporal every member, and movable payment amount can more or less have one for the different members in group every time Fixed has different views, such as some members think that payment amount is more expensive, not cost-effective in this playground carry out activity, wants to change one The high playground of family's cost performance;
Therefore this example is being generated with after amount paid relevant parameter information, can be respectively sent to pre- expenditure amount information Other clients carry out ballot operation to prompt each client to be based on the pre- expenditure amount information, enable to so entire Current cost detail and cost object in group allow every member to know.
Step S30: receiving the voting results of each terminal feedback, when the voting results meet default effective term, from The expenditure target amount of money corresponding with the pre- expenditure amount information is paid in public coin pond with completing public expense.
In the concrete realization, each terminal under above-mentioned public expense information management system i.e. (each client), which has, is receiving When to pre- expenditure amount information, based on one vote interface of the pre- expenditure amount information generation, the corresponding use of each client Family can initiate ballot operation after seeing vote interface.
In the present embodiment, the default effective term needs the corresponding user of client under public expense information management system to exist It votes in 24 hours, did not voted more than 24 hours, think to abandon ticket, when being more than that half number is agreed in the user of ballot, Then think that the voting results of above-mentioned published amount paid parameter information come into force, and then server can be executed from public coin pond The step of expenditure corresponding with pre- expenditure amount information target amount of money to complete movable payment, wherein the gold in public coin pond Volume is the amount of money pre-deposited.Server can generate public expense expenditure detail simultaneously, and public expense expenditure detail is respectively sent to Each terminal, so that each terminal is shown public expense expenditure detail.
Further, when the voting results meet default effective term, can to the current balance in public coin pond into Row detection, in the current balance target amount of money corresponding not less than the pre- expenditure amount information, execution is from described public Expenditure completes the step of public expense expenditure with the target amount of money in coin pond;And the default item that comes into force is unsatisfactory in the voting results When part, payment cancellation notice is sent to the present terminal.
And the current balance in the public coin pond is when being less than the corresponding target amount of money of the pre- expenditure amount information, root It is that each terminal generates subsequent collection amount information, such as the mesh for currently needing to pay respectively according to the target amount of money and the current balance Standard gold volume is 500 yuan, and current balance is 400 yuan, then remaining 100 yuan will be by each end under public expense information management system Corresponding user is held to carry out subsequent collection;Each subsequent collection amount information is respectively sent to each terminal, so that each terminal is to described public Coin pond sends the subsequent collection amount of money corresponding with the subsequent collection amount information;
Specifically, when client receives the subsequent collection amount information of server transmission, the corresponding user of client can lead to It crosses client and initiates (gold corresponding with the subsequent collection amount information received to payment platform (such as wechat payment platform or Alipay) Volume) volume payment request is mended, payment platform responds benefit volume payment request and the corresponding amount of money is stored in the public coin pond.
The server of the present embodiment obtains the public expense expenditure request of present terminal transmission first, please be sought survival based on public expense expenditure At pre- expenditure amount information;Then pre- expenditure amount information is respectively sent to other terminals, it is described to prompt each terminal to be based on Pre- expenditure amount information carries out ballot operation, and voting results are fed back;Can allow in this way every in current organization at Member knows movable cost detail and object;The voting results for finally receiving each terminal feedback, meet default in voting results When effective term, the expenditure target amount of money corresponding with pre- expenditure amount information is from public coin pond to complete public expense expenditure, in turn Realize common cost more transparence and rationalization when in use.
With reference to Fig. 4, Fig. 4 is the second embodiment flow diagram of public expense approaches to IM of the invention;Based on this hair The first embodiment of bright above-mentioned public expense approaches to IM proposes the second embodiment of public expense approaches to IM of the invention.
In the present embodiment, before the step S10, the public expense approaches to IM further include:
Step S01: server receives the corresponding amount information to be deposited of each terminal that payment platform is sent, described to be deposited Amount information is generated by the payment platform according to the payment request that the terminal is initiated;
It will be appreciated that a collective needs to guarantee to have the enough public expense amount of money to exist before above-mentioned first embodiment Before step S10, public coin pond needs to obtain the amount of money expense of each user's deposit.
Specifically, the client under the public expense information management system is initiated to pay to the payment platforms such as Alipay or wechat After request, payment platform generates an amount information to be deposited based on the payment request received, then by the amount of money to be deposited Information feedback is sent to the server.
Step S02: public expense detail interface to be deposited is generated based on each amount information to be deposited;
Step S03: public expense detail interface to be deposited is pushed into each terminal respectively, to prompt each terminal to the public affairs Take detail interface to be deposited to be confirmed, and feedback acknowledgment result;
It will be appreciated that server can give birth to after receiving the amount information to be deposited of each client of payment platform feedback At public expense detail interface to be deposited;In order to guarantee publicity, the transparency of public expense income, need the public expense is to be deposited Detail interface pushes to the corresponding user of each terminal,
Step S04: receiving the confirmation of each terminal feedback as a result, when the confirmation result meets preset condition, by each end The corresponding amount of money of the amount information to be deposited at end is stored in public coin pond.
Specifically, the preset condition needs the corresponding user of client under public expense information management system in 24 hours Validation of information is carried out, it is unconfirmed more than 24 hours then to think to abandon, more than the number of half in the user that information successfully confirms Agree to, then it is assumed that this public expense, which is transferred to, rationally to come into force, and then server can execute and correspond to the amount information to be deposited of each terminal The amount of money be stored in public coin pond the step of.
The present embodiment is not directly to turn the amount of money of payment platform after client initiates payment request to payment platform Enter in public coin pond, but firstly generate amount information to be deposited, and further generates validation of information interface, the public expense information Each user under management system based on this time public expense seen be transferred to detail after carry out confirmation operation, confirm and successfully then execute The amount of money of payment platform is transferred to the step in public coin pond, and then ensure that the publicity of public expense income, the transparency, while energy Enough avoiding the occurrence of the unreasonable phenomenon of information inaccuracy, (such as some user is mantissa multi input one 0 when inputting the amount of money, such as Fruit carries out amount of money deduction from payment platform at once, subsequent also to return from public coin pond by the amount of money of user's erroneous input, With regard to more troublesome).
With reference to Fig. 5, Fig. 5 is the 3rd embodiment flow diagram of public expense approaches to IM of the invention;Based on this hair The first embodiment or the second embodiment of bright public expense approaches to IM proposes that the third of public expense approaches to IM of the present invention is real Apply example.
In the present embodiment, the public expense approaches to IM be the described method comprises the following steps:
Step S50: the amount of money detail inquiry instruction of present terminal input is received, according to the amount of money detail inquiry instruction pair Amount of money detail in the public coin pond is searched;
Step S60: the amount of money detail found is fed back into the present terminal, so that the present terminal is to described Amount of money detail is shown.
The present embodiment can be checked entirely to guarantee that public expense is taken in the publicity of expenditure, the transparency, each client Income detail, expenditure detail and the remaining sum in public coin pond.
Further, the client can be divided into fund manager and rank and file according to function privilege difference, wherein money Golden administrator has produces money for public expense spending from public coin pond, and has publication public information and initiate ballot activity Function privilege, and rank and file is then without above-mentioned permission.
In addition, the present invention also proposes a kind of public expense apparatus for management of information with reference to Fig. 5, described device includes:
Respond module 10 please be sought survival for obtaining the public expense expenditure request of present terminal transmission based on public expense expenditure At pre- expenditure amount information;
Vote module 20, for the pre- expenditure amount information to be respectively sent to other terminals, to prompt each terminal base Ballot operation is carried out in the pre- expenditure amount information, and voting results are fed back;
Payment module 30 meets the default item that comes into force in the voting results for receiving the voting results of each terminal feedback When part, the expenditure target amount of money corresponding with the pre- expenditure amount information is paid from public coin pond with completing public expense.
It will be appreciated that the public expense apparatus for management of information of the present embodiment can be it is a kind of for carrying out public expense information management Application software, and be loaded into the server, the specific embodiment of the public expense apparatus for management of information of the present embodiment is asked Referring to above-mentioned public expense approaches to IM embodiment, it will not be described here for the present embodiment.
Further, public expense apparatus for management of information of the invention further include:
Remaining sum detection module is used for when the voting results meet default effective term, to current in public coin pond Remaining sum is detected;In the current balance target amount of money corresponding not less than the pre- expenditure amount information, execution is from institute State the step of expenditure and the target amount of money are in public coin pond to complete public expense expenditure.
It is corresponding to be less than the pre- expenditure amount information for the current balance in the public coin pond for amount of money subsequent collection module The target amount of money when, be that each terminal generates subsequent collection amount information respectively according to the target amount of money and the current balance;It will be each Subsequent collection amount information is respectively sent to each terminal, so that each terminal is sent and the subsequent collection amount information to the public coin pond The corresponding subsequent collection amount of money.
Further, public expense apparatus for management of information of the invention further include:
Information receiving module, for receive payment platform transmission the corresponding amount information to be deposited of each terminal, it is described to Deposit amount information is generated by the payment platform according to the payment request that the terminal is initiated;
Validation of information module, for generating public expense detail interface to be deposited based on each amount information to be deposited;By the public affairs Take detail interface to be deposited and pushes to each terminal respectively, it is true to prompt each terminal to carry out public expense detail interface to be deposited Recognize, and feedback acknowledgment result;
Public expense is stored in module, for receiving the confirmation of each terminal feedback as a result, meeting preset condition in the confirmation result When, the corresponding amount of money of the amount information to be deposited of each terminal is stored in public coin pond.
In addition, the embodiment of the present invention also proposes a kind of computer storage medium, it is stored in the computer storage medium Public expense information management program, the public expense information management program realize public expense information as described above when being executed by processor The step of management method.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or the system that include a series of elements not only include those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do There is also other identical elements in the process, method of element, article or system.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (10)

1. a kind of public expense approaches to IM, which is characterized in that the described method includes:
Server obtains the public expense that present terminal is sent and pays request, generates pre- amount paid letter based on public expense expenditure request Breath;
The pre- expenditure amount information is respectively sent to other terminals, to prompt each terminal to be based on the pre- expenditure amount information Ballot operation is carried out, and voting results are fed back;
The voting results for receiving each terminal feedback are propped up from public coin pond when the voting results meet default effective term The target amount of money corresponding with the pre- expenditure amount information is out to complete public expense expenditure.
2. the method as described in claim 1, which is characterized in that the voting results for receiving each terminal feedback, in the throwing When ticket result meets default effective term, from public coin pond the expenditure target amount of money corresponding with the pre- expenditure amount information with After completing public expense expenditure, the method also includes:
It generates public expense and pays detail, public expense expenditure detail is respectively sent to each terminal, so that each terminal is to the public affairs Expense expenditure detail is shown.
3. the method as described in claim 1, which is characterized in that it is described when the voting results meet default effective term, The expenditure target amount of money corresponding with the pre- expenditure amount information is paid from public coin pond with completing public expense, is specifically included:
When the voting results meet default effective term, the current balance in public coin pond is detected;
In the current balance target amount of money corresponding not less than the pre- expenditure amount information, execution is from the public coin pond Middle expenditure completes the step of public expense expenditure with the target amount of money.
4. method as claimed in claim 3, which is characterized in that the voting results for receiving each terminal feedback, in the throwing When ticket result meets default effective term, after being detected to the current balance in public coin pond, further includes:
When current balance in the public coin pond is less than the pre- expenditure amount information corresponding target amount of money, according to described The target amount of money and the current balance are that each terminal generates subsequent collection amount information respectively;
Each subsequent collection amount information is respectively sent to each terminal, so that each terminal is sent and the subsequent collection to the public coin pond The corresponding subsequent collection amount of money of amount information.
5. the method as described in claim 1, which is characterized in that described that the pre- expenditure amount information is respectively sent to other Terminal carries out ballot operation to prompt each terminal to be based on the pre- expenditure amount information, and after voting results are fed back, Further include:
When the voting results are unsatisfactory for default effective term, payment cancellation notice is sent to the present terminal.
6. the method according to claim 1 to 5, which is characterized in that the server obtains the public affairs that present terminal is sent Take expenditure request, before generating pre- expenditure amount information based on public expense expenditure request, the method also includes:
Server receives the corresponding amount information to be deposited of each terminal that payment platform is sent, and the amount information to be deposited is by institute Payment platform is stated to be generated according to the payment request that the terminal is initiated;
Public expense detail interface to be deposited is generated based on each amount information to be deposited;
Public expense detail interface to be deposited is pushed into each terminal respectively, to prompt each terminal to public expense detail to be deposited Interface is confirmed, and feedback acknowledgment result;
The confirmation of each terminal feedback is received as a result, when the confirmation result meets preset condition, by the gold to be deposited of each terminal The corresponding amount of money of volume information is stored in public coin pond.
7. the method according to claim 1 to 5, which is characterized in that the method also includes:
The amount of money detail inquiry instruction for receiving present terminal input, according to the amount of money detail inquiry instruction to the public coin pond In amount of money detail searched;
The amount of money detail found is fed back into the present terminal, so that the present terminal carries out the amount of money detail It shows.
8. a kind of public expense apparatus for management of information, which is characterized in that described device includes:
Respond module is paid to request to generate based on the public expense and be paid in advance for obtaining the public expense expenditure request of present terminal transmission Amount information out;
Vote module, it is described to prompt each terminal to be based on for the pre- expenditure amount information to be respectively sent to other terminals Pre- expenditure amount information carries out ballot operation, and voting results are fed back;
Payment module, for receiving the voting results of each terminal feedback, when the voting results meet default effective term, from The expenditure target amount of money corresponding with the pre- expenditure amount information is paid in public coin pond with completing public expense.
9. a kind of server, which is characterized in that the server includes: memory, processor and is stored on the memory And the public expense information management program that can be run on the processor, the server and multiple terminals, payment platform, public coin Pond carries out communication connection, and the public expense information management program is arranged for carrying out the public expense as described in any one of claims 1 to 7 The step of approaches to IM.
10. a kind of computer storage medium, which is characterized in that be stored with public expense information management journey in the computer storage medium The public expense as described in any one of claims 1 to 7 is realized in sequence, the public expense information management program configuration when being executed by processor The step of approaches to IM.
CN201810958733.4A 2018-08-21 2018-08-21 Public expense approaches to IM, device, server and computer storage medium Pending CN109087189A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810958733.4A CN109087189A (en) 2018-08-21 2018-08-21 Public expense approaches to IM, device, server and computer storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810958733.4A CN109087189A (en) 2018-08-21 2018-08-21 Public expense approaches to IM, device, server and computer storage medium

Publications (1)

Publication Number Publication Date
CN109087189A true CN109087189A (en) 2018-12-25

Family

ID=64794241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810958733.4A Pending CN109087189A (en) 2018-08-21 2018-08-21 Public expense approaches to IM, device, server and computer storage medium

Country Status (1)

Country Link
CN (1) CN109087189A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101017586A (en) * 2006-02-10 2007-08-15 刘明晶 Method for customer self-defined combined authorization payment
CN201917942U (en) * 2011-01-27 2011-08-03 北京华夏电通科技有限公司 Expense budget and reimbursement management system for company
CN102262756A (en) * 2011-08-05 2011-11-30 姜正富 Technology for controlling rural collective finance
CN103679449A (en) * 2013-12-25 2014-03-26 拉卡拉支付有限公司 System and method for data processing
CN106372849A (en) * 2016-08-29 2017-02-01 无锡史提沃德移动互联网科技有限公司 Payment method having public consumption preauthorization
CN108053215A (en) * 2017-12-18 2018-05-18 陈伟德 A kind of supervision payment system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101017586A (en) * 2006-02-10 2007-08-15 刘明晶 Method for customer self-defined combined authorization payment
CN201917942U (en) * 2011-01-27 2011-08-03 北京华夏电通科技有限公司 Expense budget and reimbursement management system for company
CN102262756A (en) * 2011-08-05 2011-11-30 姜正富 Technology for controlling rural collective finance
CN103679449A (en) * 2013-12-25 2014-03-26 拉卡拉支付有限公司 System and method for data processing
CN106372849A (en) * 2016-08-29 2017-02-01 无锡史提沃德移动互联网科技有限公司 Payment method having public consumption preauthorization
CN108053215A (en) * 2017-12-18 2018-05-18 陈伟德 A kind of supervision payment system and method

Similar Documents

Publication Publication Date Title
US11023874B2 (en) N to N money transfers
KR101876674B1 (en) Method of managing common account using block chain and system performing the same
CN110659887A (en) Automatic transaction processing system and method based on block chain
CN105051766A (en) Payments in communication systems
CN110322317B (en) Transaction data processing method and device, electronic equipment and medium
US20230196316A1 (en) Systems and methods for real-time, distributed processing of group bill payments
CN107527222B (en) Information processing method, device and system
US20130191172A1 (en) Ticket transfer
CN112686746A (en) Credit flow configuration method, device and equipment
CN110944008A (en) Block chain-based task reward processing method, device, equipment and storage medium
CN113592619A (en) Method, system and device for realizing banking business service process
CN113159755A (en) Multi-subject account association management method and service platform
CN106296154A (en) Transaction methods and system
CN109345075A (en) A kind of professional person, which authenticates, investigates method, apparatus and terminal device
CN109587244A (en) Cloud data in mobile phone processing method, device, computer readable storage medium and electronic equipment
CN107833034A (en) Method of payment and device, computer installation and computer-readable recording medium
CN109087189A (en) Public expense approaches to IM, device, server and computer storage medium
CN105656767A (en) Electronic resource allocation method and electronic resource allocation device
KR20200013573A (en) Integrated management mobile platform for enterprises and institutions
CN109785138A (en) A kind of terminal device for supporting to exchange between digital cash and commodity money
CN115640457A (en) Information management method, apparatus, device, medium, and program product
CN105931028A (en) Management method and system for Host-to-Host system
CN110322116A (en) Task processing method, device, electronic equipment and storage medium
CN110149372A (en) A kind of collecting method and block chain node device
CN110417851A (en) Data matching method, hosted platform, storage medium and computer equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181225