Prior art keywords
grouting
parameter
option
construction
menu
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810866581.5A
Other languages
Chinese (zh)
Other versions
CN109086519B (en
Inventor
张贵金
蒋煌斌
欧阳进武
李毅
王江营
段吉鸿
张学森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honghe Hani And Yi Autonomous Prefecture Water Conservancy And Hydropower Engineering Geological Prospecting Consultation And Planning Research Institute
Changsha University of Science and Technology
Original Assignee
Honghe Hani And Yi Autonomous Prefecture Water Conservancy And Hydropower Engineering Geological Prospecting Consultation And Planning Research Institute
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honghe Hani And Yi Autonomous Prefecture Water Conservancy And Hydropower Engineering Geological Prospecting Consultation And Planning Research Institute, Changsha University of Science and Technology filed Critical Honghe Hani And Yi Autonomous Prefecture Water Conservancy And Hydropower Engineering Geological Prospecting Consultation And Planning Research Institute
Priority to CN201810866581.5A priority Critical patent/CN109086519B/en
Publication of CN109086519A publication Critical patent/CN109086519A/en
Application granted granted Critical
Publication of CN109086519B publication Critical patent/CN109086519B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Abstract

The invention discloses a kind of strengthening motoring calculation method of adaptive construction environment and systems, this method comprises: according to construction environment and construction requirement from corresponding parameter database Selecting All Parameters data information, Parameter data information is inputted into corresponding grouting modeling, the calculating for carrying out grouting effect parameter obtains the grouting construction parameter for being suitble to construction environment;During stating grouting construction parameter guiding construction in use, pass through sensor real-time monitoring formation variation and grouting quantity, when formation variation and or grouting quantity exceed warning value or fence coverage, according to the real-time formation variation measured and or grouting quantity, again the Selecting All Parameters data information from corresponding parameter database, Parameter data information is inputted into corresponding grouting modeling, carries out the calculating of grouting effect parameter, the grouting construction parameter after being adjusted.The present invention can carry out strengthening motoring calculating, and can intelligently adjust strengthening motoring, the alternative artificial strengthening motoring design work in part.

Description

The strengthening motoring calculation method and system of adaptive construction environment
Technical field
The present invention relates to hydraulic engineering and foundation treatment engineering fields, more particularly to the strengthening motoring of adaptive construction environment Calculation method and system.
Background technique
When the builds to foundation engineering such as water conservancy, building, traffic, a large amount of poor strata can be faced, generally requires to take grouting Technology is handled.Grouting is to be poured into cementitious material in stratum or gap by grouting equipment, is reached to ground anti-seepage reinforcing Purpose.Traditional Grouting Design is based on survey information and grouting test obtains formation parameter and other design parameters, and The method for calculating determining grouting process and parameter according to specification and empirical equation afterwards, however the lengthy and tedious complexity of filling process, stratum is answered Stress-strain with grouting pressure and grouting quantity variation it is difficult to predict, the complete reliable of formation information is difficult to ensure using the above method, The strengthening motoring that empirical equation is calculated is difficult to adapt to variation of the stratum in filling process, easily causes invalid perfusion, influences Grouting quality.
With development in science and technology, grouting construction field various kinds of sensors and computer technology are used, such as each Kind grouting automatic recorder etc., but be that the technical parameter of filling process is acquired and is recorded mostly, strengthening motoring can not be applied to In design.And a plurality of types of strengthening motorings involved in Grouting Design, including stratum (soil body, rock mass and soil-rock mixture) point Class and its physical and mechanical parameter, grouting material match the applicable grouting process and design parameter etc. in when fundamental performance parameter, stratum, And these parameters are in dynamic change in filling process.
Therefore, it efficiently uses sensing technology and computer technology realizes grouting intelligentized design, be engineers and technicians one The technical problem of straight exploratory development, the mode combined especially with empirical equation and theoretical formula set strengthening motoring Meter calculates, so that parameter designing is more reasonable, and monitors filling process in real time, adjusts strengthening motoring in due course, guidance is applied The innovative approach of work is there is not yet open.
Summary of the invention
The invention reside in the strengthening motoring calculation method and system of a kind of adaptive construction environment is provided, to solve to be in the milk The lengthy and tedious complexity of journey, artificial calculating parameter easily cause invalid perfusion, influence the technical issues of grouting quality.
In order to solve the above technical problems, the present invention provides a kind of strengthening motoring calculation method of adaptive construction environment, The following steps are included:
According to construction environment and construction requirement from corresponding parameter database Selecting All Parameters data information, by supplemental characteristic The corresponding grouting modeling of information input carries out the calculating of grouting effect parameter, obtains the grouting construction parameter for being suitble to construction environment;
During stating grouting construction parameter guiding construction in use, by sensor real-time monitoring formation variation and Grouting quantity, when formation variation and or grouting quantity exceed warning value or fence coverage, according to the real-time formation variation measured With or grouting quantity, the Selecting All Parameters data information from corresponding parameter database, Parameter data information is inputted corresponding again Grouting modeling carries out the calculating of grouting effect parameter, the grouting construction parameter after being adjusted.
As further improvements in methods of the invention:
According to construction environment and construction requirement from corresponding parameter database Selecting All Parameters data information, comprising: provide Corresponding construction environment and construction requirement multilevel menu corresponding with parameter database or options for user selection, and selected according to user The result taken transfers corresponding Parameter data information from corresponding parameter database.
In multilevel menu or option, including at least one following further menu or option: " stratigraphic classification and physical mechanics Parameter ", " grouting material is with when fundamental performance parameter " and " stratum suitable grouting process and design parameter ";
Further menu or option " stratigraphic classification and physical and mechanical parameter " include at least one following second-level menu or choosing : " soil body and soil-rock mixture " and " rock mass ";
Second-level menu or option " soil body and soil-rock mixture " include at least one following three-stage menu or option: being become silted up Mud, muck soil, clay, silty clay, silt, loess, artificial earth fill, flour sand, fine sand, middle sand, coarse sand, gravelly sand, clay folder Sand, clay, which are caught broken gravel, silty clay burning into sand, silty clay and are caught broken gravel, silt burning into sand and silt, is caught broken gravel;
Second-level menu or option " rock mass " include at least one following three-stage menu or option: strong-weathered rock, completely decomposed Rock, weak-weathered rock, joints development rock stratum and karst strata.
Further menu or option " grouting material is with when fundamental performance parameter " include at least one following second-level menu Or option: " grouting material type " and " injection material slurry basic performance ";
Second-level menu or option " grouting material type " include at least one following three-stage menu or option: striaght cement Slurry, cement mortar, clay cement grout, clay water muddy water glass paste, clay hardening slurry, clay cement cream, clay cement bonded sand cream Slurry, Cement paste, cement bonded sand cream slurry, wet-milling ordinary cement, wet-milling clay cement, superfine cement and nanoclay cement;
Second-level menu or option " injection material slurry basic performance " include at least one following three-stage menu or option: ratio Weight-g/m3, viscosity-× 10-3Pa.s, presetting period-min, syneresis rate-%, calculus rate-%, compression strength-MPa.
Further menu or option " stratum suitable grouting process and design parameter " include at least one following second level dish List or option: " grouting method ";
Second-level menu or option " grouting method " they include a kind of following three-stage menu or option: complete opening once grouting method, From top to bottom segmental grouting method, from bottom to top segmental grouting method, comprehensive grouting method, bore hole-top-enclosed grouting method, sleeving valve pipe grouting method, Mould bag insulates grouting method and high-pressure pulsating grouting method.
Grouting modeling includes pressure stabilizing cleavage mechanism grouting modeling, pulsation grouting cleavage mechanism model, pressure stabilizing-pulsation compounding machine Manage the combination of one of hydrofracture grouting model and empirical model or two kinds or more;Grouting construction parameter include grouting pressure, Grouting quantity and or grout spreading range.
Sensor include be set to grouting stratum for monitoring the displacement sensor that stratum lifts, and be set to grout pipe Grouting quantity sensor in inner wall.
" Parameter data information is inputted corresponding filling by the Selecting All Parameters data information from corresponding parameter database again The calculating of slurry model, the calculating of progress grouting effect parameter ", comprising: re-start the calculating of the type and proportion of grouting material.
The present invention also provides a kind of computer equipment, including memory, processor and storage are on a memory and can The step of computer program run on a processor, processor realizes any of the above-described method when executing computer program.
The invention has the following advantages:
1, the strengthening motoring calculation method and system of adaptive construction environment of the invention provides one kind and is suitable for construction ring Border and construction requirement can carry out strengthening motoring calculating, enrich complete grouting works database, theoretical to combine with experience calculating So that strengthening motoring design is more reasonable, strengthening motoring can be adjusted, intelligently to reach better grouting effect;Whole process operation Simply, as a result reliably, the artificial strengthening motoring design work in alternative part.
2, in a preferred approach, the strengthening motoring calculation method and system of the adaptive construction environment of the present invention, by from ground The grouting process and design parameter that layer classification and physical and mechanical parameter, grouting material are suitable for when fundamental performance parameter, stratum Three large database concepts in Selecting All Parameters data information, by the data information taken input pressure stabilizing cleavage mechanism grouting modeling, pulsation Grouting cleavage mechanism model, pressure stabilizing-pulsation recombination mechanism hydrofracture grouting model and empirical model (can be the experience that specification is recommended Formula), the calculating of the grouting effect parameter under different grouting mechanism is carried out, is fitted using the method that theory is combined with experience The grouting construction parameter of engineering, and then guiding construction are closed, while reservoir stress is strained using sensing technology in the construction process, The information such as grouting quantity feedback carries out real-time monitoring to computer software, if stratum, which is lifted, to be had with the information of grouting quantity and more than design When allowing maximum value, software carries out parameter adjustment automatically according to situation of change and simplifies so that grouting construction parameter is more reasonable Design alteration step, accelerates construction speed.
Other than objects, features and advantages described above, there are also other objects, features and advantages by the present invention. Below with reference to accompanying drawings, the present invention is described in further detail.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present invention, schematic reality of the invention It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the flow diagram of the strengthening motoring calculation method of the adaptive construction environment of the preferred embodiment of the present invention;
Fig. 2 is the flow diagram of the strengthening motoring calculation method of the adaptive construction environment of the preferred embodiment of the present invention 1;
Fig. 3 is the flow chart that the strengthening motoring of the preferred embodiment of the present invention 1 calculates the process principle of analysis.
Specific embodiment
The embodiment of the present invention is described in detail below in conjunction with attached drawing, but the present invention can be defined by the claims Implement with the multitude of different ways of covering.
Referring to Fig. 1, the strengthening motoring calculation method of the adaptive construction environment of the embodiment of the present invention, comprising the following steps:
S1: according to construction environment and construction requirement from corresponding parameter database Selecting All Parameters data information, by parameter Data information inputs corresponding grouting modeling, carries out the calculating of grouting effect parameter, obtains the grouting construction for being suitble to construction environment Parameter;
S2: during stating grouting construction parameter guiding construction in use, pass through sensor real-time monitoring formation variation And grouting quantity, when formation variation and or grouting quantity exceed warning value or fence coverage, according to the real-time stratum measured Variation and or grouting quantity, the Selecting All Parameters data information from corresponding parameter database again, by Parameter data information input pair The grouting modeling answered carries out the calculating of grouting effect parameter, the grouting construction parameter after being adjusted.
By above step, strengthening motoring calculating can be carried out, it is theoretical to combine with experience calculating so that strengthening motoring designs More rationally, strengthening motoring can be adjusted, intelligently to reach better grouting effect;Whole process is easy to operate, as a result reliably, can The artificial strengthening motoring design work in substitution part.
When implementation, the above method can carry out the optimization or extension of following examples, and the technology in following all examples is special It seeks peace step, any combination, the division of embodiment can not be done merely to citing and read convenient in reasonable range The limitation of combination and protection scope.
Embodiment 1:
Referring to Fig. 1, Fig. 2, the strengthening motoring calculation method of the adaptive construction environment of the embodiment of the present invention, including following step It is rapid:
S1: according to construction environment and construction requirement from corresponding parameter database Selecting All Parameters data information, by parameter Data information inputs corresponding grouting modeling, carries out the calculating of grouting effect parameter, obtains the grouting construction for being suitble to construction environment Parameter.
According to construction environment and construction requirement from corresponding parameter database Selecting All Parameters data information, comprising: provide Corresponding construction environment and construction requirement multilevel menu corresponding with parameter database or options for user selection, and selected according to user The result taken transfers corresponding Parameter data information from corresponding parameter database.And warning information is issued, remind constructor Member's adjustment arrangement and method for construction, and all design parameter results are saved with file mode, facilitate output printing to save.Each multilevel menu All kinds of parameters can be deleted in real time according to user right, modification and addition.
In multilevel menu or option, including at least one following further menu or option: " stratigraphic classification and physical mechanics Parameter ", " grouting material is with when fundamental performance parameter " and " stratum suitable grouting process and design parameter ".
Further menu or option " stratigraphic classification and physical and mechanical parameter " include at least one following second-level menu or choosing : " soil body and soil-rock mixture " and " rock mass ".
Second-level menu or option " soil body and soil-rock mixture " include at least one following three-stage menu or option: being become silted up (fineness modulus is 2.2~1.6, is put down for mud, muck soil, clay, silty clay, silt, loess, artificial earth fill, flour sand, fine sand Equal partial size be 0.35~0.25mm), middle sand (fineness modulus be 3.0~2.3, and average grain diameter is 0.5~0.35mm), coarse sand (carefully Spending modulus is 3.7~3.1, and average grain diameter is 0.5mm or more.), gravelly sand, clay burning into sand, clay be caught broken gravel, silty clay folder Sand, silty clay are caught broken gravel, silt burning into sand and silt and are caught broken gravel.
Second-level menu or option " rock mass " include at least one following three-stage menu or option: strong-weathered rock, completely decomposed Rock, weak-weathered rock, joints development rock stratum (agensis, relatively development, are developed at development very much) and karst strata (full packing, half fill, Without filling).When implementation, joints development rock stratum can the at the same level joints development rock stratum that four kinds of development degrees are provided three-stage menu or Option.Joints development is distinguished according to joints development space D: D>400 are agensis, and 200<D≤400 are development, 20<D≤200 To develop very much, D≤20 are pole development.When implementation, karst strata can be the three of the karst strata at the same level for providing three kinds of occupied states Grade menu or option.The molten intracavitary no charges of karst are known as to do the karst of molten chamber without packed type karst.Karst is molten intracavitary existing Part charges, but the karst of some cavity is known as half packed type karst.Packed type is known as by the karst that charges fill Karst.
In each above-mentioned three-stage menu or option hereinafter, at least one following level Four menu or option can be set: infiltration Coefficient, void ratio, moisture content, effective grain size, severe and refer to bearing capacity.
Further menu or option " grouting material is with when fundamental performance parameter " include at least one following second-level menu Or option: " grouting material type " and " injection material slurry basic performance ".
Second-level menu or option " grouting material type " include at least one following three-stage menu or option: striaght cement Slurry, cement mortar, clay cement grout, clay water muddy water glass paste, clay hardening slurry, clay cement cream, clay cement bonded sand cream Slurry, Cement paste, cement bonded sand cream slurry, wet-milling ordinary cement (average particle size is about 30mm), wet-milling clay cement (average Grain partial size is about 10mm), (average particle size is about for superfine cement (average particle size is about 5mm) and nanoclay cement 0.015mm)。
Second-level menu or option " injection material slurry basic performance " include at least one following three-stage menu or option: ratio Weight-g/m3, viscosity-× 10-3Pa.s, presetting period-min, syneresis rate-%, calculus rate-%, compression strength-MPa.
Further menu or option " stratum suitable grouting process and design parameter " include at least one following second level dish List or option: " grouting method ".
Second-level menu or option " grouting method " they include a kind of following three-stage menu or option: complete opening once grouting method, From top to bottom segmental grouting method, from bottom to top segmental grouting method, comprehensive grouting method, bore hole-top-enclosed grouting method, sleeving valve pipe grouting method, Mould bag insulates grouting method and high-pressure pulsating grouting method.
Wherein, complete opening once grouting method grouting aperture is greater than 56mm, and grouting segment length is less than 6m, and array pitch, pitch-row are in 2~4m model In enclosing, maximum grouting pressure is within the scope of 4~6MPa, when injection rate is greater than less than 2 (L/min) or lasting injection length 30min is to terminate grouting standard.
Wherein, the aperture of segmental grouting method grouting from top to bottom is greater than 56mm, and grouting segment length is less than 6m, array pitch, pitch-row 2~ Within the scope of 3m, maximum grouting pressure is greater than within the scope of 4~6MPa when injection rate is less than 0.4L/min or continues injection length 30min is to terminate grouting standard.
Wherein, segmental grouting method and comprehensive grouting method grouting aperture are greater than 56mm from bottom to top, and grouting segment length is less than 6m, row Away from, pitch-row within the scope of 2~3m, maximum grouting pressure is within the scope of 4~6MPa, when injection rate is less than 0.4L/min or continues It is to terminate grouting standard that injection length, which is greater than 30min,.
Wherein, bore hole-top-enclosed grouting method grouting aperture is greater than 56~76mm, and less than 2~5m, array pitch, pitch-row exist segment length of being in the milk Within the scope of 2~3m, maximum grouting pressure is within the scope of 1~2MPa, when injection rate is big less than 2L/min or lasting injection length It is to terminate grouting standard in 30min.
Wherein, sleeving valve pipe grouting method grouting aperture is greater than 50~120mm, and segment length of being in the milk is less than 1~2m, and array pitch, pitch-row are 2 Within the scope of~3m, maximum grouting pressure is greater than within the scope of 2~4MPa when injection rate is less than 2L/min or continues injection length 20min is to terminate grouting standard.
Referring to Fig. 3, grouting modeling includes pressure stabilizing cleavage mechanism grouting modeling, pulsation grouting cleavage mechanism model, pressure stabilizing-arteries and veins Dynamic recombination mechanism hydrofracture grouting model and empirical model (empirical equation that specification is recommended).When implementation, four kinds of calculating sides can be used Method is compared, and obtains most suitable strengthening motoring.The grouting construction parameter being calculated include grouting pressure, grouting quantity and or slurry Liquid dilation angle.
S2: during stating grouting construction parameter guiding construction in use, pass through sensor real-time monitoring formation variation And grouting quantity, when formation variation and or grouting quantity exceed warning value or fence coverage, according to the real-time stratum measured Variation and or grouting quantity, the Selecting All Parameters data information from corresponding parameter database again, by Parameter data information input pair The grouting modeling answered carries out the calculating of grouting effect parameter, the grouting construction parameter after being adjusted.
Sensor includes the pressure sensor and displacement sensor for being set to grouting stratum, and is set to grouting inside pipe wall In grouting quantity sensor.Formation variation includes: that the variation (pressure sensor monitoring) of ess-strain and stratum lift (displacement biography Sensor monitoring).The present embodiment monitors strata pressure information using KELLER piezoresistive pressure sensor, and strata pressure is grouting pressure Power a certain amount of performance in the earth formation, stratum bear that pressure is excessive will lift ground, so that stratum lifts.The present embodiment Information is lifted using capacitor grid transducer feedback stratum, mechanical displacement is transformed into the phase changing capacity of electric signal.Stratum lifts Monitoring can intuitively reflect the amount (numerical value) that stratum lifts, and reservoir stress strain can not directly reflect the amount that stratum lifts.This Embodiment carries out grouting quantity monitoring using brilliance K300 electromagnet flow meter sensor.Each sensor is connect with computer, to Computer feeds back stratum by the variation of grouting slurries and the ess-strain of pressure influence and the amount of pouring into of slurries, when stratum lifts greatly It is more than or when well below design-calculated grouting quantity, is issued warning signal in software in is equal to 1cm or the slurries amount of pouring into, and The type and proportion of grouting material are voluntarily adjusted according to the stratum amount of lifting and the slurries amount of pouring into, to generate new Grouting Design ginseng Number carries out construction guidance in next step.The result corresponding relationship that the parameter and sensor being adjusted measure are as follows: if formation variation is more than Warning value illustrates that grouting pressure is excessive, and system then automatically chooses grouting material parameter, automatic to select bigger level-one proportion Slurries parameter, or the slurries parameter of smaller level-one partial size calculated;If grouting quantity be more than warning value, illustrate formation pore compared with Big or grouting pressure is excessive, and system then automatically chooses grouting material parameter, the automatic slurry for selecting smaller level-one proportion Liquid parameter, or the slurries parameter of bigger level-one partial size are calculated.Adjust automatically prosthetic participates in, and is computer software programs root Strengthening motoring is carried out according to heat transfer agent to reselect.Construction guidance in next step is carried out to include: calculating and export as a result, issuing pre- It is alert, remind construction personnel to adjust construction parameter.
When basic performance is matched to engineering information, stratigraphic categories and the physical parameter of all selections and input, grouting material Parameter, grouting process and parameter and all results of design-calculated strengthening motoring are with the output of word, printing and preservation.
The strengthening motoring intelligent design of the embodiment of the present invention has compared with prior art enriches complete grouting works Database, it is theoretical to be combined with experience calculating so that strengthening motoring designs more reasonable, strengthening motoring can be adjusted, intelligently to reach Better grouting effect;Whole process is easy to operate, as a result reliably, the alternative artificial strengthening motoring design work in part.
Embodiment 2:
The present embodiment is the concrete application of embodiment 1 or 2, selects the completely decomposed to autonomous prefecture of the Yi nationality, distributed over Yunnan, Sichuan and Guizhou of Honghe, Yunnan Hani The granite soil body carries out Grouting Design simulation, and simulated grouting depth is 10m, using the adaptive construction ring of the embodiment of the present invention 2 The strengthening motoring calculation method in border carries out construction guidance.
The present embodiment first carries out grouting formation information, grouting material information, grouting process information in computer software Selection input, concrete operations are as follows:
(1) stratigraphic classification is entered by stratigraphic classification and physical and mechanical parameter option tab and all kinds of stratum physical parameters is selected Interface is selected, completely weathered granite option is selected, computer (software) goes out from stratigraphic classification and physical parametric data library searching automatically The basic parameter of completely weathered granite includes that Standard piercing number is 30~50, and weathering coefficient is 0.2~0.4, and crack spacing is less than 0.02m。
(2) grouting classification, proportion and slurries basic performance supplemental characteristic are entered by grouting material and proportion option tab The selection of library progress grouting material parameter.It is the completely weathered granite soil body for the embodiment, can be recommended to be suitable for material according to software Material selection superfine cement, wet grinding fine cement, wet-milling clay cement three classes starch material, and selecting water-solid ratio according to execution conditions is 1: 1, software carries out grouting material parameter number from grouting classification, proportion and slurries basic performance parameter database automatically after the completion of selection Go out to select the fundamental performance parameter of grouting material according to library searching.
(3) grouting process method choice interface is entered by watertight grouting process option tab, for the embodiment For the completely weathered granite soil body, selecting software to recommend suitable grouting method is sleeving valve pipe grouting method, and software is from principal and subordinate grouting side The basic parameter that method and its parameter database voluntarily retrieve sleeving valve pipe grouting method includes that grouting aperture is greater than 50~120mm, is filled Segment length is starched less than 1~2m, array pitch, pitch-row are within the scope of 2~3m, and maximum grouting pressure is within the scope of 2~4MPa, when injection rate is small In 2L/min or continue injection length to be greater than 20min to be to terminate grouting mark.
(4) interface is calculated into people's strengthening motoring by grouting diffusion theory model and calculation options key, according to above-mentioned work The selected formation information inputted of journey and physical parameter, grouting material with when basic physical parameters and suitable grouting method And parameter be input to computer software strengthening motoring theoretical calculation model and empirical equation (empirical model, generally specification push away The empirical equation or calculation formula recommended) it is calculated, obtaining different strengthening motorings the results are shown in Table 1.
Table 1: strengthening motoring calculated result
The grouting pressure calculated with empirical equation, grout spreading range, grouting quantity result is calculated according to above-mentioned theory to carry out Analysis comparison show that best strengthening motoring is 1~2MPa of grouting pressure, and grout spreading range is 0.9~1.2m, and grouting quantity is 103m3
Grouting simulation test is carried out by above-mentioned strengthening motoring, reservoir stress strain transducer is being buried by stratum is filled, filled Inside pipe wall setting grouting quantity sensor is starched, terminates to be in the milk when injection rate is less than 2L/min, whole process, sensor feedback information The display maximum amount of pouring into is 89m3, it is less than the maximum allowable amount of pouring into 100m3, stratum lifts 0.15cm, is less than maximum allowable lift Dynamic value 1cm, therefore strengthening motoring intelligent design of the present invention is used, design result is reliable.
Embodiment 3:
As a general technical idea, the embodiment of the invention provides a kind of computer equipments, including memory, processing On a memory and the computer program that can run on a processor, when processor execution computer program, is realized for device and storage The step of method in any of the above-described embodiment.
In summary, the present invention from stratigraphic classification and physical and mechanical parameter, grouting material with when basic performance by joining Selecting All Parameters data information in three large database concepts of number, stratum suitable grouting process and design parameter, the data taken are believed Breath input pressure stabilizing cleavage mechanism grouting modeling, pulsation grouting cleavage mechanism model, pressure stabilizing-pulsation recombination mechanism hydrofracture grouting model And empirical model (can be the empirical equation that specification is recommended), the calculating of the grouting effect parameter under different grouting mechanism is carried out, The grouting construction parameter for being suitble to engineering, and then guiding construction are obtained using the method that theory is combined with experience, while being constructed The information such as reservoir stress strain, grouting quantity are fed back to computer software using sensing technology in the process and carry out real-time monitoring, if Stratum lifts when having with the information of grouting quantity with maximum value is allowed more than design, and software carries out parameter tune automatically according to situation of change It is whole, so that grouting construction parameter is more reasonable, design alteration step is simplified, construction speed is accelerated.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of strengthening motoring calculation method of adaptive construction environment, which comprises the following steps:
According to construction environment and construction requirement from corresponding parameter database Selecting All Parameters data information, by Parameter data information Corresponding grouting modeling is inputted, the calculating of grouting effect parameter is carried out, obtains the grouting construction parameter for being suitble to construction environment;
During stating grouting construction parameter guiding construction in use, pass through sensor real-time monitoring formation variation and grouting Amount, when formation variation and or grouting quantity exceed warning value or fence coverage, according to the real-time formation variation and measured Or grouting quantity, the Selecting All Parameters data information from corresponding parameter database, inputs corresponding filling for Parameter data information again Model is starched, the calculating of grouting effect parameter, the grouting construction parameter after being adjusted are carried out.
2. the strengthening motoring calculation method of adaptive construction environment according to claim 1, which is characterized in that the basis Construction environment and construction requirement the Selecting All Parameters data information from corresponding parameter database, comprising: corresponding construction environment is provided Multilevel menu corresponding with parameter database with construction requirement or options for user selection, and the result chosen according to user is from right Corresponding Parameter data information is transferred in the parameter database answered.
3. the strengthening motoring calculation method of adaptive construction environment according to claim 1, which is characterized in that the multistage In menu or option, including at least one following further menu or option: " stratigraphic classification and physical and mechanical parameter ", " grouting Material mixture ratio and fundamental performance parameter " and " stratum suitable grouting process and design parameter ".
4. the strengthening motoring calculation method of adaptive construction environment according to claim 3, which is characterized in that the level-one Menu or option " stratigraphic classification and physical and mechanical parameter " include at least one following second-level menu or option: " soil body and soil Rock mixture " and " rock mass ";
The second-level menu or option " soil body and soil-rock mixture " include at least one following three-stage menu or option: being become silted up Mud, muck soil, clay, silty clay, silt, loess, artificial earth fill, flour sand, fine sand, middle sand, coarse sand, gravelly sand, clay folder Sand, clay, which are caught broken gravel, silty clay burning into sand, silty clay and are caught broken gravel, silt burning into sand and silt, is caught broken gravel;
The second-level menu or option " rock mass " include at least one following three-stage menu or option: strong-weathered rock, completely decomposed Rock, weak-weathered rock, joints development rock stratum and karst strata.
5. the strengthening motoring calculation method of adaptive construction environment according to claim 3, which is characterized in that the level-one Menu or option " grouting material is with when fundamental performance parameter " include at least one following second-level menu or option: " grouting Material type " and " injection material slurry basic performance ";
The second-level menu or option " grouting material type " include at least one following three-stage menu or option: striaght cement Slurry, cement mortar, clay cement grout, clay water muddy water glass paste, clay hardening slurry, clay cement cream, clay cement bonded sand cream Slurry, Cement paste, cement bonded sand cream slurry, wet-milling ordinary cement, wet-milling clay cement, superfine cement and nanoclay cement;
The second-level menu or option " injection material slurry basic performance " include at least one following three-stage menu or option: ratio Weight-g/m3, viscosity-× 10-3Pa.s, presetting period-min, syneresis rate-%, calculus rate-%, compression strength-MPa.
6. the strengthening motoring calculation method of adaptive construction environment according to claim 3, which is characterized in that the level-one Menu or option " stratum suitable grouting process and design parameter " include at least one following second-level menu or option: " being filled Paste-making method ";
The second-level menu or option " grouting method " they include a kind of following three-stage menu or option: complete opening once grouting method, From top to bottom segmental grouting method, from bottom to top segmental grouting method, comprehensive grouting method, bore hole-top-enclosed grouting method, sleeving valve pipe grouting method, Mould bag insulates grouting method and high-pressure pulsating grouting method.
7. the strengthening motoring calculation method of adaptive construction environment according to claim 1, which is characterized in that the grouting Model includes pressure stabilizing cleavage mechanism grouting modeling, pulsation grouting cleavage mechanism model, pressure stabilizing-pulsation recombination mechanism hydrofracture grouting mould The combination of one of type and empirical model or two kinds or more;The grouting construction parameter include grouting pressure, grouting quantity and Or grout spreading range.
8. the strengthening motoring calculation method of adaptive construction environment according to claim 1, which is characterized in that the sensing Device include be set to grouting stratum for monitoring the displacement sensor that stratum lifts, and the grouting being set in grouting inside pipe wall Quantity sensor.
9. the strengthening motoring calculation method of adaptive construction environment according to claim 1 or claim 7, which is characterized in that described " Parameter data information is inputted corresponding grouting modeling by the Selecting All Parameters data information from corresponding parameter database again, into The calculating of the calculating of row grouting effect parameter ", comprising: re-start the calculating of the type and proportion of grouting material.
10. a kind of computer equipment, which is characterized in that including memory, processor and store on a memory and can locate The computer program run on reason device, which is characterized in that the processor realizes aforesaid right when executing the computer program It is required that the step of 1 to 9 any the method.
CN201810866581.5A 2018-08-01 2018-08-01 Grouting parameter calculation method and system for self-adaptive construction environment Active CN109086519B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810866581.5A CN109086519B (en) 2018-08-01 2018-08-01 Grouting parameter calculation method and system for self-adaptive construction environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810866581.5A CN109086519B (en) 2018-08-01 2018-08-01 Grouting parameter calculation method and system for self-adaptive construction environment

Publications (2)

Publication Number Publication Date
CN109086519A true CN109086519A (en) 2018-12-25
CN109086519B CN109086519B (en) 2024-01-16

Family

ID=64833527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810866581.5A Active CN109086519B (en) 2018-08-01 2018-08-01 Grouting parameter calculation method and system for self-adaptive construction environment

Country Status (1)

Country Link
CN (1) CN109086519B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110008566A (en) * 2019-03-29 2019-07-12 中南大学 Filling slurry performance index prediction method based on big data
US20210349073A1 (en) * 2020-05-09 2021-11-11 Guangzhou Municipal Engineering Testing Co., Ltd. Apparatus and method for detecting grout compactness in grouted splice sleeve
CN114084569A (en) * 2021-11-12 2022-02-25 长沙理工大学 Method for storing energy by compressing carbon dioxide in deep aquifer carbon dioxide geological storage
CN114183195A (en) * 2022-02-15 2022-03-15 山东山矿机械有限公司 Surface subsidence control grouting filling system based on separation layer distribution rule

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6801814B1 (en) * 2002-11-02 2004-10-05 Gannett Fleming, Inc. Apparatus and method for computerized data collection, monitoring, analysis, and control of grouting operations
CN102418337A (en) * 2011-10-17 2012-04-18 湖南宏禹水利水电岩土工程有限公司 New grouting method
CN103984807A (en) * 2014-04-29 2014-08-13 天津大学 Numerical simulation method of dam grouting capable of coupling fine geological information and monitoring information
CN104101317A (en) * 2014-07-02 2014-10-15 葛洲坝集团基础工程有限公司 Application of concrete steel bar detection instrument to grouting pre-buried pipe fast search
CN105780772A (en) * 2016-03-24 2016-07-20 三峡大学 Method for optimally designing anchor rod grouting parameters through researching characteristics of expansible binding materials in anchor rod grouting
CN106768016A (en) * 2016-11-23 2017-05-31 中铁二院重庆勘察设计研究院有限责任公司 A kind of use APP quick discriminatings, collection, the method for analysis grouting data
CN107117914A (en) * 2017-06-07 2017-09-01 郑州中德新亚建筑材料有限公司 High-strength freeze proof grouting material and preparation method thereof
CN107747312A (en) * 2017-10-12 2018-03-02 中国水利水电第十工程局有限公司 A kind of method of sand and gravel stratum well cementing construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6801814B1 (en) * 2002-11-02 2004-10-05 Gannett Fleming, Inc. Apparatus and method for computerized data collection, monitoring, analysis, and control of grouting operations
CN102418337A (en) * 2011-10-17 2012-04-18 湖南宏禹水利水电岩土工程有限公司 New grouting method
CN103984807A (en) * 2014-04-29 2014-08-13 天津大学 Numerical simulation method of dam grouting capable of coupling fine geological information and monitoring information
CN104101317A (en) * 2014-07-02 2014-10-15 葛洲坝集团基础工程有限公司 Application of concrete steel bar detection instrument to grouting pre-buried pipe fast search
CN105780772A (en) * 2016-03-24 2016-07-20 三峡大学 Method for optimally designing anchor rod grouting parameters through researching characteristics of expansible binding materials in anchor rod grouting
CN106768016A (en) * 2016-11-23 2017-05-31 中铁二院重庆勘察设计研究院有限责任公司 A kind of use APP quick discriminatings, collection, the method for analysis grouting data
CN107117914A (en) * 2017-06-07 2017-09-01 郑州中德新亚建筑材料有限公司 High-strength freeze proof grouting material and preparation method thereof
CN107747312A (en) * 2017-10-12 2018-03-02 中国水利水电第十工程局有限公司 A kind of method of sand and gravel stratum well cementing construction

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
ÅSA FRANSSON: "Swedish grouting design: hydraulic testing and grout selection", ICE, pages 275 - 285 *
张贵金: "黏土水泥膏浆流变性能及其对灌浆的影响", 长 江 科 学 院 院 报, pages 119 - 125 *
曾柳絮: "松软地层高压灌浆封孔浆体研制及效果论证", 中国优秀硕士论文电子期刊网, pages 037 - 61 *
李晓超;马海忠;童显超;: "苗尾水电站帷幕灌浆动态监控系统研究及应用", no. 1, pages 138 - 142 *
樊贵超: "大坝基础灌浆工程施工质量控制理论与应用研究", 中国博士学位论文电子期刊网, pages 037 - 8 *
王超: "关键参数自适应灌浆测控系统的研制与应用", 中南大学学报, pages 4474 - 4482 *
王超: "岩石坝基灌浆压力波动机理及其稳定性自动控制方法研究", pages 30 - 31 *
闫福根;钟登华;任炳昱;岳攀;樊贵超;李晓超;: "基于B/S结构的三维交互式灌浆可视化系统的研制及应用", no. 11, pages 71 - 74 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110008566A (en) * 2019-03-29 2019-07-12 中南大学 Filling slurry performance index prediction method based on big data
CN110008566B (en) * 2019-03-29 2021-08-31 中南大学 Filling slurry performance index prediction method based on big data
US20210349073A1 (en) * 2020-05-09 2021-11-11 Guangzhou Municipal Engineering Testing Co., Ltd. Apparatus and method for detecting grout compactness in grouted splice sleeve
US11604182B2 (en) * 2020-05-09 2023-03-14 Guangzhou Municipal Engineering Testing Co., Ltd. Apparatus and method for detecting grout compactness in grouted splice sleeve
CN114084569A (en) * 2021-11-12 2022-02-25 长沙理工大学 Method for storing energy by compressing carbon dioxide in deep aquifer carbon dioxide geological storage
CN114084569B (en) * 2021-11-12 2023-11-21 长沙理工大学 Method for developing compressed carbon dioxide energy storage on deep aquifer carbon dioxide geological storage
CN114183195A (en) * 2022-02-15 2022-03-15 山东山矿机械有限公司 Surface subsidence control grouting filling system based on separation layer distribution rule

Also Published As

Publication number Publication date
CN109086519B (en) 2024-01-16

Similar Documents

Publication Publication Date Title
CN109086519A (en) The strengthening motoring calculation method and system of adaptive construction environment
Peron et al. Fundamentals of desiccation cracking of fine-grained soils: experimental characterisation and mechanisms identification
CN106049557B (en) Using the test method of the laboratory testing rig of simulation grout pile end follow-up grouting
CN201665871U (en) Long screw drilling bored pile post-grouting technology device
Zhang et al. Large-scale geo-mechanical model tests for the stability assessment of deep underground complex under true-triaxial stress
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN105242028A (en) Model test device of soil mass stratification and sedimentation caused by high building load and underground water pumping and infusing and test method
CN105275024B (en) Defective Big-Diameter Rock-Embedded Pile vertical bearing capacity detection and the method reinforced
CN103410182A (en) Unilateral pile foundation unloading horizontal top-level pull deviation rectifying and broken pile reinforcement construction method
CN105625293A (en) Dissolution rock strong-development construction site filling-type geological processing structure and construction method thereof
CN107386309A (en) The prominent water burst method for blocking of the mine big flow high flow rate pipeline crack type karst that is recessed
CN110046470A (en) A kind of shield driving causes ground settlement method for determination of amount after work
Ye et al. Negative effect of installation on performance of a compaction-grouted soil nail in poorly graded stockton beach sand
CN108677956A (en) Covered karst development area rock and soil layer contact surface grouting method
KR101746654B1 (en) Method for constructing pile for reinforce of mine hole
CN107178077A (en) Overburden layer grouting and reinforcing structure and its design method on a kind of karst area solution cavity
CN105223117B (en) More gap set geologic element simulation of infiltration materials and preparation method thereof
CN112942309A (en) Grid type grouting reinforcement construction method for independent pile foundation
Sun et al. Experimental assessment of structural responses of tunnels under the groundwater level fluctuation
CN205898629U (en) Country rock high pressure consolidation grouting encloses effect testing arrangement that blocks water
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN108999198A (en) A kind of New-type mould bag soil nailing pile constructing process
CN105258719B (en) Many gap set medium tunnel seepage flow vegetation growth water method of testings
CN206245360U (en) The pre-embedded device of stake in a kind of drilling follow pile tube model test
Wang et al. Capacity characteristics of the underground water reservoir of an open-pit coalmine: a case study in Baorixile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant