CN109083411A - A kind of bottom moisture plugging technology - Google Patents
A kind of bottom moisture plugging technology Download PDFInfo
- Publication number
- CN109083411A CN109083411A CN201810868828.7A CN201810868828A CN109083411A CN 109083411 A CN109083411 A CN 109083411A CN 201810868828 A CN201810868828 A CN 201810868828A CN 109083411 A CN109083411 A CN 109083411A
- Authority
- CN
- China
- Prior art keywords
- dam
- checkdam
- bar shaped
- built
- closely knit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/64—Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
- E04B1/644—Damp-proof courses
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
Abstract
The invention discloses a kind of bottom moisture plugging technologies, are related to technical field of building construction, comprising the following steps: step 1: dedusting amendment, on ground dust and dirt clear up, on ground crack location handle and amendment;Step 2: construction is built a dam, at the position foundation 200-300mm, with the closely knit bar shaped checkdam of cement mortar heap 50mm high;Step 3: after the closely knit bar shaped checkdam in step 2 is done, the dam seam antiseep of closely knit bar shaped checkdam is reinforced;Step 4: correlation stock, according to the quantity built a dam, every meter of accurate quantitative analysis spare equal to the transparent watertight agent of 0.5-0.8kg;Step 5: a sub-percolation, dry a few days pour into the dam slot built adding 50% clear water to stir evenly in spare transparent watertight agent, and infiltration, closure base tear dam open after 30 minutes, then do ground.Step of the present invention is simple, easy for construction, and pore has been blocked after construction, completely cuts off the moisture in foundation thoroughly, will not interfere user again.
Description
Technical field
The present invention relates to technical field of building construction, specifically a kind of bottom moisture plugging technology.
Background technique
The moisture-proof issue handling of wall is bad, then one to rainy days, black mildew will occur in wall, and owner will such as turn over
Work is done again also can be cumbersome.It is fitted up this " return to Nan Tian " is inner, the emulsion paint brushed on metope can be because dry very slowly
And mouldy spoiled phenomenon occur and occur,
Bottom moisture plugging technology is traditionally used for the following steps are included: 1, fine dedusting: cleaning dust, dirt, dust suction are located again
Reason;2, smooth repairing: the place's of being uneven repairing;3, multipass brushing: buying the water-repellent paint for thinking best, brushes several all over just more.
But the central area for having blocked ground is but had the disadvantage in that after the completion of using above-mentioned technique, centre bit
Horizontalization net moisture is all distributed to (originally dry) surrounding foundation, so that moisture and moisture be made to move up, and moisture and wet
Gas position is higher and higher.
Summary of the invention
The purpose of the present invention is to provide a kind of bottom moisture plugging technologies, to solve mentioned above in the background art ask
Topic.
To achieve the above object, the invention provides the following technical scheme:
A kind of bottom moisture plugging technology, comprising the following steps:
Step 1: dedusting amendment, on ground dust and dirt clear up, on ground crack location handle and repair
Just;
Step 2: construction is built a dam, at the position foundation 200-300mm, with the closely knit bar shaped checkdam of cement mortar heap 50mm high;
Step 3: after the closely knit bar shaped checkdam in step 2 is done, the dam seam antiseep of closely knit bar shaped checkdam is reinforced;
Step 4: correlation stock, according to the quantity built a dam, every meter of accurate quantitative analysis standby equal to the transparent watertight agent of 0.5-0.8kg
With;
Step 5: a sub-percolation, dry a few days pour into and build adding 50% clear water to stir evenly in spare transparent watertight agent
In good dam slot, dam is torn after 30 minutes open, then do ground.
As a further solution of the present invention: the cement mortar is mixed using the cement and mortar of 1:3.
As further scheme of the invention: in the step 5 by the way of disposably entering in the dam slot built.
Compared with prior art, easy for construction the beneficial effects of the present invention are: step of the present invention is simple, it is blocked after construction
Pore, completely cuts off the moisture in foundation thoroughly, will not interfere user again.
Detailed description of the invention
Fig. 1 is a kind of completion schematic diagram of bottom moisture plugging technology.
Specific embodiment
Combined with specific embodiments below, technical scheme in the embodiment of the invention is clearly and completely described, shows
So, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the reality in the present invention
Example is applied, every other embodiment obtained by those of ordinary skill in the art without making creative efforts all belongs to
In the scope of protection of the invention.
A kind of bottom moisture plugging technology, comprising the following steps:
Step 1: dedusting amendment, on ground dust and dirt clear up, on ground crack location handle and repair
Just;
Step 2: construction is built a dam, at the position foundation 200-300mm, with the closely knit bar shaped checkdam of cement mortar heap 50mm high;
Step 3: after the closely knit bar shaped checkdam in step 2 is done, the dam seam antiseep of closely knit bar shaped checkdam is reinforced;
Step 4: correlation stock, according to the quantity built a dam, every meter of accurate quantitative analysis standby equal to the transparent watertight agent of 0.5-0.8kg
With;
Step 5: a sub-percolation, dry a few days pour into and build adding 50% clear water to stir evenly in spare transparent watertight agent
In good dam slot, dam is torn after 30 minutes open, then do ground, as shown in Figure 1.
Wherein, cement mortar is mixed using the cement and mortar of 1:3, is used in step 5 and is disposably entered the dam built
Mode in slot.
Step of the present invention is simple, easy for construction, and pore has been blocked after construction, completely cuts off the moisture in foundation thoroughly, will not
Interfere user again.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (3)
1. a kind of bottom moisture plugging technology, which comprises the following steps:
Step 1: dedusting amendment, on ground dust and dirt clear up, on ground crack location handle and repair
Just;
Step 2: construction is built a dam, at the position foundation 200-300mm, with the closely knit bar shaped checkdam of cement mortar heap 50mm high;
Step 3: after the closely knit bar shaped checkdam in step 2 is done, the dam seam antiseep of closely knit bar shaped checkdam is reinforced;
Step 4: correlation stock, according to the quantity built a dam, every meter of accurate quantitative analysis standby equal to the transparent watertight agent of 0.5-0.8kg
With;
Step 5: a sub-percolation, dry a few days pour into and build adding 50% clear water to stir evenly in spare transparent watertight agent
In good dam slot, infiltration, closure base tear dam open, then do ground after 30 minutes.
2. bottom moisture plugging technology according to claim 1, which is characterized in that the cement mortar uses the water of 1:3
Mud and mortar mix.
3. bottom moisture plugging technology according to claim 1 or 2, which is characterized in that using primary in the step 5
Property enters the mode in the dam slot built.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810868828.7A CN109083411A (en) | 2018-08-02 | 2018-08-02 | A kind of bottom moisture plugging technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810868828.7A CN109083411A (en) | 2018-08-02 | 2018-08-02 | A kind of bottom moisture plugging technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109083411A true CN109083411A (en) | 2018-12-25 |
Family
ID=64833749
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810868828.7A Pending CN109083411A (en) | 2018-08-02 | 2018-08-02 | A kind of bottom moisture plugging technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109083411A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1283663A (en) * | 2000-08-07 | 2001-02-14 | 谭助民 | Water-proof composite cream and its preparing process and application |
DE19960512A1 (en) * | 1999-12-15 | 2001-06-21 | Ytong Holding Ag | Device for applying levelling layer to brickwork consists of a U-profile made from water-impermeable polymer foam. |
CN101440637A (en) * | 2007-11-19 | 2009-05-27 | 邓忠林 | Maintenance method for water leakage of toilet and bath pool |
CN103206093A (en) * | 2013-04-10 | 2013-07-17 | 舒洪祥 | Leakage repairing and preventing method for roof settlement joint |
CN104653036A (en) * | 2014-12-23 | 2015-05-27 | 上海聚通装饰集团有限公司 | Moisture-proof and mildew-proof installation method for door pocket line and doorsill stone |
CN106049892A (en) * | 2016-05-31 | 2016-10-26 | 宝葫历史建筑科技(上海)有限公司 | Repairing method for damp-proof course of historical building |
-
2018
- 2018-08-02 CN CN201810868828.7A patent/CN109083411A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19960512A1 (en) * | 1999-12-15 | 2001-06-21 | Ytong Holding Ag | Device for applying levelling layer to brickwork consists of a U-profile made from water-impermeable polymer foam. |
CN1283663A (en) * | 2000-08-07 | 2001-02-14 | 谭助民 | Water-proof composite cream and its preparing process and application |
CN101440637A (en) * | 2007-11-19 | 2009-05-27 | 邓忠林 | Maintenance method for water leakage of toilet and bath pool |
CN103206093A (en) * | 2013-04-10 | 2013-07-17 | 舒洪祥 | Leakage repairing and preventing method for roof settlement joint |
CN104653036A (en) * | 2014-12-23 | 2015-05-27 | 上海聚通装饰集团有限公司 | Moisture-proof and mildew-proof installation method for door pocket line and doorsill stone |
CN106049892A (en) * | 2016-05-31 | 2016-10-26 | 宝葫历史建筑科技(上海)有限公司 | Repairing method for damp-proof course of historical building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109356295A (en) | The construction technique of toilet and kitchen antiseep | |
CN101565997A (en) | Construction method for large-area irregular floor tile | |
CN109184005A (en) | A kind of method of architecture indoor waterproof construction | |
CN105604198A (en) | Rigid-soft combined watertightness construction method | |
CN110206074A (en) | A kind of underground waterproof engineering construction technology | |
CN110318552A (en) | A kind of indoor wall percolating water repairerment technique | |
CN109853888A (en) | A kind of historical building plucking wall surface construction technology | |
CN110629893A (en) | Construction method of toilet waterproof engineering | |
CN109083411A (en) | A kind of bottom moisture plugging technology | |
CN102344278B (en) | Permeable crystallization type cement-based waterproof mucilage | |
CN103206093B (en) | Leakage repairing and preventing method for roof settlement joint | |
CN116537473A (en) | Construction method for plastering inner wall of building | |
CN107540314A (en) | A kind of post-cast strip basal plane inorganic agent and its construction method | |
CN109898758A (en) | Cement mortar pastes the construction method that BAC waterproof roll elder generation screed-coat does waterproof layer again | |
JP3486594B2 (en) | Waterway repair method and waterway structure | |
Mack | Repointing mortar joints in historic masonry buildings | |
CN106630855A (en) | Polymer modified cement-based anti-corrosion protectant as well as preparation method and application method thereof | |
CN207047914U (en) | A kind of anti-floating piled anchor node water-proof structure | |
Mack | Repointing mortar joints in historic brick buildings | |
CN107254951B (en) | A kind of railing outdoor tile construction method | |
Talib et al. | Classification of factor affecting external wall defects focusing on lime material of heritage buildings in Penang, Malaysia | |
CN103821293A (en) | Novel construction method of exterior wall | |
CN118273547B (en) | Cleaning and repairing method for damaged surface brick wall without breaking and tearing and without color difference | |
CN108219612A (en) | Building leakage environmental protection method for maintaining | |
CN105256922A (en) | Mounting method of light-weight wall boards |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181225 |
|
RJ01 | Rejection of invention patent application after publication |