CN109083438A - A kind of gymnasium metal Roof maintenance construction method - Google Patents

A kind of gymnasium metal Roof maintenance construction method Download PDF

Info

Publication number
CN109083438A
CN109083438A CN201811134418.6A CN201811134418A CN109083438A CN 109083438 A CN109083438 A CN 109083438A CN 201811134418 A CN201811134418 A CN 201811134418A CN 109083438 A CN109083438 A CN 109083438A
Authority
CN
China
Prior art keywords
liquid rubber
construction
spraying
metal roof
spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811134418.6A
Other languages
Chinese (zh)
Inventor
马庆海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Meichente Environmental Protection And Energy Conservation Product Co L
Original Assignee
Dalian Meichente Environmental Protection And Energy Conservation Product Co L
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Meichente Environmental Protection And Energy Conservation Product Co L filed Critical Dalian Meichente Environmental Protection And Energy Conservation Product Co L
Priority to CN201811134418.6A priority Critical patent/CN109083438A/en
Publication of CN109083438A publication Critical patent/CN109083438A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0281Repairing or restoring roofing or roof covering

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention discloses a kind of gymnasium metal Roof maintenance construction methods, and specific step is as follows: (1) corrosion metals plate repairing for construction;(2) roof-base is cleared up;(3) detail treatment sealing enhancing processing;(4) mechanical liquid rubber spray paint;(5) film base cleaning;(6) mechanically spraying can be exposed conveying appliance water-proof acrylic acid paint one time;(7) again mechanically spraying can exposed conveying appliance water-proof acrylic acid paint to providing 2mm;(8) patching coating is handled, mechanical liquid rubber spray paint;(9) it inspects for acceptance.After integral waterproofing layer is completely dried, water pouring test is carried out to metal Roof after examination, is qualification with ne-leakage.Metal Roof waterproof repairment construction method provided by the invention, the application of automatic arc spraying liquid rubber spray-coating material construction technology, the water-proofing treatment and maintenance engineering for being efficiently completed large-scale stadium metal Roof.

Description

A kind of gymnasium metal Roof maintenance construction method
Technical field
The invention belongs to waterproof construction technology fields, and in particular to a kind of gymnasium metal Roof maintenance construction method.
Background technique
Gymnasium is used mainly as spaces for activities such as indoor ball, dancings, generally uses steel construction, and roofing is double Layer steel holds in the mouth posture coloured silk steel construction, and lightweight color coated steel sheet clad can, centre is aided with heat-insulation and heat-preservation core material.But by exposure, sleet, temperature The problems such as influence of the external factors such as variation, cleaning maintenance, color steel plate material is easy to appear corrosion, tilting, degumming, loosening, cause Occur in rainy season use, percolating water situation affects the normal use of covered court, also to the safety of steel construction cause compared with Big hidden danger.
Summary of the invention
For above-mentioned the technical problems existing in the prior art, present invention technical solution used for the above purpose Be: a kind of gymnasium metal Roof maintenance construction method, specific step is as follows for construction:
(1) corrosion metals plate repairing;(2) roof-base is cleared up;There is plate corrosion and penetrates in site inspection metal Roof base , the plate that need to will be slightly larger than range at corrosion is cut off, and is adopted and is screwed after new plate covering.If roof-base is without broken Damage, surface leaf, rubbish, dross etc. are removed, and carry out floating dust cleaning using the mop after wetting.(3) detail treatment seals Enhancing processing;Sheet metal piece position carries out the continuous construction of twice film waterproof material, in face after sealing using butyl rubber belt For coating point during spraying application, the glass fiber reticular cloth along piece two sides paving 200mm wide makees enhancing processing.Metal house Face penetrates fixation using the self-tapping screw of traditional type, and screw also limits to a certain extent while fixed roof board material The deformation of plate, can not eliminate thermal stress influences the destruction power generated, occurs damaging so as to cause roof board material or self tapping Situations such as broken screw, causes leakage problem and security risk.At the waterproof repairment of sheet metal screw fixed position Reason, design is using the continuous construction for carrying out twice film waterproof material after butyl rubber belt sealing again, to form continuous whole waterproof Film layer reaches the waterproof system of seamless intervention.At plate corrosion damage, retightening for new plate is carried out, then again by upper State measure maintenance process.(4) mechanical liquid rubber spray paint;After water-repellent paint point time spraying application is finished and dried, checks and apply The problems such as film surface whether there is show-through, thickness low LCL, construction is not in place, is repaired by the way of manually brushing, and is protected Demonstrate,prove the quality of integral waterproofing film layer.Spray pressure is 4.5~5.5 MPa, and construction environment temperature is 5 DEG C or more, and bi-component applies Expect that electric mixer should be used when ingredient.Before formally starting spraying, the region other than spraying area is blocked with plastic cloth, Avoid polluting in work progress, influence appearance, spraying operation pistol spraying application, spray gun preferably perpendicular to Base is sprayed, apart from moderate, movement speed is uniform;Spraying sequence be it is difficult at first and quite easy afterwards, first up and then down, preferably work continuously, multipass film forming, Intersect the thickness for being sprayed into design requirement in length and breadth, it is every just to can be carried out after upper time coating parches completely before coating application, 1.5 mm thickness can be reached general hand spray 2~3 times, liquid rubber spray-coating material point is finished all over spraying application to drying;
(5) film base cleaning;(6) mechanically spraying can be exposed conveying appliance water-proof acrylic acid paint one time;(7) mechanically spraying can be outer again Dew type water-proof acrylic acid paint is to specific thickness;(8) patching coating is handled, mechanical liquid rubber spray paint;(9) it inspects for acceptance. After integral waterproofing layer is completely dried, water pouring test is carried out to metal Roof after examination, is qualification with ne-leakage.
Further, the specific ingredient of the liquid rubber spray-coating material are as follows: the liquid rubber spray-coating material is divided into two kinds of A, B Component;The A group is divided into anion liquid body rubber asphalt emulsion;The B group is divided into coagulant solution;The component A, with matter Measuring percentage indicates, liquid rubber asphalt emulsion weight solid content is 50-75%, wherein rubber latex 10-25%, pitch cream Liquid 1-60%, anionic dispersing agents 0.01-2%, anionic surfactant 0.01-2%, fatty alcohol polyoxyethylene ether 0.1- 10%, OEP-70 0.1-10%, AEP 0.1-10%, carbon black 0-3%, fine powder material 0-3%, antifreeze auxiliary agent 0.5-3%;The B Component indicates with mass percent, the water for being 3-18% by the concentration that calcium chloride, Complex aluminium-iron mixed with polymers are formulated Solution, the Complex aluminium-iron polymer are one or both of aluminium polychloride, bodied ferric sulfate;It is described that there is liquid rubber The spraying capacity ratio of spray paint B component and component A is 1/15-1/3.5
Compared with prior art, the beneficial effects of the present invention are: metal Roof waterproof repairment construction method provided by the invention exists The theory that " coupling hardness with softness, preferably use material " is deferred in design, follows the principle of " linking work at selected spots with that in entire areas, comprehensive treatment " in construction, then In addition the application of automatic arc spraying liquid rubber spray-coating material construction technology, being efficiently completed large-scale stadium metal Roof Water-proofing treatment and maintenance engineering.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described, Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the scope of protection of the invention.
Embodiment
Liquid rubber spray-coating material is prepared, the liquid rubber spray-coating material is divided into two kinds of components of A, B;The A group is divided into yin Ionic liquid rubber asphalt lotion;The B group is divided into coagulant solution;
A component anion liquid body rubber asphalt emulsion adds up to 100kg, wherein (co) polychloroprene rubber lotion 25kg, No. 80 stones Oil asphalt lotion 30kg, anionic dispersing agents TH -904 are 0.15kg, naphthalenesulfonate formaldehyde condensation compound 0.15kg, CD -4 are 0.15kg, anionic surfactant rosin soap 1kg, synthetic fatty acid soap 0.5kg, alkylsulfonate 0.2kg, fatty alcohol polyoxy Vinethene 2%, OEP-70 3%, AEP 4%;Carbon black 1.5kg, fineness is antifreeze not less than porcelain the powder 0.75kg, CX-01 of 800 mesh to be helped Agent 0.8kg, water are surplus.B component is indicated with mass percent, is formulated by calcium chloride, Complex aluminium-iron mixed with polymers The aqueous solution that concentration is 3-18%;B component, is indicated with mass percent, is answered by 95% calcium chloride, 1.5% sodium chloride, 5% The concentration that ferro-aluminum mixed with polymers is formulated is closed as 10% aqueous solution, Complex aluminium-iron polymer is aluminium polychloride.The liquid The spraying capacity ratio of body rubber spray paint B component and A component is 1/15-1/3.5.
Specific step is as follows for construction:
(1) corrosion metals plate repairing;(2) roof-base is cleared up;There is plate corrosion and penetrates in site inspection metal Roof base , the plate that need to will be slightly larger than range at corrosion is cut off, and is adopted and is screwed after new plate covering.If roof-base is without broken Damage, surface leaf, rubbish, dross etc. are removed, and carry out floating dust cleaning using the mop after wetting.(3) detail treatment seals Enhancing processing;Sheet metal piece position carries out the continuous construction of twice film waterproof material, in face after sealing using butyl rubber belt For coating point during spraying application, the glass fiber reticular cloth along piece two sides paving 200mm wide makees enhancing processing.Metal house Face penetrates fixation using the self-tapping screw of traditional type, and screw also limits to a certain extent while fixed roof board material The deformation of plate, can not eliminate thermal stress influences the destruction power generated, occurs damaging so as to cause roof board material or self tapping Situations such as broken screw, causes leakage problem and security risk.At the waterproof repairment of sheet metal screw fixed position Reason, design is using the continuous construction for carrying out twice film waterproof material after butyl rubber belt sealing again, to form continuous whole waterproof Film layer reaches the waterproof system of seamless intervention.At plate corrosion damage, retightening for new plate is carried out, then again by upper State measure maintenance process.(4) mechanical liquid rubber spray paint;After water-repellent paint point time spraying application is finished and dried, checks and apply The problems such as film surface whether there is show-through, thickness low LCL, construction is not in place, is repaired by the way of manually brushing, and is protected Demonstrate,prove the quality of integral waterproofing film layer.Spray pressure is 4.5~5.5 MPa, and construction environment temperature is 5 DEG C or more, and bi-component applies Expect that electric mixer should be used when ingredient.Before formally starting spraying, the region other than spraying area is blocked with plastic cloth, Avoid polluting in work progress, influence appearance, spraying operation pistol spraying application, spray gun preferably perpendicular to Base is sprayed, apart from moderate, movement speed is uniform;Spraying sequence be it is difficult at first and quite easy afterwards, first up and then down, preferably work continuously, multipass film forming, Intersect the thickness for being sprayed into design requirement in length and breadth, it is every just to can be carried out after upper time coating parches completely before coating application, 1.5 mm thickness can be reached general hand spray 2~3 times, liquid rubber spray-coating material point is finished all over spraying application to drying.(5) it applies Film base cleaning;(6) mechanically spraying can be exposed conveying appliance water-proof acrylic acid paint one time;(7) mechanically spraying can exposed conveying appliance propylene again Sour water-repellent paint is to specific thickness;(8) patching coating is handled, mechanical liquid rubber spray paint;(9) it inspects for acceptance.Integral waterproofing After layer is completely dried, water pouring test is carried out to metal Roof after examination, is qualification with ne-leakage.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (2)

1. a kind of gymnasium metal Roof maintenance construction method, it is characterised in that specific step is as follows for construction:
(1) corrosion metals plate repairing;
(2) roof-base is cleared up;
(3) detail treatment sealing enhancing processing;It is anti-to carry out twice film for sheet metal piece position after sealing using butyl rubber belt The continuous construction of water layer, during surface layer liquid rubber spray-coating material point is all over spraying application, along piece two sides paving 200mm wide Glass fiber reticular cloth make enhancing processing;The waterproof repairment of sheet metal screw fixed position is handled, after being sealed using butyl rubber belt The continuous construction of twice liquid rubber spray-coating material waterproof layer is carried out again;
(4) mechanical liquid rubber spray paint, spray pressure are 4.5~5.5 MPa, and construction environment temperature is 5 DEG C or more, double groups Electric mixer is used when dividing coating proportioning, spraying liquid rubber spray paint 2-3 times, construction is finished to drying;
(5) film base cleaning;
(6) mechanically spraying can be exposed conveying appliance water-proof acrylic acid paint one time;
(7) again mechanically spraying can exposed conveying appliance water-proof acrylic acid paint to providing 2mm;
(8) patching coating is handled, mechanically spraying liquid rubber spray-coating material;
(9) it inspects for acceptance: after integral waterproofing layer is completely dried, water pouring test being carried out to metal Roof after examination, with no infiltration Leakage is qualification.
2. a kind of gymnasium metal Roof maintenance construction method as described in claim 1, which is characterized in that the liquid rubber The specific ingredient of spray paint are as follows: the liquid rubber spray-coating material is divided into two kinds of components of A, B;The A group is divided into anion liquid body rubber Glue asphalt emulsion;The B group is divided into coagulant solution;The component A, is indicated with mass percent, liquid rubber asphalt emulsion Weight solid content is 50-75%, wherein rubber latex 10-25%, asphalt emulsion 1-60%, and anionic dispersing agents 0.01-2%, Anionic surfactant 0.01-2%, fatty alcohol polyoxyethylene ether 0.1-10%, OEP-70 0.1-10%, AEP 0.1- 10%, carbon black 0-3%, fine powder material 0-3%, antifreeze auxiliary agent 0.5-3%;The B component, is indicated with mass percent, by chlorination The aqueous solution that the concentration that calcium, Complex aluminium-iron mixed with polymers are formulated is 3-18%, the Complex aluminium-iron polymer are polymerization One or both of aluminium chloride, bodied ferric sulfate;The spraying capacity with liquid rubber spray-coating material B component and component A Than being 1/15-1/3.5.
CN201811134418.6A 2018-09-27 2018-09-27 A kind of gymnasium metal Roof maintenance construction method Pending CN109083438A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811134418.6A CN109083438A (en) 2018-09-27 2018-09-27 A kind of gymnasium metal Roof maintenance construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811134418.6A CN109083438A (en) 2018-09-27 2018-09-27 A kind of gymnasium metal Roof maintenance construction method

Publications (1)

Publication Number Publication Date
CN109083438A true CN109083438A (en) 2018-12-25

Family

ID=64842966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811134418.6A Pending CN109083438A (en) 2018-09-27 2018-09-27 A kind of gymnasium metal Roof maintenance construction method

Country Status (1)

Country Link
CN (1) CN109083438A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113738153A (en) * 2021-09-13 2021-12-03 通号工程局集团有限公司 Construction method for waterproof renovation of railway metal roof
CN113756605A (en) * 2021-09-13 2021-12-07 通号工程局集团有限公司 Construction method for waterproof renovation of railway concrete roof
CN114293741A (en) * 2022-01-30 2022-04-08 江苏立安工程技术有限公司 Maintenance construction method for steel structure factory building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5322541B2 (en) * 2008-09-05 2013-10-23 富士セラ株式会社 Slate building material repair and reinforcement processing method
CN207048366U (en) * 2017-07-28 2018-02-27 青岛春旭钢结构有限公司 A kind of metal Roof breakage maintaining structure
CN207260625U (en) * 2017-07-28 2018-04-20 上海天补材料科技有限公司 A kind of metal Roof leakage repairs structure
CN108035495A (en) * 2017-12-11 2018-05-15 大连美宸特环保节能产品有限公司 A kind of one-storey house roof membrane construction method
CN108086603A (en) * 2016-11-23 2018-05-29 北京中联天盛建材有限公司 A kind of anti-water-stopping system of existing roofing and prevent water roofing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5322541B2 (en) * 2008-09-05 2013-10-23 富士セラ株式会社 Slate building material repair and reinforcement processing method
CN108086603A (en) * 2016-11-23 2018-05-29 北京中联天盛建材有限公司 A kind of anti-water-stopping system of existing roofing and prevent water roofing
CN207048366U (en) * 2017-07-28 2018-02-27 青岛春旭钢结构有限公司 A kind of metal Roof breakage maintaining structure
CN207260625U (en) * 2017-07-28 2018-04-20 上海天补材料科技有限公司 A kind of metal Roof leakage repairs structure
CN108035495A (en) * 2017-12-11 2018-05-15 大连美宸特环保节能产品有限公司 A kind of one-storey house roof membrane construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
程晓辉等: "某体育馆金属屋面渗漏水维修施工技术 ", 《中国建筑防水》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113738153A (en) * 2021-09-13 2021-12-03 通号工程局集团有限公司 Construction method for waterproof renovation of railway metal roof
CN113756605A (en) * 2021-09-13 2021-12-07 通号工程局集团有限公司 Construction method for waterproof renovation of railway concrete roof
CN114293741A (en) * 2022-01-30 2022-04-08 江苏立安工程技术有限公司 Maintenance construction method for steel structure factory building

Similar Documents

Publication Publication Date Title
CN109083438A (en) A kind of gymnasium metal Roof maintenance construction method
KR101741177B1 (en) Quick hardening and high-strength inorganic polymer mortar and concrete repair and supplement method thereof
CN104695631A (en) Construction method for spraying polyurea waterproof coating on roof
CN105604198A (en) Rigid-soft combined watertightness construction method
CN103553538B (en) Architecture indoor percdation solidifies not damaged waterproofing agent
CN110016293A (en) A kind of osmosis type rubber asphalt waterproof coating and preparation method thereof
CN105524576A (en) Mildewproof and waterproof tile joint filling agent
CN108035495A (en) A kind of one-storey house roof membrane construction method
CN108018886A (en) A kind of subway waterproof roofing layer construction method
CN104945967A (en) Spraying-film waterproof material capable of preventing splashing, and preparation and application method thereof
CN105038064B (en) Carbon fiber particles methacrylic resin epoxy resin waterproofing membrane composition and method
KR101700652B1 (en) maintenance method for concrete crack or exfoliation
CN114433456A (en) Method for spraying polyurea elastomer on concrete surface
CN109083437A (en) A kind of gymnasium metal Roof gutter maintenance construction method
CN105133855A (en) Energy-saving and environment-friendly waterproof warming construction method for existing roof surface
CN110484038A (en) A kind of underground engineering polymer spray film water-proofing material and preparation method thereof
CN103924752B (en) Nano wearproof pottery composite protective construction method
CN109853888A (en) A kind of historical building plucking wall surface construction technology
CN109054588A (en) A kind of graphite material waterproof glue and preparation method thereof
CN105089213A (en) Water-proof construction method with advantages of energy conservation and environment protection for conventional roof
CN115160913A (en) Liquid waterproof coiled material and preparation method and use method thereof
CN109083454A (en) A kind of swimming pool waterproof construction method
CN109296149A (en) A kind of waterproof construction method of powerhouse of hydropower station
CN105178518A (en) Energy-saving environment-friendly waterproof heat-insulating construction method for existing roof
CN105731923B (en) Elastic cement based penetration crystallization type water proofing paint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181225